TOWER ASSEMBLY & ERECTION PLANNING 6/2/19 to 13/2/19
REQUIRED
S.NO TOOLS & PLANTS DESCRIPTION UOM QTY FROM NCC
AVAILABLE
1 LIFTING BELT 4MTRx4 MT NOS 4
2 BOW SHACKLE 6.5 MT NOS 4
REQUIRED
3 LIFTING BELT 6 MTRx 6 MT NOS 2
4 BOW SHACKLE 8 MT NOS 2
5 RESCUE KIT NOS 2
6 ROPE GRAB FALL ARRESTER NOS 6
7 ROPE GRAB CLAMP NOS 8
8 PP ROPE BUNDLE 2
9 LEVER HOIST 3.5 MT NOS 2
REQUIRED
S.NO TOOLS & PLANTS DESCRIPTION UOM QTY FROM NCC
1 SAFETY BELT NOS 10
2 LEVER HOIST 1.5 MT NOS 2
3 LEVER HOIST 3 MT NOS 2 1
4 FALL PROTECTION ROPES NOS 4
5 ROPE GRAB CLAMP NOS 8
6 PP ROPE 14 MM NOS 2 1
7 PP ROPE 18 MM NOS 2
8 TOMMY SPANNER 24 MM NOS 12
9 SPANNER 24MM NOS 8
10 WEB SLING 6x6 NOS 4
11 WEB SLING 4x4 NOS 3 1
12 WEB SLING 2x2 NOS 2
13 WEB SLING 1x1 NOS 2
14 D SHACKLE 8.5 MT NOS 4
15 D SHACKLE 3.5 MT NOS 12
16 SINGLE SHEAVE PULLEY NOS 4
17 RESCUE KIT NOS 1
ANTS
PURPOSE
PEAK ERECTION
LINKING LB, PEAK SECTION WITH SHACKLE
BASE ERECTION
BASE ERECTION
EXTENSION
4 SIDES FOR PEAK
4 SIDES FOR PEAK
& PLANTS
PURPOSE
41(2A+3),42(2A+6),43(2A+9),44(2C+6),54(2A+9),57(2A+6),58(2C+6),59(
3 BURJ DUBAI 9A/9B ML 2A+6)
TOWERS QTY 8
MBLY & ERECTION PLANNING WEEK 9/2/19 to 14/2/19
RESOURCES AVAILABLE RESOURCES REQU
AREA STAFF VEHICLES & EQUIPMENT STAFF
OUTSIDE CICPA
JP-2 NO's
RESOURCES REQUIRED
VEHICLES & EQUIPMENT WELFARE
HIGHUP,CRANE 70 MT
TRAILER,BUS,PICK UP TOILET
VEHICLE & EQUIPMENT EXPIRY DETAILS
REGISTRATION REGISTRATION
S.NO NUMBER VEHICLE TYPE COMPANY NAME EXPIRY
1 74792 HIGER BENZER TRANSPORT 16/1/2019
ARCADIA GENERAL
2 94573 MOBILE CRANE 70 MT TRANSPORT
3 98924 HIGH UP AL MADHAR 17/1/2019