Inspection records contain this information for a CML having a low reading in a Carbon Steel
elbow located in a piping circuit (Crude Unit H²S Service). Original (new) thickness measured
0.975 inches during a Baseline UT performed in 2002. After 5 years’ service, in 2007, the elbow
measured 0.900 inches. In 2012, the elbow measured .825 inches after 10 years. Other Info: The
.825 inch thickness is the low reading in this piping circuit that showed consistent corrosion and
metal loss over a 10 year service life. Pressure Design thickness = .400 inches and the structural
design thickness = .500 inches (Design is 500 psig @ 400°F). 24 NPS insulated line was noted to
be in very good condition with no visible damage in 2012. Piping Circuit designation = Class 1.
1. On the basis of information above, short-term & long-term corrosion rate for circuit is:
A) 1.5 MPY B) 3.0 MPY C) 10.0 MPY D) 15 MPY
Answer = D … Solution: .975 - .825 = .150 ÷ 10 years = .015 or 15 mils per year (LT rate) .900 - .825
= .075 ÷ 5 years = .015 or 15 mils per year (ST rate) Use either rate in RL calc
Reference: API 570, Para. 7.1.1 (Formula 2 & 3 for ST& LT Corrosion Rate)
2. On the basis of information above, remaining life & half remaining life of this circuit is:
A) 22 years RL and 11 years @ ½ RL B) 28 years RL and 14 years @ ½ RL
C) 32 years RL and 16 years @ ½ RL D) 38 years RL and 19 years @ ½ RL
Answer = A … Solution: .825 (actual thickness) - .500 (t required) = .325 mils of RL ÷ .015 (15MPY
Corrosion rate) = 21.66 yrs RL (ST& LT rate are the same) Ref: 570, Para. 7.1.1 …Formula for RL
3. On the basis of information above, minimum required thickness or t required for this
piping circuit is:
A) 0.200 inches B) 0.400 inches C) 0.500 inches D) 0.825 inches
Answer = C … minimum required thickness or t required = greater of pressure design t (.400) or
structural design t (.500) = .500 inches = “C” … Ref: API 570 Definition 3.51 (Min. req’d thickness)
4. On the basis of info above, the maximum inspection intervals for this piping circuit are:
A) UT Thickness insp interval = 5.0 years & Visual external inspection interval = 5 years
B) UT Thickness insp interval = 7.0 years & Visual external inspection interval = 5 years
C) UT Thickness insp interval = 8.0 years & Visual external inspection interval = 5 years
D) UT Thickness insp interval = 9.5 years & Visual external inspection interval = 5 years
Answer = A … Ref: API 570, Para. 6.3.3 & 6.3.4 & Table 2 … Class 1 = 5 years UT or ½
RL = 11 (use the lesser) = 5 years for UT interval & External Visual = Table 2 value = 5 yrs
5. On basis of info above, extent of NDE required after a 2012 visual inspection for CUI is:
A) 50% at areas within susceptible temp range B) 33% at areas within susceptible temp range
C) 10% at areas within susceptible temp range D) None of these is correct based on API 570
Answer = D … Ref: API 570, Para. 5.5.6  2nd Para. … No suspect damage  No removal
If external coverings are in good condition and there is no reason to suspect damage behind
them, it is not necessary to remove them for insp of equip … 400°F is beyond susceptible range!

1|Page
Name/Badge #: _______________________________________________ Date: ____________
Q & A for API 570 Practice Exam (150 Questions)
6. What is the minimum required thickness of a blank made of ASTM A516 Gr. 70 Plate
with a with a ring joint design (Size 2 NPS Class 600 Flange) in a piping system with a
design pressure of 400 psi @ 400°F & Corrosion Allowance = .250 inches?

A) .325 inches B) .442 inches


C) .559 inches D) .665 inches

SHOW YOUR WORK & CHOOSE CORRECT FORMULA IN THE SPACE BELOW:

Apply formula 15 of ASME B31.3

Step 1 … Solve 3P & 16SE … 3P = 400 x 3 = 1200 … 16 SE = 16 x 21,600 (E=1) = 345,600


Step 2 … (3P ÷ 16SE) or 1200 ÷ 345,600 = .0034722 … Remember “c” is saved for last!!!
Step 3 … The square root of .0034722 = .058925, and dg = 3.250 x .058925 = .1915 = .191 in.
Step 4 … Add CA last … Solution is .191 inches + .250 inches = .442 inches = Answer = B

7. What is the minimum required thickness, given the design conditions below for an
existing piping system in a local refinery? Given: Design Pressure & Temp = 600 psig @
500°F, ASTM A-106 Gr. B, Pipe is 24 NPS and the structural minimum design thickness
for the 24 NPS system = .250 inches
A) 0.038 inches B) 0.250 inches
C) 0.380 inches D) 0.520 inches

SHOW YOUR WORK & CHOOSE CORRECT FORMULA IN THE SPACE BELOW:

Answer = C … use tm = PD ÷ 2(SE) … Barlow’s Formula … API 574, Sect. 11.2


First, solve PD & SE values separately, quickly, efficiently & double check them.
PD = 14400 (600 x 24*) … *24 = 24 NPS OD value in API 574 Pipe Schedules (Table 1 = CS)
SE = 19,000 (A-1 Tables) … Table A-1 ASME B31.3 must be tabbed at CS pipe & other areas
Note: E = 1.0 for seamless pipe specs like A-106  Tab Table A-1B ASME B31.3
tm = 14400 ÷ 2 (19,000) or 38,000 = .380 in. or .250 in., use the greater*  .380 inches = C
*API 574 Section 11.1 & 11.2 covers structural minimum thickness rules  Be sure you know it
Tip # 1: If your value is not listed above in one of the four answers … Consider the fact that
common errors include simple math & selection of wrong values when working calcs. Make sure
that you always double check the math and NEVER RUSH when in Table A-1 because the
letters are SO SMALL & often a wrong value for “ksi” is applied based on wrong temp column
or material row selected by mistake. Lesson Learned: Double check all A-1 Table values.
Tip # 2: If you are very close to an answer, but maybe are one of two or a few mils off, consider
that your Pipe OD value used may be incorrect … 10.750 versus 10.625, etc … Recheck API
574 Pipe Schedules and apply the correct OD piping value or recheck other factors, especially E.

2|Page
Name/Badge #: _______________________________________________ Date: ____________
Q & A for API 570 Practice Exam (150 Questions)
8. Determine Corrosion Rate (LT or ST), UT thickness Insp Interval (Class 1 piping) and
MAWP of corroded pipe … Given: Design pressure/temp = 300 psig/500°F for A106 Gr B,
Pipe = NPS 20 STD Wall, baseline “t” 2002 = .360 in., in 2007 = .330 in., in 2012 = .300 in.
Has RL greater than 10 years, and assume a proposed 5 year interval for the MAWP calc!

A) Corr rate is 5 MPY, UT insp interval = 10 yrs, MAWP = 248 psi  interval = Not acceptable
B) Corr rate is 6 MPY, UT insp interval = 5 years, MAWP = 365 psi  interval = Acceptable
C) Corr rate is 6 MPY, UT insp interval = 5 years, MAWP = 456 psi  interval = Acceptable
D) Corr rate is 5 MPY, UT insp interval = 10 years, MAWP = 365 psi  interval = Acceptable

SHOW YOUR WORK & CHOOSE CORRECT FORMULA IN THE SPACE BELOW:

