03 Table of contents
Scope of delivery
04 | 05 Basic equipment | Additional equipment
Operation
06 | 07 Setup • Wiring diagram | 3D drawing TecBox
08 | 09 Function • TecBox | Vessels | Additional equipment
10 – 13 BrainCube control • Function | Set parameters | menu | Messages
Assembly
14 | 15 TecBox | Vessels • Installation | Assembly procedure | Example installation
16 DNe expansion pipes • About the vessels | Standard values as defined in
EN 12828, SWKI 93-1
16 | 17 DN additional equipment • About the TecBox | Standard values
18 | 19 Electrical connection • Requirements | Network supply | RS 485 | ComCube
20 Terminal plan
Start-up (IBN)
21 Requirements • Vessels empty | Consumer system ready, filled and
vented!
21 BrainCube • Switching on | Follow the instructions on BrainCube
21 | 22 Welcome/initial start-up • Welcome - Language - Date - Setting the clock
• Start up following the instructions
• Select standby or auto
• Set parameters on BrainCube
23 BrainCube with ComCube DCD • Follow the separate ComCube Assembly | Operation
instructions
• Sensors | Signals | Evaluation
23 BrainCube with ComCube DCA • Follow the separate ComCube Assembly | Operation
instructions
Operation
24 Basic
03
24 auto • All functions activated | Keep in auto operation throughout
the year de
24 standby • Only display activated | Carrying out maintenance work
24 menu • Functions can be selected, checked and modified fr
25 check • Maintenance and functional check:
en
Pneumatex Customer Service recommends once per year
Messages • Display, acknowledge | Message list | Resolving technical nl
26 faults
27 Checking | Disassembly • According to national regulations
• First allow to cool and depressurise!
! 28 Safety
29 Technical data
Terms | Media | Outputs
30 | 31 CE compliance
33 Customer service
pneumatex.com
P compresso CPV 0705
Scope of delivery Basic equipment
Scope of delivery is described on the delivery note and may include other products in addition to
Compresso CPV. Intermediate storage is required in a dry room protected from frost. In addition to
the primary vessel, delivery may include one or more secondary vessels.
TecBox Item 1
CPV Floor-standing assembly,
with assembly kit (1.1) and
1.1
PA 12/10 polyamide hose,
push-fit connections
and retaining clips (1.4). 1.4
04
de
fr
en
nl
pneumatex.com
P compresso CPV 0705
Scope of delivery Additional
equipment
05
de
fr
en
nl
pneumatex.com
P compresso CPV 0705
Operation Setup
DN
SA SE
SF Module P TecBox (1) Module V
by NT
customer DV1 SF1
+
FIQ LS P1 V1
NS
SNS
SD
VE
K2 V2
V
1.2
SV
+ +
SF2
SF PIS
PS VG PIS
Module C 1.2.1
1.1 230 V
06
de
KV 5 KV 5
+
fr 1.2.2.
LIS
2.1 3.1 *
2.2 3.2
en Primary Secondary
vessel (2) vessel (3)
nl DNe
pneumatex.com
P compresso CPV 0705
Operation Setup
1.2
NT
1.3
PIS 1.2.1
VE
VG
DV1
FIQ
V1
SA 07
NS de
SE
SNS fr
SD SF1
P1 K2 + V2 SL
PS en
SF2 nl
SV
pneumatex.com
P compresso CPV 0705
Operation Function
Compresso CPV is a modular, precision pressure maintenance system (± 0.1 bar) with compressors,
water make-up and degassing, for closed heating, solar, and chilled water systems. It consists essen-
tially of one TecBox (1), one primary vessel (2) and optional secondary vessels (3). Its functionality can
be extended with additional equipment.
pneumatex.com
P compresso CPV 0705
Operation Function
Vessels Primary vessel (2) with content sensor LIS | bag vent valve EVG | condensate drain KV | airproof butyl
bag, secure protection of expansion water from oxygen.
As many secondary vessels (3) as required can be connected to the primary vessel (2).
