Académique Documents
Professionnel Documents
Culture Documents
User Advisory - This Excel Worksheet or Workbook "Tool" is locked and password protected. The user may
only enter date in the "yellow" cells. Other cells on this "Tool" includes locked "cells" that contain complex math
formulas. Care should be taken to learn where these cells are and if the streadsheet is ever unlocked that the
cells with the formulas are not disturbed. Disturbing or altering these cells may render the "Tool" unable to
function properly.
Instruction # 1
Instruction # 2
Instruction # 3
Instruction # 4
Instruction # 5
Instruction # 6
Instruction # 7
Instruction # 8
Instruction # 9
Instruction # 10
Instruction # 11
Instruction # 12
Instruction # 13
otected. The user may
at contain complex math
ever unlocked that the
the "Tool" unable to
413812055.xls
PROJECT KICKOFF 1
CLIENT
Client and Company PM
jointly set time, place and
Project Mngmt. agenda for Kickoff meeting Arrange for
project
number and
space, office
Engr Mngr & computers
En'g Mngmt
Selected Joint Company and Client
Project Kick-Off meetings
Process
Civil
Structural Discipline
Mech Equip Leads
Vessels assigned
Electrical
Instruments
Piping
Material
Engineering
Piping Design
Group
Piping
Material
Control
Pipe Stress
Engineering
Page 3 of 23
413812055.xls
PROJECT
Preliminary
KICKOFF
Engineering 2
CLIENT
Project Mngmt.
En'g Mngmt
Piping PME
Material assigned
Engineering (Latest)
Piping
Design
Piping Design
Supervisor
Group
assigned
(latest)
Piping
Material
Control
Pipe Stress
Engineering
Determine
availability of
Piping Group Input to overall Project Execution Plan
Engineering Leads
Lead (PEL) Input to project Document Distribution Matrix
Start job planning and Instructions
Attend all Meetings, Visit Jobsite, Collect Client Specs and keep Piping Manager informed
Page 4 of 23
413812055.xls
PROJECT
Preliminary
KICKOFF
Engineering 3
CLIENT
Project Mngmt.
En'g Mngmt
Piping
Material P&ID Reviews
Engineering
Line Number and "Spec" P&IDs
Initiate Line List
P&ID Reviews
Piping
Material
Piping
Control All PMC
Material
Supvr Staffed
Control P&ID Reviews
assigned
(not Staffed)
PMC Supervisor available as required
Lead Pipe
Stress Eng
Pipe Stress
assigned &
Engineering
avail as P&ID Reviews
required
PSE Supervisor available as required
P&ID Reviews
Piping
Engineering
Lead (PEL)
Page 5 of 23
413812055.xls
PROJECT
Scope, Estimate
KICKOFF& Schedule 4
CLIENT
Project Mngmt.
En'g Mngmt
Piping
Prepare Shop Tonnage
Material
Estimate
Control
Scope of Work, Labor Hour Estimate &
input to Piping Control Level Schedule
Pipe Stress
Engineering
Review and finalize Shop Fab Spec. Develop Pipe Fab Shop Bidders List
Piping
Engineering Review w/
Review w/ Review w/ Review w/
Lead (PEL) Piping &
Piping Mngr Project Mngr Project Mngr
Develop SOW Develop Estimate Proj Mngr
Page 6 of 23
413812055.xls
Detailed
PROJECT Engineering
KICKOFF and Design 5
CLIENT
Project Mngmt.
En'g Mngmt
Process
Civil
Structural
Mech Equip
Vessels Vess Orient Review
Electrical
Instruments
Piping
Material Build Commodity Code Catalog
Engineering
Piping Design
Group Detailed Piping Layout all Areas
Piping
Material
Control
Pipe Stress
Engineering
Piping
Engineering Review w/ Review w/
Lead (PEL) Develop Control Level Piping Mngr Project Mngr
Schedule
Monitor, Control and Report
Page 7 of 23
413812055.xls
Detailed
PROJECT Engineering
KICKOFF and Design 6
CLIENT
Project Mngmt.
En'g Mngmt
Process
Civil
Structural
Mech Equip
Vessels
Electrical
Instruments
Piping De-staff
Material PME Staff
Engineering as needed
In-house Update as
Piping Design Update as Client Model required
Model
Group Detail Piping Layout all Areas Required Review
Review
Piping
Engineering
Lead (PEL)
Page 8 of 23
413812055.xls
PROJECT
Production
KICKOFF
Engineering 7
CLIENT
Project Mngmt.
