TAG. No.

: P-FO -1
PROJ. NO. : TECHNICAL SPECIFICATION FOR Sheet 1 of 1
PROJECT : MB & E manu. plant GEAR PUMP Rev. 0
LOCATION : Kolkata -
APPLI. TO ENQUIRY: AS ORDERED: AS BUILT: LOCATION OUTDOOR

SERVICE Furnace oil
QTY.REQD : OPERATING : 3 SPARE : 0 TOTAL : 3
MANUFACT. TYPE : INTERNAL GEAR / *
CODE TESTING CODE :
OPERATING CONDITIONS
LIQ. PUMPED Furnace oil CAPACITY MIN. 4 M3 / Hr SUBMERGENCE *
PUMPING TEMP. 50 deg C REQUIRED NOR. 15 M3 / Hr MAX. SHUT OFF PR. *
SP.GR. AT P.T 0.9 DESIGN MAX. * M3 / Hr GUARANTEED FLOW * m3//hr
VAP.PR.AT P.T 50 mmHg SUCTION MIN. 11.86 MWC abs PERFORMANCE HEAD * mlc
VISC. AT P. T 164 Cp HEAD NOR. 12.5 MWC abs NPSH (R) * mlc
SOLID CONTENT - MAX. 13 MWC abs EFF *
CORROSIVE - DISCH. HEAD 36.86 MWC abs POWER * kw/hp
DUTY CONT  DIFF. HEAD 25 MWC MAX. POWER *
INT. NPSH (A) 11.1 MWC abs MAX. CAP. *
REC. MIN. CAP. *
CONSTRUCTION
NO. OF STAGES * CPLG TYPE * FLUSHING MEDIA QTY.
IMP. TYPE * CASE SPLIT * LANT RING - -
MIN. * PACKING * THRO BUSH - -
IMP. DIA TRIMMED * BRGS. RADIAL * GLAND - -
MAX. * THRUST * SEAL - -
SPEED * THRUST BAL. BY COOLING MEDIA QTY.
MOUNTING * SEALING MECHANICAL BRGS. - -
ROTA.FACING COUPLING * LUBRICATION STUFF BOX - -
CASING DESIGN PR. * SIZE RATING/FAC SEAL Mechanical *
TEST PR. * SUCTION * 150#,SORF
SHIPPING WEIGHT * FLANGES DISCH * 150#,SORF
PUMP * VENT/DR *
MOTOR * AUX. *
MATERIAL
CASING CS / * IMP. RING * BAL. DISC. *
SHAFT. CS / * IMP. NUT * OTHER INT. PARTS *
IMPELLER CS / * LANT RING * WEAR RINGS *
SH. SLEEVE CS / * PACKING * COUPLING *
STUFF BOX - SEAL * CASE STUDS *
MECHANICAL SEAL * INT. BRG. * BASE FRAME *
DRIVE UNIT
MOTOR RATING * KW MOTOR MAKE KIRLOSKAR/SIEMENS/* FRAME SIZE
TYPE TEFC /Non Flm INSUL. CLASS: B POWER SUPPLY 3Ph,50 Hz,440V
Prf
SCOPE OF SUPPLY DATA DOCUMENTS (P=PRINTS R= REPRODUCIBLE, C-COPIES)
PUMP  DRIVE MOTOR WITH OFFER FOR APPRL FINAL

BASE PL.  CPLG  G.A. DRAWINGS  


FD. BOLTS  CPLG. GUARD  PERF. CURVE   
COMP. FLG.  DRAIN PAN  SECT. DRG. 
SAFETY VALVE
CONV. KIT  PART LIST  

INSPECTION & TEST FDN DRAWINGS 
TEST CERT REQD WITND INSTRUCT MANUAL 
MATL.  - SPARES   
HYDR.   SCOPE OF WORK
PERFOR & STRIP  ASSLY & ALIGNMENT OF MOTOR & PUMP BY SUPPLIER  PUR -
NPSH TEST   MOTOR SIDE COUPLING FITTED BY SUPPLIER  PUR -
NOTES: 1. * VENDOR TO FURNISH DATA MARKED THUS.
2. . PUMP SUPPLY WITH MOTOR
3. PUMP TO HAVE WITH INBUILT PRESSURE RELIEF VALVE
PREP PDP Date 22/6/10
Subject :
ACCENT FURNACE OIL TRANSFER CHKD. PDP Date 22/06/10
TECHNOSOLUTION PUMP
S
Client: HINDUSTAN COLAS LTD. APRVD. VDM Date 22/06/10