! Operation with In Switzerland, there is no legal inspection requirement by the SVTI for vessels up to
Safety valve SV only! PS * V = 3000 bar * litres. The following combinations with TecBox are recommended.
Condition: SV ≥ PSV ( page 11):
ComCube DCA
The ComCube DCA communication module provides 2 galvanically isolated 4-20 mA analogue out-
puts. These make it easy to send PIS pressure signals and LIS content signals to a central monito-
ring station.
ComCube Assembly | Operation
09
de
fr
en
nl
pneumatex.com
P compresso CPV 0705
Operation BrainCube control
Function
escape
Back
Key lock
Press and hold for 5 s
until « » is displayed.
Press again for 5 s
to release the key lock. menu
Main menu
auto standby
Pressure maintenance, Display only
Water make-up,
Degassing
check
Function check,
Maintenance instructions
Pressure Content
min max 0 % 100 %
P0 PSV
10
Message line 1
Equipment type,
de
Current menu item
Analogue display
fr
Only appears in the Status line
admissible range between Pump P1, compressor K2,
en min and max. Valve V1, V2,
Water make-up NS (if activated)
nl
Illuminated display:
Light goes off 60 s after last action.
Message line 2
Re-activated by Scroll. Operating mode,
Most recent message
pneumatex.com
P compresso CPV 0705
Operation BrainCube control
HST
HST = (pman – 0.7 bar) * 10 ΔpP
PSV
The target pressure value must be at least equal to the ac-
TAZ
tual static height.
Example: Compresso
CPV
Actual static height : HST = 21 m
PIS
Target pressure : pman = 3.5 bar
Static height to be set : HST = 28 m
HST = (3.5 – 0.7) * 10 bar = 28 m
Variant 2
TAZ Temperature limit in heat generator
an
pm
PSV Response pressure of safety valve at heat generator
If the heat generator is located h (m) below the pressure
maintenance system, the BrainCube PSV setting value is
HST PSV
calculated as follows:
PSV – h/10; if it is located above: PSV + h/10.
nl
pneumatex.com
P compresso CPV 0705
Operation BrainCube control
Main menu
Start-up
Check
Parameters
Info
page 21 Start-up
Check
automatic vacuum test Tightness 6)
manual switching Check pumps/valves
manual switching Check outputs
Water make-up
activate | deactivate | test Hydr. compensation P1
View check
1)
Standard:
Info output 1 = alarm
Type Compresso CPV.1 output 2 = M01 Min. pressure
2)
Version V2.20 Actuation of an external water make-up device
Water make-up quant. 10 l
3)
Terminal plan page 20,
if selected, switches the Invers
as on type plate Primary vessel 200 l output (NO → NC)
cont. degassing run time remaining Degassing duration 21 h 4)
Relevant only if «water make-up active»
page 11 MinPressure P0 1.8 bar 5)
For messages from M27 onwards, please contact
Initial pres. Pa 2.1 bar Pneumatex Customer Service
Final pres. Pe 2.3 bar 6)
start → Start vacuum test
current pressure in vacusplit vessel VG Pressure VG -0.8 bar on → Vacuum test in progress, please wait
last 20 message View messages ok → Vacuum test completed successfully
M24 → Vacuum test not successful,
View start-up
check vacusplit vent and replace
if necessary
12 Parameters 7)
Max. make-up quantity calculated by BrainCube
standard: de, en, fr, nl Language selection has been exceeded.
de Date 12.01.2007 Risk of corrosion in the system.
