Mr. Ramachandran Yenkataraman
{QAQC aspectorEngncer (Mechanical)
Email ID: am amneo@hoo in
"96551217025
Objective
‘To seok a challenging positon that would enable me to contribute to the
‘orgunzatonal goals to enhance my knowledge and skill, which would help me in my
rofssional development, and to contbute othe growth ofthe organization
Summary
A graduate ir Meshanial Engineering having a relevant experience of 8+ year
in the field of Mecharical Discipline Piping. Equipment and Stel stactre fabrication
fn! erection, Expeviense in Piping / Welding / Steel Structures / (Rotating &
‘Static) Equipment Installation & Alignment, Curent the enployee of Sung
Chang (AI Kuhib) Kawai
Academie qualifications
> Gide in Bachelor of Engineering in Mechanical
> CSWIP 3. Level{I- CERTIFIED WELDING INSPECTOR,
> Cartfcation of Nondstuctive examination ASNT Level IL
(Radiographic test Ultrasone test, Magnetic particle est, Liquid penetrant test,
Visual inspection).
Additional Details
> Kuwait Driving License (No. 287122504435)
> Kuvait Society of Engincers(No.~ 3847)
Keysills
> Good Prablem Solving, Practical and Technical kills.
> Communication kil
> Imerpretation ki
‘with Knowledge of enginering. drawings, standards and
speclfcations, ASME, AWS, ASNT, Shell DEP stands
Jobs aned
> ping, Sect Stscaes, Pressure Vessels Storage tanks, Chlorination system, Water
filer tanks.
> ‘State & Rotating Equipments,
‘Professional Expericmse History
Page 10141) Company: ALKuisi nero ning amps Wi. (SUNGCHTANG EC), Kuve
Duration AUG 2016~ THLE DATE
Project Clan Fuel Project & AlZour Refinery Projet
Positions QMQC Inspector
Client + KNPCAKIDIC
2) Company: Sound Babel & Sons Co WALL, Kat
Duration DEC 2012 JAN 2016
Positions: QAUQC Engineer.
Clients): KNPC, KOC, MEW
3) Company: EC FABCHEN LTD. Chen
Duration: Az 2009 Aug 2012
Positions Q/V0C Engineer
Clients” BEL, NTPC, TNEB, BGR, Zimbabwe Power Board, Kelpklam
ATP,
‘Roles and Responsibility
Inspection caried out based on Inspection Notification as pe the applicable Inspection
‘Test PlanQulity contol plan & Projet Speifcation,
Preparing the PQR & WPS as pr the Client, project && ASME Code requirement
Verification of approvod Drawings, Document List (as per ITP) Pabriaton Inspection
Program, Approved txt procedures (Welding procedure, Visul Inspection Procedure,
[NDT Procedure, Funct onal test procedures, et)
Inspection of equipment foundation, leveling pa installation, equipment erection,
centring, igen and bot tightening in static and rotating equipment
Cari out inspection for installation of Static Equipments & intemals for Equipments
(Schoepentocer,Interral Trays, et.)
Inspection of Rotay equipment Alignment (Reverse Dial Indisation J Rim & Face
method), in high temperature pumps and turbines, asswing expansion allowance in
coupling
Inspection of Ai-Fin Cooler assembly, Fan shaft alignment, Fan blade angle and
bade tp cleacanceseting, Fan bet tensioning.
Scheduling and co-ordination of inspection activites wit len inspection team,
Reviewing of Welde's Qualification as er project requirement
Monitoring of wolde’s performance weekly and weld repair rate as per project
specification and stands,
Reviw of material test certiests for the raw materials and verification for Material
|dentcaton as por aplcable standardise & a pr purchase oder requiem
Monitoring of Welding variables during GMAW, SMAW, GTAW, FCAW and SAW
process.
‘Check the parameters of welding and counter check with approved WPS.
‘Witnessing for sage-y sage inspection of f-up, hyo testing, and welding inspetin,
In accordance to the drawing specification and relevant codes
Page 0f4+ Fina visual & dimensinal inspections of piping spool as per Clint Approved drawings
‘+ Monitoring end witness of post activities PWHT, NDT activites (ike UT, RT, MPT, PT,
PMI, HT, leak testing tp approved procedures
‘+ Radiography in inepctations of WOT, PQR coupons and ether joints
‘+ Maintining record 0° welder qualification, ealibeaton of welding machine & welding
‘+ Before welding, perfoming ftp inspection for proper root gap, sroove angle, root
fice, and chocking the preheat temperature & during welding performing inprocess
\velding inspection suchas protest and interpess temperature and proper cleaning
between the weld beads
+ Coordinating wth conoling of welding consumables.
+ Preparation of Dalyveekiy inspection reports on work progress & evalating a per the
planned Schedules,
+ Conducting oo! box meetings about the problems focng in the welding process, piping
& insrument installation, banding the materials according the spesification
+ Monitoring quality tems & compliance with preset standard, troubleshooting
and- maining requsite doctmenis 10 ensure complete in-process quality &
improvement in proces capabilites
+ Implementation of Procedures, ITP & Method statement requirement in fibriction and
+ Fully conversant with isometries, PRID's and general arangement drawings, as built
preparation & mosiieation as per site requirements
‘+ Fit-up & visual inspection (Dimensional Check, Alignment, Weld Visual) of pipe spools
(Carbon stel, SS, Duplex SS, ALLOY P11, PAS) and Pipe support as per pi
Isometric drawing (Weld Map) a fasication and installation.
“Involved in Line check, Hydro test, ar blowing, flushing, chemical cleaning,
reinstatement, bol tightening, N2 lek tes, Cross ale lak test, N2 Blanking and punch
clearance
Preperation and review of Test Packs with material and weld traceability
‘Analysis RT repair preentage every month and take necessary ation to minimize that
(Cari ut Reinstatement, inal bot sorque and tur over.
+ Conducting final walk down and clearing all the punch iss prior to the externa walk
own
+ Prepring inspection fortum over Gubsystom and system) and Cooninating with the
‘Contactor & PMC far the inspection,
+ Preparing & Reviewing of QC dossier as per lint project requirements
+ ASME seadonIX for Welder Quan & Proce,
ASME secon! farMateri,
+ ASME secon V for NDT Examiaton,
age 3014