En'g Mngmt
Process
Civil
Structural
Mech Equip
Vessels
Electrical
Instruments
Piping
Material
Engineering
Answer questions as required during Iso Check and Issue
Lead Piping Material Engineer available as required
Extract all Isometrics, Check, make corrections as required. Initiate QA/QC Check of all Critical Lines in
Piping Design accordance with approved project plan.
Group
Process "Heat Tracing" Isometrics as required.
Piping
Engineering
Lead (PEL)
Page 9 of 23
413812055.xls
Project
PROJECTCompletion
KICKOFF (Home Office) 8
CLIENT
Project Mngmt.
En'g Mngmt
Process
Civil
Structural
Mech Equip
Vessels
Electrical
Instruments
Piping
Material
Engineering Prepare input to Piping
Final Job Report
Lead Piping Material Engineer available as required
De-staff
Piping Design non-
Check, Correct and Issue all Isometrics
Group essential
staff
MTO Final
Isometrics Update final
material
Piping
quantities
Material Prepare Bill of Material (BOM) for Isometrics as Issued
and Check
Control
for
Shortages
Issue Final
Iso to Shop
Piping
Fab
Engineering
Lead (PEL)
Page 10 of 23
413812055.xls
PROJECT
Fabrication
KICKOFF
& Delivery 9
CLIENT
Project Mngmt.
En'g Mngmt
Process
Civil
Structural
Mech Equip
Vessels
Electrical
Instruments
Piping
Material
Engineering
De-staff
PME Lead
Lead Piping Material Engineer available as required
De-staff last
Piping Design PDG Staff
Field follow-up as required
Group and
Supervisor
De-staff all
Piping
Evaluate Shortages and Issue Supplements as PMC staff
Material Process Final Supplement data
required. except
Control
Supervisor
Pipe Stress
Engineering
Piping
Engineering
Lead (PEL)
Prepare Piping Home Office Final Job Report
Monitor, Control and Report
Page 11 of 23
413812055.xls
PROJECT
Construction
KICKOFF 10
CLIENT
Project Mngmt.
En'g Mngmt
Process
Civil
Structural
Mech Equip
Vessels
Electrical
Instruments
Piping
Material
Engineering
Piping Design
Group
Piping
Collect Data on all surplus Piping material and with Client resolve
Material
"Keep or Return" guidelines
Control
Pipe Stress
Engineering
De-staff
Piping
Piping
Engineering
Engineering
Lead (PEL)
Lead
Page 12 of 23
413812055.xls
Page 13 of 23
413812055.xls
Page 14 of 23
413812055.xls
Page 15 of 23
413812055.xls
1 st Vendor Drawings
Milestones
Util P&IDs
Page 16 of 23
413812055.xls
Milestones
Vess Orientation Review
Page 17 of 23
413812055.xls
Page 18 of 23
413812055.xls
Page 19 of 23
413812055.xls
Last Iso to
Milestones
Shop
Page 20 of 23
413812055.xls
Last Spools
Milestones
fm Shop
Page 21 of 23
413812055.xls
Milestones
Page 22 of 23
413812055.xls
This Piping, Process Plant Project Sequence "Chart" is a broad generalization of the major
project activities by the different Piping groups and is not intended to be an absolutely detailed
match for every project. It was prepared specifically for use as a guide in this Training Program
for Piping Leads.
To use the Chart on screen go to the first page of the Chart, Place the courser in "Cell" C-1 and
then go to "Windows (in the tool bar above) and click on "Split" This will freeze the left-hand "B"
column. Then you can scroll right to any page and you will still see the discipline designations in
the "B" column. On print-Out Column "B" will be repeted on each page.
The major Piping Engineering and Design sub-groups stretch across the pages horizontally.
Their individual activities and tasks remain in their individual horizontal bar. Joint activities are
shown grouped vertically.
The vertical fields are not intended nor should they be interpretive as implying any unit of time
such as Hours, Days, Weeks, Months or Years. They are only there for the presentation of the
data.
Instructions:
These "Notes and Instructions" along with the attached "Chart" are "Locked" and Password
protected. To make any changes you must "Unlock" the individual document first. After the
changes have been completed you should relock the document. The "password" for both
documents is located in "Cell" CO-1 of the Chart file.
Page 23 of 23