MANO DE OBRA

CATEGORIA $/DIA HS/DIA $/DIA


OF. EPECIALIZADO 2176.65 8.00 HS. $ 272.08
OFICIAL 1912.46 8.00 HS. $ 239.06
MED. OFIAL 1793.85 8.00 HS. $ 224.23
AYUDANTE 1678.92 8.00 HS. $ 209.87

MATERIALES
PRECIO POR TN PRECIO POR M3 PRECIO POR M2
DETALLE
VENTA COSTO VENTA COSTO VENTA COSTO
RIPIO LAVADO 1/3 345 271.65 724.5 570.465 171.142 134.756
ARENA SILICEA LAV. 345 271.65 724.5 570.465 171.142 134.756
RIPIO TRIT. 6-19 430 338.58 903 711.018 213.307 167.957
ARENA TRIT. 0-6 520 409.45 1092 859.845 257.953 203.113

EQUIPOS 1 DÓLAR 40.72

CANT. MODELO DETALLE HP/EQUIPO HP $ EQUIPO TOTAL


INDUMIX PLANTA DE HORMIGON 12.00 HP 0.00 HP USS 65,790.00 $ 2,678,968.80 $ -
DC12 41 GRUPO ELECTROGENO 340.00 HP 0.00 HP 36,000.00 USS $ 1,465,920.00 $ -
938GII CARGADORA FRONTAL 160.00 HP 0.00 HP 258,000.00 USS $ 10,505,760.00 $ -
SULLAIR MOTOCOMPRESOR SULLAIR 70.00 HP 0.00 HP 11,230.00 USS $ 457,285.60 $ -
RN 7.23 COMPACTADOR TORTONE 94.00 HP 0.00 HP 104,500.00 USS $ 4,255,240.00 $ -
VALTRA TRACTOR BH-140 100.00 HP 0.00 HP 58,000.00 USS $ 2,361,760.00 $ -
MB 1620 CAMION VOLQUETE 200.00 HP 0.00 HP 31,580.00 USS $ 1,285,937.60 $ -
L1620 REGADOR DE AGUA 200.00 HP 0.00 HP 34,000.00 USS $ 1,384,480.00 $ -
M BENZ M. B. (MANTENIMIENTO) 200.00 HP 0.00 HP 51,600.00 USS $ 2,101,152.00 $ -
416E 4x4 RETROPALA CAT 78.00 HP 0.00 HP 65,000 $ 2,646,800.00 $ -
P94CB 6X4 SCANIA C/ BATEA 260.00 HP 0.00 HP 108,000.00 USS $ 4,397,760.00 $ -
CAT COMPACTADOR DE SUELO 130.00 HP 0.00 HP 171,500.00 USS $ 6,983,480.00 $ -
MB SPRINTER 313 FURGON C/ASIENTO 200.00 HP 0.00 HP 35528 $ 1,446,700.16 $ -
RANGER 4X2 FORD RANGER DOBLE CABINA 163.00 HP 0.00 HP 11,850.00 USS $ 482,532.00 $ -
CAMION C/CARRETON 0.00 HP 111,852.11 USS $ 4,554,617.73 $ -
UACF17P-1 PLANTA ASFALTO CIBER 0.00 HP USS 726,000.00 $ 29,562,720.00 $ -
HONDA MOTOBOMBA 12.00 HP 0.00 HP 526.32 USS $ 21,431.58 $ -
CASILLA HABITACIONAL 0.00 HP 2,631.58 USS $ 107,157.89 $ -
LABORATORIO 0.00 HP 4,250.00 USS $ 173,060.00 $ -
CAT MOTONIVELDORA 160H 200.00 HP 0.00 HP 330,000.00 USS $ 13,437,600.00 $ -
DESCRIPCION: BACHEO SUP. CON MEZCLA ASFALTICA EN CALIENTE
HORAS LABORALES: 8.00 hs. RENDIMIENTO: 30.00 m3/dia
A) EQUIPOS:
DESCRIPCION CANT. POTENCIA VALOR TOTAL
Compresor con Implementos 1 65.00 hp $ 50,000.00 $ 50,000.00
Aplanadora 1 118.00 hp $ 340,000.00 $ 340,000.00
Cargador Frontal 1 170.00 hp $ 380,000.00 $ 380,000.00
Rodillo Neumatico Autop. 1 97.00 hp $ 290,000.00 $ 290,000.00
Planta Asfaltica c/ Grupo Elect. 1 380.00 hp $ 1,100,000.00 $ 1,100,000.00
Fresadora - 1 m. 1 200.00 hp $ 600,000.00 $ 600,000.00
Terminadora Asfaltica 1 170.00 hp $ 480,000.00 $ 480,000.00
Minicargador 1 105.00 hp $ 80,000.00 $ 80,000.00
Camion Regador de Asfalto 1 140.00 hp $ 150,000.00 $ 150,000.00
Vibrocompactador 1 15.00 hp $ 14,000.00 $ 14,000.00
Camion c/ Carreton 1 340.00 hp $ 380,000.00 $ 380,000.00
Camion Volcador 3 420.00 hp $ 115,000.00 $ 345,000.00

