as built
operating voltage
SAACKE VKK Marine Boilers GmbH
protection note according to DIN 34 consider !
: 440V/60 Hz Kaiserstrasse 4
Betriebsspannung
24143 Kiel / Germany
control voltage
: 230V/60 Hz phone : +49 (0) 431 7303 0
Steuerspannung
fax : +49 (0) 431 7303 303
regulation
Vorschrift
: LR ETS 25775-11 electrical documentation
degree of protection
: IP 54 Elektro-Dokumentation
Schutzart
Auftragsnummer
Colour :Munsell 7.5 BG 7/2
Cabinet Zeichnungsnummer
PCS PID Dimension
project : CMB-VS-1.6+1.0/7
H 1800 x W 1600 x D 400
Control cabinet 1
BN 001 Projekt
+ 100mm socket
CS010
comment on project : NEW TIMES SY
1 Projektkommentar
Starter box FWP 2 CS010 H 380x W 380 x D 210
A A
The regulation of the acceptance associations have to be considered
1.) Grounding of the casing (base, door, console panel, etc.) 13.) Screw which cannot be lost are to be used for plug-in modules.
4.) When installing unions in flange plates not processed or finished the area
17.) The control cabinet is to be equipped with fasting strips.
of the unions has to be made metallically bare and is to be greased.
18.) Mounting plate, cabinet door and back wall are to be reinforced.
5.) Use standard parts with processed surface (disks, lock washers, spring lock
washers, etc.)
C 19.) Use non halogen lines C
6.) Electric control equipment for more than one boiler has to be erected apart and
20.) Use non halogen cable duct
must be mechanically separated (partition). This is applicable too for the
7.) When using cable ducts the supply line may only be arranged in a separate
22.) Tension spring terminals client side. (Cutting terminals internally internal sid
cable duct or must remain visible.
9.) Separating disks are to be provided between terminals with and pierced copper busbar for connection cable shilding.
H07Z-K 1,5mm²
L1 Green
different potentials. The voltage of the terminals must be labeled.
L2 Yellow
26.) Install cable pull relief bar so that cables can be fitted directly.
L3 Brown
10.) All equipment labels on the mounting plates are to be coated additionally
with transparent lacquer (paper labels) 27.) Copper busbars for cable shilding have to be isolated und equipped
PE green / Yellow
all lines without indication of cross section are
12.) Control transformers must by all means be grounded via cable. 24 V DC (+) Red
24 V DC (-) Blue
Measuring
Cable White
Extern Orange
Voltage
F F
date 2012-01-30 cover sheet / Deckblatt =BCC
drawn ROS Control Cabinet Boiler
2 0-8100-100454-14 /3-32 +CC
0 as built 30.01.2012 ROS check ROS sheet 2
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by design specification / Bauvorschrift 6 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
=ECR : engine control room +F : field equipment +.._D : equipment in cabinet door
X1: terminal strip for external items equipment 230V
Maschinenkontrollraum Feldgeräte Geräte in Schaltschranktür
Klemmenleiste für außenliegende Geräte 230V
=MSB1 : main switch board 1 +BO : boiler equipment +.._S : equipment at cabinet side walls
X2: terminal strip for external items equipment <230V
Hauptschalttafel 1 Kesselgeräte Geräte in den Seitenwänden
Klemmenleiste für außenliegende Geräte <230V
=MSB2 : main switch board 2 +BW : junction box burner +.._B : equipment at cabinet bottom plate
X3: terminal strip for external items equipment analoge signals
Hauptschalttafel 2 Anschlußkasten Brenner Geräte in der Bodenplatte
Klemmenleiste für analoge Signale
D D
H07Z-K 1,5mm²
example circuits:
Beispiel Strompfade:
13 14
/12.7
21 22
*sheet-No.
all lines without indication of cross section are
31 32
*Blatt-Nr.
43 44
Strompfad-Nr.
E E
circuit-No.
b...z= modifications before delivery Änderung vor Auslieferung Kontakt auf dem where the contactor
1...30 = modification after delivery Änderung nach Auslieferung handen sind. on the same sheet.
F F
date 2012-01-30 cover sheet / Deckblatt =BCC
drawn ROS Control Cabinet Boiler
3 0-8100-100454-14 /3-32 +CC
0 as built 30.01.2012 ROS check ROS sheet 3
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by legend / Zeichenerklärung 6 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
+BN001
Klemmenkasten Steuerteil
Pumps / drives boiler
A =BCC A
CS010
+BW BCC_1004 (M4G2,5) BCC_1005 (M4G1,5)
=BCC M +BN020-2M3 ignition oil pump
Flame scanner 1 BCC_4001 (M5x0,75SH)
+CC BCC_1003 (M4G4)
Flame scanner 2 BCC_4002 (M5x0,75SH) M +BN001-2M5 combustion air fan
BCC_1010 (M4G1,5)
M +FO001 -3M2fuel oil pump 1
BCC_3005 (M 12G1,5)
B B
BCC_1006 (M4G2,5)
M +FW001 -4M2 feed water pump 1
protection note according to ISO 16016 consider!
BCC_2020 (M3G1,5)
+BN001 M +FW008-5M2 chemical dosing pump
+FO 001
Heater box
CS062
+FW 001
CS061
MSB 1 BCC_2222 (M7G1,5)
D BCC_1000 (M4G25) D
+BCCFWP2
H07Z-K 1,5mm²
MSB 2
BCC_1007(M4G2,5)
CS010
E +FW 002 E
CS061
F F
date 2012-01-30 cover sheet / Deckblatt =BCC
drawn ROS Control Cabinet Boiler
5 0-8100-100454-14 /3-32 +CC
0 as built 30.01.2012 ROS check ROS sheet 5
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by cable overview / Kabelübersicht 6 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
control unit
Sensors boiler
Steuerteil
+F -9S2 emergenca stop 1 escape route
BN 001 BCC_3006 (M2X1,5)
A BCC_3001 (M2X1,5) A
PSH +BO034 -52F2 pressure monitor boiler
CS 010
S
=BCC BCC_3007 (M2X1,5)
TSH +BO041 -53F2temperature monitor flue gas
+F -9S3 emergency stop 2 escape route +CC
BCC_4000 (M 2X0,75SH)
BCC_3002 (M2X1,5) PT +BO033-64B2 transmitter steam pressure
S
Push button " emegency stop " only option
B BCC_4003 (M 4 X0,75SH) B
LSL +BO022-69B3 level monitor 1 boiler water
LT
BCC_2006 (M 2x1,5) boiler water
C C
BCC_3014 (M2X1,5)
D BCC_3010 (M4X1,5) D
GS
+FO002-56S2/57S2 limit switch 3-way valve return line HFO / MDO
=ECR
remote indicator
BCC_6001 (M5X1,5SH)
PT Boiler CS 080
LT Boiler CS 081
all lines without indication of cross section are
BCC_2008 (M5G1,5)
E GS E
BCC_6010 (M24X1,5) +CO 011-77A2 oil detector device
volt free contacts
BCC_6011 (M24X1,5)
BCC_6012 (M18X1,5)
BCC_6014 (M18X1,5)
BCC_4099(M2x0,75SH)
GS conductivity electrode
F F
date 2012-01-30 cover sheet / Deckblatt =BCC
drawn ROS Control Cabinet Boiler
6 0-8100-100454-14 /3-32 +CC
0 as built 30.01.2012 ROS check ROS sheet 6
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by cable overview / Kabelübersicht 6 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
control unit
A
Steuerteil
MGO pump A
CS 010
BCC_1008 (M4G1,5)
M +GO001 -3M5 MGO pump 1
=BCC
BCC_3018 (M2X1,5)
PSL +GD 006 -23F7 pressure monitor MGO pump
BCC_3020 (M4X1,5)
GS +GO 015-59S2/59S5 limit switch 3-way valve HFO / MDO
B BCC_3021 (M4X1,5) B
GS
+GO 016 -59S3/59S6 limit switch 3-way valve MGO
+GO 001
BCC_2122 (M7G1,5)
MGO pump 1
+GO 002
CS062
CS062
C C
D D
H07Z-K 1,5mm²
all lines without indication of cross section are
E E
F F
date 2012-01-30 cover sheet / Deckblatt =BCC
drawn ROS Control Cabinet Boiler
7 0-8100-100454-14 /3-32 +CC
0 as built 30.01.2012 ROS check ROS sheet 7
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by cable overview / Kabelübersicht 6 sh.
1 2 3 4 5 6 7 8
directory
drawn revision
no. kind of plan sheet no. sheet designation special notes
date date
ROS a
1 cover sheet / Deckblatt 1 general informations / allgemeine Informationen
2012-01-30 25.07.2011
ROS a
2 cover sheet / Deckblatt 2 design specification / Bauvorschrift
2012-01-30 25.07.2011
ROS a
3 cover sheet / Deckblatt 3 legend / Zeichenerklärung
2012-01-30 25.07.2011
ROS a
4 cover sheet / Deckblatt 5 cable overview / Kabelübersicht
2012-01-30 25.07.2011
ROS a
5 cover sheet / Deckblatt 6 cable overview / Kabelübersicht
2012-01-30 25.07.2011
ROS a
6 cover sheet / Deckblatt 7 cable overview / Kabelübersicht
2012-01-30 25.07.2011
ROS
7 directory / Inhaltsverzeichnis 1
2012-01-30
ROS
8 directory / Inhaltsverzeichnis 2
2012-01-30
ROS
9 directory / Inhaltsverzeichnis 3
2012-01-30
ROS
10 directory / Inhaltsverzeichnis 4
protection note according to ISO 16016 consider!
2012-01-30
ROS
11 directory / Inhaltsverzeichnis 5
2012-01-30
ROS
12 directory / Inhaltsverzeichnis 6
2012-01-30
ROS
13 circuit diagram / Stromlaufplan 1 power supply / Einspeisung
23.07.2011
ROS
14 circuit diagram / Stromlaufplan 2 burner oil pumps
2012-01-30
ROS
15 circuit diagram / Stromlaufplan 3 fuel oil pumps
2012-01-30
ROS
16 circuit diagram / Stromlaufplan 4 feed water pumps
2012-01-30
ROS
17 circuit diagram / Stromlaufplan 5 electrical heater/ chemical dosing pump
2012-01-30
ROS
18 circuit diagram / Stromlaufplan 7 230V supply
2012-01-30
ROS
19 circuit diagram / Stromlaufplan 8 230V supply
2012-01-30
ROS
20 circuit diagram / Stromlaufplan 9 emergency stop
2012-01-30
ROS
21 circuit diagram / Stromlaufplan 10 control voltage
2012-01-30
ROS
22 circuit diagram / Stromlaufplan 11 24VDC supply
2012-01-30
ROS
23 circuit diagram / Stromlaufplan 12 firing sequence control
2012-01-30
ROS
24 circuit diagram / Stromlaufplan 13 PLC S7 200
2012-01-30
ROS
25 circuit diagram / Stromlaufplan 14 PLC S7-200
2012-01-30
ROS
26 circuit diagram / Stromlaufplan 15 PLC S7-200
2012-01-30
ROS
27 circuit diagram / Stromlaufplan 16 FOP control
2012-01-30
ROS
28 circuit diagram / Stromlaufplan 17 fuel oil pump 1
23.07.2011
ROS
29 circuit diagram / Stromlaufplan 18 fuel oil pump 2
23.07.2011
ROS
30 circuit diagram / Stromlaufplan 19 FWP control
2012-01-30
remark :
2012-01-30
ROS
41 circuit diagram / Stromlaufplan 31 safety interlock circuit
2012-01-30
ROS
42 circuit diagram / Stromlaufplan 32 safety interlock circuit
2012-01-30
ROS
43 circuit diagram / Stromlaufplan 33 safety interlock circuit
2012-01-30
ROS
44 circuit diagram / Stromlaufplan 34 emergency operation
2012-01-30
ROS
45 circuit diagram / Stromlaufplan 35 burner start
2012-01-30
ROS
46 circuit diagram / Stromlaufplan 36 burner reset
2012-01-30
ROS
47 circuit diagram / Stromlaufplan 37 ignition system
2012-01-30
ROS
48 circuit diagram / Stromlaufplan 38 oil valves
2012-01-30
ROS
49 circuit diagram / Stromlaufplan 39 flame detection 1
2012-01-30
ROS
50 circuit diagram / Stromlaufplan 40 flame detection 2
2012-01-30
ROS
51 circuit diagram / Stromlaufplan 41 flame detection
2012-01-30
ROS
52 circuit diagram / Stromlaufplan 42 firing sequence control
2012-01-30
ROS
53 circuit diagram / Stromlaufplan 43 firing sequence control
2012-01-30
ROS
54 circuit diagram / Stromlaufplan 44 primary air pressure
2012-01-30
ROS
55 circuit diagram / Stromlaufplan 45 combustion air pressure
2012-01-30
ROS
56 circuit diagram / Stromlaufplan 46 burner swung out
2012-01-30
ROS
57 circuit diagram / Stromlaufplan 47 limit switch compund regulator
2012-01-30
ROS
58 circuit diagram / Stromlaufplan 48 fire in windbox
2012-01-30
ROS
59 circuit diagram / Stromlaufplan 49 oil pressure
2012-01-30
ROS
60 circuit diagram / Stromlaufplan 50 HFO temperature
2012-01-30
remark :
2012-01-30
ROS
71 circuit diagram / Stromlaufplan 62 load control
2012-01-30
ROS
72 circuit diagram / Stromlaufplan 63 alarm steam pressure
2012-01-30
ROS
73 circuit diagram / Stromlaufplan 64 steam pressure
2012-01-30
ROS
74 circuit diagram / Stromlaufplan 68 boiler water level
2012-01-30
ROS
75 circuit diagram / Stromlaufplan 69 low low water 1
2012-01-30
ROS
76 circuit diagram / Stromlaufplan 70 low low water 2
2012-01-30
ROS
77 circuit diagram / Stromlaufplan 73 alarms control boiler level
2012-01-30
ROS
78 circuit diagram / Stromlaufplan 74 alarms control boiler level
2012-01-30
ROS
79 circuit diagram / Stromlaufplan 76 conductivity minitoring
2012-01-30
ROS
80 circuit diagram / Stromlaufplan 77 oil monitoring
2012-01-30
ROS
81 circuit diagram / Stromlaufplan 90 ilumination door 1 ( left)
2012-01-30
ROS
82 circuit diagram / Stromlaufplan 92 ilumination door 2 ( right)
2012-01-30
ROS
83 circuit diagram / Stromlaufplan 100 volt free contacts
2012-01-30
ROS
84 circuit diagram / Stromlaufplan 101 volt free contacts
2012-01-30
ROS
85 circuit diagram / Stromlaufplan 102 volt free contacts
2012-01-30
ROS
86 circuit diagram / Stromlaufplan 103 volt free contacts
2012-01-30
ROS
87 circuit diagram / Stromlaufplan 104 volt free contacts
2012-01-30
ROS
88 terminalblock diagram / Klemmenplan 1 =BCC+CC_M-X0
25.07.2011
ROS
89 terminalblock diagram / Klemmenplan 2 =BCC+CC_M-X0
25.07.2011
ROS
90 terminalblock diagram / Klemmenplan 3 =BCC+CC_M-X1
25.07.2011
remark :
25.07.2011
ROS
101 terminalblock diagram / Klemmenplan 14 =BCC+CC_M-X19
25.07.2011
ROS
102 terminalblock diagram / Klemmenplan 15 =BCC+CC_M-X20
25.07.2011
ROS
103 terminalblock diagram / Klemmenplan 16 =BCC+CC_M-X21
25.07.2011
ROS
104 terminalblock diagram / Klemmenplan 17 =BCC+CC_M-X30
25.07.2011
ROS
105 terminalblock diagram / Klemmenplan 18 =BCC+CC_M-X31
25.07.2011
ROS
106 terminalblock diagram / Klemmenplan 19 =BCC+CC_M-X40
25.07.2011
ROS
107 terminalblock diagram / Klemmenplan 20 =BCC+CC_M-X41
25.07.2011
ROS
108 terminalblock diagram / Klemmenplan 21 =BCC+CC_M-X111
25.07.2011
ROS
109 terminalblock diagram / Klemmenplan 22 =BCC+CC_M-XPE
25.07.2011
ROS
110 terminalblock diagram / Klemmenplan 23 =BCC+BW-X1.1
25.07.2011
ROS
111 terminalblock diagram / Klemmenplan 24 =BCC+BW-X2.1
25.07.2011
ROS
112 terminalblock diagram / Klemmenplan 25 =BCC+BW-X3.1
25.07.2011
ROS
113 terminalblock diagram / Klemmenplan 26 =BCC+BW-X3.2
25.07.2011
ROS
114 terminalblock diagram / Klemmenplan 27 =BCC+BW-X3.3
25.07.2011
ROS
115 terminalblock diagram / Klemmenplan 28 =BCC+BW-X8
25.07.2011
ROS
116 terminalblock diagram / Klemmenplan 29 =BCC+BW-X8
25.07.2011
ROS
117 terminalblock diagram / Klemmenplan 30 =BCC+ECR-X
25.07.2011
ROS
118 terminalblock diagram / Klemmenplan 31 =BCC+ECR-X
25.07.2011
ROS
119 terminal connection diagram / Anschlussplan 1 =BCC+CC_M-X0
07.12.2011
ROS
120 terminal connection diagram / Anschlussplan 2 =BCC+CC_M-X1
07.12.2011
remark :
07.12.2011
ROS
131 terminal connection diagram / Anschlussplan 13 =BCC+CC_M-X30
07.12.2011
ROS
132 terminal connection diagram / Anschlussplan 14 =BCC+CC_M-X31
07.12.2011
ROS
133 terminal connection diagram / Anschlussplan 15 =BCC+CC_M-X40
07.12.2011
ROS
134 terminal connection diagram / Anschlussplan 16 =BCC+CC_M-X41
07.12.2011
ROS
135 terminal connection diagram / Anschlussplan 17 =BCC+CC_M-XPE
07.12.2011
ROS
136 terminal connection diagram / Anschlussplan 18 =BCC+BCCFWP2-X0
07.12.2011
ROS
137 terminal connection diagram / Anschlussplan 19 =BCC+BCCFWP2-X1
07.12.2011
ROS
138 layout diagram / Aufbauplan 1 front view / Frontansicht
23.07.2011
ROS
139 layout diagram / Aufbauplan 2 legend door 2 / Legende Tür 2
23.07.2011
ROS
140 layout diagram / Aufbauplan 3 control cabinet / Schaltschrank
2012-01-30
ROS
141 layout diagram / Aufbauplan 4 control cabinet / Schaltschrank
2012-01-30
ROS
142 layout diagram / Aufbauplan 5 base control cabinet / Sockel Schaltschrank
2012-01-30
ROS
143 layout diagram / Aufbauplan 8 bore holes / Bohrungen
2012-01-30
ROS
144 layout diagram / Aufbauplan 9 base control cabinet / Sockel Schaltschrank
2012-01-30
ROS
145 layout diagram / Aufbauplan 10 bore holes / Bohrungen
23.07.2011
ROS
146 layout diagram / Aufbauplan 11 mounting plate / Montageplatte
2012-01-30
ROS
147 layout diagram / Aufbauplan 11.1 mounting plate / Montageplatte
2012-01-30
ROS
148 layout diagram / Aufbauplan 12 lables / Schilder
2012-01-30
ROS
149 layout diagram / Aufbauplan 20 front view / Frontansicht Starterbox FWP2
2012-01-30
ROS
150 layout diagram / Aufbauplan 21 lables Starterbox FWP 2
2012-01-30
remark :
2012-01-30
ROS
161 item list / Geräte-Stückliste 5
2012-01-30
ROS
162 item list / Geräte-Stückliste 6
2012-01-30
ROS
163 item list / Geräte-Stückliste 7
2012-01-30
ROS
164 item list / Geräte-Stückliste 8
2012-01-30
ROS
165 item list / Geräte-Stückliste 9
2012-01-30
ROS
166 item list / Geräte-Stückliste 10
2012-01-30
ROS
167 item list / Geräte-Stückliste 11
2012-01-30
ROS
168 item list / Geräte-Stückliste 12
2012-01-30
ROS
169 item list / Geräte-Stückliste 13
2012-01-30
ROS
170 item list / Geräte-Stückliste 14
2012-01-30
ROS
171 item list / Geräte-Stückliste 15
2012-01-30
ROS
172 item list / Geräte-Stückliste 16
2012-01-30
ROS
173 item list / Geräte-Stückliste 17
2012-01-30
ROS
174 item list / Geräte-Stückliste 18
2012-01-30
ROS
175 item list / Geräte-Stückliste 19
2012-01-30
ROS
176 item list / Geräte-Stückliste 20
2012-01-30
ROS
177 item list / Geräte-Stückliste 21
2012-01-30
ROS
178 item list / Geräte-Stückliste 22
2012-01-30
ROS
179 item list / Geräte-Stückliste 23
2012-01-30
ROS
180 item list / Geräte-Stückliste 24
2012-01-30
remark :
remark :
L1
/2.1
L2
/2.1
A L3 A
/2.1
-1K3 -1K6
5
3 6
6
B B
-1F6
3
-1F3
3
1 A
1 A
4
2
4
protection note according to ISO 16016 consider!
-1K6 22 -1K3
22
C main switch main switch C
6 3
Hauptschalter Hauptschalter
21
21
2
6
-1Q2 -1Q5
+CC_D +CC_D
1
5
A1
A1
16 mm2
16 mm2
16 mm2
16 mm2
16 mm2
16 mm2
-1K3 -1K6
A2
A2
D D
-1PE
-2PE
-1L1
-1L2
-1L3
-2L1
-2L2
-2L3
power supply 1 power supply 2
PE 1 2 PE 1 2
-X0 2 -X0 5
3 4 3 4
H07Z-K 1,5mm²
2 5
5 6 5 6
2 5
13 14 13 14
/90.2 /92.6
GNYE
GNYE
21 22 21 22
6 3
-BCC_1000 -BCC_1001
1
3
31 32 31 32
all lines without indication of cross section are
M4G25 43 44 M4G35 43 44
/100.5 /100.5
53 54 53 54
1PE
2PE
1L1
1L2
1L3
2L1
2L2
2L3
E E
-X -X
+MSB1 +MSB2
PE
PE
PE
PE
PE
Einspeisung Einspeisung
440V / 60Hz 440V / 60Hz PE
24 KW~50 A 24 KW~50 A
max fuse: 63A max fuse: 63A
F F
date 23.07.2011 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
1 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 1
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by power supply / Einspeisung 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L1 L1
/1.8 /3.1
L2 L2
/1.8 /3.1
A L3 L3 A
/1.8 /3.1
13
21
33
43
13
21
33
43
-2Q3 -2Q5
13
21
33
43
5
-2Q2
5
B 16...20A B
2.5...4A
14
22
34
44
14
22
34
44
0.63...1A
14
22
34
44
/29.3
/30.6
/29.2
/30.2
/102.6
/29.2
/30.4
/102.6
ignition oil I>>I>>I>> combustion air fan I>>I>>I>>
rotary cup atomizer I>>I>>I>>
pump
6
2
6
protection note according to ISO 16016 consider!
