SS (SR) 09/2015
NOVEMBER 2014
GAUTENG PROVINCE
PREPARED FOR:
PREPARED BY:
TEL: +27 (0)11 668 0724 TEL: +27 (0) 11 954 3835
FAX: +27 (086) 6922903 FAX: +27 (0) 11 954 6565
Table of Contents
1. EXECUTIVE SUMMARY........................................................................................................................ 4
2. BACKGROUND AND PROBLEM STATEMENT .............................................................................. 5
3. OUTLINE BUSINESS CASE ................................................................................................................. 5
5. PROJECT SCOPE .................................................................................................................................. 6
6. REGULATORY REQUIREMENTS ....................................................................................................... 6
6.1 Environmental Impact Assessment .......................................................................................................... 6
6.2 Geotechnical Studies ................................................................................................................................ 6
7. CONSTRAINTS AND ASSUMPTIONS ............................................................................................... 7
7.1 Physical Constraints.................................................................................................................................. 7
7.2 Financial Constraints ........................................................................... Error! Bookmark not defined.
8. STAKEHOLDERS AND COMMUNICATION ..................................................................................... 7
9. PROJECT MANAGEMENT TEAM STRUCTURE ............................................................................. 7
10. TIME FRAME ....................................................................................................................................... 8
11. PROJECT FINANCES ...................................................................................................................... 8
11.1 Professional Fees .................................................................................................................................... 8
11.2 Cash Flow Projection .............................................................................................................................. 9
12. PLACES OF WORK ......................................................................................................................... 10
13. SITE CLEARANCE ........................................................................................................................... 10
14. DELIVERABLES ............................................................................................................................... 10
15. MILESTONE....................................................................................................................................... 11
16. SUCCESS CRITERIA....................................................................................................................... 11
17. REPORTING REQUIREMENTS AND MEETING SCHEDULE ................................................. 11
18. GUIDELINES AND STANDARDS .................................................................................................. 12
19. QUALITY ASSURANCE AND CODE OF CONDUCT ................................................................ 13
20. RISK MANAGEMENT ...................................................................................................................... 13
20.1 Health and Safety Risks ........................................................................................................................ 13
20.2 Financial Risks .......................................................................................... Error! Bookmark not defined.
21. PROJECT APPROVAL REQUIREMENTS................................................................................... 13
22. PROJECT SPONSOR ...................................................................................................................... 13
23. ACCEPTANCE .................................................................................................................................. 14
Page 2 of 14
Table of Tables
Table 1: Project objectives and desired outcome .............................................................................................. 6
Table 2: Project Management Team Structure .................................................................................................. 7
Table 3: Time Frames Related to the Project ..................................................................................................... 8
Table 4: Professional Fees .................................................................................................................................. 9
Table 5: Cash Flow Projection .......................................................................................................................... 10
Table 6: Reporting Deliverables ....................................................................................................................... 11
Page 3 of 14
1. EXECUTIVE SUMMARY
MORAD Consulting Engineers was appointed by Mogale City Local Municipality for the
Upgrade of Muldersdrift Sports Complex Project. This Project Charter forms part the
Consultants’ appointment and covers the strategy for the planning, designing, tender
documentation and contract administration of the upgrade of Muldersdrift Sports
Complex as per the subject project requirements.
Morad undertook site investigations at Muldersdrift Sports Complex with the view of
establishing the extend of deterioration of the facilities at the swimming pool. The
investigations showed that there is need to upgrade the Muldersdrift Sports Complex.
The allocated budget for the project during this financial year is R 500 000.00, all
inclusive. The total project cost estimate for the construction would be R410 000.00
including contingencies and VAT. The professional fees would be R90 000.00
including VAT. The duration of the construction will be 6 months.
Page 4 of 14
2. BACKGROUND AND PROBLEM STATEMENT
Morad undertook site investigations at Muldersdrift Sports Complex with the view of
establishing the extend of deterioration of the facilities at the swimming pool. During
the investigations, it was discovered the following;
The steel sports pavilion sits right onto the edge of the sports field and it needs
to be moved by 7 meters backwards.
The soccer field sits right on to the edge of the buildings and it needs to be
moved by 3m away from the existing buildings
The soccer field needs to be expanded.
The soccer goal posts need to be relocated together with the soccer field.
Amongst other mitigation measures that could be done, Morad recommended moving
of the sports pavilion and soccer field.
To meet this target, Mogale City Local Municipality assigned Morad Consulting the
Upgrade of Muldersdrift Sports Complex project in-order to assist in coming up with an
engineering sound solution to relocated the sports pavilion and soccer field.
