Académique Documents
Professionnel Documents
Culture Documents
GIS INSTALLATION
REPORT
Prepared by:
Eng. Mohamed Mustafa Elgweiny
followed by:
Eng. Ali Abo ashour (site manager)
Checked by:
Eng. Tawfik Elsaid (project manager)
محمد مصطفى الجوينى.م
Page 1
محمد مصطفى الجوينى.م
Table of contents
Page 2
محمد مصطفى الجوينى.م
General specifications
C.B 7 bar
Rated gas pressure
Others 5 bar
2 OHTL
2 Transformers
2 future
underground cable
bays
1 transformer future
bay
Page 3
محمد مصطفى الجوينى.م
7 LCCs panels.
Page 4
م .محمد مصطفى الجوينى
Page 5
محمد مصطفى الجوينى.م
Page 6
م .محمد مصطفى الجوينى
Page 7
محمد مصطفى الجوينى.م
CB SITE TEST.
By inject 100A DC and measuring the voltage, and then get the resistance.
Micro-ohm
meter
Page 8
محمد مصطفى الجوينى.م
2. Timing test
This test to be done to determine the close and open time for circuit breaker
Page 9
محمد مصطفى الجوينى.م
Used to isolate or connect circuits for maintenance, test, and load transfer and operation reliability.
Each phase in separate compartment with or without E.S.
In each bay there are one or more D.S depend on its function.
Operation of D.S / E.S done off load.
Page 10
محمد مصطفى الجوينى.م
Page 11
محمد مصطفى الجوينى.م
Page 12
محمد مصطفى الجوينى.م
E.S D.S
Metallic rod isolator rod
Page 13
محمد مصطفى الجوينى.م
All signals of V.Ts, C.Ts, and position indicators of (C.B, D.S, E.S...)
transferred to LCC panel by L.V cables.
Page 14
محمد مصطفى الجوينى.م
LCC components:
1. Mimic diagram.
2. Annunciator.
7. Heaters.
8. MCB (AC/DC/VT).
10. Timer
12. Semaphore
Ammeters, voltmeters, test switch
13. Lamps
14. Thermostat
Page 15
محمد مصطفى الجوينى.م
Page 16
محمد مصطفى الجوينى.م
CT Components:
Types:
According to class:
According to location:
CT connection
Page 17
محمد مصطفى الجوينى.م
1. Polarity test
2. Ratio test
3. Exciting current characteristic test
4. Megger test
Technical data:
Page 18
محمد مصطفى الجوينى.م
VT Components:
1. Primary winding.
2. Secondary winding.
3. MCB with auxiliary contact on secondary side.
4. Terminal block.
5. Hand Earthing for primary winding at CCVT.
6. Manual Isolating DS for underground Bays.
Types:
1. GIS type(Inductive) VT
2. Outdoor type (coupling capacitive voltage transformer)
CCVT
Technical data:
1. Ratio test
2. Megger test
Page 19
محمد مصطفى الجوينى.م
In our case:
SF6/air bushing to be installed after installation the gantry to avoid any damage due to gantry installation
process.
There are 12 bushings for 4 circuits.
Page 20
محمد مصطفى الجوينى.م
Page 21
محمد مصطفى الجوينى.م
Page 22
محمد مصطفى الجوينى.م
1. Pressure disc.
This device used to release SF6 gas when its pressure increases inside the compartment.
It is fabricated from aluminum and must be replaced after damage.
2. Absorbent zeoram.
This material used to absorb humidity from SF6; it must be used for each compartment.
It’s attached to pressure disc flange or man holes covers which used for cleaning.
This material must change directly before vacuum process or after open its flange.
Page 23
محمد مصطفى الجوينى.م
3. Pressure gauges.
Used to monitor the pressure of SF6 gas inside the gas section.
Have two contacts:
Used to isolate gas between two sections supporting the conductors centralized.
Marked by yellow color from outside.
Page 24
محمد مصطفى الجوينى.م
Used to measure the partial discharge for check wave around conductor symmetrical without distortion.
The PD test is applied at 1.2 design voltage per phase.
Acceptance criteria: less than 5pC.
Page 25
محمد مصطفى الجوينى.م
Used to connect between SF6 gas inside the enclosure and gas gauge and to link between multi
compartments to become one gas section.