-30K4 -30K2
1
5
/30.4 /30.2
2
6
-2T5
C C
2,5mm²
2,5mm²
2,5mm²
k K
PE
l L
2
-30K6
5
-X10 combustion air fan
/30.6
4 mm²
4 mm²
4 mm²
-2P5
+CC_D
A
combustion air fan
10
11
12
PE PE PE
1
9
D D
-X0 -X0 -X0
GNYE
GNYE
GNYE
20/5A
3
H07Z-K 1,5mm²
656
658
660
-X8
all lines without indication of cross section are
+BW
PE
PE
PE
W
W
U
U
V
V
E E
M M M
3~ 3~ 3~
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L1 L1
/2.8 /4.1
L2 L2
A /2.8 /4.1 A
L3 L3
/2.8 /4.1
13
21
33
43
13
21
33
43
13
21
33
43
13
21
33
43
-3Q2 -3Q3 -3Q5 -3Q7
5
0.63...1A 0.63...1A 0.63...1A 0.63...1A
14
22
34
44
14
22
34
44
14
22
34
44
14
22
34
44
/16.2
/17.2
/16.2
/18.2
/23.1
/24.2
/23.2
/25.2
/101.6
/101.6
/104.3
/104.3
B fuel oil pump 1 I>>I>>I>>
2 fuel oil pump 2 I>>I>>I>> MGO pump 1 I>>I>>I>> MGOpump 2 I>>I>>I>> B
4
6
2,5mm²
2,5mm²
2,5mm²
2,5mm²
2,5mm²
2,5mm²
2,5mm²
2,5mm²
2,5mm²
2,5mm²
2,5mm²
2,5mm²
protection note according to ISO 16016 consider!
5
1
5
/17.2 /18.2 /24.2 /25.2
2
6
2
6
C C
D D
13
14
15
16
32
33
34
35
17
18
19
20
36
37
38
39
PE PE PE PE
-X0 -X0 -X0 -X0
GNYE
GNYE
GNYE
GNYE
H07Z-K 1,5mm²
-BCC_1010 -BCC_1008
1
3
-BCC_1011 -BCC_1009
1
3
M4G1,5 M4G1,5 M4G1,5 M4G1,5
all lines without indication of cross section are
PE
PE
PE
PE
W
W
W
W
E E
U
U
V
V
U
U
V
V
M M M M
3~ 3~ 3~ 3~
FO 001 GO 001
fuel oil pump 1 fuel oil pump 2 MGO pump 1 MGO pump 2
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
3 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 3
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by fuel oil pumps 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L1 L1
/3.8 /5.1
L2 L2 +BCCFWP2
/3.8 /5.1
A L3 L3 A
/3.8 /5.1
-Q2
AT
/21.5
5
0,16-0,25A
A
13
21
33
43
-4Q2 /21.1
5
BT
4...6.3 A /21.4
14
22
34
44
/21.2
33
13
21
-Q1
6
1
5
/19.2
/20.2
/103.3
feed water I>>I>>I>>
B B
pump 1
14
22
34
4...6.3 A
2,5mm²
2,5mm²
2,5mm²
/21.5
/21.5
feed water I>>I>>I>> /21.6 -F1
4
pump 2
6
0,5 A
protection note according to ISO 16016 consider!
-20K2
1
2,5mm²
2,5mm²
2,5mm²
3
control
/20.2
2
-K1
5
-T1 115V
4mm²
4mm²
4mm²
C C
/21.7
6
0V 0V
440V 115V
0V
STU 63/2x115
PE
-1PE
-1L1
-1L2
-1L3
PE
-X0
21
22
23
24
D PE D
-X0
GNYE
PE
4
-X0
H07Z-K 1,5mm²
-BCC_1006
1
M4G2,5
GNYE
GNYE
-BCC_1007
3
all lines without indication of cross section are
-BCC_1002 M4G2,5
1
M4G4
PE
W
U
PE
1PE
V
1L1
1L2
1L3
W
E E
V
-X
M +MSB2 M
3~
3~
power supply 2
-4M2
-4M3
Einspeisung 2
+FWP1
+FWP2
440V / 60Hz
6,1A
6,1 A
3,5KW~10A
3 KW
3 KW
max fuse: 16A
FW 001
feed water pump 1
feed water pump 2
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
4 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 4
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by feed water pumps 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L1 L1
/4.3 /7.1
L2 L2
/4.3
A L3 L3 A
/4.3 /7.1
Abo
/8.4
N1
/7.5
13
21
33
43
-5Q4
5
12
14
22
24
-5F2
1
12,5-16A
1 A
14
22
34
44
B B
2
11
21
chemical
/28.4
/29.5
dosing pump electrical I>>I>>I>>
/27.2
/29.4
preheater
6
protection note according to ISO 16016 consider!
A27
/28.3
A28
-28K4
5
C /28.3 C
-27K2
11
21
/28.4
6
/27.2
12
14
22
24
1 mm2
1 mm2
1 mm2
1 mm2
1 mm2
4mm²
4mm²
4mm²
D D
25
26
27
28
29
30
31
12
13
14
15
21
22
PE PE
-X0 -X0 -X1
GNYE
GNYE
GNYE
-BCC_2020 -BCC_1012 -BCC_2022
1
3
H07Z-K 1,5mm²
-5E3
all lines without indication of cross section are
+BN
230V
electrical heater
0V
PE
01
02
05
PE
L1
L2
L3
burner
E E
U
relay
current 13A controller
M PE
power 6 KW
1~
-5M2
+FW
0,28A
0,09KW
FW 008 BN 001
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L1
/5.8
L3
/5.8
A A
C
/11.2
-7Q2
1
4
4...6.3 A
B B
3
A1T
/9.7
2
A1
-7F3
2
/8.5
2
4 A
protection note according to ISO 16016 consider!
-7F4
1
A1T1
2
-X11 /9.7
1
24V AC supply 4 A
1
230V AC supply
C C
L
/8.1
-7T2
A1
115V
-7K5
-20V 0V
A2
460V 115V
power fault
0V
14 11
D /90.2 12 D
440V/230V
1600VA 24 21
PE
control transformer
/100.5 22
H07Z-K 1,5mm²
5
6
BbnT2
/30.5
7
N1
all lines without indication of cross section are
/5.8
8
N
-X11 /8.5
E E
9
N2
/9.7
10
N4
/27.1
N_N
/77.2
N2_N
/77.2
N4_N
/42.6
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
7 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 7
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by 230V supply 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
L A1 A1
/7.4 /7.8 /9.4
A A
N N
/7.8 /9.4
-8F6
1
2 A
-8F4 -8F5
2
-8F3
1
fan
-8F2
1
6 A 2 A socket 230V
6 A
2 A
2
power supply power supply
2
power supply
2
power supply
boiler equipment MGO pumps
B heating tracer B
burner equipment
5
-8B6
Abo1 Thermostat θ
/68.2
protection note according to ISO 16016 consider!
6
-9K6
43
-9K6
53
-9K6 -9K6
13
33
/9.6
C /9.6 C
/9.6 /9.6
44
54
14
34
-9K7
33
-9K7
53
-9K7
23
-9K7
13
/9.6 /9.6
/9.6
34
/9.6
54
24
14
1
-X111
Amgo
/15.3
D D
Ath
L
/54.2 -8M6
PE
N
+CC_D
L
Abn -8X8
H07Z-K 1,5mm²
/12.1 fan
cabinet
PE
PE
Abo Abo PE
/5.8 /16.1
all lines without indication of cross section are
3
-X111
PE
E E
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
8 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 8
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by 230V supply 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A1 A1
/8.6 /10.2
A A
61
-9K6
-9K5 -9K5
13
23
A1T1
/7.8
6
4 4
62
14
24
A1T
/7.8
61
-9K7
1
-X12 6
B B
62
13
I2
I3
-9S8
Q4:1
Q4:2
21
14
+CC_D
/10.2 I2 /10.3 I11 reset emergency stop
22
-9K8
21
protection note according to ISO 16016 consider!
11
Kessel Stop 7
-X11
22
24
2
-X12
C C
I4
-10A3 DI
S13
S10
I12
1
/10.3
A1
13
23
33
41
-X2 -X2 -X2
-9K5
-BCC_3001 -BCC_3002
1
D SR3C AC230V D
K1
M2X1,5 * M2X1,5 *
K2
ST
K2 /30.3
K1
H07Z-K 1,5mm²
-9S2 -9S3
NC
NC
PE
PE
S11
S21
S12
S14
A2
14
24
34
42
C
A1
A1
A1
+F +F -9K6 -9K7 -9K8
/100.2
A2
A2
A2
all lines without indication of cross section are
N N N2 N2
emergency stop 1 emergency stop 2 /8.8 /10.2 /7.8 /12.1
emergency stop emergency stop reset emergency stop
E emergency stop E
escape route escape route
13 14 13 14 14 11
Not-Stop 1 Not-Stop 2 /8.2 /8.2
23 24 23 24 /29.6 12
Fluchtweg Fluchtweg /102.7 /8.3
33 34 33 34 24 21
option option /8.3 /8.4
43 44 43 44 4 22
Yard Supply Yard Supply /8.5 /29.7
53 54 53 54
If switche not used please make a connection /8.4 /8.5
between -X2.1+2 and -X2:3+4 61 62 61 62
4 4
73 74 73 74
83 84 83 84
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
9 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 9
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by emergency stop 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A1 A1
A /9.7 /13.1 A
1*) 2*)
N N
/9.7 /11.1
-10R2 -10R3
B B
/32.7
/32.8
/35.6
/47.8
/47.7
/30.3
/9.5
/9.6
/9.7
L1
L1
I1
I2
I3
I4
I5
I6
I7
I8
I1
I2
I3
I4
N
N
L1 N I1 I2 I3 I4 I5 I6 I7 I8 L1 N I9 I10 I11 I12
protection note according to ISO 16016 consider!
-10A2 -10A3
C C
Program: LOGO39
/32.3
/32.3
/61.2
/61.2
Q1:1
Q1:2
Q2:1
Q2:2
1 Q5 2 1 Q6 2
1 Q1 2 1 Q2 2 1 Q3 2 1 Q4 2 1 Q7 2 1 Q8 2
Q1:1
Q1:2
Q2:1
Q2:2
Q3:1
Q3:2
Q4:1
Q4:2
Q3:1
Q3:2
Q4:1
Q4:2
/9.8
/9.8
/12.2
/12.2
/30.2
/30.2
/30.5
/30.5
D D
H07Z-K 1,5mm²
all lines without indication of cross section are
E E
5 10 Minuten. 5 15 Minuten.
minutes minutes
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
10 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 10
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by control voltage 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
aSC
N N /34.7
/10.4 /12.6
6
aData
A -X12 A
7
aT1
/60.2
8
aT2
/13.7
9
as
/15.1
E.7
10
aT2sch
-13A1.1 DI
/92.1
B C B
/7.3 /13.4
E.7 aT1sch
/90.1
N
service input
L
230V AC I3.7
protection note according to ISO 16016 consider!
-11G2 -11F4
2
PE
-11F5
2
power supply
230VAC/24VDC
1 A
PE 24V DC 5A 4 A
1
safety devices
0V
24V
1
24V DC supply
C C
PE
bData
11
bS
/13.1
D D
12
bT2
-X12 /13.7
13
bT1
H07Z-K 1,5mm²
/60.2
14
bS2
/46.7
15
bS4
/47.6
all lines without indication of cross section are
16
bS_b
/73.1
E bT2_b E
/92.1
bT1_b
/90.1
bS2_b
/63.6
bS4_b
/70.4
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
11 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 11
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by 24VDC supply 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Abn
/8.3
A Abn A
/30.2
-12A3
10
11
12
13
X1
X2
SAACKE,
/36.2
/43.3
/36.5
/35.3
F-OSA
B Q2:1 B
-10A2 DO
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
Q2
X3
X4
/10.2 Q2
DO
Q2:2
/41.4
/36.4
/35.2
/35.4
/41.2
/35.4
/37.2
/42.4
/36.2
/42.2
/42.5
/43.2
/42.3
/36.5
/36.4
/37.3
/35.2
/38.6
/36.5
protection note according to ISO 16016 consider!
C C
D D
H07Z-K 1,5mm²
N N
A1
/11.3 /13.1
-12K2
A2
all lines without indication of cross section are
N2 N2
/9.8 /16.1
fault F-OSA
E E
14 11
/29.8 12
24 21
22
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
12 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 12
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by firing sequence control 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
bS bS
/11.7 /14.1
A A
A1 A1
/10.4 /15.1
N N
/12.7 /17.1
aT2
/11.7
bT2 bT2
PE PE /11.7 /92.1
1M
2M
1M
2M
3M
4M
L+
PE
PE
L1
1L
2L
3L
M
N
Output byte 0 - 1
Input byte 2
AC 100-230V DC 24V DC 24V/AC 24-230V DC 24V DC 15-30V
EB2
E.2 /16.2 A.2 /20.2
EB0
E.3 /29.4
E.3 /16.3 A.3 /22.2
protection note according to ISO 16016 consider!
E.4 /29.5
E.4 /16.4 A.4 /17.8
E.5 /34.8
E.5 /16.6 A.5 /18.8
E.6 /56.8
E.6 /19.2 A.6 /27.4
E.7 /57.8
E.7 /19.2 A.7 /27.6
E.0 /73.4
E.0 /19.3 A.0 /27.3
C E.1 /73.5 C
E.1 /19.4 A.1 /27.7
EB3
E.2 /76.8
EB1
E.2 /19.6
E.3 /55.7
E.3 /36.7
E.4 /42.8
E.4 /43.6
E.5 /63.7
E.5 /29.6
SIEMENS SIEMENS E.6 /63.8
analo input
S7-200 S7-200 E.7 /11.5
1 2 Input byte 3
6ES7 214-2BD23-0XB0 Input byte 0 - 1 6ES7- 221-1BH22-0XA0
-13A1
Port 1 Port 0 -13A1.1
M E V M A+ B+
D D
PE
Port 0
2
Modbus interface -13A5 SIEMENS TP177 micro PE
H07Z-K 1,5mm²
Pin 3+8
Adr:1
Baudr:9600
Parity:0
all lines without indication of cross section are
Segment:
Teilnehmernummer:
E 6AV6640-0CA11-0AX1 E
A+
/73.6
M
/73.6
Bus-In
Bus-Out
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
13 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 13
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by PLC S7 200 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
bS bS
/13.8 /15.1
A A
PE PE
1M
2M
3M
4M
1M
2M
3M
4M
PE
PE
Input byte 4 Input byte 6
B B
DC 15-30V DC 15-30V
16 x Eingang 16 x Eingang
EB6
E.3 /69.7 EB4 E.3 /23.2
E.2 /45.7
EB7
E.2 /17.3
-14A1 -14A1.1
H07Z-K 1,5mm²
all lines without indication of cross section are
E E
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
14 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 14
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by PLC S7-200 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A1 Amgo Amgo
/13.4 /8.5 /23.1
A as as A
/11.7 /16.1
bS bS
/14.8 /44.4
PE PE
B B
protection note according to ISO 16016 consider!
L+
L+
PE
PE
1L
2L
1L
2L
M
M
DC 24V/AC 24-230V DC 24V/AC 24-230V
C AB 2 AB 3 C
E E
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
15 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 15
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by PLC S7-200 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Abo Abo
/8.4 /17.1
as as
A /15.8 /17.2 A
23
-X1
-BCC_3014
1
M2X1,5
-3Q3
13
-3Q2
13
/3.2 /3.4
-16F7
14
14
13
12
+FO 006
-X11 press.switch FSL
17
-X12 FOP
14
B B
-BCC_3014
2
M2X1,5
-16S3
24
2 4 6 8 -16S4
1 = Auto P1 A0 M 1 = Auto P2 2 4 6 8
A0 M
-X1
2 = OFF 2 = OFF
protection note according to ISO 16016 consider!
+CC_D
7
3 = Man P1 3 = Man P2
+CC_D
7
mode
mode
Betriebsart
Betriebsart
C C
-16K7
11
18
13
19
14
-X12 -X11 -X12 -X11 7
14
12
FO-PP2
FO-PP1 /18.1
/17.1
D D
H07Z-K 1,5mm²
E.1
E.2
E.5
E.3
E.4
-13A1 DI -13A1 DI -13A1 DI -13A1 DI
-13A1 DI
A1
E I 0.1 E
I 0.2 I 0.3 I 0.4 F.O.PP -16K7
I 0.5
A2
N2 N2
/12.3 /17.7
press. switch
FOP
14 11
6 12
FO 006 24 21
22
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
16 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 16
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by FOP control 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Abo Abo
/16.8 /18.1
FOP1 STBY
A A
FOP1 O0.0 as as fault O0.4
/16.8 /18.2
-13A1 -13A1
-17K7 A.4
21
A.0 /13.2
/13.2
7
DO DO
24
22
A.4
A.0
E.2
-14A1.1 DI
B /14.4 B
E.2
FO-PP1
/16.4
local /remote
-17K2
23
FOP1
I 7.2
protection note according to ISO 16016 consider!
24
1
GNYE 6
PE
-X20
-17K7
14
12
C C
2
-BCC_2120
4
7
5
M7G1,5
11
-3Q2
33
6
+FOP1 -X1
/3.2
34
PE
X1
13
22
13
21
-S3 -S2 -S1
-H1
X2
GN
on off
14
21
14
22
D local / remote D
operation
Drawing no: 0-xxxx-xxxxx /3-32
A1
A1
H07Z-K 1,5mm²
-17K2
A1
-17K7
-17K8
A2
A2
A2
N2 N2
all lines without indication of cross section are
/16.8 /18.7
local / remote FOP1 Standby
N N fault
/13.8 /18.1 14 11
oil pump 1
E 14 11 E
2 12
/101.7 12
1 2 24 21
/3.2 24 21
3 4 3 22
/3.2 22
5 6
/3.2
13 14
/101.4
23 24
4
33 34
/90.3
43 44
/28.4
F F
date 23.07.2011 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
17 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 17
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by fuel oil pump 1 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Abo Abo
/17.8 /19.1
FOP2 STBY
A A
FOP2 O0.1 as as fault O0.5
/17.3 /19.1
-13A1 -13A1
-18K7 A.5
21
A.1 /13.2
/13.2
7
DO DO
24
22
A.5
A.1
E.3
-14A1.1 DI
B B
/14.4
E.3
FO-PP2
/16.5
local / remote
-18K2
23
FOP2
protection note according to ISO 16016 consider!
I 7.3
2
24
1
GNYE 6
PE
-X21
-18K7
14
12
C C
2
-BCC_2121
4
7
5
M7G1,5
11
-3Q3
33
6
+FOP2 -X1
/3.4
34
PE
X1
13
22
13
21
-S3 -S2 -S1
-H1
X2
GN
on off
14
21
14
D D
22
local / remote
operation
Drawing no: 0-xxxx-xxxxx /3-32
A1
H07Z-K 1,5mm²
A1
-18K2
A1
-18K7
-18K8
A2
A2
A2
all lines without indication of cross section are
N2 N2
/17.8 /19.1
local / remote FOP1 Standby
N N fault
/17.7 /20.1 14 11
E oil pump 2
14 11 E
2 12
/101.8 12
1 2 24 21
/3.4 24 21
3 4 3 22
/3.4 22
5 6
/3.4
13 14
/101.5
23 24
4
33 34
/90.3
43 44
/28.4
F F
date 23.07.2011 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
18 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 18
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by fuel oil pump 2 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Abo Abo
/18.8 /20.1
as as
A /18.3 /20.7 A
15
25
27
-X11
-X1 -X1
-BCC_3016
1
M2X1,5
-4Q2
13
-22K8
11
-19F7
13
/4.2 14 /22.8 +FW005
press.
14
12
20
FSL
-X12 switch
14
FWP
B B
-19S3 -BCC_3016
2
2 4 6 8 -19S4
1 = Auto P1 A0 M 1 = Auto P2 2 4 6 8 M2X1,5
A0 M
2 = OFF
2 = OFF
+CC_D
26
28
1
7
3 = Man P2
3 = Man P1
+CC_D
7
mode -X1 -X1
protection note according to ISO 16016 consider!
mode
Betriebsart
Betriebsart
16
17
C C
-X11 -X11
-19K7
11
FW-PP1 FW-PP2
21
22
/20.1 /22.1 7
-X12 -X12
14
12
D D
E.6
E.1
E.0
E.7
E.2
-13A1 DI
-13A1 DI -13A1 DI
-13A1 DI -13A1 DI
H07Z-K 1,5mm²
A1
I0.6 I 1.0 I 1.1
I0.7 F.W.PP1
all lines without indication of cross section are
-19K7
I 1.2
A2
E N2 N2 E
/18.8 /20.2
press.switch FWP
14 11
6 12
FW 005
24 21
22
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
19 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 19
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by FWP control 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Abo Abo
/19.8 /27.1
A A
FWP1 STBY
as as
FWP 1 O 0.2 fault O2.6 /19.8 /22.3
-13A1 -15A1
-20K7
21
A.2 A.6
/13.2 /15.1 7
24
22
DO DO
A.2
A.6
E.0
FW-PP1
/19.4 -14A1.1 DI
B /14.4 B
E.0
-20K2
13
-20K7
14
12
2 local remote
14
FWP1
7
protection note according to ISO 16016 consider!
I 7.0
11
GNYE 6
PE
-X30
2
-BCC_2220
5
M7G1,5
C C
6
+FWP1 -X1
PE
X1
-4Q2
33
13
22
13
21
-S3 -S2 -S1
/4.2 -H1
X2
GN
34
on off
14
21
14
22
local / remote
operation
Drawing no: 0-xxxx-xxxxx /3-32
D D
A1
A1
A1
-20K7
-20K2 -20K3
H07Z-K 1,5mm²
A2
A2
A2
N2 N2
/19.8 /22.1
N N local / remote
/18.6 /24.1
FWP1 Standby fault
14 11
all lines without indication of cross section are
14 11
2 12
feed water pump 1
/103.4 12
24 21
E 24 21 E
1 2 8 22
/4.2 22
3 4
/4.2
5 6
/4.2
13 14
5
23 24
/27.2
33 34
/90.4
43 44
/103.2
F F
date 23.07.2011 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
20 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 20
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by feed water pump 1 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
+FWP2
A P_Flt A
/22.5
X2
21
13
13
21
-S1 -S
-S
-H1 P_Stop
/22.5
-22K2
11
X1
GN
22
14
14
22
local
pump on
/22.2 FWP_Bbo
remote PE /22.5
12
14
pump 2
6
-X1 on
GNYE 7
-X31 -X31
GNYE
B B
-BCC_2222
5
3
6
2
1
5
4
-BCC_2221
3
M7G1,5
M7G1,5
+BCCFWP2
10
11
12
13
protection note according to ISO 16016 consider!
9
3
8
1
6
-X1
-K2
21
PE
-K1
13
-K1
33
-Q1
13
2
7
22
24
7 /4.6
14
C C
34
14
A
/4.8
-K2
12
14
21
13
-S1 2
21
-Q1
11
/4.6
22
14
local / remote
22
-Q1
33
AT
/4.8 /4.7
34
D D
X1
X1
A1
-H2 -H1 -K1
H07Z-K 1,5mm²
A1
X2
X2
RD GN
-K2
A2
BT
/4.8
A2
overload operation
B
/4.8
all lines without indication of cross section are
local stop
33 34
4
43 44
F F
date 23.07.2011 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
21 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 21
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by feed water pump 2 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
P_Flt
-13A1 -15A1 /21.8
A.3 A.7
/13.2 /15.1
P_Stop
DO DO as as /21.8
/20.8 /23.1
A.7
A.3 FWP_Bbo
/21.8
B B
FW-PP2
/19.5
-22K6
21
protection note according to ISO 16016 consider!
24
22
C C
E.1
-14A1.1 DI
-22K6 /14.4
11
E.1
6
12
14
local stop
FWP2
I 7.1
D D
A1
A1
A1
A1
A1
A2
A2
A2
A2
A2
N2 N2
/20.8 /23.1
feed water feed water
feed water local stop
FWP2 Standbyfault pump 2 in operation pump 2 overload
pump 2 on
14 11 14 11 14 11
all lines without indication of cross section are
14 11 14 11
2 12 /27.3 12 /19.2 12
/21.6 12 /103.5 12
24 21 24 21 24 21
24 21 24 21
E E
4 22 /90.5 22 /103.3 22
22 22
34 31
/103.2 32
44 41
42
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
22 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 22
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by feed water pump 2 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Amgo Amgo
/15.4 /24.1
as as
A /22.5 /24.2 A
41
-X1
-BCC_3018
1
M2X1,5
-3Q7
13
-3Q5 13
/3.5 /3.7
-23F7
14
14
13
33
+GO 006
-X11 press.switch FSL
30
-X12 MGO
14
B B
-BCC_3018
2
M2X1,5
-23S3
42
2 4 6 8 -23S4
1 = Auto P1 A0 M 1 = Auto P2 2 4 6 8
A0 M
-X1
2 = OFF 2 = OFF
protection note according to ISO 16016 consider!