Leakages in the system should be corrected.
fr Time 15:38
Stat. height HST 15 mWs If selected, output switches if message present
en T limiter TAZ <100°C Not selected
Saf. valve PSV 3.0 bar x Output switches if message present,
nl
not modifiable
continuous or interval degassing Degassing Duration
* Water make-up switch-off point (20% LIS)
Output 1
page 13 1) could not be reached after 60 min run time
Output 2
** Depends on installation size, calculated by
Night rest begin 20:00 BrainCube
no degassing
Night rest end 08:00 *** Final pressure pe still could not be reached
Contrast 120 after 30 min run time
pneumatex.com
P compresso CPV 0705
Operation BrainCube control
Messages
1) Output 1 / 2
Alarms
All messages
Custom
2) Ext. water make-up
3) Invers
user-defined selection
defined in BrainCube
defined in BrainCube
Example of
M19 Pump P/K2 x x Motor protection fuse tripped, Acknowledge after correcting fault
en
page 20
M20 Pump runtime P/K x 30 min *** Acknowledge after correcting fault nl
pneumatex.com
P compresso CPV 0705
Assembly TecBox | Vessels
Installation
• As the technology room, the installation room is protected against unauthorized access, ventilated,
°C and fitted with the required connections for fresh water, waste water and electricity. Room tempera-
max 40 ture should be from 5 °C to 40 °C
• Install vertically on an even floor.
min 5
• Assembly of polyamide connecting hoses: The supplied air hoses should be cut to the required
length if necessary. The ends should be cut with a sharp knife and inserted tightly into the SL connec-
tions in the TecBox (1) and vessels (2, 3).
You can release a polyamide hose by pressing the push-fit connection while pushing the plastic
ring on the connection in the same direction, then pulling out the hose. Not when pressurised!
! • Safety information page 28.
Vessels
• Vessels (2) and (3) have the same geometry, and can be connected and moved around as desired
• Bag vent valve EVG closed.
• Close condensate drain KV.
pneumatex.com
P compresso CPV 0705
Assembly Installation
TR TR
SL EVG SL EVG
SL 3.3.1 3.3
SL detail 1.4
2 3
1.2
1.3
1.4
230 V
1
KV detail 1.2.1
NT
KV
1.4
1.2.2 KV KV
1.2.2
LIS detail SL
G
LIS
SE SÜ 1.1
SNS SA LIS S S
1 2 3
SL SL
EVG EVG
SF SE 3.3.1 3.3
1.1 1.2.2 2.1
SA 3.1 (only for CUE)
≥ 600
SNS
SÜ S S
15
≥ 600 ≥ 150 ≥ 150 ≥ 150
de
fr
en
Legend
nl
further details TecBox 1 TecBox 2 Primary vessel EVG Bag vent valve
page 7 1.1 Polyamide hose PA 12/10 2.1 Flexible tube G Base plate with
with push-fit connection LIS content sensor fixing holes
1.2 BrainCube control KV Condensate drain
1.2.1 Mains plug 3 Secondary vessel NT Break tank
1.2.2 Cable for LIS with plug 3.1 Flexible hose (only for CUE) S Vessel connection
1.3 Cover with carrying handles 3.3 Polyamide hose PA 12/10 SL Air line connection
3.3.1 T-branch with push-fit SF Strainer
SA Outlet connection
connections and TR Transport ring
SE Inlet connection
two shut-offs
SNS Water make-up connection
SÜ Break tank overflow
di/da 20/25mm *
pneumatex.com
P compresso CPV 0705
Assembly Expansion pipes DNe
Connecting pipes DN
• Connection is made on the suction side of the circulating pumps, and on the return in heating installati-
ons. For other arrangements, please ask us for advice.
• Lock shield valves KAH (5) should be installed in the DNe expansion pipes. We recommend also having
a fill/drain tap (2.2, 3.2) installed by the customer between KAH and the flexible hose.
• With Compresso CPV, intermediate vessels are not necessary since the maximum operating tempera-
ture of the bags in the vessels (2, 3) is not exceeded, provided the required operating conditions are
maintained (5 > tR < 70 °C)-
. However, if intermediate vessels are still to be installed, please read the Assembly | Operation instruc-
tions for the intermediate vessels.
Length up to about 30 m Standard values for expansion pipes DNe with Compresso CPV
EN 12828 DNe 20 25 32 40 50 65 80 100
SWKI 93-1 Q | kW 1.000 1.700 3.000 3.900 6.000 11.000 15.000 23.000
Q | kW 300 600 900 1.400 3.000 6.000 9.000 —
• Connection is made on the suction side of the circulating pumps, near the connection of the DNe ex-
pansion pipe. For heating installations on the return line.
