Vous êtes sur la page 1sur 8

CURRICULUM VITAE

Name : DAUD ADOLF REYMINGTHON SITORUS, ST


Place / Date of Birth : Serang / 20 June 1985
Nationality : Indonesian
Education : Chemical Engineering Bachelor Degree
University of Lampung, Indonesia
Permanent Address : Link Baru I Yos Sudarso Street No. 33 RT.2 RW.4
Pulomerak Subdistrict, Cilegon City, Banten Province, Indonesia
Mobile : +62813-8009-2932
Email : daud_sitorus@yahoo.co.id

QUALIFICATIONS/TRAININGS :

 CSWIP 3.1 (Welding Inspector Level II)


Certified by The Welding Institute, December 2014
 Storage Tank Inspector
Certified by Ditjen MIGAS, August 2017
 Plant Inspector
Certified by Ditjen MIGAS, January 2016
 Pressure Vessel Inspector
Certified by Ditjen MIGAS, October 2015
 Pipeline Inspector
Certified by Ditjen MIGAS, December 2018
 Welding Inspector
Certified by B4T (Balai Besar Barang dan Bahan Teknik), January 2013
 ASNT NDT Level II Radiography Test (Radiography Interpreter)
Certified by PT. SLV Metropolitan Indonesia, January 2019
 ASNT NDT Level II Penetrant Test
Certified by SNS (SAR NDT Services), November 2016
 ASNT NDT Level II Magnetic Test
Certified by SNS (SAR NDT Services), November 2016

LANGUAGES AND PROFICIENCY IN EACH : Speaking Writing Reading

Indonesia : Yes Yes Yes


English : Yes Yes Yes

1 of 8
EMPLOYMENT EXPERIENCES

1. Aug 2018 – Present : PT. JAKARTA TANK TERMINAL (VOPAK-AKR JV)


Position : Mechanical & Piping Inspector
Project : Jakarta Tank Terminal Phase IIA
Job Description :
- Evaluate of designing of mechanical, structural, ; and multi-disciplined systems, and equipment
for industrial facilities with respect to requirements and scope on Projects.
- Review and assures system and product quality by designing testing method, testing finished-
products and system capabilities; confirming fabrications, assembly, and installation processes.
- Monitoring the mechanical project progress base on the project time table.
- Verify contractor work and material and conform with the specification requirement.
- Coordinate inspection, material testing and sampling.

2. Dec 2017 – Jul 2018 : PT. BARATA INDONESIA (PERSERO)


Position : Storage Tank Inspector
Client : PT. Pertamina (Persero) RU VI Balongan
Project Scope : Replacement Roof, Roof Support, Bottom, Annular Plate
and Re-painting.
Job Description :
- Existing evaluation according to latest edition of API 650 and 653
- Document Review
Quality Plan, ITP, Welding Map, NDE Map, WPS & PQR, Welder Certificate, Construction Drawing,
Procedure & Report: Material Inspection, Erection Method, Shop Fabrication, Dimension Check
(Roundness, Plumbness, Peaking, and Banding), NDE, Tank Jacking, Hydrostatic Test.
- Verification Material (plate, column, girder, rafter, gasket, bolt, nut, welding consumable), Fit-up,
Welding (including sequence), NDE, Dimension Check, Bolting, Painting, and Erection Execution.

3. Mar 2017 – Jan 2018 : PT. JUHDI SAKTI ENGINEERING


Position : Storage Tank Inspector
Client : PT. Pertamina (Persero) RU VI Balongan
Project Scope : Replacement Roof, Roof Support, Shell Course #2, Annular Plate
and Re-painting.
Job Description :
- Existing evaluation according to latest edition of API 650 and 653
- Document Review
Quality Plan, ITP, Welding Map, NDE Map, WPS & PQR, Welder Certificate, Construction Drawing,
Procedure & Report: Material Inspection, Erection Method, Shop Fabrication, Dimension Check
(Roundness, Plumbness, Peaking, and Banding), NDE, Tank Jacking, Hydrostatic Test.
- Verification
Material (plate, column, girder, rafter, gasket, bolt, nut, welding consumable), Fit-up, Welding
(including sequence), NDE, Dimension Check, Bolting, Painting, and Erection Execution.

