LEAN DEPLOYMENT OBSERVATIONS
DO YOU DO YOU
SEE? SEE?

Visual Factory
NON-LEAN LEAN
No notification/information boards (Andon) Use notification/information boards
No/little evidence of Lean Metrics used Demonstrate use of key Lean Metrics
Variation in work performance Standardized Work form prominently displayed/
Standard procedures not being followed workers knowledgeable
Dirty, cluttered, messy work areas Workers do the job the same way every time
Messy bathrooms Sparkling clean machines, tools, work areas & bathrooms
Materials piled everywhere
Designated area for full/empty containers
Unmarked gauges & tools
Marked gauges & key equipment
No min/max levels at line side
Empty shadow boards, tools missing, disorganized Min/max levels clearly marked
Oil dry on floor, pig socks used, overflowing pans, Shadow boards for tools that are used & maintained
puddles of fluid on floor Shiny clean floors; painted

Evidence of Teams
NON-LEAN LEAN
No production data visible (or outdated) Team data prominently displayed
Lack of conference rooms for teams to use Quality data, production real-time data,
Suggestion campaign old, suggestion box not active, problem solving evidence, training depth chart
little implementation of suggestions accepted Available team meeting areas
No problem solving involvement at operator level Teams implemented many of their own suggestions
8D/5P done in quality level Proof of problem solving activities in many places in plant
Team not actively involved in standardized work activity (fishbone diagrams filled out & displayed, PDCA cycle
or work flow being followed, 5 Why’s)
Aggressive Team Standardized Work input

Changeover
NON-LEAN LEAN
Usually done by one person Changeover done by team
No tracking of changeover time Clear internal/external task identification
Most work done when machine is down Changeover chart tracks times, improvements,
Lack of standardized methods goals & ideas
- no specific work task/procedures identified
Use of changeover cart, visual organization used,
standard method

Pull Systems
NON-LEAN LEAN
High level of inventory on lines & in plant - shipping & receiving Low level of inventory on line & in plant
Material waiting & stacked at line side Real kanban system in use
Delivery time of materials unregulated Material delivered frequently to line side
Centralized schedules without Takt times Use of small supermarket areas
Products "pushed" to next area
Localized/customer demand with Takt times
www.visualworkplaceinc.com
LEAN DEPLOYMENT OBSERVATIONS
DO YOU DO YOU
SEE? SEE?

Returnable Containers/Dunnage
NON-LEAN LEAN
Cardboard Containers Reusable containers (plastic, metal) recycled between
Wooden Pallets company & suppliers
Large number of parts/containers Small number of parts/containers

Layout & Good Material Flow


NON-LEAN LEAN
Insufficient, poorly-spaced docks Point of use shipping & receiving docks
Cluttered staging areas Visually clear and simple staging areas
Warehouse/storage poorly placed for continuous flow Well-placed small market area
Designated scrap areas that are full Little scrap/use of mistake-proofing
8D/5P done in quality level Short conveyors, min/max levels marked
Long conveyors, full of WIP

Lean Process Flow


NON-LEAN LEAN
Assembly running much faster than customer requirements Assembly tied to customer requirements
Large buffers/production push product Small buffers used sparingly to de-couple major processes
Large off-line repair bays Production pulled from prior operation

Cell Design
NON-LEAN LEAN
Inefficient assembly configurations U-Shaped cell/no wasted motion
Assembly long way from point of use Cells adjacent to point of use
Storage of completed materials (more than 1 day's supply) Sub-assembly and raw materials storage of 4 hours
to support production

Machine Stability
NON-LEAN LEAN
Little visible evidence of preventive maintenance process Maintenance scheduled, posted & carried out
Frequent breakdowns & no tracking Breakdowns fixed quickly & prevented
No overall equipment effectiveness data OEE at 85% or better (posted & tracked by teams)
No study/analysis into major losses

1099-V0810