Answer = C … API 570, Para. 7.2 & Table 4 Examples: When MAWP is recalculated, wall
thickness used in calcs shall be actual thickness as determined by inspection (5.6 definition)
minus twice* the estimated corrosion loss before the date of the next inspection (6.3.3).
Step # 1: Determine corrosion rate  30 mils lost in 5 yrs (both LT & ST intervals) = 6mpy
Observation: A uniform corrosion rate exists  Both LT & ST = 6 MPY
Step # 2: Determine correct UT inspection interval! Use 5 years for a MAWP calculation
Step # 3: Estimated corr. loss (ECL) in 5 yrs = 30 mils, & 2* x ECL = 60 mils (Para. 7.2)
Step # 4: Utilize the correct formula & values per API 570 Table 4 for MAWP = 2SEt ÷ D,
& use ASME B31.3 to find S = 19,000 (table A-1 value @ 500F), E = 1.0 (Table A-1B value)
t = .240  .300 (actual t) minus twice the estimated corrosion loss in 5 yrs or .060 = .240
MAWP = 2 (19,000) (1.0) (.240) ÷ 20 (From API 574 pipe schedules) = See math below
MAWP = 38,000 x .240 ÷ 20 = 9,120 ÷ 20 = 456 psi
Conclusion: 456 psi exceeds 300 psi design = the 5 year proposed interval is acceptable 
9. What is the minimum metal temperature that is exempt from impact testing for piping
specification API 5L, Gr X-60 having a 1.250 inch nominal thickness?
A) 80°F (26.7°C) B) 44°F (6.7°C) C) 6°F (-14.4°C) D) None of these is correct
Answer = A … Ref: Table A-1 Column = “A” value See A-1 Note 6  See 323.2.2b
& Table & Fig 323.2.2A  Row 1.25 in. (31.8 mm)/Curve A Column  26.7°C or 80°F
10. What is the minimum metal temperature to be maintained during a hydrotest (brittle
fracture considerations) when using API 5L, Gr X-60 pipe (1.250 inch nominal thickness)?
A) 80°F = MDMT exempt from IT, plus API 570 safety factor = 90°F
B) 44°F = MDMT exempt from IT, plus API 570 safety factor = 54°F
C) 6°F = MDMT exempt from IT, plus API 570 safety factor = 36°F
D) 6°F = MDMT exempt from IT, plus API 570 safety factor = 16°F
Ans = A … Ref: 570, Par. 5.8.3 = 80°F (26.7°C) + 10°F (6 °C) Rule above MDMT for tests
Solution: Answer question 9 correctly, then apply the appropriate API 570 rule of 10°F
because the metal thickness is 2 inches and below
3|Page
Name/Badge #: _______________________________________________ Date: ____________
Q & A for API 570 Practice Exam (150 Questions)
Answer question 11/12/13 below (WPS & PQR Review)
PQR Given Information: A-106 Gr. B material, NPS 8, XS, Weld process = SMAW. PQR #
123456 was signed and dated by Babu B. Babu and supports WPS # 123456.
Tensile Test Width by Ultimate Tensile Failure Observations/Results
Specimen thickness Strength (psi) location
1 11.8 x 11.8 70,050 Weld Metal Accepted by Babu
2 11.6 x 11.6 70,250 Weld Metal Accepted by Babu
3 11.7 x 11.7 66, 500 Base Metal Accepted by Babu
4 11.8 x 11.8 66,000 Base Metal Accepted by Babu
~~~~~~~~~~~~~EGYPTIAN MECHANICAL TESTING GROUP~~~~~~~~~~~~~~~~~~~~~
Guided Bend Specimen Imperfections
(Type Bend) & Results
Side Bend Specimen #1 2.9 mm slag in the weld area  Accepted by Babu
Side Bend Specimen #2 3.0 mm porosity in the weld area  Accepted by Babu
Side Bend Specimen #3 3.0 mm crack in the weld area  Rejected by Babu

11. What is the WPS # 123456 base metal thickness range qualified by PQR # 123456?
A) 3/16 in. (5 mm) to 3 inches (76 mm) B) 3/16 in. (5 mm) to 1-3/4 inches (44 mm)
C) 3/16 in. (5 mm) to 1 inch (25 mm) D) None of these are correct

Answer: C … QW-451.1 Table  Row = Over 3/8 but less than ¾ (NPS 8 XS = .500 inches)
Solution: 5 mm to 2t … t = .500 inches … 2t = 1 inch (25 mm) … 5 to 25 mm = C

12. Tensile test results provided above for PQR # 123456 were reviewed and found to be:
A) Adequate in number, but # 4 is below required tensile value (reject PQR # 123456)
B) Adequate in number, but # 3 & # 4 are below required tensile value (reject PQR # 123456)
C) Adequate in number, but # 1/2/3/4 are all below required tensile value (reject PQR # 123456)
D) Adequate in number and all tensile test results are acceptable and signed off by Babu B. Babu

Answer: D … Apply QW-422 Table Value of 60 ksi & 5% under rule of QW-153
The number (4) was adequate because specimens are half-size (full size = 1.5 in. or 38mm)
60,000 Table Value (no allowed reduction for weld metal failures) … Accept # 1 & # 2
60,000 Table Value x .95 (5% rule for base metal failures) = 57,000 … Accept # 3 & # 4

13. Guided bend test results provided above for PQR # 123456 were reviewed/found to be:
A) Adequate in number, but specimen # 3 with a crack is rejected (reject PQR # 123456)
B) Adequate in number, but specimens # 2 & # 3 are rejectable (reject PQR # 123456)
C) Adequate in number and all specimens are acceptable (PQR # 123456 should be accepted)
D) Inadequate in number! All 3 specimens are acceptable! Another side bend specimen is needed
Answer: D … Table QW-451.1 Note 5 allows 4 side bends in lieu of 2 face and 2 root bends,
so 1 more is needed … QW-163 acceptance criteria allows a 3mm maximum weld flaw size

4|Page
Name/Badge #: _______________________________________________ Date: ____________
Q & A for API 570 Practice Exam (150 Questions)
14. An A-106 Gr. A piping system designed at 400 psi @ 600°F is to be hydrostatically
tested at a test temperature of 80°F. What is the test pressure required?
A) 600 psig B) 627 psig
C) 632 psig D) 637 psig

Answer = B … Reference: ASME B31.3 Table A-1 & Para. 345.4.2 … Use Formula
(API EXAM QUESTIONS WILL NOT GIVE THE INFO ABOVE IN PARENTHESIS)
Solution: Determine both St & S from A-1 Tables … St = 16,000 & S = 15,300 (St ÷ S = 1.046)
1.5 (400 = pressure) (1.046 … Rr = St/S = 1.046) = 627.6 = 627 psig (Use 2010 Code, not 2008)
Para. 345.4.2 (a) requires not less than 1-1/2 times design pressure. 400 x 1.5 = 600
Solution = 627 psi to compensate for the difference between design pressure test conditions and
it must be noted that 627 exceeds the “minimum” of 1.5 times design or 600 psi in this case!!!
15. What is the essential wire & wire diameter (assume film side IQI) for 4 NPS Sch 40S
ASTM A312 Type 316L Stainless steel pipe weld in “ground flush” condition without
reinforcement. Assume Normal Fluid service!
A) Essential wire # 4 (0.16 mm) B) Essential wire # 5 (0.20 mm)
C) Essential wire # 6 (0.25 mm) D) None of these are correct

Answer = A … Solution Step # 1: Use API 574 Table 2 for SS, Sch 40 NPS 4 = .237 (6.02mm)
Solution Step # 2: Apply the rule for T-276.2(b) and proceed to Step # 3 … Add 0 reinforcement
Solution Step # 3: Add .237 + .000 = .237 inches … Metric = 6.02 mm + 0 mm = 6.02 mm
Ref: API 574 SS schedules, B31.3 table 341.3.2 is not used, ASME V, Table T-276, 1st Row
Use the Film Side Wire Type Column = Wire # 4 … 2 RULES = WELDS WITH (T-276.2a)
& WITHOUT (T-276.2b) REINFORCEMENT … Wire diameter at ASME V Table 233.2

16. What is pressure rating & the hydrostatic test pressure for a Class 600 A182 Gr. F316L
flange being subjected to a system hydrostatic test pressure at 90°F (32°C)?

A) 600 psi x 1.5 = test at 900 psi B) 800 psi x 1.5 = test at 1200 psi
C) 1200 psi x 1.5 = test at 1800 psi D) 1800 psi x 1.5 = test at 2700 psi

Ans = C … Ref: B16.5, Par. 2.6 & Table 1A  Table F2-2.3  Row 100°F & Col. Class 600

17. Minimum hold time and test pressure for a Sensitive Leak Test using the Gas and
Bubble test method with an approved low surface tension bubble forming solution is:
Additional Information: The system under test has a design pressure of only 40 psi.
A) 15 minutes at a 5 psi test pressure B) 15 minutes at a 10 psi test pressure
C) 15 minutes at a 15 psi test pressure D) 30 minutes at a 40 psi test pressure

Answer = B … Reference: ASME B31.3, Par. 345.8.a  ASME V, Art. 10, Mandatory
Appendix 1, Sections I-1032a & I-1070 = 15 minutes & 345.8.a = lesser of 15 psi or 25%
design pressure = 40 psi (25% = 10 psi)  Use 10 psi (less than 15 psi)

5|Page
Name/Badge #: _______________________________________________ Date: ____________
Q & A for API 570 Practice Exam (150 Questions)
Answer question 18 (Determine weld size) below

Fig. 328.5.2C Minimum Welding Dimensions for Socket Welding Components Other Than Flanges
18. What is the minimum required fillet weld size (Cx) for a Class 9000 socket fitting given
the piping is a size 1 NPS XXS (Class 9000 Socket wall thickness “Dimension C” = 11 mm)?
A) 6.35 mm B) 9.1 mm
C) 9.9 mm D) 11 mm
Answer = C … Ref: ASME B31.3 Table 331 & Notes 1  material = 9% Nickel = P-No 11A
API 574 Table 1  T = .358 in. or 9.09 mm x 1.09 = 9.9 mm or 11 mm (use smaller value)

19. When using water-washable penetrants, excess penetrant shall be removed with:

A) A water spray not exceeding 50 psi with a water temp not exceeding 110°F (43°C)
B) A water spray not exceeding 25 psi with a water temp not exceeding 110°F (43°C)
C) A water spray not exceeding 10 psi with a water temp not exceeding 120°F (52°C)
D) A water spray not exceeding 15 psi with a water temp not exceeding 120°F (52°C)
Answer = A … Ref: ASME V, Art. 6, T-673.1  Also BOLD ITEM T-673.3  PT No-No’s!

20. What is the PWHT temperature range, holding time/inch, and minimum holding time
for a weld (ASTM A-333 Gr. 6 material has a joint thickness that measures 1.010 inches)?

A) PWHT range = 1,100 – 1,200°F, holding time/inch = 1 hr, & minimum holding time = 1 hrs
