Vous êtes sur la page 1sur 10

TIDAK ADA IMPACT

TIDAK ADA IMPACT ADA IMPACT TAPI KECIL

1 CEK THERMO SWITCH HYDROLIK 1 CEK MAKSIMUM PRESSURE PO

2 CEK R/C ARM SWING PROXIMITY SW 2 CEK FULL IMPACT INPUT

3 CEK IMPACT SWITCH 3 CEK SOL P-Z

4 CEK IMPACT SOLENOID P-H 4 CEK DRILLING BLOCK IMPACT S

5 CEK DRILLING BLOCK IMPACT SPOOL VALVE 5 CEK N2 PRESSURE


ADA IMPACT TAPI KECIL

CEK MAKSIMUM PRESSURE POMPA P1 27 Mpa

CEK FULL IMPACT INPUT

CEK SOL P-Z

CEK DRILLING BLOCK IMPACT SPOOL

CEK N2 PRESSURE HIGH 6 Mpa LOW 0.3 Mpa


TIDAK ADA FEED

NORMAL FEED TIDAK BERFUNGSI

1 CEK HYDRAULIC CUT LEVER PROXIMITY 1

2 CEK SOLENOID D-P 2

3 CEK FEED SPEED REGULATOR DAN FEED PRESSURE REG. (KABIN) 3

4 CEK P4 PRESSURE 4 Mpa 4

5 EMERGENCY VALVE TERBUKA 5

6 BERSIHKAN/GANTI PILOT FILTER 6

7 CEK SOL F-P

8 CEK DRILLING BLOCK SPOOL VALVE


FAST FEED/SLOW FEED TIDAK BERFUNGSI

CEK PILOT PRESSURE 4 Mpa

CEK MAX PRESSURE POMPA P1 27 Mpa

CEK FEED RELIEF PRESSURE 16 Mpa 21 Mpa

CEK TUAS FEED PROXIMITY SWITCH

CEK SOLENOID F-F DAN F-R

CEK FEED MOTOR


ROTATION

TIDAK ADA PUTARAN

1 CEK ROTATION SWITCH KABIN

2 CEK SOLENOID RF DAN SOLENOID RR DI PILOT MODULAR

3 CEK PILOT PRESSURE 4 Mpa

4 CEK ROTATION RELIEF PRESS. 14 Mpa NORMAL, 19 Mpa REVERSE

5 CEK ROTATION MOTOR

6 CEK POMPA P2
TRAMMING

TIDAK BISA TRAMMING

1 CEK HYDRAULIC CUT LEVER DI KABIN 1

2 CEK PROXIMITY SWICTH TUAS TRAMMING 2

3 CEK SOLENOID TP DI PILOT MODULAR 3

4 CEK PILOT PRESSURE 4 Mpa 4

5 CEK DRILLING BLOCK TRAMMING SPOOL 5

6 CEK TRAMMING MOTOR 6


TRAMMING LAMBAT

CEK SOLENOID TR

CEK PILOT PRESSURE 4 Mpa

CEK MAX POMPA P1 27 Mpa

CEK SOLENOID TP DI PILOT MODULAR

CEK REGULATOR POMPA P1

CEK TRAMMING MOTOR


BOOM OPERATION

BOOM TIDAK BERFUNGSI

1 CEK BOOM MAIN SWITCH DI KABIN 1

2 CEK REMOTE CONTROL BOX 2

3 CEK SOLENOID BLO DI PILOT MODULAR 3

4 CEK PILOT PRESSURE 4 Mpa 4

5 CEK PRESSURE POMPA P1 5

6 CEK BOOM RELIEF 21 Mpa 6


BOOM LAMBAT

CEK SWITCH BOOM MODE KELINCI

CEK SOLENOID BS DI PILOT MODULAR

CEK PILOT PRESSURE 4 Mpa

CEK MAX PRESSURE POMPA P1 27 Mpa

CEK BOOM SPOOL DI DRILLING BLOCK

CEK BOOM RELIEF PRESSURE 21 Mpa


FLUSHING

FLUSHING TIDAK BERFUNGSI

1 CEK LOAD SWITCH DALAM POSISI ON

2 CEK TEKANAN TANGKI KOMPRESOR 1 Mpa / 10 BAR

3 CEK SOLENOID LOW DAN HIGH FLUSHING

4 CEK DIAPHRAGM LOW DAN HIGH FLUSHING

5 CEK CONTACT POINT TOGGLE SWITCH FLUSHING DI KABIN

Vous aimerez peut-être aussi