TRACT€B€L engineering
Gz>f~ jsx/ez aihind
TABLE OF CONTENT
Sr No Description Page No
1 PURPOSE 3
SCOPE
REFERENCE
EQUIPMENT
MANPOWER
6 METHODALAGY 4-10
HSE 10
8 DOCUMENTATION 10
^t:
JPL/GSPL/GSFC/ML/WP-OI 02
TRACTGBa engineering •i W
• •
"mm.
1.0 PURPOSE
To indicate the pipeline route at site including the ROW limits. Pipeline
alignment, Pipeline chainages, crossing limits, identifying the existing
pipeline in common ROW etc., in accordance with the route maps and
crossing drawings.
2.0 REFERENCE
3.0 EQUIPMENT
Ranging Rods
Pipe line locator / cable locator
Survey Umbrella
Wooden stakes
CONSTRUCTION REQUIREMENTS
Prior to the possession of land, an access to Site Protocol will be agreed with
GSPL. The entire pipeline route will be established with reference to the
route maps and alignment sheets approved by Company. The Pipeline route
survey will be carried out by means of calibrated survey equipments like
total station thredolite, dumpy level and ranging rods etc... Benchmarks,
inspection points and other required markers would be installed. (JPL)
Surveyors will carry out all survey works.
JPL will ensure that the pipe line defining trench centre line shall be staked
by placing suitable painted marker stakes at TP's and IP's between
consecutive TP'S.
The pipeline centre line shall be staked on the ground, the TP's shall be
staked on the ground, After locating the marking the TP's the intermediate
points shall be staked at the intervals of 500mtr. Along the Trench centre
line of pipe line.
The inter section points and TP's shall be serially numbered from the
starting point.
BENCH MARKS
Permanent bench marks approximately every 1 kms or permanent
structures on or off the Right of use shall be established and described.
Additional bench marks shall be established near the major pipeline
crossing sites.
The normal width of the ROU will be 20 m. On certain locations, the width
may be restricted due to imposed site conditions. The regular restricted
working width shall be defined on approved alignment sheets, normally it
will be 5 mtr. JPL will ensure that the width of the working strip will be
visible at all times. Surveyor will locate, identify and notify the existing
features or obstructions along the route that are not shown in current
alignment sheets, maps and drawings. If the existing alignment cannot be
k. DOCUMENT NO. REV
\ St
PIPELINE ROUTE SURVEY
Page 4 of 8
JPL/GSPL/GSFC/ML/WP-01 02
TRACTGBGL engineering
GOF-Swez Km
wmmmmmmmm
JPL will ensure that the working width shall be kept clean during the
construction period.
the distance in the poles &tower son each side of survey lines should be
measured. Survey line shall be established so that a minimum distance of
50mtr from survey line to nearest high tension pole or tower is maintained,
i. Existing Pipelines: Topographical survey of existing pipelines in
consultation with Client shall be carried out by JPL and data containing co
ordinates shall be supplied. Any marker of the existing pipeline will be
surveyed and copy of Drg. will be handed over to GSPL/PMC/TPIA. In case
certain marker post removed temporarily the same shall be put back with
the help of above drawings.
5.0 CHAINAGE
- Linear detail survey, sub meter accuracy (less then 1M in 1 Km) is
required by using length precision thredolite / Total stations.
- Poupulation Density survey &location class along the pipeline route will
be carried out as per specification GTS/7/0034 Chapter IV. A zone of
400m width is to be considered along the pipeline route with proposed
pipeline in the centre of the zone.
- Approval master plan for the area along the foreign route of pipeline will
be submitted prior to the work for route survey.
- Horizontal angle will be measured clockwise from the back station to
front station. All routes & observations related to the basis for
determination of the boundaries lines / corners will be mentioned during
the survey.
- Stack distance will be measured using 50 m steel tape or 30m chain. In
case of abrupt slope the tape will be straightened parallel to the
probable grading.
- Distance between Intersection Points staked along the pipeline route will
be measured and recorded. Distance between level points shall also be
measured and recorded.
- Chainage will be continuous in direction of survey
- True bearing of all straights shall be observed and recorded.
- Data on nature of terrain, viz. sandy, stony, vegetation, etc. and type of
ground will be recorded along with chainages of change points.
8.0 DOCUMENTATION
In case of any conflict between the requirements of this procedure and that
of above referred specification then requirements of latter shall govern,
until and unless specific intention is meant.
INSPECTION TEST PLAN FOR : INSPECTION AND TEST PLAN FOR PIPELINE ROUTE SURVEY
W ^SM~ lJ
Installation of TBM / PBM, etc
^|0
Calibration of Instruments / Health check of equpm. w ^RM'^.
Staking , survey of markersfor IP, setting of referfence w RM RM
marks outside ROW limits.
Establishment of width with reference to existing pillars as RM RM
w
per alignment sheets.
Crossing w
^R«V JWThJ
Clearing of Bushes, Crops etc w RM RM
10
P=PERFORM R=REVIEW
name ftl~Jfjnd£y
'j.5/©3/7©
r~
I
^^--i
^-""
y^
y (—
y
x •5/ y
av
y ^ /
/
_/
C^
z^S /
/
TODAY'S PROGRESS
^
PREVIOUS PROGRESS
CUMMULATIVE PROGRESS
SIGNATURE SIGNATURE
DATE
I^/£Lr
t<rvJo/2> [ID
SIGNATURE
DATE f( i -$\
GSFC Sikka Connectivity Spurline Project
TRACT6BSI engineering
mmmmm
Drawing No.
Reference :
S tt Chainage BS FS HI RL Remarks
Q r
**-
V
«
*
£
C7
z_Z
FORCEIL FORT Te/l / GS/l
NAME NAME NAME
DATE DATE
\3J^ ?To DATE
TRACTEBa&pffiM
II
GSFC Sikka Connectivity Spurline Project G? GOFSrtZ
PiaafHiiriaaKrai
Doc. No. : JPL/GSPL/GSFC/ML/QC/IR-01
CLIENT : M/S GUJARAT STATE PETRONET LTD.
Rev. : 00
CONSULTANT : M/S TRACTEBEL ENGINEERING PVT. LTD.
: M/S CERTIFICATION ENGINEERS INTERNATIONAL LTD. Report No. :
TPI
Date :
CONTRACTOR : M/S JAIHIND PROJECTS LIMITED
•HSPFCTION REPORT •ftPS COORDINATF DURING LOWERING WITH PIPE COVER