2220.00 hp $ 4,209,000.00
Amortizaciones:
$ 4,209,000.00 X 8.00 hs. 3367.20 $/dia
10000.00 hs.
Intereses:
$ 4,209,000.00 X 0.12 año 8.00 hs. 1010.16 $/dia
2000.00 hs/año X 2.00
Reparaciones y Repuestos:
80% de la Amortizaciones: $ 3,367.20 80.00% 2693.76 $/dia
Combustible:
0.14 lt/hp 2220.00 hp 8.00 hs. 35.17 $/lt 87446.69 $/dia
Lubricantes:
30 % del Combustible: 87446.69 $/dia 30.00% 26234.01 $/dia

TOTAL EQUIPOS = 120751.81 $/dia

B) MANO DE OBRA:
Cant. Valor Unit.
OF. EPECIALIZADO 7.00 2176.65 $/dia 15236.55 $/dia
OFICIAL 10.00 1912.46 $/dia 19124.60 $/dia
MED. OFIAL 3.00 1793.85 $/dia 5381.55 $/dia
AYUDANTE 8.00 1678.92 $/dia 13431.36 $/dia
53174.06 $/dia
Vigilancia 10.00% 53174.06 $/dia 5317.41 $/dia
TOTAL MANO DE OBRA = 58491.47 $/dia

EQUIPOS + MANO DE OBRA 120751.81 $/dia 58491.47 $/dia 5974.78 $/m3


RENDIMIENTO 30.00 m3/dia

C) MATERIALES:
Cant. Valor Unitario
Cemento Asfaltico 0.1200 tn/m3 27511.00 $/tn 3301.32 $/m3
Arena Trituracion 0-6 1.0080 tn/m3 409.45 $/tn 412.73 $/m3
Agregado Petreo de Trit 6-19 1.0320 tn/m3 338.58 $/tn 349.41 $/m3
Arena Silicea 0.2400 tn/m3 271.65 $/tn 65.20 $/m3
Filler 0.0100 tn/m3 6400.00 $/tn 64.00 $/m3
Mezcla70-30 0.0080 tn/m3 409.45 $/tn 3.28 $/m3
ER-1 0.0040 tn/m3 21850.00 $/tn 87.40 $/m3
Sub-Total Materiales 4283.33 $/m3
Materiales menores 0.00% 0.00 $/m3

TOTAL DE MATERIALES = 4283.33 $/m3

D) TRANSPORTES INTERNOS:

TOTAL TRANSP. INTERNO 40.00 km 1.32 $/m3 km 52.80 $/m3

SUB-TOTAL: 10310.91 $/m3


PERDIDAS 2.00% 206.22 $/m3
TOTAL COSTO UNITARIO: 10517.13 $/m3
COEFICIENTE DE PASO: 1.6948
PRECIO UNIT. CALCULADO 17824.43 $/m3

PRECIO UNITARIO ADOPTADO: 17,824.43 $/m3


DESCRIPCION: BACHEO PROF. con ESTABILIZADO GRANULAR

HORAS LABORALES: 8.00 hs. RENDIMIENTO 60.00 m3/dia


A) EQUIPOS:
DESCRIPCION CANT. POTENCIA VALOR TOTAL
Compresor con Implementos 1 65.00 hp $ 50,000.00 $ 50,000.00
Cargador Frontal 1 170.00 hp $ 380,000.00 $ 380,000.00
Planta de Estabilizado 1 165.00 hp $ 300,000.00 $ 300,000.00
Fresadora - 1 m. 1 200.00 hp $ 600,000.00 $ 600,000.00
Compactador liviano 2 90.00 hp $ 90,000.00 $ 180,000.00
Minicargador 1 105.00 hp $ 80,000.00 $ 80,000.00
Camion Regador de Asfalto 1 140.00 hp $ 150,000.00 $ 150,000.00
Vibrocompactador 3 45.00 hp $ 14,000.00 $ 42,000.00
Camion c/ Carreton 1 340.00 hp $ 380,000.00 $ 380,000.00
Camion Volcador 3 420.00 hp $ 1,800,000.00 $ 5,400,000.00

1740.00 hp $ 7,562,000.00
Amortizaciones:
$ 7,562,000.00 X 8.00 hs. 6049.60 $/dia
10000.00 hs.
Intereses:
$ 7,562,000.00 X 0.12 año 8.00 hs. 1814.88 $/dia
2000.00 hs/año X 2.00
Reparaciones y Repuestos:
80% de la Amortizaciones: $ 6,049.60 80.00% 4839.68 $/dia
Combustible:
0.14 lt/hp 1740.00 hp 8.00 hs. 1.35 $/lt 2630.88 $/dia
Lubricantes:
30 % del Combustible: 2630.88 $/dia 30.00% 789.26 $/dia