• Compresso CPV must be integrated into the central volumetric flow of the system, otherwise degas-
sing may be insufficient. The pipe to SE is connected first in the direction of the main volumetric flow,
then the pipe to SA. Protect the TecBox from dirt page 17.
• The DN connecting pipes are connected off-circuit to the TecBox (1), and do not require additional
safety shut-off devices. The TecBox has integrated lock shield/ball valves.
• In areas particularly sensitive to noise, we recommend fitting flexible hoses to connections SE and SA.
Length up to about 10 m Standard values for DN connecting pipes with Compresso CPV
Length up to about 30 m DN 25
DN 32
16
PSV
de
fr
en
nl ³ 500
tR
DNe
! Shut-off valves KAH (5)
DNe1 DNe2 DN
must be kept closed until 5 5
start-up.
! The vessels must be
empty.
3 2 1
pneumatex.com
P compresso CPV 0705
Assembly Connecting pipes DN
≥ 500
DN
e.g.
Zeparo ZIO
≥ 500
*
SA SNS SA SNS
SE SE
1 1
Zeparo in the horizontal main pipe. Integration with the vertical main pipe
≥ 500 ≥ 500
* *
DN DN
e.g. 17
Mains water pressure Zeparo ZUD Mains water pres-
pNS = 2...10 bar sure
pNS = 2...10 bar de
SA SNS SA SNS fr
SE SE
en
nl
1 1
Zeparo in the outflow pipe. Protection from coarse dirt:
Integration from the top with the connecting pipes.
* Only required for degassing when the circulation pump is switced off, e.g. during the summer break.
The TecBox (1) is best protected from dirt by the Zeparo sludge particle separator.
pneumatex.com
P compresso CPV 0705
Assembly Electrical connection
The electrical connection work should be performed by a skilled person in accordance with local re-
gulations. The BrainCube is equipped with a mains plug (1.2.1). The device is switched on as soon
as the plug is inserted.
Pre-requirements
The system must be shut down before starting work - disconnect the mains plug (1.2.1), and switch
!
off any external voltage on output 1/2.
C C
Terminal box 230 V connections – Cover 1
D D
pneumatex.com
P compresso CPV 0705
Assembly Electrical connection
RS 485-1 Interface
The RS 485-1 interface can be used for connecting ComCube DCD communication modules. The
interface can be read externally. The Pneumatex protocol can be supplied on request.
The total length of the data link should be no more than 300 m. A twisted pair shielded cable should
be used (for example, Belden Type 9501).
The RS 485-1 jumper in the terminal devices on the data link must be set to «On», and the jumper on
intermediate devices to «Off».
ComCube DCD
ComCube DCD should be wall-mounted. More than one BrainCube can be connected over the
RS 485. Please read the notes concening connecting cables and jumper settings.
RS 485-1 interface and ComCube Assembly | Operation
Example: Data link with A B A B A B
2 BrainCube and B A B A B A
SHIELD
SHIELD
SHIELD
SHIELD
SHIELD
SHIELD
2 ComCube DCD
A
A
B
ComCube DCA
ComCube DCA should be wall-mounted. For the building management system, PIS pressure and
LIS content can be made available in the form of galvanically isolated 4-20 mA signals through the
ComCube DCA. The existing PIS BrainCube and LIS BrainCube cable connections must be remo-
ved and rewired to the ComCube DCA. The total length of the PIS/LIS BrainCube and/or PIS/LIS
19
ComCube DCA cable connections should be no more than 4 m. A twisted pair shielded cable should
be used (for example, Belden Type 9501). de
ComCube Assembly | Operation
fr
ComCube DCA
Example: Electrical connection en
101IN
102IN
105IN
104IN
103IN
106IN
102+
105+
104+
103+
106+
GND
GND
GND
GND
GND
GND
PE
N
L
nl
0,6 m
max. max. max. max.
