Monthly
Daily cumulative Yearly cumulative
7140
MCR SCR
6:50:00 AM 6:47:00 AM
6:26:00 PM 6:27:00 PM
11:36:00 AM 11:40:00 AM
-
YES
HEALTHY
50 MW SOLAR POWER PROJECT, TAMILNADU
TITLE : Inverter Generation Report summary
Daily Generation
Sr.No Parameter Unit
1 Inverter No-01 Generation kWh
A1
2 Inverter No-02 Generation kWh
3 Inverter No-01 Generation kWh
A2
4 Inverter No-02 Generation kWh
5 Inverter No-01 Generation kWh
A3
6 Inverter No-02 Generation kWh
7 Inverter No-01 Generation kWh
A4
8 Inverter No-02 Generation kWh
9 Inverter No-01 Generation kWh
A5
10 Inverter No-02 Generation kWh
11 Inverter No-01 Generation kWh
A6
12 Inverter No-02 Generation kWh
13 Inverter No-01 Generation kWh
A7
14 Inverter No-02 Generation kWh
15 Inverter No-01 Generation kWh
A8
16 Inverter No-02 Generation kWh
17 Inverter No-01 Generation kWh
A9
18 Inverter No-02 Generation kWh
19 Inverter No-01 Generation kWh
A10
20 Inverter No-02 Generation kWh
21 Inverter No-01 Generation kWh
SCR
22 Inverter No-02 Generation kWh
23 Inverter No-01 Generation kWh
B6
24 Inverter No-02 Generation kWh
25 Inverter No-01 Generation kWh
B7
26 Inverter No-02 Generation kWh
27 Inverter No-01 Generation kWh
B8
28 Inverter No-02 Generation kWh
29 Inverter No-01 Generation kWh
B9
30 Inverter No-02 Generation kWh
31 Inverter No-01 Generation kWh
C1
32 Inverter No-02 Generation kWh
33 Inverter No-01 Generation kWh
C2
34 Inverter No-02 Generation kWh
35 Inverter No-01 Generation kWh
C3
36 Inverter No-02 Generation kWh
37 Inverter No-01 Generation kWh
C4
38 Inverter No-02 Generation kWh
39 Inverter No-01 Generation kWh
C5
40 Inverter No-02 Generation kWh
Total
7199
7166
6894
6904
7104
6985
7052
6881
7181
6981
6735
6923
7001
6946
7008
7029
7036
7067
7776
7845
6859
6884
7021
5709
7015
5826
6984
6968
7020
7149
7364
6745
7107
6871
7165
7082
7141
7001
6998
6974
279592
Actual NET
Quoted Energy
Generation Grid Load Shedding Irr Corrected Excess/Shortfa
Quoted average (quoted value for Actual Measured Actual Measured Avg.Actual Force Majeure Irr Measured Gen ll w.r.to base
Unavailability Irr (kWh/sq.m) on Actual irr Base
GHI Irr - MCR Irr - SCR Measured Irr (kWh/sq.m) (kWh generation Diff(%)
(kWh/sq.m) thedaysmonth/no. of (kWh/sq.m) prorata basis (kWh/sq.m) Generation
Sl.no Day (kWh/sq.m) (kWh/sq.m) (kWh/sq.m) (reading of (kWh)
of the (kWh)
Standby TVM at
month) (kWh) switchyard)
1 15-Dec-18 5.37 290434 4.05 4.02 4.04 0 0 0 4.04 201000 218231 -17231 -7.90%
TRIPPING R
Power
2 Transformer no. hh:mm hh:mm
XX
3 Inverter no.XX hh:mm hh:mm
Spec
DATE
NHPC LTD.
AMILNADU SOLAR POWER PROJECT ( 50 MW )
Relay Flags/indications
Total Outage Loss of
(HR : Min) Load Reporting end Other end
- -
- -
- -
Reasons/cause of fault
Engineer (E)
NAME & DESIGNATION