B) PWHT range = 1,100 – 1,325°F, holding time/inch = 1 hr, & minimum holding time = 2 hrs
C) PWHT range = 1,300 – 1,375°F, holding time/inch = 1 hr, & minimum holding time = 2 hrs
D) PWHT range = 1,025 – 1,085°F holding time/inch = 1 hr, & minimum holding time = 2 hrs
Ans = A … Ref: ASME B31.3 Table 331 & Notes 1  QW-422 material = CS = P-No 1

6|Page
Name/Badge #: _______________________________________________ Date: ____________
Q & A for API 570 Practice Exam (150 Questions)
21. Evaluations of soil corrosivity should be performed at five-year intervals for:
A) For piping buried in lengths less than 100 ft (30 m) without CP system present
B) For piping buried in lengths greater than 100 ft (30 m) without CP system present
C) Soil to air interface piping showing corrosion to a minimum depth of 12 in below the grade
D) Soil to air/asphalt interface piping showing evidence of corrosion without CP system present

Answer = B … Reference: API 570, Para. 9.3.4

22. When performing a small patch repair, what is the maximum electrode diameter, type
of electrode, and what type of weld bead should be used when temps are below 32°F (0°C)?
A) Max electrode diam. = 5/32 in. (4.0 mm), cellulosic type deposited with stringer beads
B) Max electrode diameter = 1/8 in. (3.2 mm), low-hydrogen type by weaving of weld beads
C) Max electrode diam. = 1/8 in. (3.2 mm), cellulosic type deposited by weaving of weld beads
D) Max electrode diameter = 5/32 in. (4.0 mm), low-hydrogen type deposited with stringer beads

Answer = D … Reference: API 570, Annex C, Section C.2

23. What is the acceptable range of magnetizing current (amps) required for a maximum
prod spacing of 8 inches on a welded pipe (NPS 24 Schedule 80 ASTM A-106 Gr. B)?
A) 600 to 750 amps B) 720 to 880 amps
C) 800 to 1000 amps D) None of these are correct

Answer = C … Ref: ASME V, Art. 7, T-752.2  API 574 value = 1.219 in  90 to 100A/in
Solution: 8 inches x 100 = 800, 8 inches x 125 = 1000  800 – 1000 amps  C is correct!

24. To be exempt from pressure testing after repairs, the requirements for socket welded
flanges (used as final closure welds) include all of the following conditions EXCEPT:
A) MT or PT shall be performed on both the root pass and final completed pass of socket welds
B) Welds are to be examined with appropriate NDE as specified by authorized piping inspector
C) Socket welds shall meet ASME B31.3 requirements and shall have a minimum of two passes
D) Spacers designed for socket welds shall be used to establish a minimum 1/16in. or 1.6mm gap

Answer = A … Reference: API 570, Para. 8.2.7  Socket welds are fillet welds and only on
the final completed pass is MT or PT required  Butt welds get MT or PT on the root pass
25. External and CUI inspection on a gasoline pipeline (on-site service will not significantly
vaporize during release) should be conducted every (how many) years? (No RBI, RL=6yrs)
A) 3 years B) 5 years
C) 6 years D) 10 years

Ans: C (570, 6.3, 4th Par. Rule = Use Table 2 value only)  Class 3 = 10 year visual interval
There is no ½ RL rule for Visual Inspection intervals … Use the full RL of 6 years or “C”
the RL was given to try to “trick you” … Were you fooled and did you answer 3 years? 

7|Page
Name/Badge #: _______________________________________________ Date: ____________
Q & A for API 570 Practice Exam (150 Questions)
26. The transmitted film density through the radiographic image of the body of a correct
hole-type IQI was measured with a densitometer at 2.8 in the area of interest. What is the
acceptable range of density for the film (assume no shims used with IQI & X-ray source)?

A) 2.0 to 3.2 B) 2.4 to 3.6 C) 2.0 to 4.0 D) 1.8 to 4.0


Answer = B … Reference: T-282.2(a) … It is not asking what is acceptable density range,
but what is the -15% + 30% rule … 2.8 x .85 = 2.4 & 2.8 x 1.3 = 3.6 … 2.4 – 3.6 = B

27. In qualifying a procedure for Visual Examination, a simulated flaw (defect) of what
minimum dimensional width shall be used?
A) 1/8 inch B) 1/16 inch C) 1/32 inch D) 1/64 inch

Answer: C (ASME V, T-921.3) … Please highlight & review

28. What is maximum possible API 570 interval for thickness measurement at an Injection
Point (assume no RBI)?
A) 2 years B) 3 years
C) 5 years D) To be determined on a case by case basis
Ans: B (API 570, 6.3, 3rd Par. Rule = Table 2 value)  Memorize the 3-year rule for IPs
Question #29, use given information: Data is given for a Class 1 piping system with a RL =
to 6 Yrs … Thickness = 0.360 inches (Current Insp results) … Corrosion Rate = 15 mpy
29. When is the next thickness measurement inspection and the next external visual
inspection due (using the information above)?
A) 3 years for the UT insp, and 3 years for the external visual inspection
B) 4 years for the UT insp, and 5 years for the external visual inspection
C) 5 years for the UT insp, and 5 years for the external visual inspection
D) None of these are correct
Answer: D (570, 7.1.1 & Para. 6.3.3* (Interval rules) Table 2)  External = 5 years
because the ½ RL rule only applies to Thickness measurements, not external visual insp!
*Apply rule for thickness measurement interval = ½ rem. life or 5 years (Use lower value).
RL = 6 years, therefore Half Rem. Life = 3 years … Since 3 (half rem. life) is less than 5
(Class 1 Thickness measurement interval), use 3 years!!! 3 years and 5 years = D
30. API 570 recommended upstream limits of an injection point circuit for inspection
purposes is (Assume that a 24 NPS line has a 1 NPS injection point):
Problem: An injection point exists on a 24 NPS pipe … What is the upstream limit?
A) 12 inches B) 24 inches
C) 48 inches D) 72 inches
Answer = D (API 570, Para. 5.5.9 & Figure 1) … Don’t forget the upstream rule … 12
inches or 3 pipe diameters, whichever is greater … 24 NPS = 24 in x 3 = 72 inches

8|Page
Name/Badge #: _______________________________________________ Date: ____________
Q & A for API 570 Practice Exam (150 Questions)
31. What is the maximum allowed inspection interval for Class 2 piping system requiring
thickness measurement (assuming the RL = 20 years and no RBI used)?
A) Every 3 years B) Every 5 years
C) Every 10 years D) None of these are correct

Ans: C (API 570, 6.3, 3rd Par. Rule = Table 2 value by Class or ½ RL, use the lesser value)
Solution: Table 2 Value Class 2 = 10 yrs OR ½ RL = 20 ÷ 2 = 10 years … Lesser = 10 yrs

32. External and CUI inspection on a C3 pipeline should be conducted every (how many)
years? (No RBI, RL=6yrs)
A) 3 years B) 5 years
C) 6 years D) 10 years

Ans: B (570, 6.3, 4th Par. Rule = Use Table 2 value only)  Class 1 = 5 year visual interval
There is no ½ RL rule for Visual Insp intervals … Use lesser of full RL = 6 yrs or 5 yrs = B

33. For existing insulated lines that are being pressure tested after repairs, rerating, or
alteration, it is not necessary to strip insulation on all existing welds. However, what actions
should be taken in lieu of stripping away of all of the insulation for the test?
A) Pressure test with longer hold times & match mark pressure gauges before leaving the site
B) Pressure test with longer hold times & observe pressure gauges carefully during the test
C) Pressure test with shorter hold times & perform a close pressure gauge examination
D) Check the line carefully at all exposed areas looking for small leaks

Answer = B (API 570, Par. 8.2.6)

34. Regarding future Inspection interval determination by the Inspector, which of these
statements is NOT true according to the API 570 code?
A) Inspection intervals shall be reviewed/adjusted as needed after each inspection
B) Inspection intervals shall be reviewed/adjusted as needed after a significant operating change
C) Forms of deterioration / damage mechanisms shall be considered when establishing intervals
D) Maximum inspection intervals as per API 570 Table 2 (thickness, visual) shall be mandatory

Answer: D (API 570, 6.3.3 … Last Para.) Table 2 maximum intervals are recommended

35. Category D Fluid Service is a service where all of the following are true EXCEPT:
A) Fluid handled is nonflammable, nontoxic, & not damaging to human tissues
B) Design temperature is from 0°C (32°F) through 186°C (366°F)
C) Design gage pressure does not exceed 150 psi
D) Inspection of Category D piping is optional

Answer: B (ASME B31.3 Definitions … Fluid Service) −29°C (−20°F) to 186°C (366°F)

9|Page
Name/Badge #: _______________________________________________ Date: ____________
Q & A for API 570 Practice Exam (150 Questions)
36. The RL of anhydrous hydrogen chloride system was found to be 11 yrs. When must the
next visual inspection be scheduled for this piping system? (Given = No RBI)
A) 5 years B) 5.5 years
C) 10 years D) None of these are correct
Ans: A (570, 6.3, 4th Par. Rule = Use Table 2 value only)  Class 1 = 5 year visual interval
There is no ½ RL rule for Visual Insp intervals … Use Class 1 Table Value of 5 yrs or “B”
37. A diesel pipeline is located along a river. This piping circuit should have the thickness
measurements conducted every (interval in years)? Assume no RBI & 16 year RL!
A) 5 years B) 8 years
C) 10 years D) None of these are correct
