FORM OF PROPOSAL SAMPLE ONLY BIDDER:

SECTION 3 - PROPOSAL DATA DATE:


K. MANPOWER TABULATION Year 2 SIGNATURE:

MANPOWER CLASSIFICATION MONTH 13 14 15 16 17 18 19 20 21 22 23 24 Total

Non-Manual
Project Manager 1 1 1 1 1 1 1 1 1 1 1 1 1

Construction Manager 1 1 1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 W
Environmental, Safety & Health (ES&H) Manager h
1 1 1 1 1 1 1 1 1 1 1 1 1 i
Planner
c
QA/QC Manager 1 1 1 1 1 1 1 1 1 1 1 1 1 h
e
Procurement Manager 1 1 1 1 1 1 1 1 1 1 1 1 1 v
e
Superintendent - Civil/Structural Works 2 2 3 3 3 3 3 3 3 3 3 3 3 r
Superintendent- Mechanical/Plumbing Works 2 2 2 2 2 2 2 2 2 2 2 2 2
i
Superintendent - Electrical/Telecommunication s
Works 2 2 2 2 2 2 2 2 2 2 2 2 2

QA/QC Engineer - Civil/Structural Works 1 1 1 1 1 1 1 1 1 1 1 1 1 a


p
QA/QC Engineer - Mechanical/Plumbing Works 1 1 1 1 1 1 1 1 1 1 1 1 p
QA/QC Engineer - Electrical/Telecommunication l
Works 1 1 1 1 1 1 i
c
Site Nurse a
b
Scaffold Supervisor 2 2 2 2
l
2 2 2 2 e
Environmental, Safety & Health (ES&H) Officers

Quantity Surveyor/Cost Estimator 1 1 1 1 1 1 1 1 1 1 1 1 1 f


o
Document Control Supervisor 1 1 1 1 1 1 1 1 1 1 1 1 1 r

Field Engineer - Civil/Structural Works 1 1 1 1 1 1 1 1 1 1 1 1 1 N


E
Field Engineer - Mechanical/Plumbing Works 1 1 1 1 1 1 1 2 2 2 2 2 2 C
Field Engineer - Electrical/Telecommunication Works 1 1 1 1 1 1 1 1 1 1 2 2 2

Others (Suggested by Bidder)

Total Non-Manual (Year 2)

Bidder shall complete in the above format, a tabulation covering all manpower classifications, including manual, supervisory, engineering, and management
manpower, for the entire contract period.

Note: The categories of personnel listed herein are provided for guidance only. Bidder shall add to the list any categories of personnel it deems necessary
for proper execution of the Works.
63.07 (4/03)
Replaces: 6/01
FORM OF PROPOSAL SAMPLE ONLY BIDDER:
SECTION 3 - PROPOSAL DATA DATE:
K. MANPOWER TABULATION Year 2 SIGNATURE:

MANPOWER CLASSIFICATION MONTH 13 14 15 16 17 18 19 20 21 22 23 24 Total

(Suggested by Bidder)
Liaison officer
Draftsmen 2 2 2 1 1 1 1 1 1 1 1 1 1 1
Surveyor 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Administrative staff 2 2 2 2 2 2 2 2 2 2 2 2 2 2
A/C Technicians 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Steel Fabricator
Wielders
Painter 8 8 8 8 16
Skilled Labor 10 10 10 10 10 10 10 10 10 10 10 10 10 4 4
Worker 20 20 20 20 20 20 10 10 10 10 18 18 18 18 18

Total Manual (Year 2)


Total Manpower (Manual & Non-Manual Year 2)
Total Manp. (Manual & Non-Manual Year 1&2)

Bidder shall complete in the above format, a tabulation covering all manpower classifications, including manual, supervisory, engineering, and management
manpower, for the entire contract period.

Note: The categories of personnel listed herein are provided for guidance only. Bidder shall add to the list any categories of personnel it deems necessary
for proper execution of the Works.