Vous êtes sur la page 1sur 9
IR — INSPECTION REQUEST WEST QURNA I~ SECTION. Contractor No.: AWQ0103 ExxonMobil Project Title: ce Produced Water Treatment M109 LOCATION: DS-7 | IRNO:IRNoCE-C0005 | IR ISSUE DATE: 06 January 2017 DISCIPLINE: SUBJECT: Witness INSPECTION REQUIRED DATE:07 January 2017 | TIME:09:30 REF.SPECIFICATION: 1QWQ-FT-NSPDS-00-040901 REV.1 EARTHWORK, $-CEO109-EMIL-0005 REF, DRAWINGS: 'QWQ-CE1091-LOPLT-D7-0001 REV. D 0S7 PLOT PLAN, S-CE0109-EM/IL-0005 RFF. ITP: 1QWQ-CE1092-CPQAC-00-OOOICIVIL REV. C INSPECTION AND TEST PLAN OTHERS REF.: ATTACHMENT /CHECK LIST1F ANY: | Distribution drawings of test points NAME OF CONTRACTOR/SUBCONTRACTOR: CPECC/AL MADAR ‘Our request the inspection of the following works for certficate/witness that all tems has been properly executed in accordance with approved procedures, specifications, drawings and all items has been coordinated with future works. DISCRIPTION OF WORK TO BE WITNESS: We completed re-compact the original soil(Sub-grade layer) in zone number 1 that contain the 2 points failed in the test of the compaction degree(point No. 1and 3), we are going to retest of these points Also we have been coordinated with AL-FAO lab to come to the site and take test sample. Request witness [ COMMENTS: Men by Contvackey, uals Peas start nxt yer compaction, bli Comment econ By Sepals CANS Reta has Shark aie mack Vege Claccerreo GaxccePrep with COMMENTS Gresecreo fe che dreck Reached | Dworkisnotready ned te choi clon tN | ClUnacceptable inspection result & Resutk re aceap he see comments Ti ck Tats 60x “NO” EMI. /SOC and if itis. a “WITNESS” as por TP, (by ticking this box means CPECC needs to praduce all the related documents and sign / close this IR) SIGNATURE FOR NOTIFICATION/ ACKNOWLEGEMENT SUBCONTRACTOR ‘cPECC COMPANY OTHERS PRINT NAME: PRINT NAME: PRINT NAME | PRINT NAME Metanees e Ma bu “| Yuscein chatle/ ‘SIGNATURE: ‘SIGNATURE: SIGNATURES SIGNATURE: > SE are: 6.2037 DATE: 6) pa) oar 7. 1- Col [pare Figure C-1 specication Deviation Request Form Projet ‘Gontact Number: AWQDI00 = Produced Weler | ConiraciorSuppliot CPE WEST OURNAL [SOR Number ‘SOR Tila: Requatiing taxation compaction | Revision: page T oF S.ceDvOaeML-000s | density for Earth Work To moi Shea Wares waa Wad GT Gaon GSKB, Sel PepaTes, a Tha Sarge” OWGU VAC Wo IT PARTI Roavest Response, and Veriton) SECTION 1 CONTRACTOR REQUEST FOR SPECIFICATION DEVIATION ‘Speceston Number TOWEEFTNSPOS-OUADDOT Seton TEAH Paraareph ‘Spaceaon or Docent aay SPECIFICATION = ERRTHWOR | Gioba Practice Nuriber (Coss eforanc af apectiaion NuMBer @ CPI Wi ‘Dasaipion of Requested Deviation (atach additonal shoots Wnecee=ary ‘spor |QWNG-FT.NSPOS.00-040801 Secon: 18.1.4, Tho dons ofthe tp 150 mm (6 inches) in aroas to receve fil and loading ‘hal net be lee than 96% ofthe maximum Modifed Proctor dens in accordance vith ASTM 1887, Contractor would the to raquest that compacton dans of top scared sll of ogina ayer be changed to 85% in DS7 and 90% of the maximum Modieg Proctor dont n accordance wn ASTI D1587 m DSS & DSB ateas (Note 4 in IGWO-CE1081-CODET. 6i07/08-0001, wl be modfed accordral) [Aso, itis raquast at compaction deraty of he intermediate aye of stuctural fil under the foundations be changed te 62% ofthe ‘maximum Medifee Proctor dens in accordance with ASTM D18S7 keeping the fra layer to 85% as mentioned in earth work noto 9 Of en genera note ]QMG-FT-C8STO-00-0004) | Disipine Crar Equipment Type NA ‘Reason for Requested Doviaton (aaah adiional sheats Wnecassaty) 17 constuction area locates low marshy area, 1.3m lowor than surrounding area¢ and tho existing soakod sol has high water conten (24-35%) Als, fs aralny season wih smal evaporation In aq and tere fo dry so fo mc wh the s-grade sol. {ansumes mote than 20 days te dry 200rmn thickness of orginal clayey soi flor natral water content (92936) to otra var Content (17%-21%) Hirai, the bme of cuting down water contents longer. Only Mf sol resches eptiral water content (17%-21%), ‘he dry donsty of ecarile ayer can reach 92%. Since lage thickness of Say ool layer Is boneath the scared sl ayer, compaction density of 859 of proctor dansy cannot be reached a al [Als teonsumes more than 10 days for 200mm thickness of erga clayey sollto dy trom natural water content (32%:35%) to water content of 20% to achiove 5% ofthe maximum dry mecied procter deny, when isnot aning ‘REach documents wih aU TVoTaton Tequred To evaluate We Govan (oe , PBIDG, ISOS, Nalaral Solocion Werkaheas, ‘aleulaons). ‘Atachmonts provided? ‘Yes Clittyes, provide ist here) No Ed | Roterence any a5z0caT63 NOR, 1, RFI COnGHEHOn REGUEEL CAR, I, OF aTaT | Br One:tine Deviation fo Proje Spec Requirement [L1Permanent Change to Project Spec, Appicabla to Al of Currant Project Werk lf deviation Is approved, Contractors required to ‘date Project Spec and reissue) Tis i one-tine Tevston, dascibe MECad equpTeT Campana (HCUa tag AUT, ¥ BPHNCAEG) and Toca: For, Earth Werk inside O86, DS7 and DS8 pet around all equipment and facies. Name Moke, Nauahad Wavaz FRequeete’ Organization’ CPECC Date TORT ‘equating Orgarieston Approver Pasion ‘pprovl Signature and Date Taal nae ChiStuctural Engineer Inivoaereanss

Vous aimerez peut-être aussi