IR — INSPECTION REQUEST WEST QURNA I SECTION-1 E M bi Contractor No.: AWQ0109 KonMobil 5-7 fect Produced Water Treatment M109, Locarion: 05, | iRNO.ce-co010 IRISSUEDATE: 14 January 2017 DisrPuNe: Gv SsuBiect: | inspection INSPECTION REQUIRED DATE: anvory 2017 | TME«330 FEF SPEORCATION: TGF NPS 0-040003 REV 1 EARTHNVORE REF. DRAWINGS: 1QWQ-CE1091-CDFND-D6-0002 RT 108-100-032 CeQAC OD ODL CV NSPECTION AND TEST PAW (OTHERS REF. [ATTACHMENT /CHECK LIST IF ANY: NAME OF CONTRACTOR/SUBCONTRACTOR: CPECC/ALMADAR, ‘Our request the inspection of the following works for certificate/witness that all items has been properly executed in accordance with approved procedures, specifications, drawings and all items has been coordinated with future works. DISCRIPTION OF WORK TO BE INSPECTED: We have completed marking the tank |QD6-ABJ681050 for the purpose of excavation works. Request inspection ‘COMMENTS: This IRis result of the postponement the provious IR at date 14-1-2017. Ae condtand & evobion ehecited by Mv. heeds ikccerrep ClaccerteD with COMMENTS Oiresecteo Cworkis not ready unacceptable inspection result Osee comments Ci ricK THis 80x IF “NO” ENIL / SOC and if itis a “WITNESS” as per ITP, (by ticking this box means CPECC needs to produce all the related documents and sign / close this R) SIGNATURE FOR NOTIFICATION/ ACKNOWLEGEMENT SUBCONTRACTOR PEC ‘COMPANY ‘OTHERS PRINT NAME: ; PRINT NAME: PRINT NAME PRINT NAME oeinpecar Ma Semy Hossein ShaMer ‘SIGNATURE: ‘SIGNATURE: ‘SIGNATURE KE SIGNATURE: DATE:14-1-2017 pate: £5. ur. Zeid | DATE:

Vous aimerez peut-être aussi