Vous êtes sur la page 1sur 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

General Notes :

25mm Thk.Expansion
A
Pre Stressed Precast Gap At Every 30Mtr Pre Stressed Precast Joint Filled By non A
Column Panels shrink Cement Grout

2225 2225 175 2225 2225


525
TYPICAL FOUNDATION LAYOUT PLAN AT EXPANSION GAP AT EVERY 30MTR
B B

80 Micron Hot Dip


Concertina Wire GI Barbed Wire Galvanized ISA 60X60X4
(10 Gauge) OR ISA 40X40X5 C1 05/04/16 As Per Comment SK
A
C0 17/03/16 Conceptual SK
Rev Date Description Sign
450

GI 100X80X8 Thk. Plate


C Name of developer: C

300
VIEW 'C'
SUZLON ENERGY LIMITED

300
Site Detail :

300
1800

VELTOOR, MAHABUBNAGAR

300
TELANGANA

300
Pre-stress Pre-Cast
D 300
R.C.C Panel
Job Title : D

N.G.L. N.G.L. 100MWac SOLAR PV PLANT

Weep Holes In Lower Most Drg Title :


900
1000

Panel Shall Be Provided


According To Site Condition Y Y X X
& as per manufacturers
guideline PRE STRESS PRE-CAST PANEL
BOUNDARY WALL
A 350 525
E 2225 2225 2225 2225 E
175
Scale Not to scale
TYPICAL FENCING ELEVATION WITH PRE STRESSED PRECAST PANELS AND COLUMN
Date 05/04/2016

100
Authorised By Arif Aga
300X2130mm Width Pre-stress 20 50
Concertina Wire 300X525X1000mm
75

Precast Panel
Reviewed By Ajit Biradar

10
Depth ISA 40X40X5OR
80 Micron Hot Dip ISA 50X50X4
300
150

Galvanized ISA 60X60X4

80
Pre-stress Pre-Cast Pre-stress Pre-Cast
82

F F

40
OR ISA 40X40X5 R.C.C Column R.C.C Column 4mm Thk.
Checked By Anil Shelar
106

Fillet Welding
75
450

50

100X80X8 Thk. GI Plate GI Plate


106

100 150 150 100 100X80X8 Thk.


Drawn By Sudhir Kadam
156

25 SECTION -BB
B B 4mm Thk. Fillet Welding
38 75 74 75 38
525 SECTION -XX
8

300
M12 Anchor Bolt
SECTION -YY Job Number 6/16/10369/001/PUN
SECTION OF PANEL
SEI Notes Drawing Number -------
1. Weep holes locations shall be as per the drainage design & drawing
2. The boundary wall height from above ground shall be above to
1800

the maximum ground level, Sheets 1 OF 1


100 Threading
100 Threading

G 3. Nallah side boundary wall if any shall be refered seperately.


Length

22.5 52.5 52.5 22.5 4. Flooding near the bounday wall posts shall be avoided. Name of EPC contractor :
Length

Pre-stress Pre-Cast
60
R.C.C Column
---------------------- G
52.5 22.5

N.G.L. N.G.L. Name of project consultant


GENERAL NOTE
150

1. Center to center distance between concrete post, gap in between concrete


OR post and panel shall be verified in accordance to exact length of concrete
22.5 52.5

200

200
1000

panel in compliance with technical specification by supplier / manufacturer of


the pre-stress precast boundary wall.
40

Steel 3 Nos.
2. Foundation measurement shall very in accordance to strata. Foundation
H depth shall measured below natural ground level
25
3. 25mm gap to be provided in between two foundation at expansion joint Fifth Floor, Clover Metropole, 25 NIBM Road,
H
POLE SIZE 150X150 TYPICAL M12 ANCHOR BOLT DETAIL spaced at every 30meter. Pune-411048, Maharashtra INDIA
SECTION -AA SECTION - YY (DETAIL POLE) 4. Concrete grade M30 unless noted otherwise for precast members. Tel: +91 20 65279957/ +91 20 41230967
5. Concrete foundations shall be with minimum M25 grade. www.sgurrenergy.com