Vous êtes sur la page 1sur 1

UMM WU'AL PHOSPHATE PROJECT-

FIELD ERECTED TANKS

VENDOR PO. NO.: NP/322079/MM 004
VEND0R DOCUMENT AND DATA LIST VDDL 
VDDL REV.: A01
Form PAGE: 1OF1

Instruction to Vendor/ Subcontractor
a) Vendor to complete and submit this form in accordance with Instrcuction VENDOR DOCUMENT AND REVISION NUMBERING
b) Requisitor to review and comments shall not be assumed to indicate either responsibility or liability for accuracy and completeness of this document or 
to alter contractual terms and conditions.
c) Requisitor to highlight the document to be commented by the Employer

ENGINEERING  SCHEDULED 
VENDOR DOCUMENT NUMBER DOCUMENT TITLE/ DESCRIPTION EMISSION ISSUE
DISCIPLINE DATE

ENGINEERING DELIVERABLES‐ Fuel Oil Storage Tank
FUEL OIL STORAGE TANK (209FE‐TNK‐002)

DETAIL OF RING FOUNDATION LAYOUT FOR FLUSH‐TYPE CLEANOUT FITTING 
ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2075_C01 06 SEPT. 2015 ISSUED FOR CONSTRUCTION
NOTCH

ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2077_C01 BOTTOM PLATE DEVELOPMENT LAYOUT & DETAILS 06 SEPT. 2015 ISSUED FOR CONSTRUCTION

ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2078_C01 SHELL PLATE DEVELOPMENT LAYOUT & DETAILS 06 SEPT. 2015 ISSUED FOR CONSTRUCTION

ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2079_C01 DETAIL OF FLUSH‐TYPE CLEANOUT FITTING 06 SEPT. 2015 ISSUED FOR CONSTRUCTION

ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2080_C01 DECK PLATE DEVELOPMENT LAYOUT & DETAILS 06 SEPT. 2015 ISSUED FOR CONSTRUCTION

ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2081_C01 DECK SUPPORT/NOZZLE ORIENTATION 06 SEPT. 2015 ISSUED FOR CONSTRUCTION

ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2082_C01 DETAIL OF PONTOON, ACCESSORIES & FOAM DAM 06 SEPT. 2015 ISSUED FOR CONSTRUCTION

ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2083_C01 ROOF WALKWAY LAYOUT & DETAILS ‐ 1, SPLASH BOARD DETAIL ‐ A12 06 SEPT. 2015 ISSUED FOR CONSTRUCTION

ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2084_C01 ROOF WALKWAY LAYOUT & DETAILS ‐ 2, SPLASH BOARD DETAIL ‐ A12 06 SEPT. 2015 ISSUED FOR CONSTRUCTION

ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2085_C01 ROOF WALKWAY LAYOUT & DETAILS ‐ 3 06 SEPT. 2015 ISSUED FOR CONSTRUCTION

ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2086_C01 HANDRAIL LAYOUT & DETAIL ‐ 1 06 SEPT. 2015 ISSUED FOR CONSTRUCTION

ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2087_C01 HANDRAIL LAYOUT & DETAIL ‐ 2 06 SEPT. 2015 ISSUED FOR CONSTRUCTION

ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2088_C01 ROLLING LADDER & EARTHING CABLE DETAIL 06 SEPT. 2015 ISSUED FOR CONSTRUCTION

ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2089_C01 ROLLING LADDER DETAILS ‐ 1 06 SEPT. 2015 ISSUED FOR CONSTRUCTION

ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2090_C01 ROLLING LADDER DETAILS ‐ 2 06 SEPT. 2015 ISSUED FOR CONSTRUCTION

ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2091_C01 ROLLING LADDER DETAILS ‐ 3 06 SEPT. 2015 ISSUED FOR CONSTRUCTION

ROLLING LADDER TRACK ASSEMBLY W/ LANDING PLATFORM & STAIR TO 
ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2092_C01 06 SEPT. 2015 ISSUED FOR CONSTRUCTION
FLOATING ROOF DECK DETAILS ‐ 1

ROLLING LADDER TRACK ASSEMBLY W/ LANDING PLATFORM & STAIR TO 
ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2093_C01 06 SEPT. 2015 ISSUED FOR CONSTRUCTION
FLOATING ROOF DECK DETAILS ‐ 2