4,0 m 4,0 m 4,0 m 4,0 m
GND
GND
Mains
2
2
1
pneumatex.com
P compresso CPV 0705
fr
nl
en
de
20
Contact water Pressure sensor 2) Interface Content sensor 2) Pressure switch
meter FIQ PIS RS 485-1 LIS max. pressure PS+
P P
2 2
A
B
A`
B`
OUT
OUT
+ +
1 1
2
1
2
1
FREE
FREE
FREE
FREE
FREE
FREE
PE
PE
SHIELD
SHIELD
SHIELD
SHIELD
1
2
br
br
br
ws
ws
ws
DE A DE B DE C PIS RS 485-1 LIS DE D DE E DE F
pneumatex.com
IN IN IN IN + A B A` B` IN + IN IN IN
OFF ON
P
Jumper
2 2 RS 485-1 2
1 1
1
20 Display 14 Keyboard Diagnostics plug
Fuse F200
Pump 1
10 AT / type: 5x20 Use only the specified
fuses!
Lower cover
12A 5A
L1 N L` N L` N L` N L` N L` N
MAINS P/K1 MV UE1 MV N P/K2 MV UE2 POT1 POT2
Connections shown grey = included in Pneumatex delivery
L
N
C
bl
bl
bl
bl
bl
C
PE
br
br
br
br
br
NO
NC
NO
gegn
gegn
gegn
gegn
gegn
Terminal plan
Line
protection
FREE
FREE
FREE
on site
Mains plug
M M
1~ 1~
Requirements
BrainCube is self-explanatory
All start-up steps and processes are described on the BrainCube itself. Please follow the instructions
given. The following notes are only to provide addiitional information.
Switching BrainCube On
Insert mains plug (1.2.1). The BrainCube is ready for start-up. At the initial startup, it displays a
«Welcome» message (if there is no operator action for 4 min., it automatically changes to standby
with display function only, then to the menu - Start-up.
Fill vessel • Fill by hand, for example through the drain taps (2.2, 3.2)
page 6, 30% for heating installaitons,
50% for cooling installations. The bag vent valves
EVG on the vessels are kept closed.
pneumatex.com
P compresso CPV 0705
Start-up
Start-up
Hydr. compensation P1 • Compressor K2 and spill valve V2 bring the pressure
in the expansion vessels (2, 3) up to the system
pressure calculated by BrainCube.
Note: This process can take several minutes.
If system pressure cannot be reached within
5 minutes, this step is automatically aborted with an
«unsuccessful» message and must be repeated.
• Pump and overflow capacity (P1, V1) must then be
adjusted so that the calculated flush pressure is
present in vacusplit vessel VG. The adjustment is
made at regulating fitting DV1.
• If the adjustment is insufficient, the BrainCube
indicates that further adjustment is required.
IBN complete • The system can only go into operation after all
start-up steps have been completed and confirmed.
pneumatex.com
P compresso CPV 0705
Start-up
Up to four BrainCube controls can be operated with one or more ComCube DCD communication
modules. Besides the cabling work ( electrical connection page 19), the following parameter set-
tings are required on the BrainCube:
• Open *ComCube* menu: press menu, then press esc + push at the same time
• Make the settings in the *ComCube* menu:
ComCube
BrainCube off Indicate the selected BrainCube No.
ComCube push Enable BrainCube for ComCube DCD operation
BrainCube 1
}
* If a BrainCube No.
scroll
For the building management system, PIS pressure and LIS content can be made avalable in the
form of galvanically isolated 4-20 mA signals through the ComCube DCA ( electrical connection
page 19). Parameter settnigs must not be made on the BrainCube. The conversions of PIS and LIS
4-20 mA signals are performed by the customer.
To evaluate PIS for the Compresso CPV, check that the pressure in the consumer system is not dis-
played continuously. The process-related pressures in the vacusplit vessel VG are being transferred
during degassing and water make-up.
