Vous êtes sur la page 1sur 5
Sebwan — Ratodero ACW Project Capacity Test for Highway Inspectors (SD name DOV THe tig HE SOOM 5 OIA Period of Work for this Project: Starting form _ Asp bmonth) , 2O/ 2 (year) Currently Working for Section © (ca Rhaw,. Time of Test: One Hpur mis Tota: 100 Marks / oe pi S Fill in the blanks or Describe answers in the following questions: 3) OD Qu Allowable Tolerances (2 x 5 =10 marks) 8 (Fl inthe Blanks in he following table) a ys Table of Allowable Tolerances Co {2 Work Thickness (mm) Level (mot ~Crowsfall (y ) © Subgrade +17 £245 Xl+0- ao Fe 05 q Subbase 10,=20) £0,= #03 ° ‘Aggregate Base 5-Je / |S, a ( Asphaltic Base | +3, - 10 3,-10 3F 02 =| ht ° Note: Table in GS 9-2 \0 Q.2 Standard Construction Sequence (10 marks) [o Fill the number in blank (you may use the same nulgbers with dyplication): Lo a es soto. via g O8 ‘Aaa, bose 150mm ome a Subbase(109mm 99m) Embankment Fil (180mm) none layer Embenkment Fil (130mm in one ‘ayer EmbankimontFil ‘Subbase tat layer EmbonkmentFit (20-280mmm} in 2 oor) (10:380mm) 92 layers ors layare Gonstruetion Sequence for Type DG (Not to Seale) pg. 1 Q.3- Testing of Concrete Strength (2x5=10 marks) ©) ‘What kinds of the materials to be used for the bottom of 3m wide median? d em | AGE an) — la Subgrade Material (Pay item No. 108c) ‘gg. Base Wat Matralo be (iBdmm 00mm) Uses fortis Proiest for ; Stmvide median botom | in this Project Secu pease Cause) | (Seleed vata tinan | Retorio Drawing NoNKIM-001) DETAIL OF RAISED MEDIAN. s-1:50 44 Asphatc Base Course Construction 1Omarks) List up and desoribe the types and capacity of rollers to be used for the Project Towdom Evil boy, PTR @ 18 bu, (9 Ke ’ OAR es) {© QS Spreading Finishing and Compaction of AC Aggregate Base Hot-Mix @ x 5 =10 marks) (1) All mixtures shall be spread at a temperature of not less than _| BO degrees C. (2) Final rolling shall eliminate marks from previous rolling. In no ease shall the temperature be less than [JO degree C for initial breakdown rolling while other compaction operations shall be conptéfed before the temperature down to 110 degree C, Note: Sub-ltems 203.3.7 and 203.3.8 of GS pg. 2 Q.6 Material Requirements for Aggregate Base (2 x 5= 10 marks) (1) Crushed aggregate (materials retained on sieve No) shall consist of materials of which at least 6 _ percent by weight shall be crushed particles having a minimum of which at least 2 fractured faces @ The Specifications allows how many % of the uncrushed serials (materials retainedon sieve No)? Select from 0% 5% of 10%:_&F “ Note: Sub-item 202.2 of GS Q.7 Material Requirements for Aggregate Base (10 marks) — (_) The round material content is 0.39% for the ageregate base material at stock yard, To reduce its ratio to les than 0.2%, select the required mix portion in the right coluran (either A, B oo _& Ea a oe ee ae ee — a. . jee 7 : Levitan . ee ‘aq ao] sino SS : Fear vend hi. se a oe page Rane 7a a a FA ouWw)) 0-32] ot7 Nhe Engineer Not Accepted] | a ey oO Wate: * requirement oF tha round materials contents Teese tan 02% 7 ms Q.8 Material Requifements for Asphal (1) Crushed aggregate materials of which at least ft by weight shall be crushed particles having a ‘minimum of which at least 2 fractured faces. 2) The Specifications allows how many % of the uncrushed materials (materials retained on sieve Nod)? Select from 0%, 2% or5%:, O Note: Sub-ltem 203.2.1 of GS ' ic Concrete Base 2x 5=10 marks) | O eg retained on sieve Nos) shall consist of pg. 3

Vous aimerez peut-être aussi