Answer: A (570, 6.3.4.2.f, Table 2) Must know piping over or along a waterway = Class 1
(Table 2 interval for UT = 5 years) … Common mistake = Call this Class 3 line = 10 years
The ½ RL rule = 8 years … The lesser value will be found in Table 2 = 5 years!

38. The potential for a brittle failure shall be evaluated by an engineer prior to Hydrostatic
Testing or especially prior to Pneumatic Testing because of the:
A) Higher chance for leakage involved in the pneumatic test
B) Lower chance for leakage involved in the pneumatic test
C) Higher potential energy involved in the pneumatic test
D) Lower potential energy involved in the pneumatic test
Answer: C (API 570, Para. 5.8.3) … Must know Pneumatic Test Stored Energy Calculation

39. Using the illustration from ASME B16.5 (Table 5) identify Value “P” as it relates to the
applicable API 570 calculation?

A) Ring Type Joint (RTJ) dimension B) Value Dg in the blank calculation


C) Ring Joint pitch dimension D) Flat face pitch diameter
Answer: B (ASME B16.5 Table 5 Illustration of Ring Joint Gasket pitch diameter)

10 | P a g e
Name/Badge #: _______________________________________________ Date: ____________
Q & A for API 570 Practice Exam (150 Questions)
40. The Class 2 piping has an insulated area of 200 sq. ft. that is exposed to a susceptible
temperature and the mist spray of a cooling tower. According to API 570, how much of the
minimum area is recommended for NDT survey for CUI during an external inspection?
A) 100 sq. ft. B) 50 sq. ft. C) 66 sq. ft. D) 150 sq. ft.
Answer: C (See API 570 Table 3 and apply rules for Class 2) … 200 x 33% = 66 sq. feet
41. Actual thickness measured at a TML was 0.400 inches. Corrosion rate is 10 mpy. If the
next planned thickness inspection is after 6 years, what thickness is used for MAWP calcs?
A) 0.400 inch B) 0.340 inch C) 0.280 inch D) None of these
Answer: C (API 570, Para. 7.2 … See the last two paragraphs & example in Table 7-1)
MAWP thickness used shall be Actual Thickness minus twice the corrosion loss up to next
inspection. Corrosion loss (6 yrs) = 60 mils … Corrosion loss (6 yrs) x 2 = 120 mils (0.12 in)
Therefore, 0.4 – 0.12 = 0.28 inch
42. Determine MAWP from the following given information and state whether the
proposed interval of 5 years is acceptable: API 5L Grade X-60 (Fusion welded), NPS 16
Sch. 160, Piping installed 1982 (No baseline UT records) 2007 UT = 1.279 inches, 2012 UT =
1.115 in, Design = 500 psig/400ᴼF
A) 468 psig, 5-yr interval = proposed interval of 5 years is unacceptable
B) 675 psig, 5-yr interval = proposed interval of 5 years is acceptable
C) 975 psig, 5-yr interval = proposed interval of 5 years is acceptable
D) 2336 psig, 5-yr interval = proposed interval of 5 years is acceptable
Step # 1 … Do Corrosion rate … 1.279 – 1.115 = 0.164 in. or 164 Mils ÷ 5 = .0328 in/yr or 32.8 MPY
Step # 2 … Determine “ t “ … 1.115 inches – (2 x ECL  0.164) = 1.115 in - .328 = 0.787 inches = t
Step # 3 … Determine S  A-1 Table (B31.3), Determine E (A-1B Tables), & “D” (API 574 Table 1)
Step # 4 … 2SEt÷D = (2)(25,000)(0.95)(.787) ÷ 16 = 47,500 (.787) = 37,382.5 ÷ 16 = 2336 = OK = “D”

43. When designating an injection point circuit for purposes of inspection, it may often be
appropriate:
A) To extend the circuit to the next fitting downstream of the injection point
B) To extend the circuit two fittings downstream of the injection point
C) To extend the circuit to the next piece of pressure equipment
D) To extend the circuit to the next specification break
Answer = C (API 570, Para. 5.5.9)
44. Buried piping longer than 100 feet and NOT cathodically protected should have a soil
corrosivity measurement at what interval?
A) 2 years B) 3 years
C) 5 years D) 10 years
Answer: C (API 570, 9.2.4)

11 | P a g e
Name/Badge #: _______________________________________________ Date: ____________
Q & A for API 570 Practice Exam (150 Questions)
45. During a leak test of buried piping, the Inspector checked the pressure four hours after
the initial pressurization of the piping system and noted a pressure drop of about 3%. The
Inspector requested that the line be repressurized to the original test pressure and isolated
from the pressure source (test pump). After remaining time in the test period passed
(another 4 hours), a final check of the test gauge showed a reduction in the test pressure
(450 psi), which was reduced to 425 psi. What action(s) should the Inspector recommend?
A) Piping should be visually inspected externally (full excavation)
B) Piping should be visually inspected internally (wherever this is possible, if it is possible)
C) Request sonic measurements to locate suspected leaks as a result of this pressure drop
D) All of the above, and the test results should not be accepted

Answer: D (API 570, 9.2.7) … 5% pressure drop rule over final 4 hours = leak exists

46. When a corroded area of pipe exceeds ½ the diameter of the pipe size, a temporary
patch about equal to the size of the corroded area may be installed by fillet welding
(temporary repair) IF:
A) Patch corners shall have at least a 1” radius
B) Diameter of electrode is 5/32 in. or more
C) A full encirclement sleeve is used
D) None of these

Answer: C (API 570, App. C) … You must take a look carefully at Figure C-2 “Notes”

47. Planning for a hydro-test of a piping system with hydro test pressure of 40kg/cm²g, you
see calibrated test gauges are 0-50 kg/cm²g, 0-100 kg/cm²g, 0-150 kg/cm²g, & 0-200 kg/cm²g.
Which two of the four calibrated gauges available in your shop are acceptable for the test?

A) 0-100 kg/cm²g and 0-150 kg/cm²g B) 0-50 kg/cm²g and 0-100 kg/cm²g
C) 0-100 kg/cm²g and 0-200 kg/cm²g D) 0-50 kg/cm²g and 0-200 kg/cm²g
Answer: A (ASME V, Art.10, T-1031a) … Apply the “1.5 to 4 times” pressure rule
0 to 1 ½ times (minimum range) and 0 to 4 times (maximum range) … For our given
example value of 40: 0 – 60* (min) and 0 – 160** (max) … 40 x 1.5 = *60 … 40 x 4 = **160
Step 2: Answers B & D must be eliminated (Value of 50 is below our 1.5 x 40 or value 60)
Step 3: Answer C must also be eliminated (Value of 200 exceeds our 4 x 40 or value 160) …
Using a process of elimination, the only remaining answer = A … Same rules apply for PSI

48. To verify satisfactory PWHT, what test is conducted per ASME B31.3 requirements?

A) Radiography or UT B) Visual examination


C) Hardness survey D) MT or PT

Ans: C (ASME B31.3, 331.1.7 … First sentence)  also know 10% & 100% Test Reqmts

12 | P a g e
Name/Badge #: _______________________________________________ Date: ____________
Q & A for API 570 Practice Exam (150 Questions)
49. During impact testing of A106 Gr. B (deoxidized) & A53 Gr. B pipes (non-deoxidized),
the following absorbed energy values in ft-lb were observed as follows:
 A106 Gr. B: 12.5, 13.5, 12 (Deoxidized)
 A53 Gr. B: 11, 11.5, 9 (Non-deoxidized)
 Assume that full size 10 mm specimens were taken
Your assessment of these impact test results is that:
A) Both A106 Gr. B and A53 Gr. B specimens are acceptable
B) Both A106 Gr. B and A53 Gr. B specimens shall be rejected
C) Only A53 Gr. B specimens can be accepted
D) Only 106 Gr. B specimens shall be accepted
Answer: C (B31.3, Table 323.3.5, See also A-1 Values for specified min. tensile strength)

A106 Gr B (deoxidized) tensile strength = 60 ksi, & average of 3 values required =13 ft/lb
Note: A106 Gr B (deoxidized) material MINIMUM VALUE (1 specimen) = 10 ft/lb
A53 Gr B (Non-deoxidized) tensile strength = 60 ksi, & average of 3 values req’d =10 ft/lb
Note: A53 Gr B (Non-deoxidized) material MINIMUM VALUE (1 specimen) =7 ft/lb
A quick look reveals that all 6 Charpy specimen values MEET MINIMUM REQMTS
Now, let’s average the 3 values as follows:
Average for A106 Gr B = 12.5 + 13.5 + 12 = 38 ÷ 3 = 12.66 < 13 = FAILURE
Average for A53 Gr B = 11 + 11.5 + 9 = 31.5 ÷ 3 = 10.5 > 10 = ACCEPT ONLY A53 Gr B
50. A piping system to be pneumatically pressure tested has a 160 psi design pressure.
During first stage of pressurization, test pressure will be ___ psi. Test pressure = ___ psi*.
(*RV setting = Test pressure +10%) & pressure during visual inspection shall be ___ psi.
Select correct answer below after consulting the ASME B31.3 code requirements.
A) First stage pressurization = 80, test pressure = 176, pressure during exam for leaks = 160 psi
B) First stage pressurization = 25, test pressure = 200, pressure during exam for leaks = 176 psi
C) First stage pressurization = 25, test pressure = 176, pressure during exam for leaks = 160 psi
D) First stage pressurization = 80, test pressure = 200, pressure during exam for leaks = 176 psi
Answer: C (ASME B31.3, Para. 345.5.4/345.5.5, Procedure for Pneumatic Test on Page 83)
Remember the 25 psi rule or ½ design pressure at the start of the test … use lesser value
Note: If the question had a design pressure of 40 psi, the first stage value would be 20 psi
Bonus: Relief Valve Setting must be 176 + 10% = 176 + 17.6 = 193.6 = 194 (See 345.5.2)

13 | P a g e
Name/Badge #: _______________________________________________ Date: ____________
Q & A for API 570 Practice Exam (150 Questions)
~~~~~~~~~~BEGIN CLOSED BOOK SECTION 100 QUESTIONS~~~~~~~~~~