+CC_D
7
3 = Man P1 3 = Man P2
+CC_D
7
mode
mode
Betriebsart
Betriebsart
C C
-35K2
31
-23K7
11
31
34
32
35
/35.2
-X12 -X11 -X12 -X11 7
32
34
14
12
MGO-PP2
MGO-PP1 /25.1
/24.1
D D
H07Z-K 1,5mm²
E.2
E.3
E.0
E.6
E.4
E.5
A1
E I 6.2 E
I 6.3 I 6.4 I 6.5 MGO .PP MGOP -23K7
I 6.0 I 6.6
A2
N2 N2
/22.3 /24.7
press. switch
MGO
14 11
7 12
GO 006 24 21
22
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
23 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 23
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by MGO control 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Amgo Amgo
/23.8 /25.1
A MGOP1 STBY A
-15A1.1 -15A1.1
-24K7
21
A.0 A.2
/15.3 /15.3
7
DO DO
24
22
A.0
A.2
E.4
-14A1.1 DI
/14.4
B B
E.4
MGO-PP1
/23.4
local remote
MGOP1
-24K2
23
I 7.4
protection note according to ISO 16016 consider!
24
1
GNYE 6
PE
C -X40 C
-24K7
14
12
2
-BCC_2122
4
7
5
M7G1,5
11
-3Q5
33
6
+MGOP1 -X1
/3.5
PE
34
X1
13
22
13
21
-S3 -S2 -S1
-H1
X2
D GN D
on off
14
21
14
22
local / remote
operation
Drawing no: 0-xxxx-xxxxx /3-32
H07Z-K 1,5mm²
A1
A1
-24K2
A1
-24K7
-24K8
A2
A2
A2
all lines without indication of cross section are
N2 N2
/23.8 /25.7
local / remote FOP1 Standby
N N fault
E /20.7 /25.1 14 11 E
MGO pump 1
14 11
2 12
/104.4 12
1 2 24 21
/3.5 24 21
3 4 3 22
/3.5 22
5 6
/3.5
13 14
/104.1
23 24
/90.6
33 34
43 44
F F
date 23.07.2011 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
24 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 24
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by MGO pump 1 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Amgo Amgo
/24.8
A MGOP2 STBY A
MGOP2 O3.1 as as fault O3.3
/24.3 /29.1
-15A1.1 -15A1.1
-25K7
21
A.1 A.3
/15.3 /15.3
7
DO DO
24
22
A.1
A.3
E.5
-14A1.1 DI
/14.4
B E.5 B
MGO-PP2
/23.5
local remote
MGOP2
-25K2
23
I 7.5
protection note according to ISO 16016 consider!
24
1
GNYE 6
PE
-X41
-25K7
14
12
C C
2
-BCC_2123
4
7
5
M7G1,5
11
-3Q7
33
6
+MGOP2 -X1
/3.7
34
PE
X1
13
22
13
21
-S3 -S2 -S1
-H1
X2
GN
D on off D
14
21
14
22
local / remote
operation
Drawing no: 0-xxxx-xxxxx /3-32
A1
H07Z-K 1,5mm²
A1
-25K2
A1
-25K7
-25K8
A2
A2
A2
all lines without indication of cross section are
N2 N2
/24.8 /27.3
local / remote FOP2 Standby
N N fault
/24.6 /28.1 14 11
E MGO pump 2
14 11 E
2 12
/104.5 12
1 2 24 21
/3.7 24 21
3 4 3 22
/3.7 22
5 6
/3.7
13 14
/104.2
23 24
4
33 34
/90.6
43 44
F F
date 23.07.2011 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
25 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 25
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by MGO pump 2 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Abo Abo
/20.8
A A
common
O1.0 ( ECR ) O0.6 (ECR ) O2.3 ( boiler cabinet ) O0.7 ( ECR )O1.1 ( ECR )O2.0
11
A.0 A.6 A.3 A.7 A.1 A.0
/13.2 /13.2 /15.1 /13.2 /13.2 /15.1
/5.2
DO DO DO DO DO DO
12
14
A.3
A.7
A.1
A.0
A.0
A.6
B B
18
-X11
protection note according to ISO 16016 consider!
-27S2
+CC_D
2
Chemikaliendosierpumpe
19
C -X11 C
-22K7
11
-20K2
23
pump 1
feed water
pump 2
feed water
/22.7
/20.2
12
14
24
D D
H07Z-K 1,5mm²
A1
A1
A1
A1
A1
A1
A1
A2
A2
A2
A2
A2
A2
all lines without indication of cross section are
N4 N4 N2 N2
/7.8 /35.1 /25.8 /32.2
chemical dosing
common common
accoustic com flame failure
pump in operation alarm comb.air low ( ECR) alarm ( cabinet)
alarm ( ECR ) shut down alarm ( cabinet)
E alarm (ECR) E
14 11 14 11 14 11
14 11 14 11 14 11 14 11
/5.2 12 /100.4 12 /100.4 12
12 /102.4 12 /102.5 12 /92.7 12
24 21 24 21 24 21
24 21 24 21 24 21 24 21
/5.2 22 22 22
22 22 22 22
34 31
/90.5 32
44 41
/101.5 42
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
27 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 27
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by dosing pump 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
A54
/54.3
-5Q4
13
B /5.4 B
14
protection note according to ISO 16016 consider!
-17K2 -18K2
43
43
C /17.2 /18.2 C
44
44
pump 2
fuel oil
pump 1
fuel oil
A27
/5.5
A28
/5.6
D D
H07Z-K 1,5mm²
A1
-28K4
A2
all lines without indication of cross section are
N N
/25.6 /30.2
E E
electrical preheater
1 2
/5.4
3 4
/5.4
5 6
/5.4
13 14
/92.6
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
28 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 28
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by electrical preheater 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A as as A
/25.3 /55.2
13
13
33
43
-5F2 -9K8
21
11
-12K2
11
B /2.2 /2.6 /2.4 /5.2 /5.4 /9.7 /9.6 /12.2 B
14
14
14
34
44
22
24
12
14
12
14
protection note according to ISO 16016 consider!
C C
E.0
E.1
E.2
E.3
E.4
E.5
E.0
E.1
-13A1.1 DI -13A1.1 DI -13A1.1 DI -13A1.1 DI -13A1.1 DI -13A1 DI -13A1 DI -14A1.1 DI
overload overload combustion air overload overload chemical overload reset voltage alive ( I 0.0) fault F-OSA
rotary cup fan ignition oil dosing pump preheater I 1.5 I 6.1
D I 2.0 I2.1 pump I2.3 D
I2.4
I2.2
H07Z-K 1,5mm²
all lines without indication of cross section are
E E
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
29 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 29
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by common inputs 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Abn Abn
/12.2 /31.1
A A
-46K6
14
/46.6
13 20
-X11
2/4
-30S2 ST ST
/9.7 /32.7
A0 M
B B
+CC_D
Q4:1
combustion air fan
41
-48K6
/48.6
-10A2 DO
21
22
-32K6
21
42
-X11
/10.2 Q4
protection note according to ISO 16016 consider!
/32.6
Q3:1
24
22
-10A2
I2
-10A2 DO Q4
-10A3 DI /10.2
/10.2 Q3 DO
I10
Q4:2
C /10.3 ZP C
/37.3
-10A2
Q3
/10.2
DO
Q3:2
-2Q2
33
/2.2
-2Q3
33
34
-2Q5
33
/2.4
/2.6
34
34
D D
36
-X11
H07Z-K 1,5mm²
-30P5
A1
A1
+CC_D
-30K4 h
A1
-30K6
30K2
A2
all lines without indication of cross section are
BbnT2
A2
A2
/7.8
N N
E /28.8 /33.4 E
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Abn Abn
/30.2 /36.6
A A
-49K6 -52K6
61
23
13
13
-56K6
-59K7
13
HFO steam
/56.6 MGO /49.6
oil pressure /52.6
/59.7 press.
24
14
14
62
14
high
B B
-48K6
13
-53K6
14
/48.6
-57K6
13
61
14
fire
flue gas/53.6
/57.6 in
protection note according to ISO 16016 consider!
temp
windbox
14
13
62
MDO
61
-34K6
C C
/34.6
-59K4
14
12
62
ESS
/59.4
mode
HFO /MDO H1
11
/32.2
-34K6
14
/34.6
ESS
13
mode
-50K6
13
D D
/50.6
14
HFO_T_low
F1
H07Z-K 1,5mm²
/34.6
all lines without indication of cross section are
E E
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
31 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 31
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by safety interlock circuit 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
-30K2
43
comb.air fan
/30.2
H1
44
/31.7
-69K5
13
/69.5 LLW1
-30K4
44
14
rotary cup
/30.4
B B
43
-70K5
11
LLW2
-45K4
34
/70.4
comb.air
12
14
protection note according to ISO 16016 consider!
/45.4
33
-46K6
33
ST ST
SW burner /30.4 /35.6
/46.6
-44K4
34
C C
34
primary air
/44.4
-32K2 -32K6
11
11
33
2 6
12
14
12
14
Q1:1
-34K6
24
I3
I4
ESS mode /34.6 -10A3 DO
Q5 -10A2 DI -10A2 DI
23
71
33
/10.3 Q5 -34K6
DO /10.2 I3 /10.2 I4
/34.6
Q1:2
Ess-mode
34
D D
72
M1
/34.3
N1
H07Z-K 1,5mm²
/33.4
A1
A1
-32K2 -32K6
A2
A2
all lines without indication of cross section are
N2 N2
/27.8 /35.5
combustion air fan rotary cup atomizer
E E
14 11 14 11
7 12 8 12
24 21 24 21
22 /30.4 22
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
32 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 32
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by safety interlock circuit 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
N1
/32.5
B B
protection note according to ISO 16016 consider!
C C
S13
S10
A1
13
23
33
41
-33K4
SR3C AC230V
K1
K2
K2
K1
D D
S11
S21
S12
S14
A2
14
24
34
42
/35.2
/54.6
/42.2
H07Z-K 1,5mm²
N N
/30.8 /34.3
safety interlock circuit
all lines without indication of cross section are
E E
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
33 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 33
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by safety interlock circuit 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
aSC aSC
A /11.4 /35.7 A
-38K2
12
14
/38.2
-34K6
43
11
6
44
-39K3 -40K3 -34K7
13
13
13
23
/39.3 /40.3 7
14
14
14
24
B M1 B
/32.5 FL
/39.2
E.5
-39K3 -40K3 OV
24
24
/38.1
23
23
/13.4
E.5
protection note according to ISO 16016 consider!
ZV
/37.2
C C
N
/33.5
2
6
-X1
GNYE
F1 F1
/31.5 /35.3
10
-BCC_2005
7
M16G1,5
D D
+BW
INC
A1
PE
10
16
/61.6
7
-X1.1 -16K1
DEC
/61.6
H07Z-K 1,5mm²
A2
A1
A1
195
197
196
198
199
200
191
189
190
193
194
-34K6 -34K7
-X8 BBW1
*)
/37.2
A2
A2
14 11
all lines without indication of cross section are
N
21 /61.6 12 /35.2
X1
X2
+BN
-H1 -S4 24 21
13
13
/32.2 5
22 14
33 34 33 34
14
14
19.00
/32.5 /37.3
-S3 43 44 43 44
8 /42.6
ignition oil valves flame 53 54 51 52
/54.5 /39.3
21
/31.4 /40.3
71 72 71 72
/32.5 /42.6
81 82 81 82
*) wire jumper has to be /38.6
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
34 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 34
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by emergency operation 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
-12A3
X3:16 X4:35 X2:12 X3:18 X3:21
/12.3
-33K4
13
/33.4
14
B B
protection note according to ISO 16016 consider!
-43K2
25
11
-X11
/43.2 aSC aSC
burner /34.8 /36.7
12
14
C fault C
2/4
-35S5
1 0 2
burner mode ST ST
/32.8 /47.7
Brenner Betriebsart +CC_D
1
1- automatic / Automatik
-63K3
14
12
-35K2 -35K2
11
21
0- off / Aus
26
27
2 2
-X11
11
12
14
22
24
F1
/34.7
D D
E.0
I5
-10A2 DI -14A1 DI
H07Z-K 1,5mm²
/10.2 I5 /14.1
E.0
A1
A1
-35K2
-35K6 burner start
burner start ( I4.0)
A2
A2
all lines without indication of cross section are
N N
/34.7 /39.3
N4 N4 N2 N2
/27.2 /42.2 /32.6 /36.1
burner start burner
E E
stand by
14 11
14 11
6 12
/92.2 12
24 21
24 21
7 22
/100.3 22
34 31
/23.6 32
44 41
42
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
35 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 35
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by burner start 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Abn Abn
A /31.3 /39.3 A
-12A3
X4:24 X1:3 X4:31 X3:15 X4:30 X4:40 X1:5
/12.3
-47K6
11 -47K6
21
-42K5
11
/47.6 aSC aSC
/47.6 /35.7 /37.6
/42.5
12
14
22
24
B B
12
14
ignit.position
-36K7
14
12
-36K7
24
22
6
6
-47K5 -47K5
14
62
11
21
-36K3
11
protection note according to ISO 16016 consider!
/47.5 /47.5
23
purge position
-X11 2
13
61
12
14
12
13
-36S5
+CC_D
11
14
C C
reset burner
E.3
24
-13A1 DI
-X11
/13.2
E.3
D D
A1
A1
-36K3 -36K7
H07Z-K 1,5mm²
A2
A2
N2 N2
/35.8 /37.7
purge position reset
all lines without indication of cross section are
14 11 14 11
7 12 4 12
E 24 21 24 21 E
22 5 22
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
36 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 36
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by burner reset 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
aSC aSC
A /36.8 /41.6 A
-12A3
X3:22 X4:34
/12.3 -37K7
11
7
12
14
ZP
B /30.7 B
E.6
-14A1.1 DI
protection note according to ISO 16016 consider!
/14.4
-34K7 E.6
33
/34.7
ignition ( I 7.6)
34
C ZV C
/34.2
7
-X1 -X1
-BCC_2005 -BCC_2005
1
M16G1,5 M16G1,5
D D
1
10
11
12
13
2
9
-X8 -X8 -X8 -X8
A1
-37K7
BBW1 BBW1
/34.6 /38.6
A2
all lines without indication of cross section are
A2
PE
PE
PE
PE
1
2
ignition
E E
7 12
24 21
/54.6 22
ignition transformer ignition oil valve 1 ignition oil valve 2 ignition oil relief valve
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
37 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 37
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by ignition system 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
oil valves
-12A3
X4:36
/12.3
B B
protection note according to ISO 16016 consider!
81
-34K7
/34.7
82
C C
OV
/34.5
9
-X1
-BCC_2005
3
M16G1,5
D D
3
+BW -X1.1
17
18
19
20
21
22
14
15
16
29
30
31
H07Z-K 1,5mm²
A1
/37.6 /61.7
L+
L-
V
all lines without indication of cross section are
N2 N2 -3A1
/37.7 /41.5 -3Y1 -3Y2 -3Y5
rectifier
PE
PE
PE
oil valves
1
2
E 14 11 Gleichrichter E
+BN +BN +BN
/34.4 12
A1
A2
A3
A4
24 21
/54.6 22
main oil valve 1 main oil valve 2 main oil relief valve
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
38 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 38
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by oil valves 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
FL Abn Abn
/34.5 /36.7 /40.3
28
A A
-X11
51
-34K7
2/4
-39S2
1 2 /34.7
selection
52
+CC_D
3
flame scanner
emergency operation
29
30
-X11
FL2
/40.3
B B
11
15
10
9
-39A3
Saacke, FLUS 06 UV
protection note according to ISO 16016 consider!
flame detector 1
Flammenwächter 1
6
12
14
13
7-
8+
PE
C C
6
-X3
-BCC_4001
S
5
1
M5X0,75SH
D D
6
+BW -X3.1
H07Z-K 1,5mm²
A1
501
502
503
504
505
506
-39K3
-X8
A2
all lines without indication of cross section are
N N
/35.3 /40.3
E flame signal 1
-40B1 E
WH
GN
RD
BU
YE
13 14
/34.4
23 24 +BN Die Verlegung der Fühlerleitung muß räumlich getrennt von Netz- und
/34.4 Saacke FLS 09 UV
Steuerleitungen sowie energiereichen Starkstromleitungen bzw.- einrichtungen
33 34
/41.4 (z.B. Zündleitungen, Zündtrafos, Elektromotoren, Schütze) erfolgen. Eine
43 44
parallele Leitungsführung zu Netzleitungen in Kabelkanälen ist nicht zulässig.
/41.4
53 54
61 62 flame scanner 1 The installing of the probe line must be separate from the supply
and control mains as well as from the power lines and high voltage
71 72 Flammenfühler 1
systems (e.g. ignition lines, ignition transformers, electric motors,
83 84
contactors). A parallel line arrangement to the supply lines in the
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
39 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 39
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by flame detection 1 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Abn Abn
/39.4 /42.6
A A
61
-34K7
/34.7
62
FL2
/39.2
B B
11
15
10
9
-40A3
Saacke, FLUS 06 UV
protection note according to ISO 16016 consider!
flame detector 2
Flammenwächter 2
6
12
14
13
7-
8+
PE
C C
11
10
12
9
7
-X3
-BCC_4002
S
5
1
M5X0,75SH
D D
6
+BW -X3.2
H07Z-K 1,5mm²
A1
507
508
509
510
511
512
-40K3
-X8
A2
all lines without indication of cross section are
N N
/39.4 /54.7
E flame signal 2
-40B2 E
WH
GN
RD
BU
YE
13 14
/34.4
23 24 +BN Die Verlegung der Fühlerleitung muß räumlich getrennt von Netz- und
/34.4 Saacke FLS 09 UV
Steuerleitungen sowie energiereichen Starkstromleitungen bzw.- einrichtungen
33 34
/41.4 (z.B. Zündleitungen, Zündtrafos, Elektromotoren, Schütze) erfolgen. Eine
43 44
parallele Leitungsführung zu Netzleitungen in Kabelkanälen ist nicht zulässig.
/41.4
53 54
61 62 flame scanner 2 The installing of the probe line must be separate from the supply
and control mains as well as from the power lines and high voltage
71 72 Flammenfühler 2
systems (e.g. ignition lines, ignition transformers, electric motors,
83 84
contactors). A parallel line arrangement to the supply lines in the
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
40 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 40
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by flame detection 2 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
aSC aSC
/37.8 /42.7
flame signal
-12A3
X3:20 X3:14
/12.3
B B
-41K5
11
5
12
14
protection note according to ISO 16016 consider!
-40K3
33
43
/40.3
C C
34
44
43
-39K3
34
/39.3
E.5
44
33
-14A1 DI
purge
-47K5
34
/14.1
-42K2 -42K2 E.5
11
21
pos.
/47.5
D /42.2 /42.2 reached D
33
flame signal ( I5.5)
12
14
22
24
purge
A1
H07Z-K 1,5mm²
-41K5
A2
N2 N2
all lines without indication of cross section are
/38.2 /42.2
ignition
14 11
E E
6 12
24 21
22
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
41 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 41
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by flame detection 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Abn Abn
/40.4 /61.4
A A
-42K2
31
-42K4
11
B B
4 2
32
34
12
14
71
43
-34K7
-33K4
33 /34.7
protection note according to ISO 16016 consider!
44
/33.4
72
ESS-Mode
34
E.4
E.4
-14A1 DI -13A1.1 DI
/14.1 /13.4
C E.4 E.4 C
31
-X11 release purge ( I 3.4)
1
-42S6
release
+CC_D
load control
2
32
-X11
D D
H07Z-K 1,5mm²
A1
A1
A1
A1
A1
N4_N
-42K2 -42K3 -42K6
-42K4 -42K5 /7.8
A2
A2
A2
A2
A2
N4
/35.2
all lines without indication of cross section are
N2 N2
/41.5 /43.2
purge release flame control
end of purge burner fires
scanner
E 14 11 14 11 14 11 E
14 11 14 11
/41.2 12 /43.6 12 /61.2 12
7 12 /36.6 12
24 21 24 21 24 21
24 21 24 21
/41.2 22 22 /61.2 22
22 /43.7 22
34 31 34 31
34 31
8 32 /61.5 32
/92.3 32
44 41 44 41
44 41
/61.3 42 42
/100.2 42
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
42 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 42
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by firing sequence control 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
external trouble
fault
shut-down
-12A3
X4:28 X1:4
/12.3
B B
aSC aSC
/42.8 /44.2
protection note according to ISO 16016 consider!
-42K5
21
-42K3
11
-43K2
21
/42.5
2 /42.3
22
24
12
14
22
24
C C
E.7
E.4
E.7
-14A1 DI -13A1 DI -14A1.1 DI
A1
-43K2
A2
all lines without indication of cross section are
N2 N2
/42.6 /74.6
E E
fault
14 11
/35.5 12
24 21
5 22
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
43 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 43
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by firing sequence control 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
aSC
/43.7
A A
aSC
/45.7
-44K4
23
4
24
B B
protection note according to ISO 16016 consider!
E.3
-14A1 DI
/14.1
E.3
C C
primary air failure (I5.3)
7
-X2
S13
S10
-BCC_3005
1
A1
13
23
33
41
M12X1,5 -44K4
D SR3C AC/DC24V D
K1
PE
+BW
1
-X2.1 K2
K2
K1
H07Z-K 1,5mm²
201
202
203
S11
S14
S21
S12
A2
14
24
34
42
-X8
aBW
/45.2
/32.5
-17F1
all lines without indication of cross section are
NO
PE
C
bS bS
+BN /15.8 /45.4
E ΔP primary air failure
E
> min.
Zerstäuberluftdifferenzdruckwächter
04.04
04.04
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
44 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 44
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by primary air pressure 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
aSC aSC
/44.8 /46.7
-45K4
23
4
24
B B
protection note according to ISO 16016 consider!
E.2
-14A1 DI
/14.1
E.2
C C
combustion air failure (I 5.2)
9
-X2
S13
S10
-BCC_3005
3
A1
13
23
33
41
M12X1,5 -45K4
D SR3C AC/DC24V D
3
K1
+BW -X2.1
K2
K2
K1
H07Z-K 1,5mm²
204
205
206
S11
S14
S21
S12
A2
14
24
34
42
-X8
aBW aBW
/44.3 /46.2
/32.5
-17F2
all lines without indication of cross section are
NO
PE
C
bS bS
+BN /44.4 /46.6
E P combustion air failure
E
> min.
Verbrennungsluftdruckwächter
04.03
04.03
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
45 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 45
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by combustion air pressure 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
aSC aSC
/45.8 /48.7
-46K6
23
6
24
B B
E.1
protection note according to ISO 16016 consider!
-14A1 DI
/14.1
E.1
-X2
S13
S10
-BCC_3005
8
A1
13
23
33
41
M12X1,5 -46K6
D SR3C AC/DC24V D
K1
+BW
8
-X2.1 K2
K2
K1
H07Z-K 1,5mm²
225
226
227
S11
S14
S21
S12
A2
14
24
34
42
-X8
A1
aBW aBW
/45.3 /47.2 -46K8
7
/30.2
/32.2
A2
-19S1
all lines without indication of cross section are
NO
PE
C
bS bS bS2 bS2
+BN /45.4 /47.5 /11.7 /55.5
burner swung out
E burner swung out E
14 11
/102.7 12
24 21
Endschalter Drehzerstäuber
04.40
04.40
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
46 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 46
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by burner swung out 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
ST ST
/35.6
-47K6
31
-47K5
23
6
5
32
34
24
B B
protection note according to ISO 16016 consider!