ROLLING LADDER TRACK ASSEMBLY W/ LANDING PLATFORM & STAIR TO 
ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2094_C01 06 SEPT. 2015 ISSUED FOR CONSTRUCTION
FLOATING ROOF DECK DETAILS ‐ 3

ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2095_C01 SPIRAL STAIR LAYOUT & DETAILS ‐ 1 06 SEPT. 2015 ISSUED FOR CONSTRUCTION

ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2096_C01 SPIRAL STAIR LAYOUT & DETAILS ‐ 2 06 SEPT. 2015 ISSUED FOR CONSTRUCTION

ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2097_C01 GAUGERS PLATFORM & DETAILS ‐ 1 06 SEPT. 2015 ISSUED FOR CONSTRUCTION

ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2098_C01 GAUGERS PLATFORM & DETAILS ‐ 2 06 SEPT. 2015 ISSUED FOR CONSTRUCTION

ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2099_C01 PRIMARY & INTERMEDIATE WIND GIRDER DETAILS, CURB ANGLE DETAILS 06 SEPT. 2015 ISSUED FOR CONSTRUCTION

ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2100_C01 DETAIL OF SHELL MANWAY ‐ M1/M2 & FLOATING ROOF MANWAY ‐ M4 06 SEPT. 2015 ISSUED FOR CONSTRUCTION

DETAIL OF FLOATING ROOF DECK MANWAY ‐ M3, DETAIL OF PONTOON 
ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2101_C01 06 SEPT. 2015 ISSUED FOR CONSTRUCTION
MANWAY ‐ M5
DETAIL OF FUEL OIL INLET NOZZLE ‐ N1, DETAIL OF ROOF DRAIN (SHELL) OUTLET 
ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2102_C01 06 SEPT. 2015 ISSUED FOR CONSTRUCTION
NOZZLE ‐ N12
DETAIL OF FUEL OIL OUTLET NOZZLE ‐ N2, DETAIL OF FUEL OIL RECYCLE NOZZLE ‐
ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2103_C01 06 SEPT. 2015 ISSUED FOR CONSTRUCTION
N8

ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2104_C01 DETAIL OF DRAIN NOZZLES N6 & N7 & DETAIL OF EARTHING LUG ‐ A9 06 SEPT. 2015 ISSUED FOR CONSTRUCTION

ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2105_C01 DETAIL OF GAUGE HATCH NOZZLE ‐ N5A  06 SEPT. 2015 ISSUED FOR CONSTRUCTION

DETAIL OF RIM VENT NOZZLE ‐ N15A/B,  DETAIL OF SUPPLEMENTARY DRAIN 
ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2106_C01 NOZZLE ‐ N16, DETAIL OF EMERGENCY ROOF VENT NOZZLE ‐ N13, DETAIL OF  06 SEPT. 2015 ISSUED FOR CONSTRUCTION
ROOF DRAIN (DECK) INLET NOZZLE ‐ N10

DETAIL OF LEVEL TRANSMITTER NOZZLE ‐ K1 & K2, & DETAIL OF TEMPERATURE 
ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2107_C01 06 SEPT. 2015 ISSUED FOR CONSTRUCTION
TRANSMITTER NOZZLE ‐ K3

FLOATING ROOF DECK LEG SUPPORTS 'DS1', 'DS2', DET. OF BLEEDER VENT ‐ 
ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2108_C01 06 SEPT. 2015 ISSUED FOR CONSTRUCTION
'N14A/B'

ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2109_C01 GENERAL ASSEMBLY OF ROOF DRAIN SYSTEM 06 SEPT. 2015 ISSUED FOR CONSTRUCTION

ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2110_C01 PIPE SUPPORTS DETAIL OF ROOF DRAIN SYSTEM 06 SEPT. 2015 ISSUED FOR CONSTRUCTION

ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2111_C01 GENERAL ASSEMBLY OF ROOF SEAL 06 SEPT. 2015 ISSUED FOR CONSTRUCTION

ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2112_C01 PARTS DETAIL OF ROOF SEAL 06 SEPT. 2015 ISSUED FOR CONSTRUCTION

ME MD‐512‐F9FE‐EG‐ME‐DDE‐0001‐2116_C01 TANK MARKING ‐ NUMBERING & CONTENT 06 SEPT. 2015 ISSUED FOR CONSTRUCTION

***********************NOTHING FOLLOWS**********************

Vous aimerez peut-être aussi