51. Which of the following conditions have the “highest potential” to create an emergency
should a leak occur in a Class 1 piping system containing flammable fluids?
A) Rapid vaporization on leakage B) Slow vaporization on leakage
C) No significant vaporization D) None of the above
Answer: A (API 570, 6.2.1)
52. Regarding brittle fracture failures, cracking found will typically show evidence of:

A) Straight, non-branching cracks largely without evidence of any associated plastic deformation
B) Both straight & multi-facet cracks with evidence of a shear lip or localized necking at cracks
C) Branching cracks having evidence of a shear lip or localized necking around the cracks
D) None of these are correct
Answer: A … API 571 … Para. 4.2.7.5.a … Brittle Fracture Question

53. Most cases of Brittle Fracture occur only at:

A) Charpy Impact temperatures have no relationship to Brittle Fracture occurrences


B) Temperatures above Charpy Impact transition temperatures
C) Temperatures below Charpy Impact transition temperatures
D) Temperatures below ambient & only in very thick sections
Answer = C … See Paragraph 4.2.7.3.e below  Critical Factors

54. Long-term and short-term corrosion rates should be compared to see which results in
the shortest remaining life as part of the data assessment. Who is responsible to select the
corrosion rate that best reflects the current process?

A) Piping Engineer after consultation with the Corrosion Engineer


B) Authorized Inspector after consultation with a Corrosion Engineer
C) Authorized Inspector determines the rate that best reflects the current process
D) Authorized Piping Engineer determines Corrosion Rate based on Inspector’s recommendation
Answer = B (API 570, Para. 7.1.1)

55. Insulating materials often “hold moisture” that creates corrosion. The ability of
insulation to draw and hold water or moisture is known as:

A) Wicking B) Saturation
C) Wetting D) None of these are correct

Answer: A … API 571, Para. 4.3.3.3.f – Corrosion under Insulation Question

14 | P a g e
Name/Badge #: _______________________________________________ Date: ____________
Q & A for API 570 Practice Exam (150 Questions)
56. Authorized piping inspectors shall be qualified & certified in accordance with what
code requirement?

A) API 570 Annex A B) API 570 Annex B


C) API 570 Annex C D) API ICP (Inspector Certification Program)
Answer = A (API 570, Para. 4.2 & Appendix A)
57. An API Authorized Inspection Agency may be defined as any of these below except:

A) Inspection organization of the jurisdiction in which the piping system is used


B) An owner or user of piping systems who maintains an inspection organization for activities
relating to piping systems not intended for sale or resale
C) An independent inspection organization employed by or under contract to owner or user of
piping systems that are used only by the owner or user and not for sale or resale
D) An independent inspection organization not licensed or recognized by the jurisdiction in
which the piping system is used & employed by or under contract to the owner or user
Answer = D (API 570, Para. 3.1.6 Definition)

58. A Repair Organization may be defined as any of the following EXCEPT:

A) An owner or user of piping systems who repairs or alters his equipment per API 570
B) Contractor with qualifications acceptable to an owner or user of piping systems and who
makes repairs or alterations in accordance with API 570
C) One who is authorized by, acceptable to, or otherwise not prohibited by a jurisdiction and
who makes repairs in accordance with API 570
D) A Group outside of a Jurisdiction that travels into a new location and does Repair Work
Answer = D (API 570, Para. 3.1.79 Definition)

59. Who is responsible for developing, documenting, implementing, executing, and


assessing piping inspection systems and inspection procedures that will meet the
requirements of the API 570 Inspection Code?

A) Owner/user organization B) Contractor with qualifications acceptable to owner/user


C) Authorized Inspection Agency D) Repair Organization
Answer = A (API 570, Para. 4.3.1.1)

60. API 570 Authorized Piping Inspectors are responsible to the Owner/User for all of the
following EXCEPT:

A) Determining if API 570 requirements for inspection/examination/testing have been met


B) Being directly involved in all inspection activities, including any examiners assisting him
C) Settle all nonconformances by having repairs done quickly as based on inspector’s findings
D) Evaluating & accepting (or rejecting) all examination results provided by any examiner
Answer = C (API 570, Para. 4.3.4)

15 | P a g e
Name/Badge #: _______________________________________________ Date: ____________
Q & A for API 570 Practice Exam (150 Questions)
61. Historically, the greatest number of incorrect material substitutions during fabrication
and construction is between what types of materials:

A) CS & Low Alloys B) CS & SS


C) Low Alloy & Nickel steels D) None of these
Answer = A … CS substitutions into Low Alloy (CrMo) systems  API 578, Para. 4.3.3.1
62. What is the API 570 “minimum possible upstream limit” for an injection point circuit
for inspection purposes (It can NEVER be less than this value, although it may be greater):
A) 6 inches
B) 12 inches
C) 24 inches
D) None of these are correct
Ans = B (API 570, Para. 5.5.9 & Figure 1) … Don’t forget the upstream rule … 12 inches or
3 pipe diameters, whichever is GREATER … Minimum possible always = 12 inches

63. The owner/user or the inspector may establish inspection intervals and the thickness
measurements should be scheduled based on:

A) Not more than the remaining life as determined from calculated corrosion rates
B) Only at maximum intervals recommended in Table 2 for a given Class of piping
C) The remaining life value or the Table 2 value, whichever is less
D) None of these is correct
Ans = D (570, Par. 6.3.3)  At ½ RL value or the Table 2 value, whichever is less

64. Critical Environmental Factors for CUI can include all of the following EXCEPT:

A) Insulation system design & type


B) Humidity & Rainfall
C) Chlorides from Marine Environment
D) Industrial pollution (SO², etc)

Answer = A … API 571 See Paragraph 4.3.3.3.a (Critical Factors)

65. The owner/user or the inspector may establish inspection intervals and the visual
inspection intervals should be:

A) Not more than the remaining life as determined from calculated corrosion rates
B) At maximum intervals recommended in Table 2 for a given Class of piping
C) At the remaining life value or the Table 2 value, whichever is less
D) None of these is correct
Ans = B (570, Par. 6.3.3) First sentence  many miss this easy question!

16 | P a g e
Name/Badge #: _______________________________________________ Date: ____________
Q & A for API 570 Practice Exam (150 Questions)
66. Thickness measurement inspection on hot surfaces must apply a 1% temperature
correction factor for every 100°F when the surface temperature measures greater than:
A) 100°F (38°C) B) 125°F (52°C)
C) 150°F (65°C) D) 212°F (100°C)

Answer = C (API 570, Para. 5.7.1)

67. When an owner/user chooses to conduct RBI assessment of piping system, assessments
must include a systematic evaluation for all items listed below EXCEPT:
A) Likelihood of failure based on forms of degradation reasonably expected in a given service
B) In accordance with API 580 and detailed methodology per API 581.
C) In accordance with API 579 and detailed methodology per API 581.
D) Consequence of failure of the piping system in a given service
Answer = C (API 570, Para. 5.2 … Second Paragraph)

68. External visual inspections are used to identify all of the following EXCEPT:
A) Corrosion (at supports & at interface corrosion points), Coating/Insulation deterioration.
B) Support Condition (Inadequate supports, loose supports, spacing (gaps) not having bearing
C) Leaks (Flanged joints, Steam tracing, existing clamps, valve stems, seal welds, threads, etc)
D) Condition of externally accessible surfaces after any piping flanges are opened
Answer = D (API 570, Para. 5.4.3 … last sentence) Note: “D” is considered an internal insp

69. Soil to air interface zone is generally located “where” on a piping system?
A) Pipe running parallel to and less than 12 in. (300 mm) above soil line
B) 12 in. (300 mm) below to 12 in. (300 mm) above grade
C) 12 in. (300 mm) below to 6 in. (150 mm) above grade
D) None of these are correct
Answer: C (570, 3.42) … Always apply the 6 inch rule for pipe parallel & close to grade
70. Insulated piping systems susceptible to CUI include all of the following EXCEPT:
A) CS piping systems operating between 10°F (–12°C) and 350°F (175°C)
B) Austenitic SS piping systems operating between 50°F (10°C) & 400°F (205°C)
C) CS piping systems normally operating above 350°F (175°C) in intermittent services
D) Those exposed to cooling tower mist, steam vents, deluge systems & subject to process spills
Ans: B (570, Par. 5.5.6/Table 2 & 574, Par. 7.4.4.1.e/f/h)  120°F (60°C) & 400°F (205°C)

71. Atmospheric Corrosion rates vary greatly due to a variety of factors. Corrosion rates
for CS increase with the temperature up to about:

A) 215°F (101°C) B) 250°F (121°C)


C) 350°F (175°C) D) 400°F (205°C)
Ans: B (570, Par. 5.5.6/Table 2 & 574, Par. 7.4.4.1.e/f/h)  120°F (60°C) & 400°F (205°C)
17 | P a g e
Name/Badge #: _______________________________________________ Date: ____________
Q & A for API 570 Practice Exam (150 Questions)
72. A mechanical form of degradation in which cracks are produced as the result of
dynamic loading due to water hammer, slugging, or unstable fluid flow is known as:

A) Vibration-Induced Fatigue B) Thermal Fatigue


C) Mechanical Fatigue D) Erosion/Erosion Corrosion
Answer: A … API 571, Para. 4.2.17.1 – Vibration-Induced Fatigue Question

73. Fasteners should extend completely through their nuts. Any fastener failing to do so is
considered acceptably engaged if:
A) The end of the fastener is flush with the face of the nut
B) The lack of complete engagement is not more than 1 thread
C) The lack of complete engagement is not more than 2 threads
D) At least one thread must extend beyond the face of the nut
Answer: B (API 570, Para. 5.12)

74. These points are areas defined by a circle having a diameter not greater than 2 inches
for a line diameter not exceeding 10 inches or not greater than 3 inches for larger lines.
A) Hold B) Examination
C) Witness D) CML
Answer: B (API 570, Para. 3.1.20)

75. API 570 Piping Classification schemes are based upon the:
A) Likelihood of failure B) Consequence of failure
C) Risk of failure D) None of these

Answer: B … (API 570, Para. 6.3.1  2nd Paragraph (below)

76. Regarding the appearance or morphology of Mechanical Fatigue, the signature mark of
fatigue failure will typically appear as:
A) Single clam shell fingerprint with vertical straight lines directly below the crack initiation site
B) Single clam shell fingerprint with rings called beach marks coming from a crack initiation site
C) Concentric lines throughout the entire cross-sectional area
D) None of these are correct
Ans: B … API 571, Para. 4.2.16.5.a & Figures 4-30/31/32/33 – Mechanical Fatigue Question

77. The common method used to monitor boiler water for condensate corrosion is:
A) Operational Temp Range Analysis B) Treatment Chemical (Scavenger) Analysis
C) Water Analysis D) pH Analysis

Answer = C … See Para. 4.3.5.7 (Inspection & Monitoring)

18 | P a g e
Name/Badge #: _______________________________________________ Date: ____________
Q & A for API 570 Practice Exam (150 Questions)
78. Loss of ductility/notch toughness in susceptible low alloys, such as ≤ 2-1/4 Cr occurs
when:
A) Prolonged service at high temperature (700 F – 1070 F) leads to Temper embrittlement
B) Prolonged operation at high cyclical service leads to Vibration-Induced fatigue
C) Prolonged services at low temperature (-20 F) leads to Brittle Fracture
D) Prolonged service at high pressure and temperature leads to creep
Answer: A (API 570, Para. 3.44) … definition of Temper Embrittlement

