COMPLIANCE REGISTER

Aarti Industries Limited


04 SUMMARY OF OBLIGATIONS

Title Environment (Protection) Act 1986 & 1991 / Rules 1986


Authority Ministry of Environment, Forest and Climate Change (MoEFCC)
Central Pollution Control Board
Gujarat Pollution Control Board

No Obligation Reference Responsibility


Document
1. Coal heap should not be higher than 5 meter and clear distance
between two adjoining heaps
2. There should be mechanized loading/ unloading system from the
loading /unloading area to the stacking yards
3. ensure that all trucks before leaving the storage yard shall be
showered with water and covered with tarpaulin or any other
effective measure/device completely.
4. he coal should not be overloaded by raising the height of carriage.
Weigh scale shall be provided within the loading area only and port /
coal park authority shall ensure that no overloading is done.
5. Agency shall obtain transport permission from the
local Administration under the relevant rules
6. shall construct compound wall all along
periphery of the premises with minimum 9 meters height
7. Continuous water sprinkling shall be carried out on the top of the
heap at regular intervals
8. Water sprinkling shall be carried out at each and every stage of
handling
9. ensure regular sweeping of coal dust from internal and main road
10. Dust containment cum suppression system for the coal stack,
loading and unloading.
11. Construction of effective wind breaking wall suitable to local
condition
12. Construction of metal road & RCC Pucca flooring in the plot
area/godown area
13. System for regular cleaning and wetting of the floor area within the
premises.
14. Entire coal storage area/ godown should be covered with
permanent weather shed roofing and side walls
15. carryout three rows plantation with tall growing tress all along the
periphery of the coal handling premises, inside & outside of the
remises along with road
16. Proper drainage system shall be provided in all coal storage area and
collected water must be reused after treatment with effective
treatment system
17. All engineering machineries related with activity should be covered
18. Provision of adequate firefighting measures
19. An onsite emergency plan shall be prepared and implemented by
coal handling unit.
20.

Prepared by Reviewed & Approved by


Management Representative Unit Head
AIL-JHA-EHS-CR Revision No - 0 | 01.07.2018