2 of 8
4. Jun 2013 – Mar 2017 : PT. DEPRIWANGGA
Perform inspection activities as on behalf of Indonesian Directorate General Oil and Gas (Ditjen.
Migas) and prepare inspection report.
4.1 Position : SKPI (Plant) Inspector for Process, Safety, and Piping Discipline
A. New Certification
a. Piping
 Document Review: Material certificates, fit-up, welder certificate, WPS, NDT
(procedure, technician certificate, equipment calibration, and report),
Painting/Coating, pressure pest report.
 Inspection/Spot Witness: fit-up, welding, pressure test, bolt tightening, line check,
flushing & clean Out.
b. Process
 Document Review: Equipment Layout, PFD & Heat-Mass Balances, P&ID, Cause and
Effect Diagram, Fire and Gas Layout, instrument datasheet & calibration certificate,
plant manual operation.
 Inspection/Spot Witness: Visual, and Loop/Sequence Test.
c. Safety
 Document Review: Safety Equipment Layout, Emergency Response Plan, safety
equipment datasheet.
 Inspection/Spot Witness: Visual inspection, and function test.
B. Recertification
 Document Review: Equipment Layout, PFD, P&ID, Cause and Effect Diagram, Fire
and Gas Layout, Safety Equipment Layout, Emergency Response Plan, RPL & RKL
report, equipment government certificate (SKPP, SKKP, Kemenaker, and Metrology),
plant manual operation, operation and maintenance record.
 Visual inspection: piping, structural, instrument, and safety facility

Project Assigned :
1. Period : June 2013
Location : Sembakung - East Kalimantan
Client : PT. Medco EP Sembakung
Project : Recertification Sembakung Oil Gathering Station
2. Period : July 2013
Location : Padang Island - Riau
Client : EMP Malacca Strait S.A.
Project : Recertification Oil Gathering Station and Processing Kurau Plant, Selatan AI,
LP Platform
3. Period : September - October 2013
Location : Cepu - Central Jawa
Client : PT Pertamina EP Gundih Area
Project : Jawa Gas Development (CPP Gundih)
4. Period : November 2013
Location : Sumpal - South Sumatera
Client : ConocoPhillips (Grissik) Ltd.
Project : Sumpal Expansion (Sumpal Gas Gathering Station Train 2)
5. Period : December - January 2013
Location : Grissik - South Sumatera
Client : ConocoPhillips (Grissik) Ltd.
Project : Central Gas Processing Expansion (CGPX) and Dayung Compression I (DC I)

3 of 8
6. Period : February - March 2014
Location : Duri - Riau
Client : PT Chevron Pacific Indonesia
Project : Recertification Oil Gathering Station; Rangau DS, Pemburu GS, Kotabatak
GS, Petapahan GS, Suram GS
7. Period : April - May 2014
Location : Balongan - West Jawa
Client : PT Pertamina (Persero) Balongan RU VI
Project : Recertification Exor Oil Refinery Plant
8. Period : September 2014
Location : Cepu - Central Jawa
Client : PT Schlumberger Geophysics Nusantara
Project : Early Oil Expansion
9. Period : November 2014
Location : Prabumulih - South Sumatera
Client : PT Pertamina Asset 2 UBEP Limau
Project : Stasiun Pengumpul Niru
10. Period : February - Maret 2015
Location : Arun - Aceh
Client : PT Pertamina Arun Gas
Project : LNG Receiving-Hub and Regasification Terminal
11. Period : September 2015
Location : Duri - Riau
Client : PT Chevron Pacific Indonesia
Project : Recertification Oil Gathering Station: Bekasap GS-GP-EOR, Sebanga GP
12. Period : November 2015 – February 2016
Location : Donggi – Sulawesi Tengah
Client : PT Pertamina EP
Project : Matindok Gas Development Project
13. Period : November 2016
Location : Natuna Sea – Kep. Riau
Client : Premier Oil Natuna Sea B.V.
Project : Recertification Gajah Baru Production Facilty
14. Period : Desember 2016
Location : Natuna Sea – Kep. Riau
Client : Star Energy (Kakap) Ltd.
Project : Recertification KRA Platform
4.2 Position : Welding Inspector
Job description :
 Material verification
 Review Document (Material and consumable certificate, Equipment calibration certificate
validity, NDT report, Mechanical Test report)
 Witness fit up, welding operation (Surveillance in welding parameter recording)
 Perform visual inspection
 Perform radiography film interpretation
 Witness the tests (Bending, Tensile, Impact, Macro, Hardness Test)
 Prepare welder certificate draft
Project Assigned :
1. Period : July 2014, Purwakarta
Location : West Jawa
Client : PT Sulzer Turbo Services
Project : Turbine Hardfacing