79. Magnetic Particle examination methods can detect which of these discontinuities?
A) Both shallow sub-surface cracks and surface cracks
B) Both deep sub-surface cracks and surface cracks
C) Shallow sub-surface cracks
D) Deep sub-surface cracks
Answer: A (ASME V, Art. 7, T-720) … Shallow sub-surface cracks & other discontinuities
may be found using MT … Many miss this question and answer “C”

80. API 578 gives rules for Alloy Verification for:


A) Carbon steel piping material for old or new piping
B) Alloy steel piping materials, for old or new piping
C) Carbon steel materials used for old piping only
D) Alloy steels used for old piping only

Answer: B (API 578, 1.1)

81. Regarding the thickness measurement of small diameter piping NPS 1 & smaller, the
best NDT technique (API 570 preferred method) is to use the:
A) Ultrasonic thickness technique B) Radiographic profile technique
C) Real time radiographic methods D) None of these are correct per API 570

Answer: B (API 570, Para. 5.6) … Reason … The effects of “doubling” occur during UT

82. For recalculating Piping Circuit MAWP, what computation determines wall thickness?
A) Actual thickness as determined by inspection
B) Actual thickness minus estimated corrosion loss before the next inspection date
C) Actual thickness minus twice the estimated corrosion loss before the next inspection date
D) Actual thickness minus estimated corrosion loss since the last inspection date
Answer: C (API 570, 7.2)

19 | P a g e
Name/Badge #: _______________________________________________ Date: ____________
Q & A for API 570 Practice Exam (150 Questions)
83. What term best describes a physical change in a component that has design
implications affecting pressure containing capability or flexibility of a piping system
beyond the scope of the original design.
A) Rerating B) Repair
C) Alteration D) Assembly
Answer: C (API 570, Para. 3.1 … Definition) … A guaranteed test question

84. Who has responsibility to the owner/user that includes the supply of materials,
equipment, quality control and workmanship necessary to maintain and repair piping
systems per API 570?

A) Repair organization B) Inspection Agency


C) Contractor D) Piping Engineer
Answer: A (API 570, Para. 4.3.3)

85. Injection points are sometimes subject to accelerated corrosion from normal or
abnormal operating conditions. Because of this, how must they be treated?

A) Injection points may be treated as a separate inspection circuit


B) Injection points are treated as any other piping in the plant
C) Injection points require no special treatment
D) None of the above
Answer: A (API 570, 5.3.1)

86. Rerating piping systems by changing MAWP & / or temp rating may be done only if all
of the following requirements below have been met EXCEPT (Select incorrect answer):

A) Piping system uses same pressure relieving device settings if capacity is not affected
B) Calculations are performed by the piping engineer or the inspector
C) Rerating is acceptable to the inspector or piping engineer
D) All piping system components are adequate for the new combination of pressure/temperature
Answer = A (API 570, Par. 8.3.e) … Relief must be reset at the appropriate new pressure

87. The API-570 Piping Inspection Code applies to:


A) Inspection, rating, repair, & alteration procedures for piping systems already in-service
B) May be used for modification or addition of new piping systems constructed per the code
C) May be used when in conflict with any prevailing regulatory requirements
D) Pressure vessels, heaters, or heat exchanger internal or external piping
Answer: A (API 570, 1.1.1)

20 | P a g e
Name/Badge #: _______________________________________________ Date: ____________
Q & A for API 570 Practice Exam (150 Questions)
88. API-570 Piping Inspection Code is intended for use and may be used by all of these
EXCEPT:
A) Those in the Refinery Industry
B) Those in the Chemical Process industry
C) Those in the Pharmaceutical Industry
D) Whoever uses it and can access Inspection
Answer: D (API 570, 1.2.1)  Authorized Inspection, Engineers, Repair Org, etc)

89. Which of the following types of imperfections cannot be detected by radiography?

A) Cracks
B) Slag or Porosity
C) Incomplete Penetration
D) Planar flaws (such as laminations)

Answer = D … ASME V, Art. 1, Table A-110 (RT Col. Product Form & weld imperfection)
90. The owner/user shall maintain appropriate permanent and progressive records of each
piping system covered by API 570 for all of the following items EXCEPT:

A) Piping system service, classification, identification numbers, & inspection intervals


B) Documents recording details of testing (inspector/examiner, date, types of testing, etc)
C) Results of thickness measurements & other tests, inspections, repairs (temp/permanent),
alterations, or rerating. Design information and piping drawings may be included
D) Fitness for service assessment plans and strategies
Answer = D (API 570, Par. 7.6.1)

91. When reviewing RT film, a darkened perfectly straight line can be seen in the very
center of the root pass (lightest area). The length of the line is about 75mm long. It is likely
which type of discontinuity?

A) Incomplete penetration
B) Incomplete fusion
C) Wormhole porosity
D) Crack
Ans: A (API 577 NDT General Knowledge) … Note 2 in API 577 RT Illustrations

92. Which of the following imperfections may appear as a dark round spots using
radiography?

A) Cracks and Incomplete Penetration


B) Slag and Incomplete fusion
C) Porosity or Burn through
D) Laminations
Answer = C … General NDE knowledge Note 2 in API 577 RT Illustrations

21 | P a g e
Name/Badge #: _______________________________________________ Date: ____________
Q & A for API 570 Practice Exam (150 Questions)
93. Which of these imperfections may appear as a light white spot using radiography?
A) Cracks
B) Incomplete Penetration
C) Porosity
D) Tungsten Inclusion
Answer = D … General NDE knowledge & RTFI Presentation in E-Library Folder # 27
94. Deadlegs include all of the following EXCEPT:
A) Lines with one end blanked
B) Control valve bypass lines
C) Relief valve inlet and outlet header piping
D) Sample points, drains, bleeders, and instrument connections
Answer: B (API 570, Para. 3.1.16)
95. Injection points are sometimes subject to accelerated corrosion from normal or
abnormal operating conditions, and because of this injection points are treated as:
A) A part of the circuit that needs to be inspected regularly per API 570 requirements
B) A separate inspection circuit needing thorough inspection on a regular schedule
C) An inspection circuit covered along with On-stream inspection surveys
D) A separate part of an external inspection, similar to CUI inspection
Answer: B (API 570, 5.4.2)
96. Before performing required inspections, inspectors shall familiarize themselves with:
A) Similar piping system repairs
B) Piping system baseline inspection results
C) Previous history of similar piping systems
D) Current Inspection Plans for the piping system
Answer: D (API 570, 5.3.5)  Review the current Inspection Plan)
97. Examples of environmental cracking include all of the following except:
A) Polythionic acid SCC B) Caustic SCC (caustic embrittlement)
C) Temper Embrittlement and Creep D) Chloride SCC of Austenitic SS
Answer: C (API 570, 5.4.1.1)

98. Typical sources of moisture that cause corrosion under insulation (CUI) include:

A) Cooling Towers located downwind from Plant Prevailing winds


B) Rain, water leaks, condensation and deluge systems
C) Breaks, holes or sealant deterioration in insulation
D) Penetration locations in the insulation
Ans: B (5.4.2.c API 574, Sect 7.4.4) … sources, not causes (If causes for CUI, ans = C)

22 | P a g e
Name/Badge #: _______________________________________________ Date: ____________
Q & A for API 570 Practice Exam (150 Questions)
99. Regarding reporting & records, Computer programs are particularly useful for all of
the following EXCEPT:
A) Storing thickness readings
B) Calculating short and long-term corrosion rates, retirement dates, MAWP, and reinspection
intervals on a test-point by test-point basis.
C) Highlighting areas of high corrosion rates & circuits overdue for inspection
D) Fitness for service assessment docs per API 581

Answer: D (API 570, Para. 7.6) … Fitness for Service Assessment docs are per API 579

100. ASME IX Mechanical Tests (Tension Tests) are used to determine the:

A) Degree of soundness and ductility of groove-weld joints


B) Ultimate strength of groove-weld joints
C) Notch toughness of the weld
D) Stress values used in calcs

Answer = B … QW-141.1

101. ASME IX Mechanical Tests (Guided-Bend Tests) are used to determine the:

A) Degree of soundness and ductility of groove-weld joints


B) Ultimate strength of groove-weld joints
C) Notch toughness of the weld
D) Stress values used in calcs

Answer = A … QW-141.2

102. ASME IX Mechanical Tests (Charpy Impact Tests) are used to determine the:

A) Degree of soundness and ductility of groove-weld joints


B) Ultimate strength of groove-weld joints
C) Notch toughness of the weld
D) Stress values used in calcs

Answer = C … QW-141.3

103. API 574 External Insp Checklist for Misalignment covers all the following except:

A) Piping Misalignment
B) Restricted Movement
C) Support misalignment
D) Expansion joint misalignment

Answer: C (API 574, Annex A – External Inspection Checklist)

23 | P a g e
Name/Badge #: _______________________________________________ Date: ____________
Q & A for API 570 Practice Exam (150 Questions)
104. Which of these statements are False regarding On-stream inspections per API 570?
A) On-Stream inspections may be required by the Inspection plan
B) On-stream inspections should be conducted by either an inspector or examiner
C) The external thickness measurement inspection shall be a part of an on-stream inspection
D) On-stream inspection work done by examiners shall be authorized & approved by Inspector
Answer: C (API 570, Para. 5.5.2)

105. Which of these are NOT mandatory requirement(s) for re-rating a piping system?
A) Current insp. records shall be reviewed to verify that piping system is satisfactory for the
proposed service conditions & an appropriate corrosion allowance has been provided
B) The piping system is checked to affirm that the required pressure relieving devices are
present, are set at appropriate pressure & have appropriate capacity at the set pressure
C) All deficiencies in the piping system must be corrected before the re-rating is complete
D) Calculations must be performed by the piping engineer or the inspector
Answer: C (API 570, 8.3)

