Vous êtes sur la page 1sur 1
esata 00086 Terral by ape ad (Coastal oad) Curing execution o he Works. proausion in the etsing APCo an PII lems and pont operaane onthe xing nasa soy he now Dry Suk seared pr oes wi continue ‘he erat ocaton an boundaries of he Ste wl depend onthe particular Secon and InePian for Constcton ahs paca Secon an sho be dete y the Empayer "coneulon he Contract proto Cammencemnt the Wks on Ste era areouar Section ‘The Contactor sal city he Employer in advange of ny ay nc nthe Works 3:3 Location tthe Contractors Construction Site Paraftheexising APCo terminal the storage fsa may be used by the Contador ‘orofies and dorapeo! materials, Th aca lead a he seaside othe Coasts ‘non ty ~ Inview fhe relate sal se ofthis conetucton site, te Cortastor may vs a hal be sranged bythe Contractor wih th Agsba Deelopennt Capea (ADC), 34 Provaling climatic, environmental end operat “The folowing climatic envienmanta nd peratnal condone preva a the Site Low PMC) 24 mast 2 High (Arce a7 mst + AnGenttenpersire 2 tiinon | 5 2 Manu ety cad 2 Wetsuit Paes + Reve Honity 3-08 % 2 Rena + oy maxnam 68mm Hout maximum 38 om + femal avenge 3mm + erhaiate ozone one in UAC code + wind spena resonant ind ae kom the Neth o Nor Noth West, tess fluent Soden winds conu Which an tenth higher wed spose + ‘Sabi ‘Seo gusts at 1m above ground {1 esgn Vind Speed, rom allectons 130" kmh ‘Moan anna! wn speeds massuod at King Husson Itematonal AipartinAgabe fanged om 4:40 10 2unai (2 26m/enc tos 2omiee) the pid 1995-2002 “The ables inate hatin th paras 1976-2000 mes hou wind speeds ware les 1 not (623m) fo 88% of he tine. Wind spond exposed 2 knots

Vous aimerez peut-être aussi