Content LIS en
Expansion vessels up to 1,000 litres 0– 500 kg → 4-20 mA
Expansion vessels from 1,000 to 5,000 litres 0– 2,000 kg → 4-20 mA nl
The LIS mA signal at 0% and 100% can be determined in the following ways:
• Read off the mA values stored in the BrainCube for 0% or 100% (service level performed by
Pneumatex Customer Service only, at cost),
• Measure the mA signals when the primary vessel is empty (0%) and when full (100%),
• Measure the mA signal with the primary vessel empty (0%), calculate the mA signal for 100% accor-
ding to the size of the primary vessel, and assuming that weight is distributed equally between the
three vessel feet ( 1 litre ≈ 0.33 kg/foot).
pneumatex.com
P compresso CPV 0705
Operation Operating modes
Basic principles
As far as this is possible, the Compresso CPV is designed to be maintenance-free. Operation is con-
trolled and monitored by the BrainCube ( pages 10 | 11). Operating states and deviations from
normal operation are displayed and can if necessary be transferred to the central monitoring station
over the digital outputs or through ComCube communication modules.
In general, auto operating mode is distinguished from standby mode. To ensure safety at work, the
Compresso CPV should be assumed to be in operation when in either mode. Before working on the
electrical components, Compresso CPV should be shut down. Pull out the mains plug (1.2.1).
! Place the BrainCube off circuit. Important: output POT1 | POT2 terminal plan page 20.
auto
After a successful start-up, the Compresso CPV remains in auto mode all year round, whether the
connected heating or cooling system is switched on or off. This is required in order to ensure pres-
sure maintenance.
standby
Standby mode can be selected manually. The pressure maintenance, water make-up and degassing
functions go off, and error messages are not displayed or registered.
menu
All functions of the Compresso CPV can be selected, tested and modified from the main menu.
24
de
fr
en
nl
pneumatex.com
P compresso CPV 0705
Operation Operating modes
check
We recommend carrying out preventive maintenance and a function check once per year. Pneumatex
Customer Service can provide these services for you at a cost.
All the main services are listed and described in the special check menu. You can obtain more details
through direct dialog with the BrainCube.
auto mode is deactivated in the check menu. Messages that occur during function tests, or when
the pumps and valves are being adjusted, are stored in the message list.
Pressure indicator page 10 In check mode, corresponds to the current pressure in the vacusplit
vessel VG. After maintenance work is completed, automode must be activated again.
In addition to following the check maintenance instructions, the following operations/checks are either
required or recommended:
Safety valve
Vent the safety valve (SV) on the Compresso TecBox ( page 7). The valve must blow off.
Please follow the local maintenance regulations and maintenance instructions for the installation con-
!
cerned!
Condensate in vessels
Carefully operate condensate drain KV ( pages 6 | 15) on the primary and secondary vessels and
! allow any accumulated condensate to drain off. Caution: the vessels are pressurised! Water may
spray out.
The quantity of condensate depends on vessel size and operating conditions, and may vary from a
few millilitres to several litres. If the flow of condensate continues for too long, the butyl bag may be
damaged. In this case, please contact Pneumatex Customer Service.
cessary. fr
en
After maintenance work is completed, automode must be activated again.
nl
pneumatex.com
P compresso CPV 0705
Operation Messages
LED flashes
if messages are present
Deviations from selected parameter settings and parameters calculated by the BrainCube, but
operating information is also shown as codes on the bottom line of the display. If a current mes-
sage is present, use push to open the message list.
26
nl Fault messages
Please refer to the terminal plan, particularly for fault messages M15-M19 page 20.
Are all devices connected correctly, are the fuses ok?
If full functionality cannot be restored, please contact the Pneumatex Customer Service.
pneumatex.com
P compresso CPV 0705
Operation Inspection | Disassembly
Inspection
There are no unified international regulations applicable for periodic inspections and system checks
before start-up. Please comply with the regulations at the place where the Compresso CPV is instal-
led. Classification is usually determined by the expansion vessels (2, 3) and the vacusplit vessel VG.