I7
I6
-10A2 DI -10A2 DI
/10.2 I7 /10.2 I6
C C
11
12
-X2 -X2
10
-BCC_3005 -BCC_3005
9
M12X1,5 M12X1,5 10
D +BW D
9
-X2.1 -X2.1
228
229
231
232
233
H07Z-K 1,5mm²
-X8 -X8
aBW aBW
/46.3 /48.2
A1
A1
-47K5 -47K6
-6Y1
A2
A2
NO
NO
PE
PE
all lines without indication of cross section are
-S3 -S4
+BN
bS bS bS4 bS4
/46.6 /48.6 /51.6 /11.7
purge position
E ignition position E
13 14 14 11
6Y1 /36.2
/61.6 23 24 /36.2 12
7
limit switch compund regulator limit switch compound regulator 33 34 24 21
/41.4
in ignition position in purge position 43 44 /36.4 22
in Zündstellung in Lüftstellung 61 62 8 32
/36.4
08.02 08.02 71 72 44 41
83 84 42
08.02 08.02
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
47 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 47
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by limit switch compund regulator 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
aSC aSC
/46.8 /49.8
A A
-48K6
23
6
24
B B
E.0
-14A1 DI
/14.1
E.0
protection note according to ISO 16016 consider!
C C
13
-X2
S13
S10
A1
13
23
33
41
-48K6
SR3C AC/DC24V
-BCC_3005
6
K1
K2
M12X1,5
K2
D D
K1
+BW
6
-X2.1
S11
S14
S21
S12
A2
14
24
34
42
H07Z-K 1,5mm²
7
/31.7
/30.3
216
217
218
-X8
aBW aBW
/47.4 /49.2
bS bS
/47.5 /49.6
NC
PE
C
θ
+BN
E E
< max.
Luftkastentemperaturwächter
04.09
04.09
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
48 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 48
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by fire in windbox 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
aSC aSC
/48.7 /50.6
-49K6
23
6
24
B B
E.7
-14A1 DI
protection note according to ISO 16016 consider!
/14.1
E.7
oil press
C C
14
-X2
S13
S10
-BCC_3005
7
A1
13
23
33
41
M12X1,5 -49K6
D SR3C AC/DC24V D
K1
+BW
7
-X2.1 K2
K2
K1
H07Z-K 1,5mm²
222
223
224
S11
S14
S21
S12
A2
14
24
34
42
-X8
aBW aBW
/48.3 /50.2
8
/31.4
/102.4
-18F4
all lines without indication of cross section are
NC
PE
C
bS bS
+BN /48.6 /50.6
E P oil pressure too high
E
< max.
Öldruckwächter
06.04.07
06.04.07
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
49 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 49
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by oil pressure 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
aSC aSC
/49.8 /51.7
-50K6
33
-59K4
21
-57K6
23
/59.4 6
/57.6
34
22
24
24
B B
E.5
-14A1 DI
protection note according to ISO 16016 consider!
/14.1
E.5
C C
15
-X2
S13
S10
-BCC_3005
4
A1
13
23
33
41
M12X1,5 -50K6
D SR3C AC/DC24V D
K1
+BW
4
-X2.1 K2
K2
K1
H07Z-K 1,5mm²
210
211
212
S11
S14
S21
S12
A2
14
24
34
42
-X8
aBW aBW
/49.3 /51.2
8
/31.2
/54.3
/102.3
-18F1
all lines without indication of cross section are
NO
PE
C
bS bS
θ
+BN /49.6 /52.6
HFO temperature too low
E E
> min.
Schweröltemperaturwächter
06.36
06.36
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
50 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 50
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by HFO temperature 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
aSC aSC
/50.8 /52.2
-51K6
11
B B
6
12
14
protection note according to ISO 16016 consider!
E.6
-14A1 DI
/14.1
E.6
C C
-X2
-BCC_3005
5
M12X1,5
D D
+BW
5
-X2.1
H07Z-K 1,5mm²
213
214
215
-X8
A1
aBW
/50.3
-51K6
A2
-18F2
all lines without indication of cross section are
NC
PE
C
bS4 bS4
θ
+BN /47.6 /70.4
E HFO temperature high E
< max. 14 11
7 12
24 21
heavy fuel oil temperature monitor
/54.3 22
Schweröltemperaturwächter
34 31
06.35
/102.8 32
44 41
42
06.36
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
51 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 51
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by HFO temperature high 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
aSC aSC
/51.8 /53.2
A A
-52K6
23
6
24
B B
E.1
-14A1 DI
/14.1
protection note according to ISO 16016 consider!
E.1
C C
17
18
-X2
S13
S10
-BCC_3006
1
A1
13
23
33
41
M2X1,5 -52K6
D SR3C AC/DC24V D
K1
K2
K2
K1
H07Z-K 1,5mm²
S11
S14
S21
S12
A2
14
24
34
42
7
/31.7
/100.7
-52F2
all lines without indication of cross section are
NC
PE
C
bS bS
+BO /50.6 /53.6
E P steam pressure too high
E
< max.
Dampfdruckwächter
BO 034
BO 034
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
52 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 52
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by steam pressure 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
aSC aSC
/52.8 /55.7
A A
-53K6
23
6
24
B B
E.2
-14A1 DI
protection note according to ISO 16016 consider!
/14.1
E.2
20
-X2
S13
S10
-BCC_3007
1
A1
13
23
33
41
M2X1,5 -53K6
D SR3C AC/DC24V D
K1
K2
K2
K1
H07Z-K 1,5mm²
S11
S14
S21
S12
A2
14
24
34
42
8
/31.4
/100.8
-53F2
all lines without indication of cross section are
NC
PE
C
bS bS
θ
+BO /52.6 /56.6
flue gas temperature too high
E E
< max.
Rauchgastemperaturwächter
BO 041
BO 041
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
53 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 53
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by flue gas temperature 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
62
A In case of MGO ( HEL ) A
MGO
/59.7
-34K6 -33K4
53
23
operation
61
heater has to be disconnected !
/34.6 /33.4
54
24
-56K6
53
ESS-mode safety
HFO
/56.6
54
-37K7
21
/37.7
ignition
22
24
B B
-51K6
21
HFO
-38K2
22
24
/51.6
high
22
24
/38.2
oil valves
21
protection note according to ISO 16016 consider!
A54
/28.5
-59K7
72
/59.7
44 71
-50K6
42
C -56K6 C
HFO /50.6
low /56.6
HFO
41
43
N N
/40.4 /68.2
16
17
18
19
20
-X1
11
12
13
14
15
-BCC_2005
M16G1,5
D D
12
13
11
14
15
+BW
-X1.1 -X1.1 -X1.1 -X1.1
105
106
107
51
52
53
54
55
56
57
58
59
60
61
62
45
46
47
48
49
50
H07Z-K 1,5mm²
PE
PE
PE
N
N
L
L
PE
PE
PE
PE
N
N
L
burner heater ESV valve heater oil block heater oil feed hinge heater oil distributor heater 1 oil distributor heater 2 igniter heater
(OPTION)
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
54 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 54
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by heating tracer 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
as as
/29.8 /56.2
A A
aSC aSC
/53.8 /56.8
-55K6
11
6
12
14
B B
E.3
protection note according to ISO 16016 consider!
-13A1.1 DI
/13.4
E.3
oil return
C C
to tank ( I3.3)
21
22
23
24
-X2 -X2
-BCC_3008 -BCC_3008
1
M4X1,5 M4X1,5
D D
H07Z-K 1,5mm²
A1
A1
-55K5 -55K6
-55S2 -55S3
A2
A2
NO
NO
PE
PE
C
C
all lines without indication of cross section are
+F +F
bS2 bS2
/46.8 /59.4
fuel oil circulating to pump fuel oil circulating to tank
E E
14 11 14 11
/57.6 12 7 12
limit switch 3-way-valve limit switch 3-way-valve
24 21 24 21
return line in tank position return line in pump position
22 22
Endschalter 3-Wege-Ventil Endschalter 3-Wege-Ventil
FO 003 FO 003
FO 003 FO 003
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
55 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 55
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by selection fuel 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
as as aSC aSC
/55.4 /57.2 /55.8 /57.8
A A
-56K6
13
6
14
B B
protection note according to ISO 16016 consider!
E.6
-13A1.1 DI
/13.4
E.6
C C
HFO
operation ( I2.6)
25
26
27
28
-X2 -X2
-BCC_3010 -BCC_3012
1
M4X1,5 M4X1,5
D D
H07Z-K 1,5mm²
A1
-56K6
-56S2 -56S3
A2
NO
NO
PE
PE
C
C
all lines without indication of cross section are
+F +F
bS bS
/53.7 /57.6
HFO operation selected
E E
13 14
8
23 24
limit switch 3-way-valve limit switch 3-way-valve /31.2
33 34
pre line in heavy fuel oil position pressure controller in heavy fuel oil position /100.2
43 44
Endschalter 3-Wege-Ventil Endschalter 3-Wege-Ventil /54.6
53 54
Zuleitung in Schwerölstellung Druckregler in Schwerölstellung /54.3
61 62
FO 002 BN 010 /31.2
71 72
/102.3
83 84
/102.3
FO 002 BN 010
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
56 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 56
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by selection fuel 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
as as aSC aSC
/56.2 /59.2 /56.8 /59.8
A A
-57K6
33
6
34
B B
protection note according to ISO 16016 consider!
E.7
-13A1.1 DI
/13.4
E.7
C C
MDO
operation ( I2.7)
29
30
31
32
-X2 -X2
-55K5
11
/55.5
12
14
-BCC_3012
3
-BCC_3010
3
M4X1,5 M4X1,5
D D
H07Z-K 1,5mm²
A1
-57K6
-57S2 -57S3
NO
NO
A2
PE
PE
C
C
all lines without indication of cross section are
+F +F
bS bS
/56.6 /59.7
E MDO selected E
13 14
/31.2
23 24
limit switch 3-way-valve limit switch 3-way-valve /50.6
33 34
pre line in light fuel oil position pressure controller in light fuel oil position 8
43 44
Endschalter 3-Wege-Ventil Endschalter 3-Wege-Ventil /100.3
53 54
Zuleitung in Leichtölstellung Druckregler in Leichtölstellung
61 62
FO 002 BN 010 /31.2
71 72
83 84
FO 002 BN 010
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
57 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 57
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by selection fuel 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
as as aSC aSC
/57.2 /61.2 /57.8 /63.7
A A
-59K7
43
7
44
B B
protection note according to ISO 16016 consider!
E.7
-14A1.1 DI
/14.4
E.7
C C
MGO
operation ( I6.7 )
35
36
37
38
39
40
41
42
-X2 -X2
-X2 -X2
-BCC_3021
1
-BCC_3020
1
-BCC_3021
4
-BCC_3020
4
M4X1,5 M4X1,5
M4X1,5 M4X1,5
D D
H07Z-K 1,5mm²
A1
A1
-59K4
-59S2 -59S3 -59K7
-59S5 -59S6
A2
NO
NO
PE
PE
C
A2
NO
NO
PE
PE
C
C
+F +F
all lines without indication of cross section are
+F +F
bS2 bS2
/55.6 /61.2 bS bS
selection HFO / MDO
/57.6 /70.1
E MGO operation E
14 11
13 14
/31.2 12 /31.2
limit switch 3 way -valve limit switch 3 way -valve 23 24
24 21 limit switch 3 way -valve limit switch 3 way -valve /104.5
to HFO / MDO position toHFO / MDO position 33 34
/50.6 22 to MGO position to MGO position
43 44
8
53 54
61 62
/54.3
71 72
/54.6
83 84
GO 015 GO 016
GO 015 GO 016
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
59 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 59
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by selection fuel oil MGO 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
DIP - Switches
aT1 aT1
/11.7 /63.2 spare spare AI1 AI0
A A
off
on
B B
1 +24VDC/ L1 -60N3
+CC_D
RS232 Interface
2 0VDC/ N
5
9
4
3 PE SAACKE, 8
protection note according to ISO 16016 consider!
3
7
PE RSE-P II ENGLISCH 2
6
1
/64.3 4 0VDC
/64.2 5 +24VDC
/62.2 6 I0 AQ 0+ 31 /64.5
C C
7 I1 AQ 0- 32 /64.5
AI 0- 34 /62.3
AI 1+ 35 /64.3
/61.3 12 Y+ DI 2 39 /64.6
/61.4 14 Y-
D D
Program: RSEP01_2MpaRev1
H07Z-K 1,5mm²
bT1 bT1
/11.7 /90.1
all lines without indication of cross section are
E E
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
60 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 60
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by load control 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
as as Abn
/59.5 /63.5 /42.6
A A
-42K6
31
/42.6
-61K4
11
control
32
34
-60N3
13 12 14 4
+CC_D
-42K6 /60.3
11
21
14
12
Y Y+ Y-
burner
/42.6
control
12
14
22
24
23
24
25
-61K2
11
B -X12 B
14
12
-61K3
11
21
3
protection note according to ISO 16016 consider!
14
12
24
22
Q2:1
C C
10
11
-10A3 DO -X1
/10.3 Q6 -42K2
41
-BCC_2005
5
/42.2 M16G1,5
-10A3
42
44
purge
Q6 pos.
5
/10.3 +BW -X1.1
DO
Q2:2
-16K1
11
21
67
68
63
64
65
66
D /34.5 D
-X8 -X8
BBW1
INC
14
12
24
22
/38.7
/34.5
H07Z-K 1,5mm²
DEC
/34.5
-6Y1
A1
A1
A1
PE
2
1
all lines without indication of cross section are
+BN
A2
A2
A2
E bS2 bS2 E
/59.4 /63.3
boiler purge increase burner load decrease burner load
14 11 14 11 14 11
M
5 12 4 12 4 12 1~
-M
24 21 24 21 24 21 6Y1 6Y1
/47.4 /62.2
22 5 22 22
servo motor compound regulator
Stellmotor Verbundregler
08.02
08.02
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
61 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 61
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by load control 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
-60N3
6 33 34 8
+CC_D
/60.3
I0 AI0+ AI0- GND
B B
protection note according to ISO 16016 consider!
GND
C C
13
14
15
GND
-X3
SW
-BCC_4011
1
M3X0,75SH
+BW
1
-X3.3
D D
513
514
515
516
-X8
H07Z-K 1,5mm²
-6Y1
G
B
+BN
all lines without indication of cross section are
E E
-R1
300 Ω
6Y1
/61.8
Stellmotor Verbundregler
08.02
08.02
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
62 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 62
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by load control 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
aT1 aT1 as as
/60.2 /61.2 /70.1
A A
-63K3
21
3
-60N3
11 9 10
22
24
+CC_D
aSC aSC
/60.3 /59.8 /69.7
REL REL0 REL1
26
27
28
29
B -X12 B
-63K6 -63K5
11
11
-63K4
11
21
4 6 5
protection note according to ISO 16016 consider!
12
14
12
14
12
14
22
24
E.5
E.6
C C
-13A1.1 DI -13A1.1 DI
/13.4 /13.4
E.5 E.6
D D
H07Z-K 1,5mm²
A1
A1
A1
A1
-63K3 -63K4 -63K5 -63K6
all lines without indication of cross section are
A2
A2
A2
A2
E bS2 E
/61.4
controlled shut-down steam pressure low/high steam pressure high steam pressure low
bS2_b
14 11 14 11 14 11 14 11 /11.7
/35.4 12 5 12 8 12 7 12
24 21 24 21 24 21 24 21
6 22 6 22 /103.6 22 /103.5 22
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
63 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 63
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by alarm steam pressure 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
-60N3
5 35 36 4 31 32 37 38 39 40
+CC_D
/60.3
+24V AI1+ AI1- 0VDC AQ0+ Aq0- DI0 DI1 DI2 DIGND
B B
GND
protection note according to ISO 16016 consider!
GND
C C
16
17
18
19
2
GND
GND
-X3 -X6
-BCC_4000 -BCC_6001
S
1
2
M2X0,75SH M5X0,75SH
D D
H07Z-K 1,5mm²
all lines without indication of cross section are
-64B2
+ECR
+
-
E +BO E
P/I
0...16bar = 4...20mA
Dampfdruckmeßumformer Dampfdruck
BO 033 CS 080
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
64 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 64
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by steam pressure 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A Abo1 Abo1 A
/8.4 /69.2
fcl+
B /73.2 B
fcl-
/73.2
GND
fwl+
/70.2
fwl-
/70.2
protection note according to ISO 16016 consider!
GND
N N
/54.8 /69.2
C C
20
21
22
23
24
25
-X3
29
30
31
-X1
GNYE
GND
-BCC_2006 -BCC_4005
S
1
2
M3G1,5 M2X0,75SH
D D
H07Z-K 1,5mm²
all lines without indication of cross section are
-68B2
2+
PE
1-
+BO
3
E E
Kesselwasserstandsmeßumformer
BO 021
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
68 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 68
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by boiler water level 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Abo1 Abo1
A /68.2 /76.4 A
aSC aSC
/63.8 /70.7
-69K5
33
B B
16
23
24
26
34
-69A2
L
Niveauschalter
N
1
17
27
E.3
-14A1 DI
C /14.1 C
26
E.3
27
28
29
30
-X3
boiler water level 1 too low ( I4.3)
-BCC_4003
S
4
M4X0,75SH
S13
S10
A1
13
23
33
41
-69K5
D -69B3 SR3C AC230V D
GND
+BO K1
1
K2
K2
Gestra NRG 16-50
H07Z-K 1,5mm²
K1
S11
S21
S12
S14
A2
14
24
34
42
boiler water level electrode
7
/32.2
/102.2
Kesselwasserstandselektrode
all lines without indication of cross section are
BO 022
N N
/68.2 /76.4
E boiler water level 1 too low E
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
69 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 69
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by low low water 1 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
as as
/63.6 /73.1
aSC aSC
A /69.7 /76.8 A
-70K5
31
4
32
34
B B
E.4
-14A1 DI
protection note according to ISO 16016 consider!
/14.1
E.4
Configuration
GND
GND
CURR 4-20mA
UNIT %
bS bS DECP 111.1
/59.8 /73.1
DISP Lo 0.0
D D
GND
-X6 DISP Hi 100.0
A1
REL UNIT PERC
fwl+
/68.4 -70K5 R1 FUNC = SETP
-BCC_6001
4
fwl-
H07Z-K 1,5mm²
R1 CONT NC
/68.4
A2
M5X0,75SH
R1 SETP 65%
bS4 ACT DIR Incr
/51.6
R1 Hyst 5%
bS4_b
/11.7 ERR ACT No
boiler water level 2 too low
ON DEL 10 sec.
all lines without indication of cross section are
14 11
OFF DEL 5 sec.
R2 CONT NO
24 21
E +ECR R2 SETP 10 % E
+
/102.2 22
-
ACT DIR INC
34 31 R2 Hyst 0.1%
ERR ACT No
8 32
ON DEL 5 sec.
44 41
OFF DEL 10 sec.
42
boiler water level
ANA OUT = CURR
Kesselwasserniveau
O Range 4-20mA
CS 081
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
70 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 70
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by low low water 2 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
as
/70.2
A Configuration A
CURR 4-20mA
UNIT %
DECP 111.1
DISP Lo 0.0
DISP Hi 100.0
R1 FUNC = SETP
R1 CONT NC
R1 SETP 85%
ERR ACT No
ON DEL 30 sec.
R2 FUNC = SETP
R2 CONT NO
protection note according to ISO 16016 consider!
R2 SETP 18 %
R2 Hyst 0.1%
-73A2 low <18% delay 30 sec. high >85% delay 30 sec.
ERR ACT No
ON DEL 5 sec.
33+ PR electronics
OFF DEL 30 sec.
0-10V
24 V DC input output
14 +
C PReasy 4116 C
4 - 20 mA 4 - 20 mA
ANA OUT = Volt
GND
A+ GND
/13.4
bS
/70.2 M
/13.4
D D
bS_b analog
/11.7
input water level
fcl+
/68.4 0-10 V
fcl-
H07Z-K 1,5mm²
E.0
E.1
/68.4
-13A1.1 DI -13A1.1 DI
/13.4 /13.4
E.0 E.1
all lines without indication of cross section are
boiler water level low ( 3.0 ) boiler water level high ( I 3.1 )
E E
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
73 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 73
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by alarms control boiler level 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
-15A1 -15A1
A.4 A.5
/15.1 /15.1
DO DO
A.5
A.4
B B
protection note according to ISO 16016 consider!
C C
D D
H07Z-K 1,5mm²
A1
A1
-74K6 -74K7
A2
A2
all lines without indication of cross section are
N2 N2
/43.3 /76.4
/101.2 12 /101.3 12
24 21 24 21
22 22
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
74 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 74
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by alarms control boiler level 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Abo1 Abo1
/69.5 /77.2
A A
aSC aSC
/70.8 /77.7
-76K5
11
5
12
14
B B
A1
-76K5
A2
N2 N2
E.2
/74.8 /77.2
protection note according to ISO 16016 consider!
N N -13A1.1 DI
/69.5 /77.2
conductivity high
/13.4
14 11 E.2
8 12
32
33
34
35
-X1
GNYE
-BCC_2009
3
M4G1,5
D D
H07Z-K 1,5mm²
-76A3
15+
16-
PE
+F
9
8
Unisafe SL 6005
all lines without indication of cross section are
11
12
13
14
E E
-BCC_4099
1
conductivity monitoring
GND
M4X0,75SH Leitfähigkeitsüberwachung
FW 007
-76B3
+F
1
conductance probe
Leitfähigkeitssonde
FW 007
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
76 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 76
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by conductivity minitoring 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Abo1
/76.5
A A
aSC
/76.8
-77K4
11
4
12
14
A1
B B
-77K4
A2
N2
/76.6
N2_N
/7.8
protection note according to ISO 16016 consider!
oil turbidity
E.6
N
/76.6 14 11
-14A1 DI
8 12
N_N
/7.8 24 21 /14.1
E.6
/100.6 22
C C
oil detector ( I5.6 )
40
36
37
38
39
-X1
-BCC_2008
1
M4G1,5
D D
H07Z-K 1,5mm²
all lines without indication of cross section are
-77A2
NO
NC
PE
N
C
L
E +F E
Mobrey MCU201
Öltrübungsüberwachung
CO 011
CO 011
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
77 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 77
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by oil monitoring 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
aT1sch
/11.7
A A
-7K5
11
/7.5
12
14
1K6
/92.6
-20K2 -24K2
33
23
-25K2
33
-22K7
21
-27K2
31
-1K3
13
-17K2 -18K2
33
33
/20.2 /22.7 /24.2 /25.2
/27.2
34
24
34
/1.3
22
24
/17.2 /18.2
32
34
14
34
34
LT
B /92.1 B
10
2
6
1
9
-X19
LT
LT
LT
LT
LT
LT
LT
LT
LT
LT
10
LT
LT
LT
LT
LT
2
6
LT
LT
LT
LT
LT
1
9
protection note according to ISO 16016 consider!
1. control fuel oil fuel oil feed water feed water chemical MGO MGO
voltage pump 1 pump 2 pump 1 pump 2 dosing pump 1 pump 2
selected pump
bT1
/60.2
D D
bT1_b
/11.7
H07Z-K 1,5mm²
all lines without indication of cross section are
E E
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
90 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 90
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by ilumination door 1 ( left) 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
aT2sch
/11.7
5
-X12
1K6
/90.8
13
-1K6
13
-92S7
-42K5
31
-35K6
11
-28K4
13
-30K2
13
-30K4 -30K6
13
13
-27K6
11
/1.6
/35.5 /42.5 +CC_D
14
/28.4
14
/30.4 /30.6 /30.2 /27.6 lamp test
32
34
14
B B
12
14
14
14
14
12
14
Lampenprüfung
LT
/90.8
14
15
18
13
16
17
11
12
LT
LT
LT
LT
LT
LT
LT
LT
protection note according to ISO 16016 consider!