106. Which of the following API 570 cases does requires the approval from the piping
engineer and is considered an “alteration” as defined by API 570?
A) Changing out a damaged flange with a new flange of the same rating and material
B) Changing out a corroded branch connection (no required reinforcement)
C) Adding a large bore branch connection requiring reinforcement
D) Adding a small bore weld boss not requiring reinforcement
Answer: C (API 570, 8.1.1 & Definition in Para. 3.1) … HIGHLIGHT YOUR API 570

107. After completion of alterations or major repairs, a pressure test is:


A) Normally required
B) Not normally required
C) Required if deemed necessary by Examiner
D) Mandatory per API 570
Answer: A (API 570, 8.2.6 First Paragraph) … Normally required after alterations

108. Any welding conducted on piping components in operation must be done in


accordance with this document, and Inspector shall use as a minimum “Suggested Hot Tap
Checklist” contained in this document for hot tapping performed on piping components.
Which of the following documents referenced in API 570 addresses hot tapping?
A) API 2201 B) API 574
C) ASME B31.3 D) ASME PCC-2
Answer: A (API 570, 8.2)

24 | P a g e
Name/Badge #: _______________________________________________ Date: ____________
Q & A for API 570 Practice Exam (150 Questions)
109. Which of the following statements are correct?
A) Soil resistivity is a measure of resistance used by drilling operations in oil exploration and it
has no connection with corrosive soil
B) Soil resistivity has nothing to do with corrosiveness of soil because soil corrosion depends on
the amount of corrosive chemicals present in the soil
C) Lower soil resistivity indicates less corrosive soil
D) Higher soil resistivity indicates less corrosive soil
Answer: D (API 570, 9.1.4 on Soil Resistivity) HIGHER soil resistivity indicates LESS
corrosive soil … and therefore, LOWER soil resistivity will indicate MORE corrosive soil

110. Who shall be responsible to the owner-user for determining that the requirements of
API 570 for inspection, examination and testing are met?
A) Engineer B) Inspector
C) Repair Organization D) Operating Personnel
Answer: B (API 570, Para. 4.3.4) … Authorized Piping Inspector = Inspector in API 570)
111. General types of inspection & surveillance recognized for piping systems per API 570
include all of these EXCEPT:
A) Internal visual and external visual inspections
B) On-stream and thickness measurement and supplemental inspections
C) CUI inspection and vibrating piping inspection and Injection point inspection
D) Infrared Thermography for Hot spots, RT for fouling/plugging, Soil/Air interface inspections
Answer: D (API 570, 5.5)  These are not general types of inspection as per API 570
112. Bellows expansion joints should be visually inspected for all of these problems except:
A) Displacement exceeding design
B) Coating failure & corrosion
C) Unusual deformation
D) Misalignment
Answer: B (API 570, Par. 5.5.4 )
113. External inspections include surveys for condition of piping hangers/supports. Which
item below is NOT an inspection item concerning piping hangers/support conditions?
A) Locate any “bottomed out” spring supports and support shoes displaced from their supports
B) Support dummy legs have adequate drainage (not filled with water that causes corrosion)
C) Locate any cracked or broken hangers including any missing/damaged hardware
D) Restraint conditions that relieve stress existing in the piping system
Answer: D (API 570, Par. 5.5.4  See also API 574, Par. 10.1.4.1  Annex A Checklist
Note: Improper restraint conditions “create” or “Cause” stress in piping  Not relieve it

25 | P a g e
Name/Badge #: _______________________________________________ Date: ____________
Q & A for API 570 Practice Exam (150 Questions)
114. In addition to inspector, what other personnel can perform 570 external inspections?
A) Qualified Operating/Maintenance Personnel when acceptable to Inspector
B) Personnel suitably trained and appointed by the Management
A) Any plant personnel
C) Only the inspector
Answer: A (API 570, Par. 5.5.4)  Third Paragraph
115. At junctions where vibrating piping systems are restrained (such as branch
connections), what method(s) of NDE should be used to assess pipe condition and what
damage mechanism is likely to occur if periodic inspections are neglected?
A) MT or PT … To detect the onset of fatigue cracking
B) RT or UT … To detect the onset of fatigue cracking
C) VT or ET … To detect the onset of fatigue cracking
D) None of these are correct because fatigue cracking cannot be detected before it happens
Answer: A (API 570, 5.5.7)

116. Piping systems will have more CMLs and will be monitored more frequently when all
of the following conditions apply EXEPT:
A) Piping systems having high potential consequences if a failure occurs
B) Piping systems subject to higher corrosion rates
C) Piping systems subject to localized corrosion
D) Piping systems selected by Inspector
Answer: D (API 570, 5.6.2, 1st Paragraph)
117. A minimal number of CMLs are acceptable:
A) Whenever the corrosion rate is low and the corrosion is not localized
B) Whenever the corrosion rate is well known to an owner/user
C) Whenever the corrosion rate has been accurately established
D) Whenever it is acceptable to the API Authorized Inspector

Answer: A (API 570, 5.6.3) …

118. What is the formula for remaining life (½ RL = used for Thickness Measure
intervals)?
A) RL (years) = t actual – t required ÷ corrosion rate (in. or mm/year)
B) RL (years) = t initial – t actual ÷ the time (years) between t initial and t actual
C) RL (years) = t previous – t actual ÷ the time (years) between t previous and t actual
D) None of these is correct per API 570
Ans: A (API 570, 6.3, 3rd Par. Rule & 7.1.1 Formula 1)  Must memorize these 3 formulas
A = Correct = RL Formula # 1 … Both B & C are incorrect … see the next few questions

26 | P a g e
Name/Badge #: _______________________________________________ Date: ____________
Q & A for API 570 Practice Exam (150 Questions)
119. What is the formula for LT Corrosion Rate?
A) Corrosion Rate LT = t actual – t required ÷ corrosion rate (in. or mm/year)
B) Corrosion Rate LT = t initial – t actual ÷ the time (years) between t initial and t actual
C) Corrosion Rate LT = t previous – t actual ÷ the time (years) between t previous and t actual
D) None of these is correct per API 570
Ans: B (API 570, 6.3, 3rd Par. Rule & 7.1.1 Formula 2)  Must memorize these 3 formulas
because B = Correct = Corrosion Rate (LT) uses t initial … see the next two questions
120. What is the formula for ST Corrosion Rate?
A) Corrosion Rate ST = t actual – t required ÷ corrosion rate (in. or mm/year)
B) Corrosion Rate ST = t initial – t actual ÷ the time (years) between t initial and t actual
C) Corrosion Rate ST = t previous – t actual ÷ the time (years) between t previous and t actual
D) None of these is correct per API 570
Ans: C (API 570, 6.3, 3rd Par. Rule & 7.1.1 Formula 3)  Must memorize these 3 formulas
because C = Correct = Corrosion Rate (ST) uses t previous … see the next two questions
121. Regarding surface preparation for the various NDE techniques, the inspector may
need advice from:
A) No one (Inspectors call it)
B) Corrosion specialist
C) NDE specialist
D) Engineer

Answer: C (API 570, 5.7.3)

122. As part of a routine inspection, pressure tests are:


A) Conducted only when specified by owner/user
B) Not normally conducted
C) Normally conducted
D) Never conducted

Answer: A (API 570, 5.8)  Pressure testing deserves its own color code (red)

123. As part of a routine inspection, pressure tests must be conducted under all of the
following circumstances EXCEPT:

A) Whenever U.S. Coast Guard regulations apply for over water piping
B) Whenever specified per requirements of local jurisdictions
C) Whenever specified by the inspector or piping engineer
D) Whenever specified by a repair organization
Answer: D (API 570, 5.8)  Pressure testing deserves its own color code (red)

27 | P a g e
Name/Badge #: _______________________________________________ Date: ____________
Q & A for API 570 Practice Exam (150 Questions)
124. Lower pressure tests, which are used only for tightness of piping systems, may be
conducted at pressures designated by:

A) Owner/user B) Engineer
C) ASME B31.3 Code D) Jurisdiction Rules
Answer: A (API 570, 5.8 … 1st Para, 5th Sentence)
Exam Tip: Also know pressure test requirements per Section 8.2.6  normally required
after an alteration … These will be covered later in the Hundreds in Section 8.2
125. Per API 570, when a pressure test is required, it shall be conducted (when)?
A) Either before or after any heat treatment if approved by the Inspector
B) Either before or after any heat treatment if approved by the Engineer
C) Always before any heat treatment
D) Always after any heat treatment

Answer: D (API 570, 5.8 … 3rd Para)  Must know this critical rule

126. API 570 cautions the owner/user to avoid exceeding what critical limit for material
during pressure tests (especially for equipment at elevated service temperatures)?
A) Avoid exceeding 90% of SMYS of a material at test temperature during pressure testing
B) Avoid exceeding the specified maximum tensile strength during pressure testing
C) Avoid exceeding the specified minimum yield strength during pressure testing
D) Avoid exceeding the MAWP for the equipment during pressure testing

Ans: A (API 570, 5.8 … Last Para & Note)  Must know critical Note / 90% SMYS rule!

