Inspection Request no:

IR-………......(...…..)
Contractor: Al Habbai Contracting LLC Project : (13-031-DXB) SOHO Serviced Apartment - Palm Jumeirah
Date:

Material Inspection Request

1.Subject Description:

Area of Application:

Drawing Ref.: B.O.Q Ref:

2. Section

Reniforced Concrete Paints Mechanical

Plan Concrete Marbles Electrical

Others( State Below)


Water Proofing Wooden Doors

Masonry Alum. Doors & Windows

Plaster Tiles

Inspection Date:
Inspection Time :

We certify that the above required inspection has been coordinated and checked with our Quality Control team
Submitted by Q/C:………………………………………………………………… Signature

3. ENGINEER's COMMENT:

The Inspection is
Approved Approved as Note Re-submit for Inspection Reject

Signature: DATE: / /

Approval shall not relieve Contractor of any of his obligations under the Contract or constitute authorization of any change to Contract

F-CON-12 Print Date: 04/02/2019


ISSUE DATE: 01 Jan, 2013 Rev 0
Documents or variation to the works. Contractor is responsible for dimensions, quantities and coordination with other trades.