Académique Documents
Professionnel Documents
Culture Documents
Personal information:
_________________________________________________________________________
Full name: HỒ TRUNG TĨNH
Birthday: 02/12/1988
Gender: Male
Mobile: 0982 496 305
Email address: hotrungtinhkt@gmail.com
Address: Thuan An commune, Binh Duong city
Capabilities:
- Over 7 years experience in NDT/QC/ welding inspector.
Education:
- Da Nang university of techonology, Viet Nam.
Other trainings:
02/2019 :ASNT MT level III. (Cert No 296482 ; Expiry Date : 02-2024).
01/2019 : SNT-TC-1A PAUT level 2
10/2018 : ASNT UT level III. (Cert No 296482 ; Expiry Date : 10-2023).
10/2018 : ASNT RT level III. (Cert No 296482 ; Expiry Date : 10-2023).
10/2016 : Certificate CSWIP 3.1 Welding Inspector issued by TWISEA (CSWIP Cert No
111361 ; Expiry Date : 09-Sep-2021).
06/2015 : Certificate CSWIP RI level 2 ( radiographic interpretation) issued by TWISEA
(CSWIP Cert No 99006 ; Expiry Date : 19-Apr-2020).
03/2012 : Certificate UT,RT level II SNT-TC-1A.
09/2011 : Certificate MT,PT level II SNT-TC-1A.
Foreign Language:
- English (good)
Employment record:
Duration Company Position
Mar-2019 until now SamSung engineering CO.LTD
Mar-2018 to Now PetroVietnam Steel Pipe JSC NDE/QC/Welding
(PVPIPE) engineer
Dec-2017 to Mar-2018 Nghi Son Refinery & Petrochemical QC Welding Inspector
(NSRP) ( Welding project)
Mar - 2017 to Dec-2017 PVE – Petrovietnam Engineering QC Welding Inspector
Consultancy JSC
Sep - 2014 to Mar - 2017 PetroVietnam Steel Pipe JSC NDE/QC/Welding
Page 1/4
CURRICULUM VITAE
(PVPIPE) engineer
Jul - 2011 to Sep - 2014 Doosan Heavy Industries Vietnam NDE Suppervisor
company
Page 2/4
CURRICULUM VITAE
- Ensure that all records of inspection and testing reports are properly. maintained
and well coordinated with all concerned.
- Ensure that all welding activities are properly in accordance with client welding
specification requirements.
- Preparing documents for extending valid of welder.
- Monitor welder performance and prepare method statement for welding repair and
welding sequence.
- Preparing all QC’ reports, (ex. Fitup reports, visual reports, summary,…).
- Perform the inspected activities as fit-up preparation, visual inspection, NDT
performance, final inspection.
- Update the Input Date record daily and weekly and report to Management.
From Jul - 2011 to Sep - 2013: Doosan Heavy Industries Vietnam Company
Project:
- Ras Al Khair Evaporator 3 units
- Ras Al Khair Steel Piping from
- Ras Al Khair Eva. Piping Spool
- Ras Al Khair Flash Tank 8 units
Position: NDE Suppervisor
Main duties:
- Review RT film and perform UT.
Page 3/4
CURRICULUM VITAE
Certification:
I, the undersigned, certify that to the best of my knowledge and belief, this data correctly describe
myself, my qualifications and my experiences. I understand that any willful misstatement described
herein may lead to my disqualification or dismissal, if engaged.
Page 4/4