127. When flammable liquid is used for pressure testing, its flash point shall be at least:
A) 60° F (15°C)
B) 90°F (32°C)
C) 120°F (49°C)
D) 150°F (65°C)
Answer: C (API 570, 5.8.1 … 1st Para)  Pressure testing deserves its own color code (red)

128. Piping fabricated of or having components of 300 series SS should be hydrotested with
a solution made up of potable water (see note), de-ionized/de-mineralized water or steam
condensate having a total chloride concentration (not free chlorine concentration) of:

A) Less than 50 ppm


B) Less than 100 ppm
C) Less than 150 ppm
D) Less than 200 ppm
Answer: A (API 570, 5.8.1 … 2nd Para)  Pressure testing deserves its own color code (red)

28 | P a g e
Name/Badge #: _______________________________________________ Date: ____________
Q & A for API 570 Practice Exam (150 Questions)
129. A pneumatic (or hydro pneumatic) pressure test may be used when it is impracticable
to hydrostatically test a piping system. Which of these statements are correct per API 570?
A) Temperature, structural, or process limitations may make a hydrotest impracticable
B) Only an owner may decide which limitations make a hydrotest impracticable
C) Only structural or process limitations may make a hydrotest impracticable
D) Only process limitations may make a hydrotest impracticable
Answer: A (API 570, 5.8.2)  Pressure testing deserves its own color code (red)
130. Per API 570, special attention shall be given when pressure testing which of these
steels because they may be subject to Brittle Fracture during start-up/shut down because:
A) Metallurgical change known as Temper Embrittlement may affect all 1- ¼ Cr 1 Mo steels
B) Metallurgical change known as Temper Embrittlement may affect all 2- ¼ Cr 1 Mo steels
C) Metallurgical change known as Brittle Fracture may occur in all 5% - 9% Chrome steels
D) Metallurgical change known as Brittle Fracture may occur in all 1- ¼ Cr 1 Mo steels
Answer: B (API 570, Para. 5.8.3) …  Pressure testing includes Brittle Fracture concerns

131. Substituting NDE procedures for pressure test after an alteration is allowed only after:
A) Either an Engineer or an Inspector have approved the substitution
B) Both the Engineer and Inspector have approved the substitution
C) Inspector has approved the substitution
D) Engineer has approved the substitution
Answer: A (API 570, Para. 5.8.5) …  Pressure testing covers NDE also (RED & BLUE)
132. Per API 570, appropriate NDE shall be specified and conducted and substituted for a
pressure test when a pressure test is not performed after:
A) Any major repair or alteration … If the Engineer & Inspector approved the NDE substitution
B) Any major repair or alteration … If the Repair Organization approved the NDE substitution
C) Any major repair … If the Engineer & Inspector approved the NDE substitution
D) Any alteration … If the Engineer & Inspector approved the NDE substitution
Answer: D (API 570, Para. 5.8.5) … Pressure testing covers NDE also (RED & BLUE)
133. PMI testing can be accomplished by:
A) The inspector or the examiner B) The inspector only
C) The examiner only D) A trained PMI technician only
Answer: A (API 570, 5.9)
134. If a piping system component should fail because an incorrect material was
inadvertently substituted for the proper piping material, the inspector shall:
A) Ensure further sampling (Up to 100%) of existing piping materials is accomplished ASAP
B) Only consider the need for the further verification of the existing piping materials
C) Ensure that further sampling of existing piping materials is accomplished ASAP
D) Ensure 100% verification of existing piping materials is accomplished ASAP
Answer: B (API 570, 5.9)  MUST KNOW  100% Certain to be on the exam!!!

29 | P a g e
Name/Badge #: _______________________________________________ Date: ____________
Q & A for API 570 Practice Exam (150 Questions)
135. Which of the PMI test methods detects carbon content nondestructively?
A) Examining Material Test Reports (MTRs)
B) Portable Optical Emission Spectroscopy
C) Portable X-Ray Fluorescence (XRF)
D) Laboratory Chemical Analysis
Answer: B (API 570, 5.9  API 578, Par. 5.2.1  Know the three PMI methods)
136. Per API 578, if any one of a representative sample is rejected, then all of the items of
that inspection lot should be:
A) Quarantined (Segregated) and considered suspect until cleared by PMI testing or Verification
B) Considered Rejected (Segregated) until cleared by PMI testing or Verification
C) Considered Rejected only
D) Considered Suspect only
Answer: D (API 570, 5.9  API 578, Par. 6.3  Must know this likely exam question)
137. Per API 578, examples of acceptable identification markings includes all these except:
A) Documentation showing both the PMI test results and the PMI test locations
B) Low-stress stamp marking indicating that the PMI test has been performed
C) Color coding by alloy (Such as using the PFI-ES-22 system)
D) Visual verification of Mill Test Report (MTR) results
Answer: D (API 570, 5.9  API 578, Par. 7.1  Must know this likely exam question)
138. Normally thickness readings are not routinely taken on valves in piping circuits when
dismantled for servicing and repair. However gate valves in a severe corrosive/erosive
environment should have thickness readings taken (where)?
A) Between the valve seats
B) The valve bonnet
C) Thickness readings are not taken (use calipers)
C) The valve ends
Answer: A (API 570, 5.10)

139. Check valves should be visually checked and inspected internally. Which item below
is not a normally required inspection item for internally inspecting check valves?

A) Check that the flapper is free to move without excessive looseness (over tolerance) from wear
B) Excess wear on flapper stop (does not allow flapper to move past top center & remain open)
C) Flapper nut is properly secured to the flapper bolting (has not backed off, no looseness)
D) Leak checks of critical check valves
Answer: D (API 570, 5.10.a/b/c & last sentence)

30 | P a g e
Name/Badge #: _______________________________________________ Date: ____________
Q & A for API 570 Practice Exam (150 Questions)
140. If weld imperfections from original* weld fabrication (*Undercuts = crack-like flaws),
WHO assesses the impact of the weld quality on the piping system integrity per API 570?
A) Inspector and/or Corrosion Specialist B) Piping Engineer and/or Corrosion Specialist
C) Inspector and/or Engineer D) Piping Engineer only
Answer: B (API 570, 5.11, 4th Para)  This is clear in API 570! Green = Welding Question
141. Each owner/user organization should be audited periodically to determine if the
authorized inspection agency is:
A) Meeting requirements of Owner/user’s QA Inspection/Repair Management System
B) Meeting requirements of Owner/user’s Quality Assurance Manual
C) Meeting requirements of Inspection Organization’s Quality Plan
D) Meeting requirements of API 570 Piping Inspection Code
Answer: D (API 570, 5.13, First Sentence) … Must Know this one … tricky !
142. The audit team should typically be from any of these except:
A) 3rd Party Organization experienced/competent in Petrochemical Process Plant Insp. Programs
B) 3rd Party Organization experienced/competent in Refining Process Plant Inspection Programs
C) A combination of 3rd Party Organization and other owner/user sites
D) The same owner/user plant site where the audit is being conducted
Ans: D (API 570, 5.13, 3rd Sentence)  OTHER owner/user sites are acceptable)
143. Per API 570, a one-time, temporary extension of a piping inspection due date is called:
A) A deferral B) An extension
C) An inspection interval revision D) None of these are correct per API 570
Answer: A (API 570, Para. 6.1, 1st Para  Section 7.10)  Know overdue inspection rules
144. RBI assessment may be used to:
A) Increase or decrease extent of CUI inspection given in API 570 Table 3 for CUI Inspection
B) Only Increase inspection limits given in API 570 Table 3 for extent of CUI inspection
C) Only decrease inspection limits given in API 570 Table 3 for extent of CUI inspection
D) None of these as limits are given in API 570 Table 2 for extent of CUI inspection
Answer: A (API 570, 6.3.2 First sentence)
145. Regarding piping classifications, a consequence assessment considers which of these
associated with a potential failure of the piping system?
A) Explosion, Fire, Toxicity and environmental impact associated with a release
B) Potential causes of a release due to a piping system failure
C) Likelihood of a release due to a piping system failure
D) None of these are found in a consequence assessment
Answer: A (API 570, 6.3.1 … Second paragraph, First sentence)

31 | P a g e
Name/Badge #: _______________________________________________ Date: ____________
Q & A for API 570 Practice Exam (150 Questions)
146. Inspection intervals shall be reviewed and adjusted (How often) per API 570?
A) As needed after each inspection or significant change in operating conditions
B) Only as needed after each inspection if deemed necessary by the Inspector
C) Only when significant changes occur in the operating conditions
D) None of these is correct per API 570 corrosion half-life rules
Ans: A (API 570, 6.3.3, 5th Para)  Must know!

147. Regarding Thickness Measurement Intervals, prior to using Table 2 for Inspection
Interval determination by Class, what shall be done per API 570?
A) Corrosion rates do not need to be determined because intervals are given in API 570 Table 2
B) Corrosion rates shall be calculated per Section 7.1.1, Formula 1 for RL to determine ½ RL
C) Corrosion rates shall be calculated per Section 7.1.1, Formula 1 for RL to determine RL
D) Corrosion rates shall be calculated per Section 7.1.1, Formula 2 or 3 for Corrosion Rate
Answer: B (API 570, 6.3.3, 3rd Para)  You must memorize Table 2 intervals (Closed BK)
and RL formula 1 used to determine RL, then ½ RL … use lesser of Table 2 value or ½ RL

148. In addition to thickness measurement intervals by Class (also Injection Points & S/A),
Table 2 also contains recommended:
A) Maximum inspection intervals for External Inspection by Class (the RL calc is not applicable)
B) Maximum inspection intervals for External Inspection by Class or ½ RL, use greater value
C) Maximum inspection intervals for External Inspection by Class or ½ RL, use lesser value
D) Maximum inspection intervals for External Inspection by Class or RL, use greater value
Ans: (API 570, 6.3.3, 4th Para)  For Closed BK, you must memorize Table 2 intervals by
Classification & Injection Points and S/A interface corrosion  See API 574 7.4.5 & copy
these rules and place them into Table 2 margins  especially the 10-year rule for UG Pipe

149. A welder may be qualified by by all of the following methods except:


A) Radiography of a test coupon
B) Initial production welding results
C) Bend tests of a test coupon (Guided bend test)
D) Tension tests of a test coupon (tensile tests)
Answer: (API 577, Section 8  Welder Performance Qualification

150. Which of these statements are false regarding Welder Qualifications?


A) Welder quals can be revoked if there is a reason to question their ability to make welds
B) Welder performance quals expire if welding process is not used during a 6 month period
C) Welder’s log or continuity report can be used to verify a welder’s qualifications are current
D) Welder qualification tests are strictly supervised and controlled by the Authorized Inspector

Ans: (API 577, Section 8  Welder Performance Qualification  By welder’s employer