Activity ID Activity name

Milestones
A Effective Date of Contract (EDC)
B Finalise LOl Boiler Package
C Kick-Off Meeting
D Availability of Sod data, Freeze Basis of Design and Battery Limits
E Completion of Major Detail Engineering
F Receive at site- Boiller Package
G Mechanical Compietion
Engineering
A Process Engineering
B Mechanical Engineering
C Piping Engineering
D Civil Engineering
E Electrical Engineering
F Instrumentation Engineering
Procurement
Long Lead Items/ Packages
A Finalise Lol - Boiler Package
B Manufcture -Boiler Package
C Transportation & Delivery of Safe - Boiler Package
Electrical / Instrumention items
A Enquiry to order - Electrical/insturmentation items
B Manfacture - Electrical / insturmentation items
c Transportation and Delivery at site- Electrical / instrumentation
Bulk Materials
A Enquiry to order - Bulk Materials
B Manufacture Bulk materials
C Transportation and Delivery at site- Bulk Materials ( Lot 1)
D Transportation and Delivery at site- Bulk Materials ( Lot 2)
Construction/ Erection
A Enquiry to order - civil construction contract
B piling
C Civil & Structural Construction works
D Erection - Boiler Package
E Piping Fabrication / Erection
F Electrical Erection
G Instrumental installation
H Painting / Installation works
I Prercommisioning
J Mechanical Completion
Activity predecessors Start Finish Duration (month)
30-Nov-15 31-Oct-17 23
30-Nov-15
30-Nov-15
25-Dec-15 29-Dec-15 4 DAYS
ery Limits 30-Dec-15
30-Jun-16
28-Feb-17
31-Oct-17
30-Dec-15 30-Jun-16 6
30-Dec-15 31-May-16 5
30-Dec-15 31-May-16 5
30-Dec-15 30-Jun-16 6
30-Dec-15 31-May-16 5
14-Jan-16 15-Jun-16 5
29-Jan-16 30-Jun-16 5
30-Nov-15 28-Feb-17 15
30-Nov-15 28-Feb-17 15
30-Nov-15
30-Nov-15 31-Dec-16 13
1-Jan-17 28-Feb-17 2
1-Mar-16 31-Jan-17 11
1-Mar-16 31-May-16 3
1-May-16 31-Dec-16 8
1-Nov-16 31-Jan-17 3
1-May-16 15-Feb-17 9.15
1-May-16 31-Aug-16 4
1-Jul-16 16-Jan-17 6.16
19-Oct-16 17-Nov-16 1
17-Dec-16 15-Feb-17 1.29
1-Apr-16 31-Oct-17 19
1-Apr-16 31-May-16 2
1-Jul-16 15-Jul-16 15 DAYS
17-Jul-16 15-Feb-17 7
1-Mar-17 1-Sep-17 6
30-Apr-17 16-Sep-17 4- 20 DAYS
4-Jun-17 1-Oct-17 4 -27 DAYS
24-Jun-17 6-Oct-17 3 -13 DAYS
19-Jul-17 31-Oct-17 3 -13DAYS
2-Sep-17 31-Oct-17 2
31-Oct-17
a Optimistic Time (o) m Most Likely Time b Pessimistic Time (p
crash time crash cost labors