TOTAL EQUIPOS = 16124.30 $/dia

B) MANO DE OBRA:
Cant. Valor Unit.
Oficial Especializado 7 2176.65 $/dia 15236.55 $/dia
Oficial 10 1912.46 $/dia 19124.60 $/dia
Medio Oficial 3 1793.85 $/dia 5381.55 $/dia
Ayudante 8 1678.92 $/dia 13431.36 $/dia
53174.06 $/dia
Vigilancia 10.00% 53174.06 $/dia 5317.41 $/dia
TOTAL MANO DE OBRA = 58491.47 $/dia

EQUIPOS + MANO DE OBRA 16124.30 $/dia 58491.47 $/dia 1243.60 $/m3


RENDIMIENTO 60.00 m3/dia

C) MATERIALES:
Cant. Valor Unitario
Agregado Petreo Grueso de Trituracion 0.4000 tn/m3 42.44 $/tn 16.98 $/m3
Agregado Petreo grueso Natural p/Base 0.8000 tn/m3 36.23 $/tn 28.98 $/m3
Agregado Fino Natural 0.4000 tn/m3 25.83 $/tn 10.33 $/m3
Suelo de Yacimiento 0.2000 tn/m3 8.56 $/tn 1.71 $/m3
Sub-Total Materiales 58.00 $/m3
Materiales menores 0.00% 0.00 $/m3

TOTAL DE MATERIALES = 58.00 $/m3

D) TRANSPORTES INTERNOS:

TOTAL TRANSP. INTERNO 40.00 km 0.60 $/m3 km 24.00 $/m3

SUB-TOTAL: 1325.60 $/m3


PERDIDAS 2.00% 26.51 $/m3
TOTAL COSTO UNITARIO: 1352.11 $/m3
COEFICIENTE DE PASO: 1.6948
PRECIO UNIT. CALCULADO 2291.56 $/m3

PRECIO UNITARIO ADOPTADO: 2,291.56 $/m3


DESCRIPCION: SELLADO DE FISURAS TIPO PUENTE

HORAS LABORALES: 8.00 hs. RENDIMIENTO 400.00 m/dia


A) EQUIPOS:
DESCRIPCION CANT. POTENCIA VALOR TOTAL
Fusor de Asfalto 1 45.00 hp $ 55,000.00 $ 55,000.00
Camion Volcador 0.5 70.00 hp $ 115,000.00 $ 57,500.00
Compresor con Implementos 0.25 16.25 hp $ 50,000.00 $ 12,500.00

131.25 hp $ 125,000.00
Amortizaciones:
$ 125,000.00 X 8.00 hs. 100.00 $/dia
10000.00 hs.
Intereses:
$ 125,000.00 X 0.12 año 8.00 hs. 30.00 $/dia
2000.00 hs/año X 2.00
Reparaciones y Repuestos:
80% de la Amortizaciones: $ 100.00 80.00% 80.00 $/dia
Combustible:
0.14 lt/hp 131.25 hp 8.00 hs. 1.35 $/lt 198.45 $/dia
Lubricantes:
30 % del Combustible: 198.45 $/dia 30.00% 59.54 $/dia

TOTAL EQUIPOS = 467.99 $/dia

B) MANO DE OBRA:
Cant. Valor Unit.
Oficial Especializado 1 180.00 $/dia 180.00 $/dia
Oficial 1 160.00 $/dia 160.00 $/dia
Medio Oficial 0 145.00 $/dia 0.00 $/dia
Ayudante 4 130.00 $/dia 520.00 $/dia
860.00 $/dia
Vigilancia 10.00% 860.00 $/dia 86.00 $/dia
TOTAL MANO DE OBRA = 946.00 $/dia

EQUIPOS + MANO DE OBRA 467.99 $/dia 946.00 $/dia 3.53 $/m


RENDIMIENTO 400.00 m/dia

C) MATERIALES:
Cant. Valor Unitario
Sellador Asfaltico 0.1400 kg/m 2.79 $/kg 0.39 $/m
Sub-Total Materiales 0.39 $/m
Materiales menores 10.00% 0.04 $/m

TOTAL DE MATERIALES = 0.43 $/m

D) TRANSPORTES INTERNOS:

TOTAL TRANSP. INTERNO 0.00 km 0.00 $/m3 km 0.00 $/m

SUB-TOTAL: 3.96 $/m


PERDIDAS 2.00% 0.08 $/m
TOTAL COSTO UNITARIO: 4.04 $/m
COEFICIENTE DE PASO: 1.6948
PRECIO UNIT. CALCULADO 6.85 $/m

PRECIO UNITARIO ADOPTADO: 6.85 $/m


DESCRIPCION: CARPETA DE RODAMIENTO CON MEZCLA ASFALTICA EN CALIENTE

HORAS LABORALES: 8.00 hs. RENDIMIENTO 500.00 TN/dia


A) EQUIPOS:
DESCRIPCION CANT. POTENCIA VALOR TOTAL
Planta Asfaltica c/grupo Elect. 1 380.00 hp $ 27,457,320.00 $ 27,457,320.00
Cargador Frontal 1 170.00 hp $ 9,757,560.00 $ 9,757,560.00
Terminador Asfaltica 1 170.00 hp $ 9,281,396.00 $ 9,281,396.00
Rodillo Neumatico Autop. 1 97.00 hp $ 3,952,190.00 $ 3,952,190.00
Rodillo Liso Autop. p/ Asfalto 1 118.00 hp $ 6,486,130.00 $ 6,486,130.00
Camion Tanque de Agua 1 140.00 hp $ 1,285,880.00 $ 1,285,880.00

