Vous êtes sur la page 1sur 17

50 MW SOLAR POWER PROJECT, TAMILNADU

TITLE : Daily Generation Report


Parameters

Sr.No Parameter Unit

1 Total Inverter Generation kWh

Final Energy Meter Reading (TNEB meter) - EXPORT


2 kWh
(Energy meter reading: 236.84)

Final Energy Meter Reading (TNEB meter) - IMPORT


3 kWh
(Energy meter reading: 1.97)

4 Final Energy Meter Reading (TNEB meter) - NET (2 -3) kWh


5 Grid Availability %
6 Plant Availability %
7 PLF %
Aux. Power Consumption (NIGHT)
8 kWh
Aux. Power Consumption (DAY)
9 Peak load MW
Weather Station Report
MCR
1 Avg. Tilted solar irradiation (kWh/m2/day)
SCR
MCR
2 Avg. Global solar irradiation (kWh/m2/day)
SCR
MCR
3 Avg. Ambient Temperature o
C
SCR
MCR
4 Avg.Module Temperature o
C
SCR
MCR
5 Avg.Wind Speed M/Sec
SCR
6 General weather condition -
Module Cleaning
1 Nos. Of Modules Cleaned Nos 7
Operating/Breakdown Timing MCR
1 Plant start time (A7-Inv_01 & C4-Inv_01) HH:MM:SS 6:50:00 AM
2 Plant stop time (A7-Inv_02 & B8_Inv-01) HH:MM:SS 6:26:00 PM
3 Plant Operating Timing Hrs 11:36:00 AM
4 Grid Breakdown Timing Hrs
GENERAL
1 Data transfer status to NIWE server for the day YES/NO Y
2 Communication link with SLDC - Status HEALTHY HEA
Remarks: - NIL
AMILNADU
Date: 11-Feb-19

Monthly
Daily cumulative Yearly cumulative

279592.0 3042962.0 66711530

276000 3036000 66864000

3000 21000 549000

273000 3015000 66315000


100.00 100.00
100.00 100.00
22.75 22.84 TO BE UPDATED
1239.20 13691.20
67.20 738.70
45.86

5.34 5.73 5.59


6.29 5.83 5.68
4.77 5.07 4.86
4.81 4.98 4.78
29.89 29.31 27.54
30.48 29.67 27.93
32.92 32.24 30.22
35.08 33.71 31.54
0.51 0.52 4.57
1.53 1.51 1.55
Partly Cloudy Weather

7140
MCR SCR
6:50:00 AM 6:47:00 AM
6:26:00 PM 6:27:00 PM
11:36:00 AM 11:40:00 AM
-
YES
HEALTHY
50 MW SOLAR POWER PROJECT, TAMILNADU
TITLE : Inverter Generation Report summary
Daily Generation
Sr.No Parameter Unit
1 Inverter No-01 Generation kWh
A1
2 Inverter No-02 Generation kWh
3 Inverter No-01 Generation kWh
A2
4 Inverter No-02 Generation kWh
5 Inverter No-01 Generation kWh
A3
6 Inverter No-02 Generation kWh
7 Inverter No-01 Generation kWh
A4
8 Inverter No-02 Generation kWh
9 Inverter No-01 Generation kWh
A5
10 Inverter No-02 Generation kWh
11 Inverter No-01 Generation kWh
A6
12 Inverter No-02 Generation kWh
13 Inverter No-01 Generation kWh
A7
14 Inverter No-02 Generation kWh
15 Inverter No-01 Generation kWh
A8
16 Inverter No-02 Generation kWh
17 Inverter No-01 Generation kWh
A9
18 Inverter No-02 Generation kWh
19 Inverter No-01 Generation kWh
A10
20 Inverter No-02 Generation kWh
21 Inverter No-01 Generation kWh
SCR
22 Inverter No-02 Generation kWh
23 Inverter No-01 Generation kWh
B6
24 Inverter No-02 Generation kWh
25 Inverter No-01 Generation kWh
B7
26 Inverter No-02 Generation kWh
27 Inverter No-01 Generation kWh
B8
28 Inverter No-02 Generation kWh
29 Inverter No-01 Generation kWh
B9
30 Inverter No-02 Generation kWh
31 Inverter No-01 Generation kWh
C1
32 Inverter No-02 Generation kWh
33 Inverter No-01 Generation kWh
C2
34 Inverter No-02 Generation kWh
35 Inverter No-01 Generation kWh
C3
36 Inverter No-02 Generation kWh
37 Inverter No-01 Generation kWh
C4
38 Inverter No-02 Generation kWh
39 Inverter No-01 Generation kWh
C5
40 Inverter No-02 Generation kWh

Total Inverter Generation kWh


PROJECT, TAMILNADU
2/11/2019

Total
7199
7166
6894
6904
7104
6985
7052
6881
7181
6981
6735
6923
7001
6946
7008
7029
7036
7067
7776
7845
6859
6884
7021
5709
7015
5826
6984
6968
7020
7149
7364
6745
7107
6871
7165
7082
7141
7001
6998
6974

279592
Actual NET
Quoted Energy
Generation Grid Load Shedding Irr Corrected Excess/Shortfa
Quoted average (quoted value for Actual Measured Actual Measured Avg.Actual Force Majeure Irr Measured Gen ll w.r.to base
Unavailability Irr (kWh/sq.m) on Actual irr Base
GHI Irr - MCR Irr - SCR Measured Irr (kWh/sq.m) (kWh generation Diff(%)
(kWh/sq.m) thedaysmonth/no. of (kWh/sq.m) prorata basis (kWh/sq.m) Generation
Sl.no Day (kWh/sq.m) (kWh/sq.m) (kWh/sq.m) (reading of (kWh)
of the (kWh)
Standby TVM at
month) (kWh) switchyard)

A B C D E=Average(C:D) F G H I=E-(F+G+H) J K=B*(I/A) L=J-k M=L/K

1 15-Dec-18 5.37 290434 4.05 4.02 4.04 0 0 0 4.04 201000 218231 -17231 -7.90%

# Sensitivity: LNT Construction Internal Use


(1) WEATHER MONITORING STATION (1 MINUTE)
MCR
DATE:- Monday, February 11, 2019
GLOBAL TILTED
HORIZONTAL RADIATION - WIND SPEED
MODULE TEMP. AMBIENT
DATE & TIME RADIATION - MET MET Station for MET
(Deg C) TEMP. (Deg C)
Station Station (m/s)
(W/M2) (W/M2)
SCR
Monday, February 11, 2019
GLOBAL TILTED
AMBIENT HORIZONTAL RADIATION - WIND SPEED
MODULE TEMP.
TEMP. RADIATION - MET MET Station for MET
(Deg C)
(Deg C) Station Station (m/s)
(W/M2) (W/M2)
N
TAMILNADU SOLA

TRIPPING R

Tripping Time Restoration Time


SL. No. Name of system
(HR : Min) (HR : Min)

1 LINE hh:mm hh:mm

Power
2 Transformer no. hh:mm hh:mm
XX
3 Inverter no.XX hh:mm hh:mm

Spec

DATE
NHPC LTD.
AMILNADU SOLAR POWER PROJECT ( 50 MW )

TRIPPING REPORT FOR : DATE Report No.: NH/TNSP/TRIP/18-19/XX

Relay Flags/indications
Total Outage Loss of
(HR : Min) Load Reporting end Other end

- -

- -
- -

Specific reasons, if not attached


NH/TNSP/TRIP/18-19/XX

Reasons/cause of fault
Engineer (E)
NAME & DESIGNATION

Vous aimerez peut-être aussi