0 évaluation0% ont trouvé ce document utile (0 vote)
3 vues1 page
The document is a bill of materials for a mechanical assembly containing 10 items including circular discs, support bars, chains, sprockets, bearings, shafts, arms, and a supporting structure. The materials include mild steel, castings, and ready made parts. The total cost of materials and labor is Rs. 10,000.
The document is a bill of materials for a mechanical assembly containing 10 items including circular discs, support bars, chains, sprockets, bearings, shafts, arms, and a supporting structure. The materials include mild steel, castings, and ready made parts. The total cost of materials and labor is Rs. 10,000.
The document is a bill of materials for a mechanical assembly containing 10 items including circular discs, support bars, chains, sprockets, bearings, shafts, arms, and a supporting structure. The materials include mild steel, castings, and ready made parts. The total cost of materials and labor is Rs. 10,000.
1 CIRCULAR DISC DIA 400 MM X 6 MM THICK MILD STEEL 2 1400
CIRCULAR DISC COUPLING DIA 25 MM MILD STEEL 2 400 2 SUPPORT BAR FOR DISC DIA 20 MM X 50 MM LENGTH MILD STEEL 24 600 3 CHAIN 5/8 PITCH READY MADE 1 200 4 SPROCKET BIG 5/8 PITCH - 46 TEETH READY MADE 1 180 SPROCKET BIG COUPLING DIA 25 MM MILD STEEL 1 200 5 SPROCKET SMALL 5/8 PITCH - 14 TEETH READY MADE 1 180 SPROCKET SMALL COUPLING DIA 60 MM MILD STEEL 1 400 6 BEARING 20 MM DIA CASTING 4 1600 7 SHAFT 20 MM DIA - 600 MM LENGTH MILD STEEL 3 900 8 ARM 25 X 6 MM MILD STEEL 4 800 9 SUPPORTING STRUCTURE 25 X 25 SQ PIPE MILD STEEL 1 SET 2600 10 PAINT, NUT BOLT, EXTRA EXTRA READY MADE 1 SET 500 11 LABOUR CHARGE EXTRA EXTRA EXTRA 1500 TOTAL 1E+04