Used to vacuum process, gas filling and test point (dew point).
Page 26
محمد مصطفى الجوينى.م
9. Inspection windows.
Used for inspection of moving mechanism and inside area of each compartment.
Do not look inside which mechanism is operating.
Page 27
محمد مصطفى الجوينى.م
Advantages:
SF6 is non-flammable
Electrical insulating capability is much higher
than air
SF6-Gas is a cooling gas
New and clean SF6 is NOT poisonous
SF6 is chemically stable
SF6 has approx. 5,7x higher density than air
Page 28
محمد مصطفى الجوينى.م
Supporting conductors
fixed in the center of the enclosure
12. Conductor.
Page 29
محمد مصطفى الجوينى.م
Installing and loading test for over-head crane for GIS equipment transportation inside GIS room.
Page 30
محمد مصطفى الجوينى.م
Closed all opening holes by wooden plate and Fabricated of temporary door or the perpetually door (roll
up door) must be installed; that should be done before transportation for keeping to clean room condition
& safety.
Tools for tightening and assembly, lifting and erection and for unpacking Vacuum cleaner for
installation.
Before start the installation process we should check the equipment boxes if there are any
damage or loose.
Man power.
The requested man power depends on bays number and time available for mission, in normal
conditions 4Technicians, 4 helpers, 1 erection engineer and 1project engineer.
Page 31
محمد مصطفى الجوينى.م
In the beginning erection engineer should study the packing list and its drawings to can put
suitable transportation plan and arrangement for equipment in GIS room, erection schedule is
depend on this study.
All required documents like inspection and test plan (ITP), method of statements and tools
certificates…etc.). Should be prepared.
Preparation of vacuum pump at the least two sets and prepares the vacuum hose and torr gauge.
Fabricated of shelf should be installed before starting the erection to arrange and keeps installation
materials, prepare fabricated of shim plates for adjusted of alignment each of thickness like (1mm, 2mm,
3mm), Preparing the wooden plates for protecting the GIS equipment.
Page 32
محمد مصطفى الجوينى.م
Marking center line on the embedded plate surface floor for positioning of main-body equipment and
draw the main bus and datum line of each bay
Ground marking executed according to layout drawing and civil drawings that contain all dimensions of
equipment and distance between them.
The basic lines in ground marking are X-axis and Y-axis which representative of C.Bs centers and
transformer GIB holes centers respectively.
1.Surveyor takes several points on X-axis and Y-axis lines, and then start connects between these
points making these 2 lines.
3.These lines representative of bus bar line, center of bus coupler C.B, all C.Bs positions
points and M/B supports which hold the V.Ts.
4.Then take height and level of plates take in consideration that, bus coupler plate is the
reference level.
Page 33
م .محمد مصطفى الجوينى
Page 34
محمد مصطفى الجوينى.م
Transportation process
After revise and compare the packing list drawings with packing list and boxes, start transport the boxes
and unpacking the equipment then arrange this equipment inside GIS room according to the installation
process.
The amount of equipment to be transported inside GIS room is determined on the basis of the area of
GIS room, so the transportation process may divide to more than one stage.
Page 35
محمد مصطفى الجوينى.م
3. Installation process.
Initial assembly process
After arrange the equipment and completely close all doors, windows and holes, start the installation
process as follow:
Install of each C.B equipment without any docking between bays or any ground welding
Install of C.T, D.S, E.S, supports and bus bars for each C.B.
Notes:
C.T and D.S compartment may be in one compartment or separate depend on them size.
Page 36
محمد مصطفى الجوينى.م
Installation starts by remove the transportation cover then replace gasket by a new one, and cleaning
the spacer, flange, gasket and conductor by alcohol and wipes.
Page 37
محمد مصطفى الجوينى.م
Replace the old grease of flange (yellow grease) and conductor contact positions (white grease) with
new grease.
After preparing the flange of equipment for assembling cover it till assembling it.
.
Page 38
محمد مصطفى الجوينى.م
After assembling the C.B equipment, it become ready to install and temporary welding in ground.
Docking process
There are two methods two to docking the bays together as follow:
1. Install all C.Bs in it positions and temporary welding, then start assembling the equipment of (bay1)
in direction to the extension for future bays, then bus bars and GIB reach to AIR/SF6 bushing.