4 of 8
2. Period : September 2014
Location : Karimun - Kep. Riau
Client : PT Saipem Indonesia
Project : Jangrik Complex Project - FPU Topside Piping & Structural
4.3 Position : Pipeline Inspector
Job description :
A. New Certification
 Document Review: Calculation (Wall Thickness, Crossing, Flexibility, Buoyancy), material
certificates, fit-up, welder certificate, WPS, NDT (procedure, technician certificate,
equipment calibration, and report), construction procedure & report (storage, handling,
stringing, trenching, fit-up, welding, lowering, backfilling), painting/coating, Holiday Test
Report, Hydrostatic Test Report.
 Inspection/Witness: Storage, handling, stringing, trenching, fit-up, welding, lowering,
backfilling, painting/coating, concrete, Precommisionning (Flooding, Cleaning, Gauging,
& Hydrostatic Test), bolt tightening, ROW check.
B. Recertification
 Document Review: Operation Log, Alignment Sheet, P&ID, operation manual, patrolling
report and procedure, repair report and procedure, periodic thickness report, Emergency
Response Plan, Pressure Relief Certificate, RKL-RPL Report.
 Verification: Operating pressure and temperature, visual, ROW, location class, corrosion
control system, thickness measurement, MAOP calculation.

Project Assigned :
1. Period : January - February 2015
Location : Karimun - Kep. Riau
Client : PT Oiltanking Karimun Indonesia
Project : Oiltanking Karimun Terminal (16 units)
2. Period : March 2015
Location : Grissik, Suban, Dayung, Sumpal, Gelam – South Sumatera
Client : ConocoPhillips (Grissik) Ltd.
Project : Recertification of pipelines (8 units)
3. Period : July - August 2015
Location : Johor Bahru - Malaysia
Client : Eni Muara Bakau B. V.
Project : Jangkrik Complex Project – Subsea Flexible Pipeline & Riser (8 units)
3. Period : October 2016
Location : Kalundborg - Denmark
Client : Star Energy (Kakap) Ltd.
Project : Flexible Riser Replacement (2 units)
4. Period : November 2015 – February 2016
Location : Donggi – Sulawesi Tengah
Client : PT Pertamina EP
Project : Matindok Gas Development Project (9 units)
5. Period : January 2016 – January 2017
Location : Handil Baru & Makassar Strait, East Kalimantan
Client : Eni Muara Bakau B. V.
Project : Jangkrik Complex Project – Subsea Rigid Pipeline (4 units)
6. Period : March - June 2016
Location : Duri, Riau
Client : PT Chevron Pacific Indonesia
Project : Recertification Oil Transmission Line (10 units)

5 of 8
4.4 Position : Storage Tank Inspector
A. New Certification
 Document Review: Calculation, material certificates, fit-up, welder certificate, WPS, NDT
(procedure, technician certificate, equipment calibration, and report), Dimensional
Report (plumbness, roundness, peaking, bending, foundations, Nozzle, Shell Manhole),
Vacuum Test, Settlement & Hydrostatic Test Procedure & Report.
 Inspection/Witness: Dimensional (plumbness, roundness, peaking, bending, foundations,
Nozzle, Shell Manhole), Vacuum Test, Settlement & Hydrostatic Test, Bund Wall.
B. Recertification
 Document Review: Operation Log, repair report and procedure, periodic thickness &
settlement report, Pressure Relief Certificate.
 Verification: Fire protection, operating level and temperature, visual, bund wall,
thickness measurement.
Project Assigned :
1. Period : January - February 2015
Location : Karimun - Kep. Riau
Client : PT Oiltanking Karimun Indonesia
Project : Oiltanking Karimun Terminal (1 units)
2. Period : September 2015
Location : Duri - Riau
Client : PT Chevron Pacific Indonesia
Project : Pematang GS Shipping Tank
4.5 Position : Pressure Vessel Inspector
A. New Certification
 Document Review: Calculation, material certificates, welding & NDT map, as built
drawing, fit-up, welder certificate, WPS, NDT (procedure, technician certificate,
equipment calibration, and report), Dimensional Hydrostatic Test Procedure & Report.
 Inspection/Witness: Dimensional check, Hydrostatic Test.
B. Recertification
 Document Review: Operation Log, repair report and procedure, periodic thickness &
settlement report, Pressure Relief Certificate.
 Verification: visual, thickness measurement.
Project Assigned :
1. Period : June - July 2013
Location : Padang Island - Riau
Client : EMP Malacca Strait S.A.
Project : Recertification (144 units)
2. Period : May - June 2015
Location : Busan - South Korea
Client : Eni Muara Bakau B. V.
Project : Jangkrik Complex (4 units)
3. Period : June 2015
Location : Cikarang - West Jawa
Client : PT Maruta
Project : Kilang LPG Plant (1 units)
4. Period : November 2016
Location : Natuna Sea – Kep. Riau
Client : Premier Oil Natuna Sea B.V.
Project : Recertification (11 units)