1075.00 hp $ 58,220,476.00
Amortizaciones:
$ 58,220,476.00 X 8.00 hs. 46576.38 $/dia
10000.00 hs.
Intereses:
$ 58,220,476.00 X 0.12 año 8.00 hs. 13972.91 $/dia
2000.00 hs/año X 2.00
Reparaciones y Repuestos:
80% de la Amortizaciones: $ 46,576.38 80.00% 37261.10 $/dia
Combustible:
0.14 lt/hp 1075.00 hp 8.00 hs. 35.17 $/lt 42344.68 $/dia
Lubricantes:
30 % del Combustible: 42344.68 $/dia 30.00% 12703.40 $/dia

TOTAL EQUIPOS = 152858.48 $/dia

B) MANO DE OBRA:
Cant. Valor Unit.
Oficial Especializado 3 2176.65 $/dia 6529.95 $/dia
Oficial 8 1912.46 $/dia 15299.68 $/dia
Medio Oficial 3 1793.85 $/dia 5381.55 $/dia
Ayudante 6 1678.92 $/dia 10073.52 $/dia
37284.70 $/dia
Vigilancia 10.00% 37284.70 $/dia 3728.47 $/dia
TOTAL MANO DE OBRA = 41013.17 $/dia

EQUIPOS + MANO DE OBRA 152858.48 $/dia 41013.17 $/dia 387.74 $/tn


RENDIMIENTO 500.00 TN/dia

C) MATERIALES:
Cant. Valor Unitario
Cemento Asfaltico 0.0520 tn/tn 27511.00 $/tn 1430.57 $/tn
Agregado Petreo de Trit 6-19 0.4300 tn/tn 338.58 $/tn 145.59 $/tn
Arena de Trituracion 0-6 0.4400 tn/tn 409.45 $/tn 180.16 $/tn
Arena Natural P/Carpeta 0.0580 tn/tn 271.65 $/tn 15.76 $/tn
Filler 0.0200 tn/tn 6400.00 $/tn 128.00 $/tn
Mezcla 70-30 0.0080 tn/tn 16500.00 $/tn 132.00 $/tn
Gas - oil 2.0000 lt/m2 35.17 $/lt 70.34 $/tn
Sub-Total Materiales 2102.42 $/tn
Materiales menores 10.00% 210.24 $/tn

TOTAL DE MATERIALES = 2312.66 $/tn

D) TRANSPORTES INTERNOS:

TOTAL TRANSP. INTERNO 40.00 km 5.13 $/m3 km 205.24 $/tn

SUB-TOTAL: 2905.64 $/tn


PERDIDAS 2.00% 58.11 $/tn
TOTAL COSTO UNITARIO: 2963.75 $/tn
COEFICIENTE DE PASO: 1.6948
PRECIO UNIT. CALCULADO 5022.97 $/tn

PRECIO UNITARIO ADOPTADO: 5,022.97 $/tn


DESCRIPCION: RIEGO DE LIGA
46427.4649481
HORAS LABORALES: 8.00 hs. RENDIMIENTO 2500.00 m2/dia
A) EQUIPOS:
DESCRIPCION CANT. POTENCIA VALOR TOTAL
BARREDORA SOPLADORA 1 45.00 hp $ 185,000.00 $ 185,000.00
CAMION REGADOR DE AFALTO 1 140.00 hp $ 1,285,000.00 $ 1,285,000.00

185.00 hp $ 1,470,000.00
Amortizaciones:
$ 1,470,000.00 X 8.00 hs. 1176.00 $/dia
10000.00 hs.
Intereses:
$ 1,470,000.00 X 0.12 año 8.00 hs. 352.80 $/dia
2000.00 hs/año X 2.00
Reparaciones y Repuestos:
80% de la Amortizaciones: $ 1,176.00 80.00% 940.80 $/dia
Combustible:
0.14 lt/hp 185.00 hp 8.00 hs. 1.35 $/lt 279.72 $/dia
Lubricantes:
30 % del Combustible: 279.72 $/dia 30.00% 83.92 $/dia

TOTAL EQUIPOS = 2833.24 $/dia

B) MANO DE OBRA:
Cant. Valor Unit.
Oficial Especializado 1 1748.68 $/dia 1748.68 $/dia
Oficial 1 1874.15 $/dia 1874.15 $/dia
Medio Oficial 0 2012.39 $/dia 0.00 $/dia
Ayudante 4 2292.22 $/dia 9168.89 $/dia
12791.72 $/dia
Vigilancia 10.00% 12791.72 $/dia 1279.17 $/dia
TOTAL MANO DE OBRA = 14070.90 $/dia