Page 5 of 14
4. PROJECT OBJECTIVES AND DESIRED OUTCOME
The major objective of this project is to complete the Upgrade of Muldersdrift
Sports Complex by the end of the 2014/15 financial year as follows;
Quart end Sep Quart end Dec Quart end Quart end Jun 2015
2014 2014 Mar 2015
Stage 1: Prepare a Stage 2: Final Stage 3: Stage 4: Upgrade of
report to request Designs and Bid Tender Muldersdrift Sports
Permission from the Specifications process Complex completed:
MM to assign the Completed. completed
Project and draft and
Designs. contractor
appointed
5. PROJECT SCOPE
The project scope is as follows;
Relocation of the steel sports pavilion by 7 meters.
Relocation of the soccer by 3m from the existing buildings
Expansion of the soccer field.
Relocation of the soccer goal posts.
6. REGULATORY REQUIREMENTS
This project is not listed under the Environmental Impact Assessment Regulations
Listing Notice 1 of 2010, hence there is no need to conduct an EIA.
Page 6 of 14
7. CONSTRAINTS AND ASSUMPTIONS
7.1 Physical Constraints
The upgrade of the swimming pool is being done on public facilities which are
being utilized by the public at the moment. Simultaneously carrying out the
refurbishments and using the facilities is going to be a huge challenge and this
might mean closing some or all of the facilities at some point to allow the
upgrade to go on.
Project Team
Project Team Role Organization Email
Member(s)
Executive Manager: S. Mathebula Mogale City Local
Social Services Municipality
Manager: Sports, Art , Bertha Mogale City Local
Culture and Recreation Bongopane Municipality
Page 7 of 14
Additional team members will be introduced as required for the successful completion
of the project. Only skilled and experienced staff, professionally registered where
appropriate, will be assigned to the project.
Inceptio
n
Concept
and
Viabilit
y
Design
develop
ment
Docume
ntation
and
Procure
ment
Workin
g
drawing
s
Constru
ction
Stage
Close
Out
Legend:
Planned Tasks
Completed Tasks
Fees will be calculated according to the fee scales agreed in the above contract, for
Page 8 of 14
the following stages as defined in the Engineering Professions Act (Act 46 of 2000)
3.0 DISBURSEMENTS
ITEM DESCRIPTION RATE QTY AMOUNT
3.1 Travelling R 4.00 2000 R 8 000.00
3.2 Health and Safety R 500.00 4 R 2 000.00
3.2 Copies and Printing R 0.35 25000 R 8 750.00
R 18
Sub-Total Excl. VAT (Disbursements)
750.00
R 78
TOTAL (Excl. 14% VAT)
947.37
Add 14% VAT R 11 052.63
Page 9 of 14
Nov 2014 R 13,725.00 R 48,037.50
Dec 2014 R 47,421.87 R 95,459.37
Jan 2015 R 49,701.87 R 145,161.25
Feb 2015 R 75,961.87 R 221,123.12
Mar 2015 R 73,961.87 R 294,805.00
Arp 2015 R 71,081.88 R 365,886.88
May 2015 R 69,121.87 R 435,008.75
Jun 2015 R 64,991.25 R 500,000.00
14. DELIVERABLES
The project deliverables for this upgrade of Muldersdrift Sports Complex project are as
follows;
Relocation of the steel sports pavilion by 7 meters.
Relocation of the soccer by 3m from the existing buildings
Expansion of the soccer field.
Relocation of the soccer goal posts.
Reporting as follows;
Page 10 of 14
Deliverable Status Importance
15. MILESTONE
The main project milestone is to complete the upgrade of the Muldersdrift Sports
Complex by the end of the 2014/15 financial year within the allocated budget of
500 000.00.
Page 11 of 14
The provisional meeting schedule allows for the following meetings:
One monthly meeting with the Executive Manager: Social Services and the
Manager: Sport, Art, Culture and Recreation.
A biweekly meeting with the Manager: Sport, Art, Culture and Recreation.
Other staff shall attend the meeting when required by the Manager: Sport, Art, Culture and
Recreation.
During the execution of the project, the following reports will be prepared and submitted
Page 12 of 14
Additional guidelines and standards will be consulted where required. In such cases
Morad will ensure that only recognized local and international documents are used as
the basis for any analysis or design.
Morad project team members will at all times conduct themselves in a professional
manner and act in accordance with the provisions of the Engineering Services Act (Act
46 of 2000).
Each stage of the project shall be approved by the Manager: Sport, Art, Culture and
Recreation before the next stage is commenced.
Page 13 of 14
23. ACCEPTANCE
This Project Charter prepared by Morad Consulting is based on the content of the
appointment letter dated 06 August 2014 and the discussion during the Project
Specification Meeting held on 22 September 2014 at 10H00 at the Mogale City Local
Municipality Social Services Board Room in Commissioner Street, Krugersdorp.
The meeting was attended by the persons identified on the Attendance Register
attached to the Minutes of the Project Inception Meeting, included in the Annexure B.