14
15
18
13
16
17
11
12
LT
LT
LT
LT
LT
LT
LT
LT
C C
selected
D D
H07Z-K 1,5mm²
bT2
/13.8
bT2_b
/11.7
all lines without indication of cross section are
E E
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
92 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 92
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by ilumination door 2 ( right) 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
+ECR
13
15
17
11
19
21
1
9
-X -X -X -X -X -X -X -X -X -X -X
13
15
17
11
19
21
-BCC_6010 1
9
M24X1,5
13
15
17
11
19
21
1
9
B B
-X4 -X4 -X4 -X4 -X4 -X4 -X4 -X4 -X4 -X4 -X4
-7K5
21
-9K5
33
protection note according to ISO 16016 consider!
/7.5
/9.4
24
22
34
-52K6
33
-53K6
33
-77K4
21
-76K5
21
/52.6 /53.6
-42K5
34
-56K6 -57K6
41
33
43
-35K6 -27K7
21
11
34
C -1K6 C
43
-27K8
11
-1K3 /77.4
43
/76.5
24
22
/42.5 /56.6 /57.6 /35.5 /27.7
24
22
/27.8 /1.3 /1.6
34
44
44
42
44
24
22
14
12
44
14
12
10
14
16
18
20
12
22
2
D D
-X4 -X4 -X4 -X4 -X4 -X4 -X4 -X4 -X4 -X4 -X4
14
16
18
20
12
22
-BCC_6010
2
alarm
M24X1,5 burner
all lines without indication of cross section are
10
14
16
18
20
+ECR
12
22
2
-X -X -X -X -X -X -X -X -X -X -X
E E
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
100 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 100
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by volt free contacts 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A +ECR A
27
23
25
29
37
39
41
31
33
35
-X -X -X -X -X -X -X -X
-X -X
23
13
15
17
11
3
-BCC_6010 -BCC_6011
9
M24X1,5 M24X1,5
27
23
25
29
37
39
41
31
33
35
-X4 -X4 -X4 -X4 -X4 -X4 -X4 -X4
-X4 -X4
B B
protection note according to ISO 16016 consider!
11
11
-30K2
33
-17K2 -27K2 -3Q3
13
41
43
-18K2
13
-3Q2
43
/74.7 /74.7 /17.8 /18.8
/30.2 /17.2 /18.2 /27.2 /3.4
/3.2
12
14
34
12
14
14
44
12
14
12
14
14
42
44
44
C C
28
24
26
30
38
40
42
32
34
36
-X4 -X4 -X4 -X4 -X4 -X4 -X4 -X4
-X4 -X4
D D
water water comb.air fuel oil FOP 2
fuel oil chemical FOP 1 FOP 2 FOP 1
level low level high fan on pump 1 on stand
pump 2 on dosing over over stand
on
24
14
16
18
10
12
4
-BCC_6010 -BCC_6011
2
8
M24X1,5 M24X1,5
28
all lines without indication of cross section are
+ECR
24
26
30
38
40
42
32
34
36
-X -X -X -X -X -X -X -X
-X -X
E E
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
101 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 101
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by volt free contacts 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
+ECR
63
65
43
61
45
49
51
53
55
59
47
57
-X -X -X -X
-X -X -X -X -X -X -X -X
15
17
19
13
21
11
23
-BCC_6011 -BCC_6012
9
M24X1,5 M18X1,5
63
65
43
61
45
49
51
53
55
59
47
57
-X4 -X4 -X4 -X4
-X4 -X4 -X4 -X4 -X4 -X4 -X4 -X4
B B
-50K6
23
protection note according to ISO 16016 consider!
/50.6
-27K5
11
-27K4
24
-69K5
23
11
-49K6 -2Q5
33
43
-70K5 -46K8 -51K6
21
11
31
-9K6
23
/69.5 /27.4 /27.5
/49.6 /2.6
71
/70.4 -56K6 /46.7 /51.6
/9.6
24
34
12
14
44
-2Q2
43
12
14
22
24
12
14
24
32
34
C /56.6 C
-56K6
83
/2.2
72
HFO
44
/56.6
84
HFO
64
66
44
62
46
50
52
54
56
60
48
58
-X4 -X4 -X4 -X4
-X4 -X4 -X4 -X4 -X4 -X4 -X4 -X4
D D
water fuel oil fuel oil fuel oil
Flame comb.air comb.air rotary burner not emergency
water
level 1 temp. pressure temp.
failure press low fan cup in pos. stop
level 2
too low too low too high high
over load over load
H07Z-K 1,5mm²
too low
16
18
20
14
22
12
24
10
-BCC_6011 -BCC_6012
2
8
M24X1,5 M18X1,5
64
66
44
62
all lines without indication of cross section are
46
50
52
54
56
60
48
58
+ECR
-X -X -X -X
-X -X -X -X -X -X -X -X
E E
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
102 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 102
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by volt free contacts 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
+ECR
79
81
83
67
69
71
73
75
77
-X -X -X -X -X -X -X -X -X
13
15
17
11
-BCC_6013
1
7
5
9
M18X1,5
79
81
83
67
69
71
73
75
77
B B
-X4 -X4 -X4 -X4 -X4 -X4 -X4 -X4 -X4
protection note according to ISO 16016 consider!
-63K5
21
-4Q2 -63K6
43
21
-20K3 -22K3
11
11
-22K8
21
-20K2
43
-22K7
31
/63.6 /63.5
/4.2 /20.3 /22.2
/22.8
44
22
24
/20.2 /22.7
22
24
12
14
12
14
22
24
44
32
34
C C
80
82
84
68
70
72
74
76
78
-X4 -X4 -X4 -X4 -X4 -X4 -X4 -X4 -X4
feed water feed water feed water feed water feed water feed water steam steam
D D
pump 1 on pump 2 on pump 1 pump 2 pump 1 pump 2 press. press.
14
16
18
10
12
-BCC_6013
2
8
H07Z-K 1,5mm²
M18X1,5
all lines without indication of cross section are
+ECR
80
82
84
68
70
72
74
76
78
-X -X -X -X -X -X -X -X -X
E E
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
103 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 103
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by volt free contacts 75 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
+ECR
101
97
99
85
87
89
91
93
95
-X -X -X -X -X -X -X -X -X
13
15
17
11
-BCC_6014
1
9
5
M18X1,5
101
97
99
85
87
89
91
93
95
B B
-3Q5 -3Q7
43
43
-24K8 -25K8
11
11
-24K2 -59K7
13
23
-25K2
13
44
/25.2
12
14
12
14
14
24
14
C C
100
102
98
86
88
90
92
94
96
-X4 -X4 -X4 -X4 -X4 -X4 -X4 -X4 -X4
14
16
18
10
12
-BCC_6014
2
8
H07Z-K 1,5mm²
M18X1,5
all lines without indication of cross section are
+ECR
100
102
98
86
88
90
92
94
96
E -X -X -X -X -X -X -X -X -X E
F F
date 2012-01-30 circuit diagram / Stromlaufplan =BCC
drawn ROS Control Cabinet Boiler
104 0-8100-100454-14 /3-32 +CC_M
0 as built 30.01.2012 ROS check ROS sheet 104
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by volt free contacts 75 sh.
1 2 3 4 5 6 7 8
protection note according to ISO 16016 consider!
R. modification
cable external target sign cable internal
free
free
target sign
terminal block
external internal
0
0
0
0
date
type
item
item
terminal
terminal
comment
presentation
0 -BCC_1012 M4G4
0 -BCC_1003 M4G4
0 -BCC_2020 M3G1,5
0 -BCC_1011 M4G1,5
0 -BCC_1010 M4G1,5
0 -BCC_1006 M4G2,5
0 -BCC_1005 M4G1,5
0 -BCC_1004 M4G2,5
lace connection
wire connection
date
terminal number
check
drawn
name standard
ROS
ROS
strip : -X0
number of terminals : 47
25.07.2011
1
+BW-X8 654 1 /2.2
origin
+BW-X8 656 2 /2.2 -30K4 4
3 GNYE
1
+F-2M3 U 5 /2.4 -30K6 2
2
+F-2M3 V 6 /2.4 -30K6 4
3 GNYE
1
+BN-2M5 U 9 /2.6 -2T5 L
2
+BN-2M5 V 10 /2.6 -30K2 4
replaced for
Control Cabinet Boiler
+BN-2M5 PE 12 /2.6 +CC_MPE
3 GNYE
1
+FOP1-3M2 U 13 /3.2 -17K2 2
2
+FOP1-3M2 V 14 /3.2 -17K2 4
3 GNYE
1
+FOP2-3M3 U 17 /3.4 -18K2 2
2
+FOP2-3M3 V 18 /3.4 -18K2 4
3 GNYE
replaced by
1
+FWP1-4M2 U 21 /4.2 -20K1 2
2
+FWP1-4M2 V 22 /4.2 -20K1 4
3 GNYE
1
+FW-5M2 U 25 /5.2 -27K2 14
1
+FW-5M2 PE 27 /5.2 +CC_MPE
2 GNYE
1
+BN-5E3-X L1 28 /5.4 -28K4 2
2
+BN-5E3-X L2 29 /5.4 -28K4 4
3 GNYE
=BCC+CC_M-X0
terminalblock diagram / Klemmenplan
0-8100-100454-14 /3-32
=BCC
0-8100-100454-14-3
+CC_M
31
sheet 1
sh.
protection note according to ISO 16016 consider!
R. modification
cable external target sign cable internal
free
free
target sign
terminal block
external internal
0
0
date
type
item
item
terminal
terminal
comment
presentation
4 -BCC_1001 M4G35
4 -BCC_1000 M4G25
0 -BCC_1000 M4G25
0 -BCC_1001 M4G35
0 -BCC_1009 M4G1,5
0 -BCC_1008 M4G1,5
lace connection
wire connection
date
terminal number
check
drawn
name standard
ROS
ROS
strip : -X0
number of terminals : 47
25.07.2011
1
+MGOP1-3M5 U 32 /3.5 -24K2 2
origin
+MGOP1-3M5 V 33 /3.5 -24K2 4
3 GNYE
1
+MGOP2-3M7 U 36 /3.7
2
+MGOP2-3M7 V 37 /3.7 -25K2 4
3 GNYE
1
replaced for
Control Cabinet Boiler
+MSB1-X 1PE -1PE /1.2 +CC_MPE
GNYE
1
GNYE
replaced by
2
=BCC+CC_M-X0
terminalblock diagram / Klemmenplan
0-8100-100454-14 /3-32
=BCC
0-8100-100454-14-3
+CC_M
31
sheet 2
sh.
protection note according to ISO 16016 consider!
R. modification
cable external target sign cable internal
free
free
target sign
terminal block
external internal
0
0
0
date
type
item
item
terminal
terminal
comment
presentation
0 -BCC_3016 M2X1,5
0 -BCC_3014 M2X1,5
0 -BCC_2022 M4G1,5
0 -BCC_2009 M4G1,5
0 -BCC_2008 M4G1,5
0 -BCC_2006 M3G1,5
lace connection
wire connection
16 -BCC_2005 M16G1,5
date
terminal number
check
drawn
name standard
ROS
ROS
strip : -X1
number of terminals : 42
25.07.2011
6
+BW-X1.1 6 1 /34.3 -34K6 34
origin
+BW-X1.1 7 2 /34.2
8
+BW-X1.1 8 3 /34.3 -38K2 14
9
+BW-X1.1 9 4 /34.4 -39K3 24
10
+BW-X1.1 10 5 /34.4 -34K6 A2
-33K4 A2
+BW-X1.1 PE 6 /34.4
GNYE 1
+BW-X1.1 1 7 /37.2 -34K7 33
2
+BW-X1.1 2 8 /37.3 -34K7 34
3
+BW-X1.1 3 9 /38.6 -34K7 82
4
+BW-X1.1 4 10 /61.5 -61K2 14
replaced for
Control Cabinet Boiler
5
+BW-X1.1 5 11 /61.5 -61K2 12
1
+BN-5E3 01 -18K2 44
2
+BN-5E3 02 13 /5.5 -X11 7
+BN-5E3 PE 15 /5.5
3 GNYE
11
+BW-X1.1 12 16 /54.2 -51K6 21
12
+BW-X1.1 13 17 /54.3 -50K6 42
13
+BW-X1.1 11 18 /54.6 -56K6 44
replaced by
14
+BW-X1.1 14 19 /54.7 -38K2 21
15
+BW-X1.1 15 20 /54.8 -40A3 14
21 /5.6
22 /5.6
1
+FO 006-16F7 13 23 /16.7 -X20 3
-X11 12
3
+FO 006-16F7 14 24 /16.7 -16K7 A1
1
+FW005-19F7 13 25 /19.7 -X11 15
2
+FW005-19F7 14 26 /19.7 -19K7 A1
27 /19.8 -X30 3
28 /19.8
=BCC+CC_M-X1
1
-69A2 16
+BO-68B2 PE 31 /68.2
2 GNYE
+F-77A2 L 36 /77.2
2
+F-77A2 PE 38 /77.3
3
40 /77.3
0-8100-100454-14 /3-32
=BCC
0-8100-100454-14-3
+CC_M
31
sheet 3
sh.
cable internal
free 0
A1
33
terminal
target sign
internal
-23K7
protection note according to ISO 16016 consider!
-X40
-X11
item
/23.7
/23.7
presentation
number of terminals : 42
comment
terminal block
strip : -X1
wire connection
lace connection
type
terminal number
41
42
13
14
terminal
target sign
external
+GO 006-23F7
+GO 006-23F7
item
R. modification
cable external target sign cable internal
free
free
target sign
terminal block
external internal
date
type
item
item
terminal
terminal
comment
presentation
0 -BCC_3012 M4X1,5
0 -BCC_3010 M4X1,5
0 -BCC_3008 M4X1,5
0 -BCC_3007 M2X1,5
0 -BCC_3006 M2X1,5
0 -BCC_3002 M2X1,5
0 -BCC_3001 M2X1,5
lace connection
wire connection
2 -BCC_3005 M12X1,5
date
terminal number
check
drawn
name standard
ROS
ROS
strip : -X2
number of terminals : 40
25.07.2011
1
+F-9S2 C 1 /9.2 -X12 2
origin
+F-9S2 NC 2 /9.2
1
+F-9S3 C 3 /9.3
2
+F-9S3 NC 4 /9.3
5 /9.3
1
+BW-X2.1 1 7 /44.2 -42K5 21
-44K4 23
2
+BW-X2.1 2 8 /44.2 -44K4 A1
3
+BW-X2.1 3 9 /45.2 -45K4 A1
8
+BW-X2.1 8 10 /46.2 -46K8 A1
replaced for
Control Cabinet Boiler
9
+BW-X2.1 9 11 /47.2 -47K6 A1
10
+BW-X2.1 10 12 /47.4 -47K5 A1
6
+BW-X2.1 6 13 /48.2 -48K6 A1
7
+BW-X2.1 7 14 /49.2 -49K6 A1
4
+BW-X2.1 4 15 /50.2 -59K4 22
5
+BW-X2.1 5 16 /51.2 -51K6 A1
1
+BO-52F2 C 17 /52.2 -51K6 11
-52K6 23
2
+BO-52F2 NC 18 /52.2 -52K6 A1
replaced by
1
+BO-53F2 C 19 /53.2 -53K6 23
-52K6 23
2
+BO-53F2 NC 20 /53.2 -53K6 A1
1
+F-55S2 C 21 /55.2 -12K2 11
2
+F-55S2 NO 22 /55.2 -55K6 A1
3
+F-55S3 C 23 /55.3
5
+F-55S3 NO 24 /55.4 -55K5 A1
1
+F-56S2 C 25 /56.2
2
+F-56S2 NO 26 /56.2
1
+F-56S3 C 27 /56.3
2
+F-56S3 NO 28 /56.4 -56K6 A1
=BCC+CC_M-X2
3
+F-57S2 C 29 /57.2
4
+F-57S2 NO 30 /57.2
3
+F-57S3 C 31 /57.3
4
0-8100-100454-14-3
+CC_M
31
sheet 5
sh.
cable internal
free 0
A1
A1
11
terminal
target sign
internal
-59K4
-42K6
-59K7
protection note according to ISO 16016 consider!
item
/59.2
/59.2
/59.3
/59.3
/59.5
/59.5
/59.6
/59.7
presentation
number of terminals : 40
comment
terminal block
strip : -X2
wire connection
lace connection
type
terminal number
35
36
37
38
39
40
41
42
C
C
NO
NO
NO
NO
terminal
target sign
external
+F-59S2
+F-59S2
+F-59S3
+F-59S3
+F-59S5
+F-59S5
+F-59S6
+F-59S6
item
0 -BCC_3021 M4X1,5 1 2 3 4
cable external
R. modification
cable external target sign cable internal
free
free
target sign
terminal block
external internal
date
type
item
item
terminal
terminal
comment
presentation
lace connection
wire connection
date
terminal number
check
drawn
0 -BCC_4011 M3X0,75SH
0 -BCC_4005 M2X0,75SH
0 -BCC_4003 M4X0,75SH
6 -BCC_4002 M5X0,75SH
6 -BCC_4001 M5X0,75SH
0 -BCC_4000 M2X0,75SH
name standard
ROS
ROS
strip : -X3
number of terminals : 30
25.07.2011
1
+BW-X3.1 1 1 /39.6 -39A3 1
origin
+BW-X3.1 2 2 /39.6 -39A3 2
3
+BW-X3.1 3 3 /39.6 -39A3 3
4
+BW-X3.1 4 4 /39.5 -39A3 4
5
+BW-X3.1 5 5 /39.5 -39A3 5
S
+BW-X3.1 6 6 /39.6 -39A3 6
1
+BW-X3.2 1 7 /40.6 -40A3 1
2
+BW-X3.2 2 8 /40.6 -40A3 2
3
+BW-X3.2 3 9 /40.6 -40A3 3
4
+BW-X3.2 4 10 /40.5 -40A3 4
5
+BW-X3.2 5 11 /40.5 -40A3 5
replaced for
Control Cabinet Boiler
S
+BW-X3.2 6 12 /40.6 -40A3 6
1
+BW-X3.3 1 13 /62.2 +CC_D-60N3 6
2
+BW-X3.3 2 14 /62.3 +CC_D-60N3 33
3
+BW-X3.3 3 15 /62.3 +CC_D-60N3 34
1
+BO-64B2 + 16 /64.2 +CC_D-60N3 5
17 /64.3 +CC_D-60N3 35
18 /64.3
2
+BO-64B2 - 19 /64.3
1
+BO-68B2 2+ 20 /68.3 -73A2 43+
replaced by
21 /68.4 -73A2 42-
24 /68.4
2
+BO-68B2 1- 25 /68.4
S
-SH 26 /69.3 -69A2 5
7
+BO-69B3 1 27 /69.3 -69A2 4
2
+BO-69B3 GND 28 /69.3 -69A2 3
3
+BO-69B3 2 29 /69.4 -69A2 2
4
=BCC+CC_M-X3
terminalblock diagram / Klemmenplan
0-8100-100454-14 /3-32
=BCC
0-8100-100454-14-3
+CC_M
31
sheet 7
sh.
protection note according to ISO 16016 consider!
R. modification
cable external target sign cable internal
free
free
target sign
terminal block
external internal
date
type
item
item
terminal
terminal
comment
presentation
lace connection
wire connection
0 -BCC_6012 M18X1,5
0 -BCC_6011 M24X1,5
0 -BCC_6010 M24X1,5
date
terminal number
check
drawn
name standard
ROS
ROS
strip : -X4
25.07.2011
1
+ECR-X 1 1 /100.2 -42K5 41
origin
+ECR-X 2 2 /100.2 -42K5 44
3
+ECR-X 3 3 /100.2 -9K5 33
4
+ECR-X 4 4 /100.2 -56K6 34
5
+ECR-X 5 5 /100.3 -57K6 43
6
+ECR-X 6 6 /100.3 -57K6 44
7
+ECR-X 7 7 /100.3 -35K6 21
8
+ECR-X 8 8 /100.3 -35K6 24
9
+ECR-X 9 9 /100.4 -27K7 11
10
+ECR-X 10 10 /100.4 -27K7 14
11
+ECR-X 11 11 /100.4 -27K8 11
replaced for
Control Cabinet Boiler
12
+ECR-X 12 12 /100.4 -27K8 14
13
+ECR-X 13 13 /100.5 -7K5 21
14
+ECR-X 14 14 /100.5 -1K3 44
-1K6 44
15
+ECR-X 15 15 /100.6 -76K5 21
16
+ECR-X 16 16 /100.6 -76K5 24
17
+ECR-X 17 17 /100.6 -77K4 21
18
+ECR-X 18 18 /100.6 -77K4 24
19
+ECR-X 19 19 /100.7 -52K6 33
replaced by
20
+ECR-X 20 20 /100.7 -52K6 34
21
+ECR-X 21 21 /100.8 -53K6 33
22
+ECR-X 22 22 /100.8 -53K6 34
23
+ECR-X 23 23 /101.2 -74K6 11
24
+ECR-X 24 24 /101.2 -74K6 14
1
+ECR-X 25 25 /101.3 -74K7 11
8
+ECR-X 26 26 /101.3 -74K7 14
3
=BCC+CC_M-X4
7
0-8100-100454-14-3
+CC_M
11
+ECR-X 63 63 /102.8
16
sh.
+ECR-X 64 64 /102.8
protection note according to ISO 16016 consider!
R. modification
cable external target sign cable internal
free
free
target sign
terminal block
external internal
date
type
item
item
terminal
terminal
comment
presentation
lace connection
wire connection
0 -BCC_6014 M18X1,5
0 -BCC_6013 M18X1,5
18 -BCC_6012 M18X1,5
date
terminal number
check
drawn
name standard
ROS
ROS
strip : -X4
25.07.2011
17
+ECR-X 65 65 /102.8 -51K6 31
origin
18
+ECR-X 66 66 /102.8 -51K6 34
1
+ECR-X 67 67 /103.2 -20K1 43
2
+ECR-X 68 68 /103.2 -20K1 44
3
+ECR-X 69 69 /103.2 -22K7 31
4
+ECR-X 70 70 /103.2 -22K7 34
5
+ECR-X 71 71 /103.3 -4Q2 43
6
+ECR-X 72 72 /103.3 -4Q2 44
7
+ECR-X 73 73 /103.3 -22K8 21
8
+ECR-X 74 74 /103.3 -22K8 24
9
+ECR-X 75 75 /103.4 -20K2 11
replaced for
Control Cabinet Boiler
10
+ECR-X 76 76 /103.4 -20K2 14
11
+ECR-X 77 77 /103.5 -22K2 11
12
+ECR-X 78 78 /103.5 -22K2 14
13
+ECR-X 79 79 /103.5 -63K6 21
14
+ECR-X 80 80 /103.5 -63K6 22
15
+ECR-X 81 81 /103.6 -63K5 21
16
+ECR-X 82 82 /103.6 -63K5 22
17
+ECR-X 83 83 /103.6
18
+ECR-X 84 84 /103.6
replaced by
1
+ECR-X 85 85 /104.1 -24K2 13
2
+ECR-X 86 86 /104.1 -24K2 14
3
+ECR-X 87 87 /104.2 -25K2 13
4
+ECR-X 88 88 /104.2 -25K2 14
5
+ECR-X 89 89 /104.3 -3Q5 43
6
+ECR-X 90 90 /104.3 -3Q5 44
9
+ECR-X 91 91 /104.3 -3Q7 43
8
+ECR-X 92 92 /104.3 -3Q7 44
9
=BCC+CC_M-X4
12
+ECR-X 99 99 /104.6
16
0-8100-100454-14 /3-32
=BCC
0-8100-100454-14-3
+CC_M
31
sheet 9
sh.
cable internal
free 0
31
32
11-
12+
terminal
target sign
internal
+CC_D-60N3
+CC_D-60N3
-70A2
-70A2
protection note according to ISO 16016 consider!
item
/64.5
/64.5
/70.6
/70.7
presentation
number of terminals : 4
comment
terminal block
strip : -X6
wire connection
lace connection
type
terminal number
1
4
-
-
+
terminal
target sign
external
+ECR-X
+ECR-X
+ECR-X
+ECR-X
item
free 0
l
terminal
target sign
internal
+CC_MPE
protection note according to ISO 16016 consider!
