Vous êtes sur la page 1sur 7

Toisa Warrior

DP2 Multi-purpose ROV Light Construction Vessel

13/07/16 Toisa Warrior The particulars are believed to be correct but are not guaranteed
13/07/16 Toisa Warrior The particulars are believed to be correct but are not guaranteed
13/07/16 Toisa Warrior The particulars are believed to be correct but are not guaranteed
13/07/16 Toisa Warrior The particulars are believed to be correct but are not guaranteed
Toisa Warrior - charter track record

Visser and Smit Marine (now VBMS): 27th August 2011 – 18th July 2012
ROV support and inter array cable installation at Sheringham Shoal OWF,
including use of MODUS trencher.

Seaway Heavy Lifting: 18th July 2012 – 4th December 2012


Grouting and accommodation support including W2W operations at Gwynt Y
Mor OWF

NDE Group: 14th December 2012 – 23rd December 2012


Air diving support at Global Tech 1 OWF

Bibby Remote Intervention Ltd: 15th February 2013 – 19th November 2013
ROV support including 1 x WROV and 2 x eyeball ROV at various locations.

Petrobras: 15th May 2014 – 29th July 2016


ROV support with Fugro ROVs, 2 x work class ROVs conducting various jobs in
Campos and Santos fields including nitrogen ballasting of mid water buoys.

13/07/16 Toisa Warrior The particulars are believed to be correct but are not guaranteed
Figure 1: Visser and Smit ROV and trenching spread.

Figure 2: Seaway Heavy Lift grouting and W2W spread (Ampelmann)

13/07/16 Toisa Warrior The particulars are believed to be correct but are not guaranteed
Figure 3: Walk-to-Work operations at Gwynt Y Mor OWF

For any questions relating to the charter of Toisa Warrior, please contact the
chartering department on +44 (0) 1252 737773 or chartering@sealionshipping.co.uk

13/07/16 Toisa Warrior The particulars are believed to be correct but are not guaranteed

Vous aimerez peut-être aussi