These are CE type-approved in accordance with Pressure Equipment Directive PED/DEP 97/23/EC.
In Switzerland, the Compresso CPV does not require inspection by the SVTI if the system is protec-
ted so that PSCH is not exceeded.
Either flange or endoscope inspection openings are provided for periodic examination of the vessels.
Disassembly
Before inspection or disassembly, the TecBox (1) and vessels (2, 3) must be pressureless and allowed
!
to cool. Operate the vent and drain devices slowly and carefully. The system is pressurised! When re-
moving the polyamide hoses on the air side, please refer to the notes in the «Assembly» section!
! Important: Limited 2. Shut down the secondary vessel while the system is running:
operation only! Then, the Compresso CPV can still be operated with the primary vessel.
2.1 Compresso CPV on auto.
2.2 Close the lock shield valves (5) on the expansion pipes to the secondary vessels.
27
2.3 Shut off the secondary vessel (3) on the air side of the primary vessel (2), and any
additional secondary vessels at the ball valves of the T-branch (3.2.1). de
2.4 Empty the secondary vessel (3) on the water side at the customer’s drain valve.
System under fr
2.5 Carefully open the KV condensate drain at the secondary vessel concerned (3) until the
! pressure
vessel is pressureless. The vessel is now out of service and can be disconnected from the en
(air-water jet)
system.
nl
pneumatex.com
P compresso CPV 0705
Safety
Appliance
! Compresso CPV is a modular, precision pressure maintenance system (± 0.1 bar) with compressors, water
make-up and degassing, for closed heating, solar, and chilled water systems. Applications other than the
ones described require prior agreement with Pneumatex. A declaration of conformity is included and certi-
fies compliance with EU directives. Follow the special regulations applying at the place of installation of the
Compresso CPV.
Follow the instructions
! Assembly, operation, maintenance, and disassembly must be performed as described in these instructions,
and in accordance with best practice. If anything is unclear, please contact the Pneumatex customer ser-
vice. The required commissioning tests and periodic inspections must be carried out according to the re-
gulations of the country where the equipment is installed and operated. Before disassembling any
pressurised components, the expansion vessel and TecBox must be made pressureless.
Personnel
! Installation and operating personnel must possess the appropriate skills and training.
Place of installation
! Access to the place of installation must be restricted to trained and specialized personnel. The floor statics
must be able to support the maximum operating and assembly conditions. The connections for electricity,
mains water, and waste water must be appropriate for the requirements of the equipment. The room must
be ventilated.
Quality of equipment and materials
! The materials used must comply with current regulations and must not have visible damage, particularly in
the case of pressurised components. Welding work on pressurised components, or modification of the
electrical circuits, is not allowed. Only the manufacturer’s original parts must be used.
Observe the parameters
! The details concerning manufacturer, year of construction, serial number and technical data can be found
on the type plates on the TecBox and expansion vessels. The regulation measures must be taken to pro-
vide temperature and pressure protection, i.e. to ensure that the system does not exceed or fall below the
maximum and minimum operating parameters respectively.
Protection against accidental contact
! when high temperatures are present. Thermal insulation measures are usually limited to the expansion pipes
28 and intermediate vessels in heating systems. Caution! Higher temperatures can occur under the TecBox
cover in normal operating conditions. The level of protection from accidental contact as defined in EN60529
de is indicated by the IP code on the type plate.
fr Water quality
! Compresso CPV is designed for use in closed heating, solar and cooling systems with water that contains
en
no aggressive or toxic agents. The Pneumatex airproof butyl bag reliably prevents the diffusion of oxygen
nl
in the expansion vessel(s) and any direct contact between the vessel sides and the water. The entire sy-
stem must be dimensioned and operated in such a way as to minimise the amount of oxygen admitted
through the make-up water or through permeable components. Water treatment systems are to be dimen-
sioned, installed, and operated according to the current state of the art.