-2T5
item
presentation
/2.5
/2.6
number of terminals : 2
comment
terminal block
strip : -X10
wire connection
lace connection
type
terminal number
1
terminal
target sign
external
+CC_D-2P5
+CC_D-2P5
item
free 0
cable external
R. modification
cable external target sign cable internal
free
free
target sign
terminal block
external internal
0
0
0
date
type
item
item
terminal
terminal
comment
presentation
lace connection
wire connection
date
terminal number
check
drawn
name standard
ROS
ROS
strip : -X11
number of terminals : 36
25.07.2011
1 /7.6 -10A3 Q4:1
origin
2 /7.6 -8F6 1
3 /7.6 +CC_D-9S8 13
-7K5 A1 4 /7.6
-7T2 0V 5 /7.6
6 /7.6 +CC_D-30P5
8 /7.6 -8B6 6
-77K4 A2
replaced for
Control Cabinet Boiler
+CC_D-9S8 14 11 /9.7 -9K8 A1
-X1 23
+CC_D-19S4 8 -X1 25
replaced by
+CC_D-27S2 1 18 /27.2 -5F2 14
-20K1 23
12
+CC_D-36S5 14 24 /36.6 -36K7 A1
=BCC+CC_M-X11
+CC_D-39S2 2/4 28 /39.2 -34K7 24
0-8100-100454-14-3
+CC_M
31
sheet 12
sh.
protection note according to ISO 16016 consider!
R. modification
cable external target sign cable internal
free
free
target sign
terminal block
external internal
0
0
date
type
item
item
terminal
terminal
comment
presentation
lace connection
wire connection
date
terminal number
check
drawn
name standard
ROS
ROS
strip : -X12
number of terminals : 32
25.07.2011
+CC_D-9S1 21 1 /9.2 -9K6 61
origin
+CC_D-9S1 22 2 /9.2 -X2 1
4 /92.8
5 /92.8
6 /11.6 -11F5 2
8 /11.6
10 /11.6 -35K6 11
11 /11.6 -13A1 1M
replaced for
Control Cabinet Boiler
12 /11.6
+CC_D-92H9 -73A2 31
-X12 16 +CC_D-90H8
-X12 16
replaced by
-3Q3 13
+CC_D-16S4 6 -X12 19
-22K8 11
13
+CC_D-19S4 6 22 /19.4 -13A1 E.1
=BCC+CC_M-X12
+CC_D-60N3 9 26 /63.3 -63K3 A1
28 /63.4
29 /63.4
-35K2 31
0-8100-100454-14-3
+CC_M
31
sheet 13
sh.
protection note according to ISO 16016 consider!
R. modification
cable external target sign cable internal
free
free
target sign
terminal block
external internal
0
0
date
type
item
item
terminal
terminal
comment
presentation
lace connection
wire connection
date
terminal number
check
drawn
name standard
ROS
ROS
strip : -X19
number of terminals : 18
25.07.2011
+CC_D-90H1 1 LT /90.2 -1K3 14
origin
+CC_D-90H2 2 LT /90.3 -17K2 24
9 LT /90.7
10 LT /90.8
replaced for
Control Cabinet Boiler
+CC_D-92H3 12 LT /92.3 -42K5 34
+CC_D-92H9
replaced by
14
=BCC+CC_M-X19
terminalblock diagram / Klemmenplan
0-8100-100454-14 /3-32
=BCC
0-8100-100454-14-3
+CC_M
31
sheet 14
sh.
cable internal
free 0
A1
A2
A2
11
24
23
terminal
target sign
internal
+CC_MPE
-17K7
-17K2
-17K7
-17K2
-18K2
protection note according to ISO 16016 consider!
-X21
item -X1
/17.4
/17.4
/17.5
/17.5
/17.6
/17.6
presentation
number of terminals : 6
comment
terminal block
strip : -X20
wire connection
lace connection
type
terminal number
1
6
4
terminal
target sign
external
+FOP1-X1
+FOP1-X1
+FOP1-X1
+FOP1-X1
+FOP1-X1
+FOP1-X1
item
free 0
A1
A2
A2
11
24
15
terminal
target sign
internal
+CC_MPE
-18K7
-18K2
-18K7
-18K2
-20K1
protection note according to ISO 16016 consider!
-X20
-X11
item
/18.4
/18.4
/18.5
/18.5
/18.6
/18.6
presentation
number of terminals : 6
comment
terminal block
strip : -X21
wire connection
lace connection
type
terminal number
1
6
4
terminal
target sign
external
+FOP2-X1
+FOP2-X1
+FOP2-X1
+FOP2-X1
+FOP2-X1
+FOP2-X1
item
free 0
A1
A2
A2
11
14
27
11
terminal
target sign
internal
+CC_MPE
-20K7
-20K1
-20K7
-20K1
-24K2
protection note according to ISO 16016 consider!
-5F2
item -X1
/20.4
/20.5
/20.5
/20.6
/20.6
/20.6
presentation
number of terminals : 6
comment
terminal block
strip : -X30
wire connection
lace connection
type
terminal number
1
6
4
terminal
target sign
external
+FWP1-X1
+FWP1-X1
+FWP1-X1
+FWP1-X1
+FWP1-X1
+FWP1-X1
item
free 0
A1
A1
A1
A2
14
11
terminal
target sign
internal
-22K7
-22K8
-22K1
-22K1
-22K6
-22K6
protection note according to ISO 16016 consider!
item
/21.4
/21.5
/21.6
/21.6
/21.7
/21.8
/21.8
presentation
number of terminals : 7
comment
terminal block
strip : -X31
wire connection
lace connection
type
terminal number
1
7
6
10
11
12
terminal
target sign
external
+BCCFWP2-X1
+BCCFWP2-X1
+BCCFWP2-X1
+BCCFWP2-X1
+BCCFWP2-X1
+BCCFWP2-X1
+BCCFWP2-X1
item
free 0
A1
A2
A2
11
24
41
terminal
target sign
internal
+CC_MPE
-24K7
-24K2
-24K7
-24K2
-25K2
protection note according to ISO 16016 consider!
-X41
item -X1
/24.4
/24.4
/24.5
/24.5
/24.6
/24.6
presentation
number of terminals : 6
comment
terminal block
strip : -X40
wire connection
lace connection
type
terminal number
1
6
4
terminal
target sign
external
+MGOP1-X1
+MGOP1-X1
+MGOP1-X1
+MGOP1-X1
+MGOP1-X1
+MGOP1-X1
item
free 0
A1
A2
A2
11
24
terminal
target sign
internal
+CC_MPE
-25K7
-25K2
-25K7
-25K2
-28K4
protection note according to ISO 16016 consider!
item -X40
/25.4
/25.4
/25.5
/25.5
/25.6
/25.6
presentation
number of terminals : 6
comment
terminal block
strip : -X41
wire connection
lace connection
type
terminal number
1
6
4
terminal
target sign
external
+MGOP2-X1
+MGOP2-X1
+MGOP2-X1
+MGOP2-X1
+MGOP2-X1
+MGOP2-X1
item
free 0
6
terminal
target sign
internal
+CC_MPE
protection note according to ISO 16016 consider!
-8B6
-8B6
item
presentation
/8.6
/8.6
/8.6
number of terminals : 3
comment
terminal block
strip : -X111
wire connection
lace connection
type
terminal number
1
3
L
PE
terminal
target sign
external
+CC_D-8M6
+CC_D-8M6
+CC_D-8M6
item
free 0
cable external
free 0
terminal
target sign
internal
+CC_MPE
protection note according to ISO 16016 consider!
item
presentation
/1.8
/1.8
/1.8
/1.8
/1.8
number of terminals : 5
comment
terminal block
strip : -XPE
wire connection
lace connection
type
terminal number
PE
PE
PE
PE
PE
terminal
target sign
external
item
free
cable external
R. modification
cable external target sign cable internal
free
free
target sign
terminal block
external internal
date
type
item
item
terminal
terminal
comment
presentation
lace connection
wire connection
0 -BCC_2005 M16G1,5
date
terminal number
check
drawn
name standard
ROS
ROS
strip : -X1.1
number of terminals : 16
25.07.2011
1
+CC_M-X1 7 1 ignition transformer /37.2 -X8 2
origin
+CC_M-X1 8 2 ignition
Zündtrafo
valves /37.3 -X8 5
3
+CC_M-X1 9 3 Zündventile
oil valves
13.01 /38.6 -X8 14
4
+CC_M-X1 10 servo
4 motor compound
13.03/13.09/13.11
regulator
Ölventile /61.5 -X8 67
5
+CC_M-X1 11 5 Stellmotor06.01.xx/06.10
Verbundregler /61.5 -X8 68
6
+CC_M-X1 1 6 emergency operation
08.02
box /34.3 -X8 196
7
+CC_M-X1 2 7 Notbetriebskasten
ignition /34.2 -X8 195
8
+CC_M-X1 3 8 oil
Zündung
valves /34.3 -X8 197
9
+CC_M-X1 4 9 Ölventile
flame /34.4 -X8 198
10
+CC_M-X1 5 10 Flamme /34.4 -X8 199
13
+CC_M-X1 18 11 oil distributor heater /54.6 -X8 45
replaced for
Control Cabinet Boiler
11
+CC_M-X1 16 12 Ölverteilerbeheizung
burner heater /54.2 -X8 51
12
+CC_M-X1 17 13 Brennerheizung
01.06.10
heaters /54.3 -X8 54
14
+CC_M-X1 19 14 igniter
Heizungen
01.06.11
heater /54.7 -X8 105
+CC_M-X1 20 15 Zünderbeheizung
06.01.22/06.49 /54.8 -X8 106
15 GNYE
replaced by
23
=BCC+BW-X1.1
terminalblock diagram / Klemmenplan
0-8100-100454-14 /3-32
+BW
=BCC
0-8100-100454-14-3
31
sheet 23
sh.
protection note according to ISO 16016 consider!
R. modification
cable external target sign cable internal
free
free
target sign
terminal block
external internal
date
type
item
item
terminal
terminal
comment
presentation
lace connection
wire connection
2 -BCC_3005 M12X1,5
date
terminal number
check
drawn
name standard
ROS
ROS
strip : -X2.1
number of terminals : 11
25.07.2011
1
+CC_M-X2 7 1 /44.2 -X8 201
origin
+CC_M-X2 8atomizing
2 air diff. pressure monitor /44.2 -X8 202
3
+CC_M-X2 Zerstäuberluftdifferenzdruckwächter
9 3combustion air pressure monitor /45.2 -X8 205
4
+CC_M-X2 15heavy
4 Verbrennungsluftdruckwächter
fuel oil temperature monitor
04.04 /50.2 -X8 211
5
+CC_M-X2 16heavy
5 fuel
Schweröltemperaturwächter
oil temperature monitor
04.03 /51.2 -X8 214
6
+CC_M-X2 13 6 windbox
Schweröltemperaturwächter
temperature monitor
06.36 /48.2 -X8 217
7
+CC_M-X2 14 7 Luftkastentemperaturwächter
oil pressure monitor
06.35 /49.2 -X8 223
8
+CC_M-X2 10 8limit switch rotary
Öldruckwächter
cup atomizer
04.09 /46.2 -X8 226
9
+CC_M-X2 11 9 limit
Endschalter
switch compund
Drehzerstäuber
regulator
06.04.07 /47.2 -X8 229
10
+CC_M-X2 12 10
limit switch compound
in ignitionregulator
position
04.40 /47.4 -X8 232
PE Endschalter
in purge
Verbungregler
position /44.3 -X8 203
replaced for
Control Cabinet Boiler
Endschalterin
Verbungregler
Zündstellung
in Zündstellung
08.02
08.02
replaced by
24
=BCC+BW-X2.1
terminalblock diagram / Klemmenplan
0-8100-100454-14 /3-32
+BW
=BCC
0-8100-100454-14-3
31
sheet 24
sh.
cable internal
free 0
505
504
503
502
501
506
terminal
target sign
internal
protection note according to ISO 16016 consider!
-X8
-X8
-X8
-X8
-X8
-X8
item
/39.6
/39.6
/39.6
/39.5
/39.5
/39.6
presentation
14.02
Flammenfühler 1
flame scanner 1
number of terminals : 6
comment
terminal block
strip : -X3.1
wire connection
lace connection
type
terminal number
1
6
1
terminal
target sign
external
+CC_M-X3
+CC_M-X3
+CC_M-X3
+CC_M-X3
+CC_M-X3
+CC_M-X3
item
free 0
511
510
509
508
507
512
terminal
target sign
internal
protection note according to ISO 16016 consider!
-X8
-X8
-X8
-X8
-X8
-X8
item
/40.6
/40.6
/40.6
/40.5
/40.5
/40.6
presentation
14.02
Flammenfühler 2
flame scanner 2
number of terminals : 6
comment
terminal block
strip : -X3.2
wire connection
lace connection
type
terminal number
1
6
7
10
11
12
terminal
target sign
external
+CC_M-X3
+CC_M-X3
+CC_M-X3
+CC_M-X3
+CC_M-X3
+CC_M-X3
item
free 0
513
514
515
516
terminal
target sign
internal
protection note according to ISO 16016 consider!
-X8
-X8
-X8
-X8
item
/62.2
/62.3
/62.3
/62.3
presentation
08.02
motor compound regulator
Stellmotor Verbundregler
number of terminals : 4
comment
terminal block
strip : -X3.3
wire connection
lace connection
type
servo
terminal number
1
4
13
14
15
terminal
target sign
external
+CC_MGND
+CC_M-X3
+CC_M-X3
+CC_M-X3
item
R. modification
cable external target sign cable internal
free
free
target sign
terminal block
external internal
0
0
date
type
item
item
terminal
terminal
comment
presentation
lace connection
wire connection
date
terminal number
check
drawn
name standard
ROS
ROS
strip : -X8
25.07.2011
+BN-2T1 A1 2 ignition transformer /37.2 -X1.1 1
origin
+BN-2T1 A2 3 Zündtrafo /37.2
replaced for
Control Cabinet Boiler
+BN-2Y3 PE 13 13.03/13.09/13.11 /37.6
16 06.01.01/06.01.02 /38.6
replaced by
+BN-3Y2 PE 22 06.01.02 /38.4
28
+BN-5E2 L 48 oil distributor heater 2 /54.6
=BCC+BW-X8
+BN-5E3 L 51 burner heater /54.2 -X1.1 12
+BN-5E6 PE 62 /54.5
+BN-6Y1-M 2 servo
63 motor compound regulator /61.7 -16K1 11
+BN-6Y1-M PE 66 /61.8
-16K1 12 servo
67 motor compound regulator /61.5 -X1.1 4
-16K1 22 servo
68 motor
Stellmotor
compound
Verbundregler
regulator /61.5 -X1.1 5
0-8100-100454-14-3
+BN-17F1 differential
C 201 pressure monitor atomizing air /44.2 -X2.1 1
31
/44.2
sheet 28
+BN-17F1 NO
Differenzdruckwächter
atomizing
202 air diff. pressure
Zerstäuberluft
monitor -X2.1 2
sh.
+BN-17F1 PE
Zerstäuberluftdifferenzdruckwächter
203 /44.3 -X2.1 PE
04.04
protection note according to ISO 16016 consider!
R. modification
cable external target sign cable internal
free
free
target sign
terminal block
external internal
0
0
date
type
item
item
terminal
terminal
comment
presentation
0 -BCC_1004 M4G2,5
lace connection
wire connection
date
terminal number
check
drawn
name standard
ROS
ROS
strip : -X8
25.07.2011
+BN-17F2 differential
C 204 pressure monitor atomizing air /45.2
origin
+BN-17F2 NO
Differenzdruckwächter
205
combustion air pressure
Zerstäuberluft
monitor /45.2 -X2.1 3
+BN-17F2 PE 206
Verbrennungsluftdruckwächter /45.3
+BN-18F1 NOheavy
211Temperaturwächter
fuel oil temperatureSchweröl
monitor /50.2 -X2.1 4
+BN-18F2 NCheavy
214Temperaturwächter
fuel oil temperatureSchweröl
monitor /51.2 -X2.1 5
+BN-18F3 C 216
temperature monitor windbox
06.35 /48.2
+BN-18F3 NC 217
Temperaturwächter
windbox temperature
Luftkasten
monitor /48.2 -X2.1 6
replaced for
Control Cabinet Boiler
+BN-18F3 PE 218Luftkastentemperaturwächter /48.3
+BN-19S1 Endschalter
NO 226 limit
Drehzerstäuber
switch rotary
ausgeschwenkt
cup atomizer /46.2 -X2.1 8
+BN-6Y1-S3 Endschalter
NO 229 limit
Verbundregler
switch compund
in Zündstellung
regulator /47.2 -X2.1 9
replaced by
+BN-6Y1-S4 limit switch compound
C 231 regulator
inin
ignition
purge position /47.4
+BN-6Y1-S4 Endschalter
NO 232limit
Verbundregler
switch
Endschalter
compound
in
Verbungregler
Lüftstellung
regulator /47.4 -X2.1 10
29
+BN-40B1 YE 505 flame scanner 1 /39.6 -X3.1 1
=BCC+BW-X8
+BN-40B2 RD 508 /40.5 -X3.2 4
+BN-6Y1-R1 B servo
513 motor compound regulator
14.02 /62.2 -X3.3 1
0-8100-100454-14 /3-32
+BW
=BCC
0-8100-100454-14-3
31
sheet 29
sh.
protection note according to ISO 16016 consider!
R. modification
cable external target sign cable internal
free
free
target sign
terminal block
external internal
date
type
item
item
terminal
terminal
comment
presentation
lace connection
wire connection
0 -BCC_6012 M18X1,5
0 -BCC_6011 M24X1,5
0 -BCC_6010 M24X1,5
date
terminal number
check
drawn
name standard
ROS
ROS
strip : -X
25.07.2011
1
+CC_M-X4 1 1 /100.2
origin
+CC_M-X4 2 2 /100.2
3
+CC_M-X4 3 3 /100.2
4
+CC_M-X4 4 4 /100.2
5
+CC_M-X4 5 5 /100.3
6
+CC_M-X4 6 6 /100.3
7
+CC_M-X4 7 7 /100.3
8
+CC_M-X4 8 8 /100.3
9
+CC_M-X4 9 9 /100.4
10
+CC_M-X4 10 10 /100.4
11
+CC_M-X4 11 11 /100.4
replaced for
Control Cabinet Boiler
12
+CC_M-X4 12 12 /100.4
13
+CC_M-X4 13 13 /100.5
14
+CC_M-X4 14 14 /100.5
15
+CC_M-X4 15 15 /100.6
16
+CC_M-X4 16 16 /100.6
17
+CC_M-X4 17 17 /100.6
18
+CC_M-X4 18 18 /100.6
19
+CC_M-X4 19 19 /100.7
20
+CC_M-X4 20 20 /100.7
replaced by
21
+CC_M-X4 21 21 /100.8
22
+CC_M-X4 22 22 /100.8
23
+CC_M-X4 23 23 /101.2
24
+CC_M-X4 24 24 /101.2
1
+CC_M-X4 25 25 /101.3
2
+CC_M-X4 26 26 /101.3
3
+CC_M-X4 27 27 /101.3
30
4
+CC_M-X4 28 28 /101.3
5
+CC_M-X4 29 29 /101.4
6
+CC_M-X4 30 30 /101.4
=BCC+ECR-X
7
+CC_M-X4 31 31 /101.5
8
+CC_M-X4 32 32 /101.5
9
+CC_M-X4 33 33 /101.5
10
+CC_M-X4 34 34 /101.5
11
+CC_M-X4 35 35 /101.6
12
+CC_M-X4 36 36 /101.6
13
+CC_M-X4 37 37 /101.6
14
+CC_M-X4 39 39 /101.7
16
+CC_M-X4 40 40 /101.7
17
+CC_M-X4 41 41 /101.8
18
+CC_M-X4 42 42 /101.8
19
+CC_M-X4 43 43 /102.2
20
+CC_M-X4 44 44 /102.2
21
+CC_M-X4 45 45 /102.2
22
+CC_M-X4 46 46 /102.2
23
+CC_M-X4 47 47 /102.3
24
+CC_M-X4 48 48 /102.3
1
+CC_M-X4 49 49 /102.4
2
+CC_M-X4 50 50 /102.4
3
+CC_M-X4 51 51 /102.4
4
+CC_M-X4 52 52 /102.4
5
+CC_M-X4 53 53 /102.5
6
+CC_M-X4 54 54 /102.5
7
+CC_M-X4 55 55 /102.6
8
+CC_M-X4 56 56 /102.6
0-8100-100454-14 /3-32
9
+CC_M-X4 57 57 /102.6
10
+CC_M-X4 58 58 /102.6
11
+CC_M-X4 59 59 /102.7
+ECR
=BCC
0-8100-100454-14-3
12
+CC_M-X4 60 60 /102.7
13
+CC_M-X4 61 61 /102.7
14
+CC_M-X4 62 62 /102.7
15
+CC_M-X4 63 63 /102.8
31
16
/102.8
sheet 30
+CC_M-X4 64 64
17
sh.
+CC_M-X4 65 65 /102.8
protection note according to ISO 16016 consider!
R. modification
cable external target sign cable internal
free
free
target sign
terminal block
external internal
date
type
item
item
terminal
terminal
comment
presentation
lace connection
wire connection
0 -BCC_6014 M18X1,5
0 -BCC_6013 M18X1,5
18 -BCC_6012 M18X1,5
date
terminal number
check
drawn
2 -BCC_6001 M5X0,75SH
name standard
ROS
ROS
strip : -X
25.07.2011
18
+CC_M-X4 66 66 /102.8
origin
+CC_M-X4 67 67 /103.2
2
+CC_M-X4 68 68 /103.2
3
+CC_M-X4 69 69 /103.2
4
+CC_M-X4 70 70 /103.2
5
+CC_M-X4 71 71 /103.3
6
+CC_M-X4 72 72 /103.3
7
+CC_M-X4 73 73 /103.3
8
+CC_M-X4 74 74 /103.3
9
+CC_M-X4 75 75 /103.4
10
+CC_M-X4 76 76 /103.4
replaced for
Control Cabinet Boiler
11
+CC_M-X4 77 77 /103.5
12
+CC_M-X4 78 78 /103.5
13
+CC_M-X4 79 79 /103.5
14
+CC_M-X4 80 80 /103.5
15
+CC_M-X4 81 81 /103.6
16
+CC_M-X4 82 82 /103.6
17
+CC_M-X4 83 83 /103.6
18
+CC_M-X4 84 84 /103.6
1
+CC_M-X4 85 85 /104.1
replaced by
2
+CC_M-X4 86 86 /104.1
3
+CC_M-X4 87 87 /104.2
4
+CC_M-X4 88 88 /104.2
5
+CC_M-X4 89 89 /104.3
6
+CC_M-X4 90 90 /104.3
7
+CC_M-X4 91 91 /104.3
8
+CC_M-X4 92 92 /104.3
31
9
+CC_M-X4 93 93 /104.4
10
+CC_M-X4 94 94 /104.4
11
+CC_M-X4 95 95 /104.5
=BCC+ECR-X
12
+CC_M-X4 96 96 /104.5
13
+CC_M-X4 97 97 /104.5
14
+CC_M-X4 98 98 /104.5
15
+CC_M-X4 99 99 /104.6
16
+CC_M-X6 3 + boilerDampfdruck
water level /70.6
2
+CC_M-X6 4 - /70.7
0-8100-100454-14 /3-32
+ECR
=BCC
0-8100-100454-14-3
31
sheet 31
sh.
protection note according to ISO 16016 consider!
