Vous êtes sur la page 1sur 2

POWER SYSTEMS PERFORMANCE UNIT

2 Days FAT : (OCT 16-17, 2017)


OUR Ref. : 2017-1019-1T-01

CERTIFICATE OF PARTICIPATION
CERTIFICATE Awarded to :
OF PARTICIPATION
Awarded to :
MACHNUN ARIF
(QA/QC Electrical Engineer for GRATI CCPP Extension Project 450 MW)
MACHNUN ARIF
(QA/QC Electrical Engineer for GRATI CCPP Extension Project 450 MW)
For his participation in the Joint Inspection & Technically Discussion ;
STG-UAT Transformer
(3participation
For his Ph, 50 Hz, 15.75/6.3
in the kV, &10/12.5
Joint Inspection TechnicallyMVA)
Discussion ;
Shop inspection and test plan & procedure are described on the rear page of this certificate
STG-UAT Transformer
(3 Ph, 50 Hz, Other 15.75/6.3 kV,of10/12.5
Factory Visit ; MVA)
Shop inspection and test plan & procedure are described on the rear page of this certificate
HV Transformer Division (500 kV)
Other Factory Visit of ;
HV Transformer Division (500 kV)

Jun-ho song

HYOSUNG CORPORATION
144, Yeondeok-ro, Korea 51528
Tel: 82-55-268-8230 Fax: 82-55-268-8531 Project Manager
www.hyosung.com POWER SYSTEM PERFORMANCE UNIT
POWER SYSTEMS PERFORMANCE UNIT

Shop inspection and


ITP N0. ITP-JR-17003-1
test plan & procedure
3Phase 50Hz 10/12.5MVA 15.75-6.3kV Dyn 11
Rev. No. A Page No. 2 of 8
ONAN/ONAF with OLTC on HV side

Inspection & Test Plan


Applied
Classification Description of Inspection/Test Hyosung LEC Client Remark
Specification
A. Routine Test

1. Measurement of winding resistence IEC600076-1 H W W


2. Measurement of voltage ratio IEC600076-1 H W W
3. Check of phase displacement IEC600076-1 H W W
4. Measeurement of insulation resistance (Winding/Core) IEC600076-1 H W W
5. Measurement of short circuit impedance and load loss IEC600076-1 H W W
6. Measurement of no-load loss and current IEC600076-1 H W W
7. Test of on-load tap changer Approved Drawing H W W
8. Applied Voltage Test IEC600076-3 H W W
9. Induced Voltage test IEC600076-3 H W W
Factory Test
10. Local Control Panel. Auxiliary Equipment test Approved Drawing H W W
Plan IEC600076-1 H W W
11. Oil Leackage test
12. Measurement of power factor & capacitance IEC600076-1 H W W
13. Measurement of low voltage excitacion current
magnetic balance test Reference value H W W
14. SFRA Test Reference value H W W

B. Type Tests

1. Fullwave lightening impulse test IEC600076-3 H W W


2. Measurement of zero sequence test IEC600076-1 H W W

H: Hold Point W: Witness Point R: Report Review


Remark LEC: LOTTE E&C Client: PLN/PLN ENJINIRING INDONESIA
Type test to be carried out on one unit of the same tipe

Kwanho Choi

HYOSUNG CORPORATION
Assistant Manager
144, Yeondeok-ro, Korea 51528
Quality Manager Team _ Transformer
Tel: 82-55-268-8230 Fax: 82-55-268-8531
www.hyosung.com POWER SYSTEM PERFORMANCE UNIT

Vous aimerez peut-être aussi