Educational qualifications:
Additional Certification:
ASNT-Level II in U.T, R.T, MPT & DPT (Valid up to May 2021)
Approvals
Career Summary
Experience
Page 1 of 3
Duration January 2010 to March 2012
Employer Aarvi Encon Engg Pvt Ltd, Mumbai, India
Position Mechanical Engineer
Project Proposed Baby care product factory phase-2(M.P)
Monitoring and conducting material inspection for piping, as per standards, codes and
Process standard specification.
Prepare inspection request prior to accept the construction piping welding work, release
fabricated pipe lines, pressure testing and reinstatement of piping system in order to
prepare certification for the completed items.
Inspection of shop fabrication of piping spools and supports. Visual inspection of weld
joints and plant piping, and preparing Punch List (A & B) after installation.
Verification of all supporting documents like PQR (for WPS), WQTR (for welder’s
qualification), calibration certificates (for machinery, ovens etc.) and procedure
documents(for NDT) Etc.,
Preparation of pressure test (hydro, pneumatic, and service) packages and ensure clearing
of punch items prior to Pressure test.
Verification of gaskets, bolts and nuts as per B.O.M and Witnessing bolt-torquing of
flanged joints.
Site surveillance to check the construction work and give some comments if necessary
according to standards.
Page 2 of 3
Installation of temporary spools with temporary gaskets and bolt, nuts. Removal of
temporary spools and reinstate the control valves, Check valves (NRV), Strainers with
permanent gasket and bolt, nuts with correct specification as mentioned in the drawing.
Before Fabrication, Erection to check the isometric drawing with correct revision as per
the latest record.
Monitoring the preservation of Piping Spools and Valves at site (Plant) in a good
Condition placed on Wooden Planks, Covering of ends with Plastic Covered.
ToCheck Manifold Certificates, Pressure Gauges and Relief Valve during Hydro Test.
Clearing of Reinstatement Item after Hydro Test.