R. modification
-X0
Klemmen-Anzahl : 47
1 1
date
+BW-X8 654 1 /2.2
2 2
656 -BCC_1004 2 /2.2
3 3
658 M4G2,5 3 /2.3
GNYE GNYE
660 4 /2.3
U 1 1
5 /2.4
-2M3 V 2 2
date
check
-BCC_1005 6 /2.4
drawn
M
3~
W 3 3
name standard
+F
M4G1,5 7 /2.4
PE GNYE GNYE
8 /2.4
U 1 1
ROS
ROS
9 /2.6
-2M5 V 2 2
-BCC_1003 10 /2.6
M
3~
W 3 3
07.12.2011
+BN
M4G4 11 /2.6
PE GNYE GNYE
12 /2.6
origin
U 1 1
13 /3.2
-3M2 V 2 2
-BCC_1010 14 /3.2
M
3~
W 3 3
+FOP1
M4G1,5 15 /3.2
PE GNYE GNYE
16 /3.2
U 1 1
17 /3.4
-3M3 V 2 2
-BCC_1011 18 /3.4
M
3~
W 3 3
+FOP2
M4G1,5 19 /3.4
PE GNYE GNYE
20 /3.4
U 1 1
21 /4.2
-4M2 V 2 2
replaced for
Control Cabinet Boiler
-BCC_1006 22 /4.2
M
3~
W 3 3
+FWP1
M4G2,5 23 /4.2
PE GNYE GNYE
24 /4.2
U 1 1
-BCC_2020 25 /5.2
-5M2 2
M3G1,5 26 /5.2
M
1~
V 2 GNYE
+FW
27 /5.2
1 1
+BN-5E3-X L1 28 /5.4
2 2
L2 -BCC_1012 29 /5.4
3 3
L3 M4G4 30 /5.4
GNYE GNYE
replaced by
PE 31 /5.4
U 1 1
32 /3.5
-3M5 V 2 2
-BCC_1008 33 /3.5
M
3~
W 3 3
+MGOP1
M4G1,5 34 /3.5
PE GNYE GNYE
35 /3.6
U 1 1
36 /3.7
-3M7 V 2 2
-BCC_1009 37 /3.7
M
3~
1
W 3 3
+MGOP2
M4G1,5 38 /3.7
PE GNYE GNYE
39 /3.8
13
=BCC+CC_M-X0
1 H07Z-K H07Z-K
-1L1 /1.2
23
-1Q2
3 H07Z-K H07Z-K
+CC_D -1L2 /1.2
33
5 H07Z-K H07Z-K
-1L3 /1.2
GNYE -BCC_1000 GNYE
+MSB1-X 1PE -1PE /1.2
terminal connection diagram / Anschlussplan M4G25
13
1 H07Z-K H07Z-K
-2L1 /1.5
23
-1Q5
3 H07Z-K H07Z-K
+CC_D -2L2 /1.5
33
5 H07Z-K H07Z-K
-2L3 /1.5
GNYE -BCC_1001 GNYE
+MSB2-X 2PE -2PE /1.5
M4G35
0-8100-100454-14 /3-32
0-8100-100454-14-3
=BCC.
+CC_M
19
sheet 1
sh.
protection note according to ISO 16016 consider!
R. modification
-X1
Klemmen-Anzahl : 42
6 6
date
+BW-X1.1 6 1 /34.3
Notbetriebskasten
7 7
date
check
7 2 /34.2
drawn
name standard
ignition
Zündung
ROS
ROS
8 8
07.12.2011
8 3 /34.3
oil valves
origin
Ölventile
9 9
9 4 /34.4
flame
Flamme
10 10
10 5 /34.4
replaced for
Control Cabinet Boiler
GNYE -BCC_2005 GNYE
PE 6 /34.4
M16G1,5
1 1
replaced by
1 7 /37.2
ignition transformer
Zündtrafo
13.01
2 2
2 8 /37.3
ignition valves
2
Zündventile
13.03/13.09/13.11
3 3
3 9 /38.6
=BCC+CC_M-X1
oil valves
Ölventile
06.01.xx/06.10
4 4
4 10 /61.5
Stellmotor Verbundregler
08.02
5 5
terminal connection diagram / Anschlussplan
5 11 /61.5
H07Z-K H07Z-K
-X1 12 12 /5.5
01 1 1
-5E3
02 2 2
+BN -BCC_2022 13 /5.5
05 3 3
M4G1,5 14 /5.5
PE GNYE GNYE
15 /5.5
11 11
+BW-X1.1 12 16 /54.2
burner heater
Brennerheizung -BCC_2005
01.06.11 M16G1,5
12 12
13 17 /54.3
0-8100-100454-14 /3-32
heaters
Heizungen
0-8100-100454-14-3
=BCC.
06.01.22/06.49
+CC_M
19
sheet 2
sh.
protection note according to ISO 16016 consider!
R. modification
-X1
Klemmen-Anzahl : 42
13 13
date
+BW-X1.1 11 18 /54.6
Ölverteilerbeheizung
01.06.10
14 -BCC_2005 14
date
check
14 19 /54.7
drawn
M16G1,5
name standard
igniter heater
Zünderbeheizung
ROS
ROS
12.17
15 15
07.12.2011
15 20 /54.8
21 /5.6
origin
22 /5.6
13 1 1
-16F7 -BCC_3014 23 /16.7
14 2
+FO 006 M2X1,5
2
24 /16.7
replaced for
Control Cabinet Boiler
13 1 1
-19F7 -BCC_3016 25 /19.7
14 2 2
+FW005 M2X1,5 26 /19.7
27 /19.8
28 /19.8
+BO-68B2 3 1 1
29 /68.2
boiler water level transmitter 5 2 -BCC_2006
Kesselwasserstandsmeßumformer PE GNYE M3G1,5 2
30 /68.2
BO 021 GNYE
replaced by
31 /68.2
+F-76A3
conductivity monitoring
Leitfähigkeitsüberwachung
FW 007
3
1 1 1
32 /76.4
2 2 2
-BCC_2009 33 /76.5
PE GNYE GNYE
M4G1,5 34 /76.5
8 3 3
35 /76.5
=BCC+CC_M-X1
+F-77A2 L 1 1
36 /77.2
oil turbidity monitoring N 2 2
-BCC_2008 37 /77.2
Öltrübungsüberwachung PE 4 4
M4G1,5 38 /77.3
CO 011 3
39 /77.3
40 /77.3
NC 3
terminal connection diagram / Anschlussplan
13 1 1
-23F7 -BCC_3018 41 /23.7
14 2
+GO 006 M2X1,5
2
42 /23.7
0-8100-100454-14 /3-32
0-8100-100454-14-3
=BCC.
+CC_M
19
sheet 3
sh.
protection note according to ISO 16016 consider!
R. modification
-X2
Klemmen-Anzahl : 40
C 1 1
date
+F-9S2 -BCC_3001 1 /9.2
NC 2 2
emergency stop 1 M2X1,5 2 /9.2
PE
escape route
Not-Stop 1
Fluchtweg
date
check
drawn
C 1 1
name standard
+F-9S3 -BCC_3002 3 /9.3
NC 2 2
emergency stop 2 M2X1,5 4 /9.3
PE
ROS
ROS
escape route 5 /9.3
Not-Stop 2 6 /9.3
07.12.2011
Fluchtweg
origin
1 1
+BW-X2.1 1 7 /44.2
2 2
2 8 /44.2
Zerstäuberluftdifferenzdruckwächter
04.04
replaced for
Control Cabinet Boiler
3 3
3 9 /45.2
Verbrennungsluftdruckwächter
04.03
8 8
8 10 /46.2
Endschalter Drehzerstäuber
replaced by
04.40
9 9
9 11 /47.2
in Zündstellung
4
10 10
08.02 10 12 /47.4
in purge position
Endschalter Verbungregler
=BCC+CC_M-X2
in Zündstellung
6 6
08.02 6 13 /48.2
Luftkastentemperaturwächter
04.09
7 7
7 14 /49.2
Öldruckwächter
terminal connection diagram / Anschlussplan
06.04.07
4 4
4 15 /50.2
Schweröltemperaturwächter
06.36
5 5
5 16 /51.2
Schweröltemperaturwächter
06.35
C 1 1
+BO-52F2 -BCC_3006 17 /52.2
NC 2
steam pressure monitor M2X1,5
PE 2
Dampfdruckwächter 18 /52.2
BO 034
0-8100-100454-14 /3-32
C 1 1
+BO-53F2 -BCC_3007 19 /53.2
NC 2
0-8100-100454-14-3
=BCC.
PE 2
Rauchgastemperaturwächter 20 /53.2
BO 041
19
sheet 4
sh.
protection note according to ISO 16016 consider!
R. modification
-X2
Klemmen-Anzahl : 40
C 1 1
date
+F-55S2 21 /55.2
NO 2 2
limit switch 3-way-valve 22 /55.2
PE
return line in tank position
date
check
FO 003
drawn
C 3 3
name standard
+F-55S3 23 /55.3
NO 4 4
limit switch 3-way-valve 24 /55.4
PE
ROS
ROS
return line in pump position
Endschalter 3-Wege-Ventil
07.12.2011
Rückleitung in Pumpenstellung
FO 003
origin
C 1 1
+F-56S2 -BCC_3010 25 /56.2
NO 2 2
limit switch 3-way-valve M4x1,5 26 /56.2
PE
pre line in heavy fuel oil position
Endschalter 3-Wege-Ventil
Zuleitung in Schwerölstellung
FO 002
C 1 1
+F-56S3 -BCC_3012 27 /56.3
NO 2 2
limit switch 3-way-valve M4x1,5 28 /56.4
PE
pressure controller in heavy fuel oil position
replaced for
Control Cabinet Boiler
Endschalter 3-Wege-Ventil
Druckregler in Schwerölstellung
BN 010
C 3 3
+F-57S2 -BCC_3010 29 /57.2
NO 4 4
limit switch 3-way-valve M4x1,5 30 /57.2
PE
pre line in light fuel oil position
Endschalter 3-Wege-Ventil
Zuleitung in Leichtölstellung
FO 002
C 3 3
replaced by
+F-57S3 -BCC_3012 31 /57.3
NO 4 4
limit switch 3-way-valve M4x1,5 32 /57.4
PE
pressure controller in light fuel oil position
Endschalter 3-Wege-Ventil
Druckregler in Leichtölstellung
BN 010
C 1 1
+F-59S2 -BCC_3020 35 /59.2
5
NO 2 2
limit switch 3 way -valve M4x1,5 36 /59.2
PE
to HFO
=BCC+CC_M-X2
C 1 1
+F-59S3 -BCC_3021 37 /59.3
NO 2 2
limit switch 3 way -valve M4x1,5 38 /59.3
PE
toHFO
C 3 3
+F-59S5 -BCC_3020 39 /59.5
NO 4 4
limit switch 3 way -valve M4x1,5 40 /59.5
PE
terminal connection diagram / Anschlussplan
to MGO
C 3 3
+F-59S6 -BCC_3021 41 /59.6
NO 4 4
limit switch 3 way -valve M4x1,5 42 /59.7
PE
to MGO
0-8100-100454-14 /3-32
0-8100-100454-14-3
=BCC.
+CC_M
19
sheet 5
sh.
protection note according to ISO 16016 consider!
R. modification
-X3
Klemmen-Anzahl : 30
1 1
date
+BW-X3.1 1 1 /39.6
flame scanner 1
Flammenfühler 1
14.02
2 2
date
check
2 2 /39.6
drawn
name standard
ROS
ROS
3 3
07.12.2011
3 3 /39.6
origin
-BCC_4001
M5x0,75SH
4 4
4 4 /39.5
5 5
5 5 /39.5
replaced for
Control Cabinet Boiler
S S
6 6 /39.6
1 1
replaced by
+BW-X3.2 1 7 /40.6
flame scanner 2
Flammenfühler 2
14.02
2 2
2 8 /40.6
6
3 3
3 9 /40.6
=BCC+CC_M-X3
-BCC_4002
M5x0,75SH
4 4
4 10 /40.5
5 5
terminal connection diagram / Anschlussplan
5 11 /40.5
S S
6 12 /40.6
1 1
+BW-X3.3 1 13 /62.2
2 2
2 14 /62.3
0-8100-100454-14 /3-32
0-8100-100454-14-3
=BCC.
+CC_M
19
sheet 6
sh.
protection note according to ISO 16016 consider!
R. modification
-X3
Klemmen-Anzahl : 30
3 -BCC_4011 3
date
+BW-X3.3 3 15 /62.3
M3x0,75SH
date
check
drawn
+BO-64B2 + 1 1
name standard
-BCC_4000 16 /64.2
steam pressure transmitter - 2
M2x0,75SH 17 /64.3
Dampfdruckmeßumformer
ROS
ROS
18 /64.3
BO 033 2
19 /64.3
07.12.2011
origin
+BO-68B2 2+ 1 1
-BCC_4005 20 /68.3
boiler water level transmitter 1- 2
M2x0,75SH 21 /68.4
Kesselwasserstandsmeßumformer
22 /68.4
BO 021
23 /68.4
24 /68.4
2
25 /68.4
S S
26 /69.3
+BO-69B3 1 1 1
-BCC_4003 27 /69.3
boiler water level electrode GND 2 2
replaced for
Control Cabinet Boiler
M4x0,75SH 28 /69.3
Kesselwasserstandselektrode 2 3 3
29 /69.4
BO 022 3 4 4
30 /69.4
replaced by
7
=BCC+CC_M-X3
terminal connection diagram / Anschlussplan
0-8100-100454-14 /3-32
0-8100-100454-14-3
=BCC.
+CC_M
19
sheet 7
sh.
protection note according to ISO 16016 consider!
R. modification
-X4
Klemmen-Anzahl : 102
1 1
date
+ECR-X 1 1 /100.2
2 2
2 2 /100.2
3 3
3 3 /100.2
4 4
4 4 /100.2
5 5
5 5 /100.3
6 6
date
check
6 6 /100.3
drawn
7 7
name standard
7 7 /100.3
8 8
8 8 /100.3
9 9
ROS
ROS
9 9 /100.4
10 10
10 10 /100.4
11 11
07.12.2011
11 11 /100.4
12 12
12 12 /100.4
origin
13 -BCC_6010 13
13 13 /100.5
14 M24x1,5 14
14 14 /100.5
15 15
15 15 /100.6
16 16
16 16 /100.6
17 17
17 17 /100.6
18 18
18 18 /100.6
19 19
19 19 /100.7
20 20
20 20 /100.7
21 21
replaced for
Control Cabinet Boiler
21 21 /100.8
22 22
22 22 /100.8
23 23
23 23 /101.2
24 24
24 24 /101.2
1 1
25 25 /101.3
2 2
26 26 /101.3
3 3
27 27 /101.3
4 4
28 28 /101.3
5 5
29 29 /101.4
6 6
replaced by
30 30 /101.4
7 7
31 31 /101.5
8 8
32 32 /101.5
9 9
33 33 /101.5
10 10
34 34 /101.5
11 11
35 35 /101.6
12 12
36 -BCC_6011 36 /101.6
8
13 13
37 M24x1,5 37 /101.6
14 14
38 38 /101.6
15 15
39 39 /101.7
16 16
40 40 /101.7
17 17
=BCC+CC_M-X4
41 41 /101.8
18 18
42 42 /101.8
19 19
43 43 /102.2
20 20
44 44 /102.2
21 21
45 45 /102.2
22 22
46 46 /102.2
23 23
47 47 /102.3
24 24
48 48 /102.3
1 1
49 49 /102.4
2 2
terminal connection diagram / Anschlussplan
50 50 /102.4
3 3
51 51 /102.4
4 4
52 52 /102.4
5 5
53 53 /102.5
6 6
54 54 /102.5
7 7
55 55 /102.6
8 8
56 56 /102.6
9 9
57 -BCC_6012 57 /102.6
10 10
58 M18x1,5 58 /102.6
11 11
59 59 /102.7
12 12
60 60 /102.7
13 13
61 61 /102.7
14 14
62 62 /102.7
15 15
63 63 /102.8
16 16
64 64 /102.8
17 17
65 65 /102.8
18 18
66 66 /102.8
0-8100-100454-14 /3-32
1 1
67 67 /103.2
2 2
68 68 /103.2
3 3
0-8100-100454-14-3
=BCC.
69 69 /103.2
+CC_M
4 -BCC_6013 4
70 70 /103.2
5 M18x1,5 5
71 71 /103.3
6 6
72 72 /103.3
7 7
19
73 73 /103.3
sheet 8
sh.
protection note according to ISO 16016 consider!
R. modification
-X4
Klemmen-Anzahl : 102
8 8
date
+ECR-X 74 74 /103.3
9 9
75 75 /103.4
10 10
76 76 /103.4
11 11
77 77 /103.5
12 12
78 78 /103.5
13 -BCC_6013 13
date
check
79 79 /103.5
drawn
14 M18x1,5 14
name standard
80 80 /103.5
15 15
81 81 /103.6
16 16
ROS
ROS
82 82 /103.6
17 17
83 83 /103.6
18 18
07.12.2011
84 84 /103.6
1 1
85 85 /104.1
origin
2 2
86 86 /104.1
3 3
87 87 /104.2
4 4
88 88 /104.2
5 5
89 89 /104.3
6 6
90 90 /104.3
7 7
91 91 /104.3
8 8
92 92 /104.3
9 9
93 -BCC_6014 93 /104.4
10 10
94 M18x1,5 94 /104.4
11 11
replaced for
Control Cabinet Boiler
95 95 /104.5
12 12
96 96 /104.5
13 13
97 97 /104.5
14 14
98 98 /104.5
15 15
99 99 /104.6
16 16
100 100 /104.6
17 17
101 101 /104.6
18 18
102 102 /104.6
replaced by
9
=BCC+CC_M-X4
terminal connection diagram / Anschlussplan
0-8100-100454-14 /3-32
0-8100-100454-14-3
=BCC.
+CC_M
19
sheet 9
sh.
/64.5
/64.5
/70.6
/70.7
Klemmen-Anzahl : 4
-X6
4
1
4
protection note according to ISO 16016 consider!
-BCC_6001
M5x0,75SH
1
4
-
-
+
+
Dampfdruck
steam pressure
Kesselwasserniveau
boiler water level
+ECR-X
/17.4
/17.5
/17.5
/17.6
/17.6
Klemmen-Anzahl : 6
-X20
6
GNYE
1
5
protection note according to ISO 16016 consider!
-BCC_2120
M7G1,5
1
GNYE
4
6
+FOP1-X1
/18.4
/18.5
/18.5
/18.6
/18.6
Klemmen-Anzahl : 6
-X21
6
GNYE
1
5
protection note according to ISO 16016 consider!
-BCC_2121
M7G1,5
1
GNYE
4
6
+FOP2-X1
/20.5
/20.5
/20.6
/20.6
/20.6
Klemmen-Anzahl : 6
-X30
6
GNYE
1
5
protection note according to ISO 16016 consider!
-BCC_2220
M7G1,5
1
GNYE
4
6
+FWP1-X1
/21.5
/21.6
/21.6
/21.7
/21.8
/21.8
Klemmen-Anzahl : 7
-X31
7
GNYE
1
6
protection note according to ISO 16016 consider!
-BCC_2222
M7G1,5
1
GNYE
6
10
11
12
+BCCFWP2-X1
/24.4
/24.5
/24.5
/24.6
/24.6
Klemmen-Anzahl : 6
-X40
6
GNYE
1
5
protection note according to ISO 16016 consider!
-BCC_2122
M7G1,5
1
GNYE
4
6
+MGOP1-X1
/25.4
/25.5
/25.5
/25.6
/25.6
Klemmen-Anzahl : 6
-X41
6
GNYE
1
5
protection note according to ISO 16016 consider!
-BCC_2123
M7G1,5
1
GNYE
4
6
+MGOP2-X1
/1.8
/1.8
/1.8
/1.8
Klemmen-Anzahl : 5
-XPE
PE
PE
PE
PE
PE
protection note according to ISO 16016 consider!
/4.6
/4.6
/4.6
/4.4
/4.4
/4.5
/4.5
Klemmen-Anzahl : 8
-X0
-1PE
-1L1
-1L2
-1L3
1
4
GNYE
GNYE
1
3
protection note according to ISO 16016 consider!
-BCC_1007
-BCC_1002
M4G2,5
M4G4
1
3
GNYE
GNYE
PE
W
U
1L1
1L2
1L3
1PE
M
3~
+BCCFWP2+MSB2-X
+BCCFWP2+FWP2
-4M3
R. modification
-X1
Klemmen-Anzahl : 13
1 1
date
+FWP2-X1 4 1 /21.3
2 2
3 2 /21.3
3 -BCC_2221 3
1 3 /21.2
4 M7G1,5 4
2 4 /21.2
5 5
5 5 /21.3
1 1
date
check
1 6 /21.4
drawn
+CC_M-X31
2 2
name standard
2 7 /21.5
3 3
3 8 /21.6
4 4
ROS
ROS
4 -BCC_2222 9 /21.6
M7G1,5
5 5
07.12.2011
5 10 /21.7
6 6
6 11 /21.8
origin
GNYE GNYE
7 12 /21.8
GNYE -BCC_2221 GNYE
+FWP2-X1 6 13 /21.4
M7G1,5
replaced for
Control Cabinet Boiler
replaced by
19
=BCC+BCCFWP2-X1
terminal connection diagram / Anschlussplan
0-8100-100454-14 /3-32
0-8100-100454-14-3
=BCC.
+BCCFWP2
19
sheet 19
sh.
1 2 3 4 5 6 7 8
SAACKE
SAACKE 56 SAACKE
SAACKE SAACKE
SAACKE
58
B B
99 99
50
54
protection note according to ISO 16016 consider!
22 23 26
MSB 2
20 21
1 2
30 31 32 33 36
3 4 5 6 7
C 24 25 C
8 9 10 11 12
34 35
13 14 15 16
46 48
49
60 60
57 57
45 47
D D
H07Z-K 1,5mm²
all lines without indication of cross section are
98
E E
scale : 1:10
F scale unit : mm F
date 23.07.2011 layout diagram / Aufbauplan =BCC
drawn ROS Control Cabinet Boiler
1 0-8100-100454-14 /3-32 +CC
0 as built 30.01.2012 ROS check ROS sheet 1
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by front view / Frontansicht 19 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
No. Name Hole Color Equipment Function No. Hole Color Equipment Function
5 36S5 R black Push Button reset burner 55 Aluminium plate SAACKE Type
6 9S8 R black Push Button release / reset 56 Resopal plate 25x100mm BOILER CONTROL CABINET CS 010
8 92H3 R green Lamp burner in operation 58 Resopal plate 25x100mm FEED WATER PUMP 2 CONTROL BOX CS 010
17 67
18 68
19 69
27 77
28 78
73
29 79
37 87
38 88
39 89
all lines without indication of cross section are
40 90
41 91
E E
42 92
43 93
44 94
F F
date 23.07.2011 layout diagram / Aufbauplan =BCC
drawn ROS Control Cabinet Boiler
2 0-8100-100454-14 /3-32 +CC
0 as built 30.01.2012 ROS check ROS sheet 2
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by legend door 2 / Legende Tür 2 19 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
400
1600
B B
protection note according to ISO 16016 consider!
C C
1800
D D
H07Z-K 1,5mm²
all lines without indication of cross section are
E E
100
scale : 1:10
F scale unit : mm F
date 2012-01-30 layout diagram / Aufbauplan =BCC
drawn ROS Control Cabinet Boiler
3 0-8100-100454-14 /3-32 +CC
0 as built 30.01.2012 ROS check ROS sheet 3
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by control cabinet / Schaltschrank 19 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
1135
B B
797
675
back plane
protection note according to ISO 16016 consider!
~ 140
C
bottom plate 1 C
expanded rubber
240
275
bottom plate 3
140 ~
D
Ф 16 D
H07Z-K 1,5mm²
E E
F scale unit : mm F
date 2012-01-30 layout diagram / Aufbauplan =BCC
drawn ROS Control Cabinet Boiler
4 0-8100-100454-14 /3-32 +CC
0 as built 30.01.2012 ROS check ROS sheet 4
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by control cabinet / Schaltschrank 19 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
B B
protection note according to ISO 16016 consider!