6 of 8
4.6 Position : Rotating Equipment Inspector Assistant
New Certification
Review MDR, FAT Procedure & Report, Equipment Calibration Certificate, Witness FAT
Project Assigned :
Period : May - June 2015
Location : Busan - South Korea
Client : Eni Muara Bakau B. V.
Project : Jangkrik Complex (5 units)
4.7 Position : Platform Inspector Assistant
Recertification
Underwater Inspection Surveillance
Review Underwater Inspection
Project Assigned :
Period : July 2016
Location : Natuna Sea – Kep. Riau
Client : Premier Oil Sea Natuna B.V.
Project : Underwater Inspection Campaign (Naga and Pelikan Platform, 2 units)
4.8 Position : Site Supervisor
Location : Duri, Riau
Client : PT Chevron Pacific Indonesia
Project : MIGAS Certification
Period : May – August 2016
Job description
 Plans, organized, scheduling, assigns, supervises and reviews the work of assigned
inspector in the area of capital project inspection.
 Monitors operations and activities of the work unit, recommends improvements and
modifications and prepares various reports on operations and activities, implements policies
and procedures.

5. Position : QA-QC Inspector Subsea Pipeline (on-behalf company)


Client : PT Star Energy (Kakap) Ltd.
Project : Infill Well Facility Tie-in KRA South 2 Project
Period : September - October 2016
Job description
- Pipelay & Spool Document Review: WPS, Welder certificates, QC tools calibration certificates,
Welding machine calibration certificates, Consumables certificates, Coating applicator certificates,
NDT personnel certificates, NDT equipment certificates
- Pipelay & Spool Fabrication Inspection Monitoring
- Report Review: Tally Sheet, Fit Up & Visual, Weld Repair, Welding Surveillance, Field Joint
Coating, Surface Preparation, NDT, Pipe Book
- Pipeline & Spool Hydrotest Witness
- Subsea Installation Witness: Pipe Spool, Riser Clamp, Hydratight, KaMOS gasket test, ROV as
built survey
- Completion Monitoring: Dewatering, and N2 Packing

6. 4 Jul 2011 – 7 Jan 2013 : PT. GRAND KARTECH


Position : Chemical & Water Treatment Engineer
Job description
 Boiler: boiler water quality, boiler feed water quality, chemical boiler water chemical dossing
setting, softener sizing and setting
 Cooling tower: cooling tower water, make up water, and condenser evaluation (HVAC system)
- Technical support for marketing division
- Client boiler water treatment training
- Project planning (SOP, schedule, s-curve, and material preparation)
- Project: Cleaning Boiler, and Heat Exchanger

7 of 8
-
Infineum as boiler fuel additives: evaluation of energy efficiency through indirect calculation
method
 Responsible in good management of internal and external reporting/documentation
Project Assigned :
1. Cleaning and Inspection Standard Kessel Boiler Cap. 10 TPH, PT. Unilever, Tbk
2. Cleaning Condenser, PT. Alkindo Mitraraya
3. Mechanical Cleaning Hoken Boiler Cap. 4 TPH, PT. Wiraswasta Gemilang Indonesia
4. Overhaul Heat Recovery Steam Generator Cap. 2 TPH, PT. Astra Honda Motor
5. Boil-out Hoken Boiler Cap. 5 TPH, PT. Evonik
6. Air Receiver Tank - Hot Air Piping Passivation, PT. Eagle Indopharma
7. Cleaning Hoken Boiler Cap. 12 TPH, PT. Frisian Flag Indonesia
8. Reconditioning Amsterdam Boiler Cap. 7 TPH, PT. Pertamina EP Sanga-Sanga Field

7. 10 Jun 2010 - 1 Jul 2011 : PT. LP DISPLAYS


Position : Production Engineer (Coating Division)
Job description
 Production monitoring (product quality and quantity issue)
 Defect control (root and cause analysis)
 Improvement propose and implementation
 Reporting to Division Manager and General Manager

8. 07 Aug – 07 Sept 2008 : PT. PUPUK KUJANG (Internship Program)


Job description
Performance Evaluation of Gas Interstage Compressor Cooler Unit Amonia Plant IA

Cilegon, February 2019

Daud Adolf Reymingthon Sitorus, ST

8 of 8

Vous aimerez peut-être aussi