EQUIPOS + MANO DE OBRA 2833.24 $/dia 14070.90 $/dia 6.76 $/m2


RENDIMIENTO 2500.00 m/dia

C) MATERIALES:
Cant. Valor Unitario
EMULSION ASFALTICA 0.0005 TN/m2 21850.00 $/TN 10.93 $/m
Sub-Total Materiales 10.93 $/m
Materiales menores 0.00% 0.00 $/m

TOTAL DE MATERIALES = 10.93 $/m2

D) TRANSPORTES INTERNOS:

TOTAL TRANSP. INTERNO 0.00 km 0.00 $/m3 km 0.00 $/m2

SUB-TOTAL: 17.69 $/m2


PERDIDAS 5.00% 0.88 $/m2
TOTAL COSTO UNITARIO: 18.57 $/m2
COEFICIENTE DE PASO: 1.6948
PRECIO UNIT. CALCULADO 31.47 $/m2

PRECIO UNITARIO ADOPTADO: 31.47 $/m2


DESCRIPCION: LECHADA ASFALTICA

HORAS LABORALES: 8.00 hs. RENDIMIENTO 5000.00 m2/dia


A) EQUIPOS:
DESCRIPCION CANT. POTENCIA VALOR TOTAL
BARREDORA SOPLADORA 1 45.00 hp $ 300,000.00 $ 300,000.00
EQUIPO Autop. p/Lechada 1 220.00 hp $ 2,340,000.00 $ 2,340,000.00
CARGADORA FRONTAL 1 170.00 hp $ 14,820,000.00 $ 14,820,000.00
CAMION VOLCADOR 3 420.00 hp $ 1,800,000.00 $ 5,400,000.00
RODILLO NEUMATICO AUTOP. 1 97.00 hp $ 11,310,000.00 $ 11,310,000.00
RODILLO LISO AUTOP. P/ASFALTO 1 118.00 hp $ 13,260,000.00 $ 13,260,000.00

1070.00 hp $ 47,430,000.00
Amortizaciones:
$ 47,430,000.00 X 8.00 hs. 37944.00 $/dia
10000.00 hs.
Intereses:
$ 47,430,000.00 X 0.12 año 8.00 hs. 11383.20 $/dia
2000.00 hs/año X 2.00
Reparaciones y Repuestos:
80% de la Amortizaciones: $ 37,944.00 80.00% 30355.20 $/dia
Combustible:
0.14 lt/hp 1070.00 hp 8.00 hs. 1.35 $/lt 1617.84 $/dia
Lubricantes:
30 % del Combustible: 1617.84 $/dia 30.00% 485.35 $/dia

TOTAL EQUIPOS = 81785.59 $/dia

B) MANO DE OBRA:
Cant. Valor Unit.
Oficial Especializado 3 1949.57 $/dia 5848.71 $/dia
Oficial 3 1669.74 $/dia 5009.21 $/dia
Medio Oficial 0 1531.50 $/dia 0.00 $/dia
Ayudante 6 1406.03 $/dia 8436.16 $/dia
19294.09 $/dia
Vigilancia 10.00% 19294.09 $/dia 1929.41 $/dia
TOTAL MANO DE OBRA = 21223.49 $/dia

EQUIPOS + MANO DE OBRA 81785.59 $/dia 21223.49 $/dia 20.60 $/m2


RENDIMIENTO 5000.00 m/dia

C) MATERIALES:
Cant. Valor Unitario
AGREGADO FINO PARA LECHADA 0.0025 TN/TN 480.00 $/TN 1.20 $/m2
EMULSION ASFALTICA 0.0015 TN/m2 21850.00 $/TN 32.78 $/m2
Sub-Total Materiales 33.98 $/m2
Materiales menores 0.00% 0.00 $/m2

TOTAL DE MATERIALES = 33.98 $/m2

D) TRANSPORTES INTERNOS:

TOTAL TRANSP. INTERNO 0.00 km 0.00 $/m3 km 0.00 $/m2

SUB-TOTAL: 54.58 $/m2


PERDIDAS 5.00% 2.73 $/m2
TOTAL COSTO UNITARIO: 57.31 $/m2
COEFICIENTE DE PASO: 1.6948
PRECIO UNIT. CALCULADO 97.12 $/m2

PRECIO UNITARIO ADOPTADO: 97.12 $/m2


DESCRIPCION: CONSTRUCION DE BANQUINAS

HORAS LABORALES: 8.00 hs. RENDIMIENTO 400.00 m3/dia


A) EQUIPOS:
DESCRIPCION CANT. POTENCIA VALOR TOTAL
PANTA DE ESTABILIZADO 1 165.00 hp $ 3,000,000.00 $ 3,000,000.00
DISTRIBUIDORA DE ESTABILIZADO 1 88.00 hp $ 2,340,000.00 $ 2,340,000.00
CARGADORA FRONTAL 1 170.00 hp $ 14,820,000.00 $ 14,820,000.00
MOTONIVELADORA 0.5 90.00 hp $ 18,000,000.00 $ 9,000,000.00
CAMION DE REGADOR DE AGUA 1 140.00 hp $ 11,310,000.00 $ 11,310,000.00
RODILLO LISO AUTOP. P/ASFALTO 1 118.00 hp $ 13,260,000.00 $ 13,260,000.00