C C
D D
H07Z-K 1,5mm²
all lines without indication of cross section are
E E
F F
date 2012-01-30 layout diagram / Aufbauplan =BCC
drawn ROS Control Cabinet Boiler
5 0-8100-100454-14 /3-32 +CC
0 as built 30.01.2012 ROS check ROS sheet 5
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by base control cabinet / Sockel Schaltschrank 19 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
12,7
22,5
B 45 B
protection note according to ISO 16016 consider!
Bohrung / Bore hole: Z Bohrung / Bore hole: Q Bohrung / Bore hole: X Bohrung / Bore hole: D Bohrung / Bore hole: D1
C C
142
68 92 199 177 124
D D
Bohrung / Bore hole: Y Bohrung / Bore hole: W
Bohrung / Bore hole: S
H07Z-K 1,5mm²
185²
177²
22,5
+0,8
92
all lines without indication of cross section are
45
+0,3
E 22,2 E
4,5 φ
scale : 1:10
F scale unit : mm F
date 2012-01-30 layout diagram / Aufbauplan =BCC
drawn ROS Control Cabinet Boiler
8 0-8100-100454-14 /3-32 +CC
0 as built 30.01.2012 ROS check ROS sheet 8
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by bore holes / Bohrungen 19 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
Sockel TS / socket TS
A Stahlblech / sheet steel A
62,5
100
18 x 14
80
14
92,5
17,5
47,5
30
62,5
B B
15 x 10
protection note according to ISO 16016 consider!
T3
T1
T2
T4
30
C C
B4 B1 B2 B3 B4 T1 T2 T3 T4
F F
date 2012-01-30 layout diagram / Aufbauplan =BCC
drawn ROS Control Cabinet Boiler
9 0-8100-100454-14 /3-32 +CC
0 as built 30.01.2012 ROS check ROS sheet 9
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by base control cabinet / Sockel Schaltschrank 19 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
800 800
105
105
105
A A
0
0
210
140
140
210
140
140
210
70
70
70
70
0
0
40
40
0
M
N
155
D1 D1
330
B B
Q X
400
Z P
protection note according to ISO 16016 consider!
500
R R R R R R R R R R
580
R R R R R R R R R R
660
R R R R R R
C 740 C
R R
820
R
1800
900
R R 980
1060
200
1140
M M
600
D D
H07Z-K 1,5mm²
D
250
all lines without indication of cross section are
E E
scale : 1:10
F scale unit : mm F
date 23.07.2011 layout diagram / Aufbauplan =BCC
drawn ROS Control Cabinet Boiler
10 0-8100-100454-14 /3-32 +CC
0 as built 30.01.2012 ROS check ROS sheet 10
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by bore holes / Bohrungen 19 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
B B
-43K2
-42K4
internal
-22K8
-40K3
-42K3
-22K7
-41K5
-8B6
-37K7
-X1
-36K7
-34K7
-28K4
-36K3 -5Q4
-X111
-35K6
-34K6
-8F6 -32K6
-42K6
external
-32K2 -20K2
-8F5 -4Q2
-5F2 -7T2
698
-25K8
-3Q3 -18K2
-25K7
-24K8
-77K4
-24K7
-76K5
-23K7 -17K2
-74K7 -3Q2 -2T5
-22K3
-74K6
D -22K2 D
-1F6
-20K7
-2Q5 -30K2 -1F3
-20K3
-19K7
H07Z-K 1,5mm²
-18K8
-1K6
-X11 -18K7
-2Q3 -30K6
-17K8
-69K5
-17K7
-X10 -16K7
-33K4
-1K3
-12K2 -2Q2 -30K4 -X0
-9K5 -9K8
all lines without indication of cross section are
-7K5
E E
1699
scale : 1:5
F scale unit : mm F
date 2012-01-30 layout diagram / Aufbauplan =BCC
drawn ROS Control Cabinet Boiler
11 0-8100-100454-14 /3-32 +CC
0 as built 30.01.2012 ROS check ROS sheet 11
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by mounting plate / Montageplatte 19 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
1698
B B
-11F5
-70K5
-12A3
-X21
-X20
-X31
-X30
-X40
-X41
-11F4
-51K6
-40A3
-47K6
protection note according to ISO 16016 consider!
-39A3
spare place PLC -73A2
XPE
-70A2
C -151.1 C
-X4
-15A1
698
-69A2
-59K7
-14A1.1
internal
-57K6
-56K6
-14A1 -53K6
-11G2
-X6
-X3
-52K6 -63K6
-63K5
-50K6
-63K4
D D
-13A1.1
-49K6 -63K3
-61K4
-48K6
-X19 -10A3
-61K3
-61K2
external
-47K5
H07Z-K 1,5mm²
-59K4
-13A1
-46K6 -58K6
-10A2
-X2
55K6
-45K4
-55K5 -8X8
-X12
-44K4 -46K8
all lines without indication of cross section are
E E
scale : 1:5
100
F scale unit : mm F
date 2012-01-30 layout diagram / Aufbauplan =BCC
drawn ROS Control Cabinet Boiler
11.1 0-8100-100454-14 /3-32 +CC
0 as built 30.01.2012 ROS check ROS sheet 11.1
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by mounting plate / Montageplatte 19 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
B B
protection note according to ISO 16016 consider!
Baujahr: 2012
UN = 440V f = 60 Hz
IN = PN =
D D
H07Z-K 1,5mm²
SAACKE BREMEN
GERMANY
all lines without indication of cross section are
E E
scale : 1:10
F scale unit : mm F
date 2012-01-30 layout diagram / Aufbauplan =BCC
drawn ROS Control Cabinet Boiler
12 0-8100-100454-14 /3-32 +CC
0 as built 30.01.2012 ROS check ROS sheet 12
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by lables / Schilder 19 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
B B
protection note according to ISO 16016 consider!
SAACKE
SAACKE 0
C M/ M1 C
2 3
6
XC XC XD XD
D D
H07Z-K 1,5mm²
all lines without indication of cross section are
E E
scale : 1:10
F scale unit : mm F
date 2012-01-30 layout diagram / Aufbauplan =BCC
drawn ROS Control Cabinet Boiler
20 0-8100-100454-14 /3-32 +BCCFWP2
0 as built 30.01.2012 ROS check ROS sheet 20
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by front view / Frontansicht Starterbox FWP2 19 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
1 -
10
C C
D D
H07Z-K 1,5mm²
all lines without indication of cross section are
E E
scale : 1:10
F scale unit : mm F
date 2012-01-30 layout diagram / Aufbauplan =BCC
drawn ROS Control Cabinet Boiler
21 0-8100-100454-14 /3-32 +CC
0 as built 30.01.2012 ROS check ROS sheet 21
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by lables Starterbox FWP 2 19 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
B 380 210 B
protection note according to ISO 16016 consider!
380
C C
D D
H07Z-K 1,5mm²
all lines without indication of cross section are
E E
scale : 1:10
F scale unit : mm F
date 2012-01-30 layout diagram / Aufbauplan =BCC
drawn ROS Control Cabinet Boiler
22 0-8100-100454-14 /3-32 +CC
0 as built 30.01.2012 ROS check ROS sheet 22
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by front view / Frontansicht Starterbox FWP 2 19 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
B B
protection note according to ISO 16016 consider!
60
60
0
40
40
0
N
C C
100
R R
200
R
280
D D
H07Z-K 1,5mm²
all lines without indication of cross section are
E E
scale : 1:10
F scale unit : mm F
date 2012-01-30 layout diagram / Aufbauplan =BCC
drawn ROS Control Cabinet Boiler
23 0-8100-100454-14 /3-32 +CC
0 as built 30.01.2012 ROS check ROS sheet 23
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by bore holes / Bohrungen Feed water pump 2 19 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
B B
334
protection note according to ISO 16016 consider!
-Q1
-T1
-Q2
-K2
-F1
-K1
C C
-XPE
-X0
-X1
D D
H07Z-K 1,5mm²
all lines without indication of cross section are
E E
scale : 1:5
F scale unit : mm F
date 2012-01-30 layout diagram / Aufbauplan =BCC
drawn ROS Control Cabinet Boiler
24 0-8100-100454-14 /3-32 +CC
0 as built 30.01.2012 ROS check ROS sheet 24
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by mounting plate / Montageplatte FW pump 2 19 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
Bohrung / Bore hole: XA Bohrung / Bore hole: XB Bohrung / Bore hole: XC Bohrung / Bore hole: XD Bohrung / Bore hole: XE
(M16 x 1,5) (M20 x 1,5) (M25 x 1,5) (M32 x 1,5) (M40 x 1,5)
B B
16,3
20,3
25,5
32,3
40,3
protection note according to ISO 16016 consider!
high-strength cable gland high-strength cable gland high-strength cable gland high-strength cable gland high-strength cable gland
51,20
40,50
C 32,50 C
27,30
22,70
SW 28 SW 36 SW 45
SW 20 SW 24
D D
H07Z-K 1,5mm²
all lines without indication of cross section are
E E
scale : 1:5
F scale unit : mm F
date 2012-01-30 layout diagram / Aufbauplan =BCC
drawn ROS Control Cabinet Boiler
25 0-8100-100454-14 /3-32 +CC
0 as built 30.01.2012 ROS check ROS sheet 25
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by mounting plate / Montageplatte FW pump 2 19 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
240
200
B 150 B
100
50
protection note according to ISO 16016 consider!
C XC XC XB XB C
90
D D
H07Z-K 1,5mm²
all lines without indication of cross section are
E E
scale : 1:5
F scale unit : mm F
date 2012-01-30 layout diagram / Aufbauplan =BCC
drawn ROS Control Cabinet Boiler
26 0-8100-100454-14 /3-32 +CC
0 as built 30.01.2012 ROS check ROS sheet 26
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by mounting plate / Montageplatte FW pump 2 19 sh.
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
B B
control box back side with wall mountig bracket wall mounting bracket
20 59
protection note according to ISO 16016 consider!
12 20 15 12
30
18
C C
18
36
54
8,5 10,2
3
D
D D
H07Z-K 1,5mm²
all lines without indication of cross section are
E E
F F
date 2012-01-30 layout diagram / Aufbauplan =BCCz72
drawn ROS Control Cabinet Boiler
27 0-8100-100454-14 /3-32 +CC
0 as built 30.01.2012 ROS check ROS sheet 27
0-8100-100454-14-3
R. modification date name standard origin replaced for replaced by wall mountig holders Starterbox FWP 2 19 sh.
1 2 3 4 5 6 7 8
item list
no. item
Betriebsmittel part number identifier 1 + 2
comment additional info 1 producer kind
presentation additional info 2 odering number type
1 =BCC+CC_D-8M6 260739 Filterlüfter strainer fan
fan cabinet RITTAL
=BCC/8.6 SK 3323.107
2 =BCC+CC_D-8M6 604351 Austrittsfilter discharge strainer
fan cabinet RITTAL
=BCC/8.6 SK 3322.207
3 =BCC+CC_D-90H1 613315 Meldeleuchte weiß lamp white
1. control voltage selected ABB
=BCC/90.2 CL-502W
4 =BCC+CC_D-90H2 613312 Meldeleuchte grün lamp green
fuel oil pump 1 ABB
=BCC/90.3 CL-502G
5 =BCC+CC_D-90H3 613312 Meldeleuchte grün lamp green
fuel oil pump 2 ABB
=BCC/90.3 CL-502G
6 =BCC+CC_D-90H4 613312 Meldeleuchte grün lamp green
feed water pump 1 ABB
=BCC/90.4 CL-502G
7 =BCC+CC_D-90H5 613312 Meldeleuchte grün lamp green
protection note according to DIN 34 consider !
remark :
remark :
remark :
ABB
=BCC/1.3 S 202-C 1
68 =BCC+CC_M-1F6 610118 Sicherungsautomat automatic circuit breaker
ABB
=BCC/1.6 S 202-C 1
69 =BCC+CC_M-1K3 635662 LEISTUNGSSCHUETZ A-63-30-22
power supply 1 ABB
=BCC/1.3 1 SBL 371 001 R 86
70 =BCC+CC_M-1K3 635663 Löschglied RV5 / 440
power supply 1 ABB
=BCC/1.3 SBN 0500 10R 1003
71 =BCC+CC_M-1K6 635662 LEISTUNGSSCHUETZ ABB
power supply 2 ABB
=BCC/1.6 1 SBL 371 001 R 86 2
72 =BCC+CC_M-1K6 635663 Löschglied RV5 / 440
power supply 2 ABB
=BCC/1.6 SBN 0500 10R 1003
73 =BCC+CC_M-2Q2 529941 Motorschutzschalter motor protection switch
rotary cup atomizer ABB
=BCC/2.2 MS 325-4
74 =BCC+CC_M-2Q2 622058 Hilfsschalter MOTOR PROTECTION SWITCH
rotary cup atomizer ABB
=BCC/2.2 HKF-20
75 =BCC+CC_M-2Q2 603281 Hilfsschalter auxiliary contact
rotary cup atomizer ABB
=BCC/2.2 HK-11
76 =BCC+CC_M-2Q3 529940 Motorschutzschalter motor protection switch
ignition oil pump ABB
=BCC/2.4 MS 325-1
77 =BCC+CC_M-2Q3 622058 Hilfsschalter MOTOR PROTECTION SWITCH
ignition oil pump ABB
=BCC/2.4 HKF-20
78 =BCC+CC_M-2Q3 603281 Hilfsschalter auxiliary contact
ignition oil pump ABB
=BCC/2.4 HK-11
79 =BCC+CC_M-2Q5 531353 Motorschutzschalter motor protection switch
combustion air fan ABB
=BCC/2.6 MS 325-20
80 =BCC+CC_M-2Q5 622058 Hilfsschalter MOTOR PROTECTION SWITCH
combustion air fan ABB
=BCC/2.6 HKF-20
remark :
remark :
remark :
remark :
SIEMENS
=BCC/13.4 6ES7- 221-1BH22-0XA0
148 =BCC+CC_M-13A5 632135 Operator Panel TP177micro Blue Mode-LC-Display
SIEMENS
=BCC/13.5 6AV6640-0CA11-0AX1
149 =BCC+CC_M-13A5 632136 Operator Panel TP177micro Blue Mode-LC-Display
SIEMENS
=BCC/13.5 6AV6640-0CA11-0AX1
150 =BCC+CC_M-14A1 632133 Digital Input 16 x 24VDC Digital Input 16 x 24VDC
SIEMENS
=BCC/14.1 6ES7 221-1BH22-0XA0
151 =BCC+CC_M-14A1.1 632133 Digital Input 16 x 24VDC Digital Input 16 x 24VDC
SIEMENS
=BCC/14.4 6ES7 221-1BH22-0XA0
152 =BCC+CC_M-15A1 632137 Digital Outut 8x Relay Digital Outut 8x Relay
SIEMENS
=BCC/15.1 6ES7 222-1HF22-0XA0
153 =BCC+CC_M-15A1.1 632137 Digital Outut 8x Relay Digital Outut 8x Relay
SIEMENS
=BCC/15.3 6ES7 222-1HF22-0XA0
154 =BCC+CC_M-16K7 515358 RELAIS PRINT RELAY,2-CHANGER,230 VAC
press. switch FOP FINDER
=BCC/16.7 40.52.8.230
155 =BCC+CC_M-16K7 629903 RELAIS PRINT RELAY,2-CHANGER,230 VAC
press. switch FOP FINDER
=BCC/16.7 40.52.8.230
156 =BCC+CC_M-16K7 515355 SCHRAUBFASSUNG BLAU SOCKET BLUE
press. switch FOP FINDER
=BCC/16.7 95.95.1
157 =BCC+CC_M-16K7 515356 Haltebügel blau hold-down clip blue
press. switch FOP FINDER
=BCC/16.7 095.91
158 =BCC+CC_M-17K2 527018 Leistungsschütz power contactor
oil pump 1 ABB
=BCC/17.2 A9-30-10
159 =BCC+CC_M-17K2 526164 Löschglied suppressor
oil pump 1 ABB
=BCC/17.2 RC 5-1/250
160 =BCC+CC_M-17K2 603271 Hilfskontakt auxiliary contact
oil pump 1 ABB
=BCC/17.2 CA 5-10
remark :
remark :
remark :
remark :
remark :
remark :
remark :
remark :
remark :
ignition FINDER
=BCC/37.7 095.91
328 =BCC+CC_M-38K2 515358 RELAIS PRINT RELAY,2-CHANGER,230 VAC
oil valves FINDER
=BCC/38.2 40.52.8.230
329 =BCC+CC_M-38K2 629903 RELAIS PRINT RELAY,2-CHANGER,230 VAC
oil valves FINDER
=BCC/38.2 40.52.8.230
330 =BCC+CC_M-38K2 515355 SCHRAUBFASSUNG BLAU SOCKET BLUE
oil valves FINDER
=BCC/38.2 95.95.1
331 =BCC+CC_M-38K2 515356 Haltebügel blau hold-down clip blue
oil valves FINDER
=BCC/38.2 095.91
332 =BCC+CC_M-39A3 602164 FLAMMENWAECHTER FLAME DETECTOR
flame detector 1 Flammenwächter 1 SAACKE
=BCC/39.3 FLUS 06 UV
333 =BCC+CC_M-39K3 510037 HILFSSCHUETZ AUXILIARY CONTACTOR
flame signal 1 ABB
=BCC/39.3 N 62E
334 =BCC+CC_M-39K3 526164 Löschglied suppressor
flame signal 1 ABB
=BCC/39.3 RC 5-1/250
335 =BCC+CC_M-40A3 602164 FLAMMENWAECHTER FLAME DETECTOR
flame detector 2 Flammenwächter 2 SAACKE
=BCC/40.3 FLUS 06 UV
336 =BCC+CC_M-40K3 510037 HILFSSCHUETZ AUXILIARY CONTACTOR
flame signal 2 ABB
=BCC/40.3 N 62E
337 =BCC+CC_M-40K3 526164 Löschglied suppressor
flame signal 2 ABB
=BCC/40.3 RC 5-1/250
338 =BCC+CC_M-41K5 515358 RELAIS PRINT RELAY,2-CHANGER,230 VAC
ignition FINDER
=BCC/41.5 40.52.8.230
339 =BCC+CC_M-41K5 629903 RELAIS PRINT RELAY,2-CHANGER,230 VAC
ignition FINDER
=BCC/41.5 40.52.8.230
340 =BCC+CC_M-41K5 515355 SCHRAUBFASSUNG BLAU SOCKET BLUE
ignition FINDER
=BCC/41.5 95.95.1
remark :
remark :
remark :
remark :
remark :
remark :
remark :
remark :
remark :
7 -BCC_1006 4 4
2,5 =BCC+CC_M-X0 Marine- cable 0
M4G2,5 1.00 =BCC+FWP1-4M2 0
8 -BCC_1007 4 4
2,5 =BCC+CC_M-X0 Marine- cable 0
M4G2,5 1.00 =BCC+FWP2-4M3 0
9 -BCC_1008 4 4
1,5 =BCC+CC_M-X0 Marine- cable 0
M4G1,5 1.00 =BCC+MGOP1-3M5 0
10 -BCC_1009 4 4
1,5 =BCC+CC_M-X0 Marine- cable 0
M4G1,5 1.00 =BCC+MGOP2-3M7 0
11 -BCC_1010 4 4
1,5 =BCC+CC_M-X0 Marine- cable 0
M4G1,5 1.00 =BCC+FOP1-3M2 0
12 -BCC_1011 4 4
1,5 =BCC+CC_M-X0 Marine- cable 0
M4G1,5 1.00 =BCC+FOP2-3M3 0
13 -BCC_1012 4 4
4 =BCC+CC_M-X0 Marine- cable 0
M4G4 1.00 =BCC+BN-X 0
14 -BCC_2005 16 16
1,5 =BCC+CC_M-X1 Marine- cable 0
M16G1,5 1.00 =BCC+BW-X1.1 0
15 -BCC_2006 3 3
1,5 =BCC+CC_M-X1 Marine- cable 0
M3G1,5 1.00 =BCC+BO-68B2 0
16 -BCC_2008 4 4
1,5 =BCC+CC_M-X1 Marine- cable 0
M4G1,5 1.00 =BCC+F-77A2 0
17 -BCC_2009 4 4
1,5 =BCC+CC_M-X1 Marine- cable 0
M4G1,5 1.00 =BCC+F-76A3 0
18 -BCC_2020 3 3
1,5 =BCC+CC_M-X0 Marine- cable 0
M3G1,5 1.00 =BCC+FW-5M2 0
19 -BCC_2022 4 4
1,5 =BCC+CC_M-X1 Marine- cable 0
M4G1,5 1.00 =BCC+BN-X 0
20 -BCC_2120 7 6
1,5 =BCC+CC_M-X20 Marine- cable 0
M7G1,5 1.00 =BCC+FOP1-S3 1
remark :
27 -BCC_3001 2 2
1,5 =BCC.+CC-X2 Marine- cable 0
M2X1,5 1.00 =BCC.+F-9S2 0
28 -BCC_3002 2 2
1,5 =BCC.+CC-X2 Marine- cable 0
M2X1,5 1.00 =BCC.+F-9S3 0
29 -BCC_3005 12 10
1,5 =BCC+CC_M-X2 Marine- cable 0
M12x1,5 1.00 =BCC+BW-X2.1 2
30 -BCC_3006 2 2
1,5 =BCC+CC_M-X2 Marine- cable 0
M2X1,5 1.00 =BCC+BO-52F2 0
31 -BCC_3007 2 2
1,5 =BCC+CC_M-X2 Marine- cable 0
M2X1,5 1.00 =BCC+BO-53F2 0
32 -BCC_3008 4 4
1,5 =BCC+CC_M-X2 Marine- cable 0
M4x1,5 1.00 =BCC+F-55S2 0
33 -BCC_3010 4 4
1,5 =BCC+CC_M-X2 Marine- cable 0
M4x1,5 1.00 =BCC+F-56S2 0
34 -BCC_3012 4 4
1,5 =BCC+CC_M-X2 Marine- cable 0
M4x1,5 1.00 =BCC+F-56S3 0
35 -BCC_3014 2 2
1,5 =BCC+CC_M-X1 Marine- cable 0
M2X1,5 1.00 =BCC+F-16F7 0
36 -BCC_3016 2 2
1,5 =BCC+CC_M-X1 Marine- cable 0
M2X1,5 1.00 =BCC+FW-19F7-19F1 0
37 -BCC_3018 2 2
1,5 =BCC+CC_M-X1 Marine- cable 0
M2X1,5 1.00 =BCC+GO 006-23F7 0
38 -BCC_3020 4 4
1,5 =BCC+CC_M-X2 Marine- cable 0
M4x1,5 1.00 =BCC+F-59S2 0
39 -BCC_3021 4 4
1,5 =BCC+CC_M-X2 Marine- cable 0
M4x1,5 1.00 =BCC+F-59S3 0
40 -BCC_4000 3 3
0,75 =BCC+CC_M-X3 Marine- cable screened 0
M2x0,75SH 1.00 =BCC+BO-64B2 0
remark :
47 -BCC_6001 6 4
0,75 =BCC+CC_M-X6 Marine- cable screened 0
M5x0,75SH 1.00 =ECR+.-X 2
48 -BCC_6010 24 24
1,5 =BCC+CC_M-X4 Marine- cable 0
M24x1,5 1.00 =BCC+ECR-X 0
49 -BCC_6011 24 24
1,5 =BCC+CC_M-X4 Marine- cable 0
M24x1,5 1.00 =BCC+ECR-X 0
50 -BCC_6012 18 18
1,5 =BCC+CC_M-X4 Marine- cable 0
M18x1,5 1.00 =BCC+ECR-X 0
51 -BCC_6013 18 18
1,5 =BCC+CC_M-X4 Marine- cable 0
M18x1,5 1.00 =BCC+ECR-X 0
52 -BCC_6014 18 18
1,5 =BCC+CC_M-X4 Marine- cable 0
M18x1,5 1.00 =BCC+ECR-X 0
remark :