CERTIFICATE OF ACCREDITATION

ANSI-ASQ National Accreditation Board


500 Montgomery Street, Suite 625, Alexandria, VA 22314, 877-344-3044

This is to certify that

The Inspection Company of Korea


TÜV NORD INCOK
TÜV NORD Group
20, Dogok-ro 3-gil, Gangnam-gu
Seoul, Korea
has been assessed by ANAB
and meets the requirements of international standard

ISO/IEC 17020:2012
while demonstrating technical competence in the field of

INSPECTION
Refer to the accompanying Scope of Accreditation for information regarding the types of
inspections to which this accreditation applies.

AI-2541
Certificate Number

Certificate Valid: 12/28/2017 - 12/28/2019


Version No. 001 Issued: 12/28/2017

This inspection body is accredited in accordance with the recognized International Standard ISO/IEC 17020:2012.
An inspection body’s fulfilment of the requirements of ISO/IEC 17020:2012 means the inspection body meets both the
technical competence requirements and management system requirements that are necessary for it to consistently deliver
technically valid inspection results (refer to joint ISO-ILAC-IAF Communiqué dated Sept 2013).
SCOPE OF ACCREDITATION TO ISO/IEC 17020:2012

The Inspection Company of Korea


TÜV NORD INCOK
TÜV NORD Group
20, Dogok-ro 3-gil, Gangnam-gu
Seoul, Korea
Sang Geum Kim Phone: +82 2 2188 0011
incok@tuv-nord.com

INSPECTION
TYPE A (THIRD-PARTY) BODY
Valid to: December 28, 2019 Certificate Number: AI-2541

Type and Range of


Field of Inspection Methods and Procedures
Inspection
Pressure vessel

HRSG (Heat Recovery Steam Generator)

Tank

Boiler/Heater

Water treatment

Condenser Client and/or Manufacturer


Mechanical / Machinery -
specified methods
Stationary
Intake and/or procedures

Crane/Hoist

Steel Structure

Heat Exchanger

Chemical Dosing

Tower

Version 001 Issued: December 28, 2017 www.anab.org


Page 1 of 4
Type and Range of
Field of Inspection Methods and Procedures
Inspection

Turbine

Pump
Client and/or Manufacturer
Mechanical / Machinery –
Compressor specified methods
Rotating
and/or procedures
Fan/Blower

Cooling Tower

Piping

Fitting

Flange

Valve

Gasket
Client and/or Manufacturer
Mechanical/ Machinery –
Expansion Joint specified methods
Piping & Bulk
and/or procedures
Pipe Supports/Hanger

Insulation

Bolt, Nut & Washer

Strainer

Coupling

Transformers
Client and/or Manufacturer
Electrical – Equipment UPS (Uninterruptible Power Supply) specified methods
and/or procedures
Cable (HV, MV, LV, Control, Instrument)

Version 001 Issued: December 28, 2017 www.anab.org


Page 2 of 4
Type and Range of
Field of Inspection Methods and Procedures
Inspection

UPS, UPS Battery

GIS(Gas Insulation Switchgear), Switchgear

IPB (Insulated Phase Bus Bar)


NSPB (Non-Segregated Phase Bus bar)
Bus Duct

Cathodic Protection Client and/or Manufacturer


Electrical - Equipment specified methods
Generator Circuit Breaker and/or procedures

Motor

MCC (Motor Control Center)


PLC (Programmable Logic Controller) Panel
DB (Dynamic Breaker)

Cable Tray

EDG (Emergency Diesel Generator)

DCS (Distribution Control System)


PCS (Power Conversion System)
FMS (Facility Management System)
EMS (Energy Management System)
SCADA (Supervisory Control and Data
Acquisition System)

Communication, Security system


Client and/or Manufacturer
Electrical – Instrument Flow Element & Level Gauge specified methods
and/or procedures
Field Instrument

Sampling & Analyzing System

Instrument Piping

Version 001 Issued: December 28, 2017 www.anab.org


Page 3 of 4
Type and Range of
Field of Inspection Methods and Procedures
Inspection

Lighting

Heat Tracing System


Client and/or Manufacturer
Electrical - Instrument Weather Station specified methods
and/or procedures
Pressure Safety/Relief Valve

Control Valve