771.00 hp $ 53,730,000.00
Amortizaciones:
$ 53,730,000.00 X 8.00 hs. 42984.00 $/dia
10000.00 hs.
Intereses:
$ 53,730,000.00 X 0.12 año 8.00 hs. 12895.20 $/dia
2000.00 hs/año X 2.00
Reparaciones y Repuestos:
80% de la Amortizaciones: $ 42,984.00 80.00% 34387.20 $/dia
Combustible:
0.14 lt/hp 771.00 hp 8.00 hs. 1.35 $/lt 1165.75 $/dia
Lubricantes:
30 % del Combustible: 1165.75 $/dia 30.00% 349.73 $/dia

TOTAL EQUIPOS = 91781.88 $/dia

B) MANO DE OBRA:
Cant. Valor Unit.
Oficial Especializado 3 1949.57 $/dia 5848.71 $/dia
Oficial 4 1669.74 $/dia 6678.95 $/dia
Medio Oficial 0 1531.50 $/dia 0.00 $/dia
Ayudante 2 1406.03 $/dia 2812.05 $/dia
15339.71 $/dia
Vigilancia 10.00% 15339.71 $/dia 1533.97 $/dia
TOTAL MANO DE OBRA = 16873.69 $/dia

EQUIPOS + MANO DE OBRA 91781.88 $/dia 16873.69 $/dia 271.64 $/m3


RENDIMIENTO 400.00 m3/dia

C) MATERIALES:
Cant. Valor Unitario
AGREGADO PETREO GRUESO DE TRIT 0.000 TN/M3 568.00 $/TN 0.00 $/m3
AGREGADO PETREO GRUESO NATURAL p/BA 1.200 TN/M3 480.00 $/TN 576.00 $/m3
AGREGADO FINO NATURAL 0.400 TN/M3 480.00 $/TN 192.00 $/m3
SUELO DE YACIMIENTO 0.200 TN/M3 300.00 $/TN 60.00 $/m3
Sub-Total Materiales 828.00 $/m3
Materiales menores 0.00% 0.00 $/m3

TOTAL DE MATERIALES = 828.00 $/m3

D) TRANSPORTES INTERNOS:

TOTAL TRANSP. INTERNO 40.00 km 56.00 $/m3 km 2240.00 $/m3

SUB-TOTAL: 3339.64 $/m3


PERDIDAS 5.00% 166.98 $/m3
TOTAL COSTO UNITARIO: 3506.62 $/m3
COEFICIENTE DE PASO: 1.6948
PRECIO UNIT. CALCULADO 5943.02 $/m3

PRECIO UNITARIO ADOPTADO: 5943.02 $/m3


DESCRIPCION: RECONSTRUCION DE GALIBO CON MEZCLA ASFALTICA EN CALIENTE

HORAS LABORALES: 8.00 hs. RENDIMIENTO 400.00 m3/dia


A) EQUIPOS:
DESCRIPCION CANT. POTENCIA VALOR TOTAL
PLANTA ASFALTICA C/GRUPO ELECT 1 380.00 hp $ 3,000,000.00 $ 3,000,000.00
TERMINADORA ASFALTICA 1 170.00 hp $ 2,340,000.00 $ 2,340,000.00
CARGADORA FRONTAL 1 170.00 hp $ 14,820,000.00 $ 14,820,000.00
RODILLO NEUMAT AUTOP 1 97.00 hp $ 6,000,000.00 $ 6,000,000.00
MOTONIVELADORA 0.5 90.00 hp $ 18,000,000.00 $ 9,000,000.00
CAMION DE REGADOR DE AGUA 1 140.00 hp $ 11,310,000.00 $ 11,310,000.00
RODILLO LISO AUTOP. P/ASFALTO 1 118.00 hp $ 13,260,000.00 $ 13,260,000.00

1165.00 hp $ 59,730,000.00
Amortizaciones:
$ 59,730,000.00 X 8.00 hs. 47784.00 $/dia
10000.00 hs.
Intereses:
$ 59,730,000.00 X 0.12 año 8.00 hs. 14335.20 $/dia
2000.00 hs/año X 2.00
Reparaciones y Repuestos:
80% de la Amortizaciones: $ 47,784.00 80.00% 38227.20 $/dia
Combustible:
0.14 lt/hp 1165.00 hp 8.00 hs. 1.35 $/lt 1761.48 $/dia
Lubricantes:
30 % del Combustible: 1761.48 $/dia 30.00% 528.44 $/dia

