Vous êtes sur la page 1sur 1

Tgl Dokumen: 01-08-2006

ANALISA KEBUTUHAN MATERIAL


No Dokumen : FORM/BKL/06
No. Revisi : 03
Nomor : 10001 / AKM - MKN / KOPI / 80 / 51
Halaman : Page 1 of 1
Bagian : TEKNIK MEKANIK KOPI
FACTORY

Pelaksana RABU518010001 Jenis Pekerjaan : PROJECT


Sendiri KP : PFP3028001
Sub Kontraktor

Sifat Pekerjaan : Urgent Normal

MOP No : 03/BPM/MKN-KOPI/I/18 Keterangan: PEMBUTAN JALUR UNTUK PEMASANGAN


Dari : FACTORY-KOPI FLEXIBLE PADA TIMBANGAN DI AREA ICP P-KOPI
Tanggal MOP : 29 - JANUARI - 2018
Kebutuhan : BT JALUR PSG FLEXIBLE TIMBANGAN ICP KOPI
Material Yang Dibutuhkan
QTY HARGA SAT JUMLAH (Rp)
NO KODE MATERIAL NAMA MATERIAL SAT
KBT (Rp)
1 1SMD0001-MDC27-MDS02-NN DOUBLE NEPLE SS 304 3/4" Pcs 15.00 12,800.00 192,000.00

2 1SMP0003-MPC12-MPS27-NN PIPA SS 304 SCH 20 3/4" X 6 Mtr SEAMLESS Ljr 4.00 385,000.00 1,540,000.00

3 1SMP0003-MPC12-MPS218-NN PIPA SS 304 SCH 20 1 1/4" X 6 mtr "SEAMLESS" Ljr 1.00 2,138,500.00 2,138,500.00

4 1SMK0005-MKC60-MKS97-MKO17 KENI LAS SS 304 SCH 20 - 3/4 " Pcs 19.00 27,500.00 522,500.00

5 1SMK0005-MKC60-MKS213-MKO2 KENI LAS SS SCH 20 - 1 1/4 " Pcs 6.00 45,000.00 270,000.00
2

6 1SMS0011A-MSC59-MSS78-MSC0 SELANG FLEXIBLE SS DIA 3/4" , CONETION NEPLE Bh 19.00 295,000.00 5,605,000.00
1 P = 60 CM

7 1SMS0011A-MSC59-MSS230-MSC SELANG FLEXIBLE SS DIA 1 1/4", CONECTION Bh 2.00 630,000.00 1,260,000.00


01 NEPLE P = 60 CM

8 1SMD0001-MDC27-MDS04-NN DOUBLE NEPLE DRAT SS 304 1 1/4" Pcs 6.00 31,650.00 189,900.00

sebelas juta tujuh ratus tujuh belas ribu sembilan ratus rupiah TOTAL BIAYA 11,717,900.00
Sidoarjo,29-Jan-18
Dibuat, Diperiksa, Diketahui, Disetujui,

Estimator Kadiv KOPI User

Print to PDF without this message by purchasing novaPDF (http://www.novapdf.com/)

Vous aimerez peut-être aussi