Vous êtes sur la page 1sur 6
IR — INSPECTION REQUEST (WEST QURNA |= SECTION-1 M bil Contractor No.: AWQ0109 Exon obi Project Title: jeco Produced Water Treatment M109 LOCATION: 05-7, | IRNO:IRNoCE-C0013 | IRISSUE DATE: 17 January 2017 DISCIPLINE: Civil supsect: Witness INSPECTION REQUIRED DATE:19 January 2017 | TIME:09:30 REF SPECIFICATION: 1QWA-FT-NSPDS-00-040001 REV.1 EARTHWORK, S-CEO109-EMIL-O005 REF, DRAWINGS: 1QWQ-CE1091-LDPLT-D7-0001 REV. D DS7 PLOT PLAN, S-CE0109-EMIL-0005 REF. ITP: 1QWG-CE1092-CPQAC-00-OODICIVIL REV.C INSPECTION AND TEST PLAN OTHERS REF: ATTACHMENT /CHECK LIST IF ANY: NAME OF CONTRACTOR/SUBCONTRACTOR: CPECC/AL MADAR ‘Our request the inspection ofthe following works for certfcate/witness that all tems has been properly executed in | accordance with approved procedures, specifications, drawings and all items has been coordinated with future works. DISCRIPTION OF WORK TO BE WITNESS: After backfiling, we have scarified and rolled the first layer, and have coordinated with AL FAO laboratory to take ‘several points for purpose compaction degree, Request witness. ‘COMMENTS: waiting the Resale only. Zaccerreo DaccepTep wit COMMENTS Gresecreo Diwork is not ready Dlunacceptable inspection result see comments CI Tick THIS BOX iF “NO” EMIIL / SOC and if it isa “WITNESS” as per ITP, (by ticking this box means CPECC needs to produce all the related documents and sign / close this IR) SIGNATURE FOR NOTIFICATION/ ACKNOWLEGEMENT SUBCONTRACTOR I cPECC COMPANY OTHERS PRINT NAME: PRINT NAWE: eae PRINT NAME Mohammed Alasadi Ke | va Shel acengineer Me Org Yassen Srhec ‘SIGNATURI ‘SIGNATURE: = nee ‘SIGNATURE: ae a& 7 DATE: 171-2017 DATE:17-1-2017 pate: /7. Jan. Qe) 7 | pate: aquest Farm Propet ‘ConivaciNumber AVIQOTOO™ Produced ‘ContactoSupplor: CRECC WEST QURNA| 'SOR Number ‘SOR Tilo: Requosing obvaton in compacion | Roveons Page Tota S.CEDIOeEML-0008 | density fr Earth Wer Te RE A WS RET I PTE aT CHS DTSA VT TRS, PARTI ‘qs, Response, and Vatican) ‘SECTION 1 CONTRACTOR REQUEST FOR SPECIFICATION DEVIATION ‘BpacicolonNuriber”1GING:FTNEPDS 00 04007 Section: T814 Pareaipr ‘Specicaton af Dasani Tie" SPECIFICATION - EARTH Gaba BSS Waar (CHS STARR Spe naar TS GPF" NE ‘Baan o Raqestou Doviion inch atonal shoots W recone ‘As ger JQWO-FT-NSPOS-00-040901 Section: 18.14, The densi of te top 150 mm (6 inches) in areas to recave fl ardloadng ‘hal nt love than O53 ofthe maxamum Redied Proctor dentin acct dance with ASTM DISS7 ‘Contractor would koto requast hat commpacton density oop scart soll ofa ayer be changed to 88% In O57 and S0% of {he vexinum Medted rosa: denatyn acoreance with ASTHY D165? m OBS & DEB ares (Not in GWELCEOG|-CODET- DEV07/0e O001, gl be modes acsordngy ‘Alc, tis raquasthat compaction dost of he intormatlato layer of structural ll under he foundations be changed o 92% of ho Iravimum Mesias Proctor denety in aocrdanee Wah ASTM 0857 Heesing te final yer o 95% as mentoned near work ote fehl ganra note (GIMA-FT-CBSTO:00-009, Disipine Coe Eaaipvart Typar WR ‘Raab Tr Russie DaviaTon (tach adinal cote Wnecoaeah ‘087 construction area locates low marshy rea, 13m loner than suroundng areas andthe ensting soaked Sol has high water ‘content 36%). Als, fsa rin season wih smal evaporation in aq and theres o dy sot rich the sub-grade so. {consumes more han 20 days to ary 200rvm thickness of onal lysy ol for alr wats center (26-36%) to opal wat ontat (17-21%) rata the bs a uting down wate content = nger Only sb raachesepinal water anton (17%-210) the ay density of scared iajor can roach 82%. Sco large thickness of clayey sol aye's area tw scat so ayer orpacton dons f 95% of proctor dens cannot bo reac a al ‘ise, ceneumes me then 10 dae for 200mm thsknees of signal Sayey aol dry rom natural water content (32%-38%) te water ‘conte of 26% to acleve B54 the maxim ry moded protor dani, when ff ne ining “Reach docu wih ‘aleultion). ‘eacrmsents provisos? ‘Yee [oye provide lit hrs) No Bd Tioratonreqared eo evaluae the davalin (og, PAID SOs, Material Stein Worksheets, Tefovanca any aszedatod NOR, YO, RF Conazsson Request CAR. ei, ot oriat NIA Phone ‘nome Daviaon to Proj oe Onan Porrsert Change le Prjoc Spee, Applcabis oA of Curent Projet Wi deviation s approved, Contacto i equied 'o Update Prefect Sper and lssue) Tis a one tine deviation, doscibe alae equprcompanei insuaigtag hun, FappIcaBa) a ocean For, Earth Vio inside 08,087 and 058 plot sround al equipment nd facies, amar Wohd: Nauahed Wawa Requosifs Organization” CPEOC : Baio 02042017 Requesting Organization Approve’ Posion ‘eprval Signature a Date easton CGstrvcural Engneor ercastaesy Figure 6-1: Speciation Deviation Requvel Form 2 1 Pispet ‘Gores Numer: AWODIOG - Produced Water | CorraclrSuppfor” CPECC 1 WEST QUANA ‘SDR Nurber ‘SDRTile: Requosing axatan incompaction | Revisor: 6 Page 2atZ S-CEDIOSEI.0005 | censty fr Exh iors {a RE Ee aa eGR, SHEE PR, i TING OH Van We AT "SECTION 2 COMPANY RESPONSE TO DEVIATION REQUEST (TO BE COMPLETED AFTER PART II IS COMPLETED) Pana aaron EEO AFTER PART IS COMPLETE eee ——— [Chdevation is technical accoptabe ont implemented wah ‘Cline rant aerate (£00 comments) icepons a conten descbed loco canons ole: Ono of eso boxes mus be slot fr Company Raeponeo Tobe vale change Proposal reaited, Contraco shal propare sed oan Company approval of a Chango Propotal porto implementation gianyaeiatonassocted wih hs eqs nol requed. Proceed with air Sos keto shane Proposed Compacton levels ave acceptable ‘Is Contractor verification of implementation tecpired? Tver Bite jena andaaans 3 rane By Engiwang Novag Vlas a vs recs gee strat £2. | operations Geen | eta Coielersie iconatnetion osse Greve 5). Compt Bsuoir. ner ‘Response Enginoor whe prepared response sAnl-Dar4} Fr Enginooing Wanagor a7 he regio tre and Date (OG alt conpation of Sec 4 8'as VOLE Toes PRAMS ete: SECTION 3 CONTRACTOR VERIFICATION OF IMPLEMENTATION Tiflrneratan Aetans Congloed by Contactor ave the Proje Spacicnone boon changed rao davon? Dives Tinat Rogues Cartier Se Lead Senate ate | PI Rosporae Engineer Sinatra Data

Vous aimerez peut-être aussi