TOTAL EQUIPOS = 102636.32 $/dia

B) MANO DE OBRA:
Cant. Valor Unit.
Oficial Especializado 3 1949.57 $/dia 5848.71 $/dia
Oficial 7 1669.74 $/dia 11688.16 $/dia
Medio Oficial 3 1531.50 $/dia 4594.49 $/dia
Ayudante 6 1406.03 $/dia 8436.16 $/dia
30567.53 $/dia
Vigilancia 10.00% 30567.53 $/dia 3056.75 $/dia
TOTAL MANO DE OBRA = 33624.28 $/dia

EQUIPOS + MANO DE OBRA 102636.32 $/dia 33624.28 $/dia 340.65 $/m3


RENDIMIENTO 400.00 m3/dia

C) MATERIALES:
Cant. Valor Unitario
CEMENTO ASFALTICO 0.0500 TN/TN 27511.00 $/TN 1375.55 $/m3
AGREGADO PETREO DE TRIT 6-12 0.4000 TN/TN 680.00 $/TN 272.00 $/m3
ARENA TRIT 0-6 0.4200 TN/TN 720.00 $/TN 302.40 $/m3
ARENA NATURAL C/CARPETA 0.1100 TN/TN 380.00 $/TN 41.80 $/m3
FILLER 0.0200 TN/TN 6400.00 $/TN 128.00 $/m3
MEZCLA 70-30 0.0080 TN/TN 16500.00 $/TN 132.00 $/m3
GAS-OIL 2.0000 TN/TN 36.00 $/LT 72.00 $/m3
Sub-Total Materiales 2323.75 $/m3
Materiales menores 0.00% 0.00 $/m3

TOTAL DE MATERIALES = 2323.75 $/m3

D) TRANSPORTES INTERNOS:

TOTAL TRANSP. INTERNO 40.00 km 56.00 $/m3 km 2240.00 $/m3

SUB-TOTAL: 4904.40 $/m3


PERDIDAS 5.00% 245.22 $/m3
TOTAL COSTO UNITARIO: 5149.62 $/m3
COEFICIENTE DE PASO: 1.6948
PRECIO UNIT. CALCULADO 8727.58 $/m3

PRECIO UNITARIO ADOPTADO: 8727.58 $/m3


DESCRIPCION: DEMOLICION y RECONSTRUCCION DE PAVIMENTO DE HORMIGON

HORAS LABORALES: 8.00 hs. RENDIMIENTO 150.00 m2/dia


A) EQUIPOS:
DESCRIPCION CANT. POTENCIA VALOR TOTAL
COMPRESOR CON IMPLEMENTOS 1 65.00 hp $ 120,000.00 $ 120,000.00
CAMION VOLCADOR 2 280.00 hp $ 1,450,000.00 $ 2,900,000.00
RETROEXCAV c/MARTILLO 1 180.00 hp $ 3,500,000.00 $ 3,500,000.00
REGLA VIBRANTE 1 20.00 hp $ 150,000.00 $ 150,000.00
VIBRADOR DE INMERSION 2 24.00 hp $ 30,000.00 $ 60,000.00
CARGADORA FRONTAL 1 170.00 hp $ 14,820,000.00 $ 14,820,000.00
ASERRADPRA DE JUNTAS 1 20.00 hp $ 35,000.00 $ 35,000.00
FUSOR DE ASFALTO 1 45.00 hp $ 1,500,000.00 $ 1,500,000.00
HERRAMIENTAS Y EQUIPOS MENORES 3 15.00 hp $ 15,000.00 $ 45,000.00
COMPACTADOR LIVIANO 1 45.00 hp $ 90,000.00 $ 90,000.00

864.00 hp $ 23,220,000.00
Amortizaciones:
$ 23,220,000.00 X 8.00 hs. 18576.00 $/dia
10000.00 hs.
Intereses:
$ 23,220,000.00 X 0.12 año 8.00 hs. 5572.80 $/dia
2000.00 hs/año X 2.00
Reparaciones y Repuestos:
80% de la Amortizaciones: $ 18,576.00 80.00% 14860.80 $/dia
Combustible:
0.14 lt/hp 864.00 hp 8.00 hs. 1.35 $/lt 1306.37 $/dia
Lubricantes:
30 % del Combustible: 1306.37 $/dia 30.00% 391.91 $/dia

TOTAL EQUIPOS = 40707.88 $/dia

B) MANO DE OBRA:
Cant. Valor Unit.
Oficial Especializado 4 1949.57 $/dia 7798.28 $/dia
Oficial 4 1669.74 $/dia 6678.95 $/dia
Medio Oficial 0 1531.50 $/dia 0.00 $/dia
Ayudante 8 1406.03 $/dia 11248.22 $/dia
25725.45 $/dia
Vigilancia 10.00% 25725.45 $/dia 2572.54 $/dia
TOTAL MANO DE OBRA = 28297.99 $/dia