Electrical connection
! Electrical wiring and connections must be carried out by a skilled professional in accordance with current
local regulations. The system must be shut down before working on any of the electrical components.
Failure to follow these instructions, in particular the safety instructions, may cause loss of functionality, faults or
even serious damage to the Compresso CPV, and may also result in physical injury. If there is failure to follow
the instructions, the manufacturer can no longer accept any liability or claims under warranty.
pneumatex.com
P compresso CPV 0705
Technical data
The data given on the type plates of the TecBox and vessels and the data given below should be
!
compared with the design and system parameters. There should be no inadmissible deviations.
Full technical information is available in the Zoom (Print) and on the internet at www.pneumatex.com.
Terms
PED/DEP 97/23/EC PS : ..... bar Max. admissible pressure as on type plate
PSCH : ..... bar Max. admissible press. in Switzerland (approval not required),
V | litre as on type plate
TS | °C
TS : 70 °C Max. adm. temperature
TB | °C
PS | bar V : ..... litre Internal nominal volume of pressure compartment,
PSCH | bar corresponds to VN; as on type plate
VN : ..... litre Nominal volume, Pneumatex factory specification,
corresponds to V
Media
Outputs
Compresso CPV TecBoxes should only be operated in the stated output range.
The working point ♦ (P0, VD) must be within the characteristic range of the type installed.
P0: page 11
VD [ l/h] = 0.6 * Q [kW] appoximately, for flow temperatures from 50 °C to 100 °C
VD [l/h] = 0.384 * Q [kW] approximately, for flow temperatures < 50 °C
Q = Heat capacity of all heat generators operating at the same time.
29
5
de
4
fr
3 ♦ en
P0 [bar]
0
0 1.000 2.000
VD [l/h]
pneumatex.com
P compresso CPV 0705
Konformität | Conformité | Conformity | Conformiteit
73/23/EWG | 89/336/EWG
Christian Müller
Quality Manager
pneumatex.com
P compresso CPV 0705
Konformität | Conformité | Conformity | Conformiteit
Der unterzeichnete Hersteller bescheinigt hiermit, dass Konstruktion, Herstellung und Prüfung dieses Behälters den Anforderungen der Druckgeräterichtlinie nl
PED/DEP 97/23/EC in Verbindung mit der gewählten technischen Spezifikation entsprechen. Nicht genannte Ausrüstungsteile fallen unter Artikel 3, Absatz 3.
Le constructeur soussigné déclare que la conception, la production et le contrôle de ce vase correspondent aux exigences de la Directive
PED/DEP 97/23/EC pour Equipements sous Pression en liaison avec les spécifications techniques utilisées. Les composants non décrits sont
soumis à l'Article 3, Paragraphe 3.
The undersigned manufacturer declares herewith that design, production and check-out of this vessel are in conformity with the Pressure Equipment Directive
PED/DEP 97/23/EC in connection with the chosen technical specification sheets. Parts of equipment not mentioned are subject to Article 3, Paragraph 3.
De ondertekenend fabrikant verklaart hiermee dat de constructie, fabricage en controle van dit vat conform zijn aan de drukapparaatrichtlijn
PED/DEP 97/23/EC in combinatie met de gekozen technische specificatie. Niet genoemde uitrustingsdelen vallen onder Artikel 3 Paragraaf 3.
Hersteller/Constructeur/Manufacturer/Fabrikant:
Pneumatex AG
Mühlerainstrasse 26 Christian Müller
CH-4414 Füllinsdorf Quality Manager
pneumatex.com
P compresso CPV 0705
Kundendienst | Service après-vente | Customer service | Servicedienst
www.pneumatex.com
pneumatex.com
P compresso CPV 0705
WCMOIN00020705 - ENOL
| swiss made | Pneumatex – Dynamic Watermanagement
Mühlerainstrasse 26
CH-4414 Füllinsdorf
Tel. +41 61 906 26 26
Fax +41 61 906 26 27
info@pneumatex.com
www.pneumatex.com
Dynamic Watermanagement