Vous êtes sur la page 1sur 2

QUOTATION

ROUTE SURVEY
No Descriptions Unit Quantity Rate Amount
(RM)
1 Preparatory work 1960 10 1960 19 600.00
2 Mobilization and NIL NIL NIL NIL
Demobilization
3 Point Positioning by mark 3 marks 2600 7 800.00
Global Navigation
Satellite System
4 Planimetric control and meter 250 m 50 12 500.00
connection
Built up area
5 Height control and km/party 250 m 3.00 750.00
connection per day
- Ordinary
Built up area
6 Monumenting 4 marks per 3 marks 0.75 1 470.00
- Concreting party day
- Accessible
7 Supply of plans and Per copy 11 copies 30.00 330.00
document
8 Survey of Strip with ha/party per 1.12 ha 1.5 1 463.47
Spot level and Detail day
9 Grid Heighting km/party
per day
10 Setting out of center km/party 0.140 km 4.25 1166.20
line of road per day
11 Longitudinal Profiling km/party 0.140 3.00 823.20
along Established per day
Chainage Pegs
- Built up area
12 Cross Section km/party 0.560 4 274.40
- Built up area per day sections/party
per day
Total RM 46177.27
Grand Total RM 46177.27

Ringgit Malaysia: Empat Puluh Enam Ribu Seratus Tujuh Puluh Tujuh dan Dua Puluh tujuh
Sen Sahaja.
Sekian, terima kasih.

Wisma Bina Puri,

…………………………………..
(MUHAMAD SHAH MIN)
Jurukur Tanah Berlesen
Akta 458 (Pindaan 1991)

Vous aimerez peut-être aussi