EQUIPOS + MANO DE OBRA 40707.88 $/dia 28297.99 $/dia 460.04 $/m2


RENDIMIENTO 150.00 m2/dia

C) MATERIALES:
Cant. Valor Unitario
HORMIGON ELABORADO 0.2200 M3/M2 2800.00 $/TN 616.00 $/m2
MATERIALES VARIOS 15.0000% 92.40 $/m2
Sub-Total Materiales 708.40 $/m2
Materiales menores 0.00% 0.00 $/m2

TOTAL DE MATERIALES = 708.40 $/m2

D) TRANSPORTES INTERNOS:

TOTAL TRANSP. INTERNO 56.00 $/m3 km 0.00 $/m2

SUB-TOTAL: 1168.44 $/m2


PERDIDAS 5.00% 58.42 $/m2
TOTAL COSTO UNITARIO: 1226.86 $/m2
COEFICIENTE DE PASO: 1.6948
PRECIO UNIT. CALCULADO 2079.28 $/m2

PRECIO UNITARIO ADOPTADO: 2079.28 $/m2


COSTO MANO DE OBRA - SETIEMBRE/2018

ITEM Incid AYTE Medio OFICIAL OFICIAL


Basico x hora 88.08 95.94 104.60
Basico x día 704.64 767.52 836.8
Asistencia 20% 140.93 153.50 167.36
SubTotal 845.57 921.02 1004.16
Total Bruto 22d. $ 18,602.50 $ 20,262.53 $ 22,091.52
Sereno: $ 14637,88 2% 292.76 73.16 79.75
Aportes y Contribuciones Empleado

JUBILACION 11.00% 2046.27 2228.88 2430.07


INSSJP 3.00% 558.07 607.88 662.75
A OBRA SOCIAL 3.00% 558.07 607.88 662.75
C. SINDICAL 2.50% 465.06 506.56 552.29
SEG. VIDA - Fijo Fijo 292.76 292.76 292.76
A 21.074% 3920.25 4243.95 4600.61
SUELDO A PERCIBIR $ 14,682.25 $ 16,018.58 $ 17,490.91

Aportes y Contribuciones Patronal

JUBILACION 10.17% 1891.87 2060.70 2246.71


I.N.S.S.J.P. 1.50% 279.04 303.94 331.37
B ASIGN. FAMIL 4.44% 825.95 899.66 980.86
FONDO NAC. DE EMPLEO 0.89% 165.56 180.34 196.61
RNOS - O. SOCIAL 6.00% 1116.15 1215.75 1325.49
B CONTRIB. PATRONAL 23.000% 4278.57 4660.38 5081.05

Otros costos sobre relación laboral

FERIADOS PAGOS 6.565% 1221.25 1330.23 1450.31


LEY DE R. DE TRABAJO 13.238% 2462.60 2682.35 2924.48
VACACIONES PAGAS 7.070% 1315.20 1432.56 1561.87
C ENF. INCULPABLES 3.030% 563.66 613.95 669.37
LIC. ESPECIALES 1.010% 187.89 204.65 223.12
VESTIMENTA Y VS. 1.263% 234.95 255.92 279.02
SUELDO A. COMPLEM. 11.106% 2065.99 2250.36 2453.48
C 43.282% 8,051.53 8,770.03 9,561.65

Total B + C 66.282% $ 12,330.11### $ 13,430.41### $ 14,642.70###

OBRERO EN BASE ($/HS)


Total Costo Neto Mensual 66.282 $ 30,932.60### $ 33,692.94### $ 36,734.22###

COSTO POR DIA $ 1,406.03### $ 1,531.50### $ 1,669.74###

OBRERO EN BASE ($/HS) $ 127.82### $ 139.23### $ 151.79###


Incluye: Ropa Trabajo

OBRERO EN OBRA ($/HS)

Conceptos Adicionales
Por día
COMIDA 180.00 3960.00 3960.00 3960.00
D TRASLADO 87.65 1928.37 1928.37 1928.37
AGUA 75.0000 1650.00 1650.00 1650.00
D 40.523% $ 7,538.37 $ 7,538.37 $ 7,538.37

Total ABC + D 106.805% $ 19,868.48### $ 20,968.78### $ 22,181.08###

Total Costo Neto Mensual 89.086 $ 38,470.98 $ 41,231.31 $ 44,272.60

COSTO POR DIA $ 1,748.68### $ 1,874.15### $ 2,012.39###

OBRERO EN OBRA ($/HS) $ 218.59### $ 234.27### $ 251.55###


Incluye: Ropa Trabajo; Movilidad; Comida; Agua;
O MANO DE OBRA - SETIEMBRE/2018

OF. ESPEC.
122.13
977.04
195.41
1172.45
$ 25,793.86
93.12

2837.32
773.82
773.82
644.85
292.76
5322.56
$ 20,471.29

2623.24
386.91
1145.25
229.57
1547.63
5932.59

1693.37
3414.59
1823.63
781.55
260.52
325.78
2864.67
11,164.10

$ 17,096.68

$ 42,890.54

$ 1,949.57

$ 177.23
3960.00
1928.37
1650.00
$ 7,538.37

$ 24,635.06

$ 50,428.91

$ 2,292.22

$ 286.53