2. Just install bus coupler C.B and temporary welded then start assembling the equipment and docking
it to this C.B from it both sides to the final sides of GIS (used method).
After assembling the equipment of each C.B and welded the bus coupler C.B start docking the bays
together.
Note that: the amount of assembling equipment with C.B depends on the capacity of overhead
crane and Available empty space.
Page 39
محمد مصطفى الجوينى.م
In our case:
C.Ts.
D.S/E.S.
Supports for D.S/E.S.
Bus bar in one side.
1 2 3
Page 40
محمد مصطفى الجوينى.م
4. Docking transformer
bays with V.Ts sections
in the both sides
Page 41
محمد مصطفى الجوينى.م
Page 42
محمد مصطفى الجوينى.م
Vacuum work
Notes:
Page 43
محمد مصطفى الجوينى.م
Gas filling
After vacuum process of each compartment start the gas filling process directly.
The same tools as vacuum in addition to gas filling device and SF6 gas cylinder.
Connect the gas filling device to cylinder and other side to adapter or to DILO machine and then to
adapter select gas filling function from multi functions selector in DILO machine.
Open valve cylinder and gas filling device then control the gas pressure by gas regulator.
As a first stage of gas filling continue filling to 1bar.
The second stage continues to final value 7 bar for C.B, 5 bar for others.
Page 44
محمد مصطفى الجوينى.م
Notes:
As the vacuum process the gas filling process can do to each phase separately but to save time
we use adapter to execute the process for the three phases one time. (One hose from machine
to adapter and three from adapter to phases).
When the pressure inside the cylinder decrease, gas temperature decrease and gas freezes, so
we use the compressor in DILO machine.
Gas filling process carried out to all compartment in stages of different pressures not one time to
save the barrier spacer condition although it bear the pressure difference but for more
confirmation.
Gas test
Acceptance criteria
Page 45
محمد مصطفى الجوينى.م
4. Accessories installation
Earthing shield
There are already installed earhing shields with equipment like E.S bars and its shields, but the main
earthing bars needs to be assembled in site and installed.
There are several types of earthings connection bars shapes depend on its position.
Page 46
محمد مصطفى الجوينى.م
Linkage bars
Linkage bars between the mechanism and phase’s movable part are assembled and installed in site.
There are two types of length and two types contact point.
These linkages contain flexible joint to adjust the required space.
Platforms
Firstly unpacking the platform box then start arranges and numbering its parts regarding to drawings.
Start assembling these parts according to drawings.
Page 47
محمد مصطفى الجوينى.م
Supports
As plat form;
Firstly unpacking the platform box then start arranges and numbering its parts regarding to drawings.
Page 48
محمد مصطفى الجوينى.م
Cables work
Cable tray
As plat form;
Firstly unpacking the trays box then start arranges its parts regarding to drawings.
There are several lengths and dimensions of trays, we use the suitable part according to its function
and position regarding to drawings.
Cable termination
Page 49
محمد مصطفى الجوينى.م
Including:
List of contents
DC and AC systems
Page 50
S CHEMATIC DIAGRAM FOR GIS LCC
Project
A A
DRAWING LIST
REVISION
SHEET NO DESCRIPTION
REV.0 REV.1 REV.2 REV.3 REV.4
11 220kV GIS SINGLE LINE DIAGRAM 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018
PROJECT MANAGER.
12 INTERLOCK DIAGRAM FOR T/L 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018
14 LCC MIMIC DIAGRAM FOR T/L 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018
15 LCC ANNUNCIATOR LIST 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018 SUPERVISION CONSULTANT
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EA 2 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
DRAWING LIST
REVISION
SHEET NO DESCRIPTION
REV.0 REV.1 REV.2 REV.3 REV.4
PROJECT MANAGER.
42 MULTIPLY CONTACT 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EA 3 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
DRAWING LIST
REVISION
SHEET NO DESCRIPTION
REV.0 REV.1 REV.2 REV.3 REV.4
PROJECT MANAGER.
72 CURRENT TRANSFORMER 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EA 4 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
DRAWING LIST
REVISION
SHEET NO DESCRIPTION
REV.0 REV.1 REV.2 REV.3 REV.4
91 PARTS LIST FOR TERMINAL BLOCK 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018
Reference DWG NO. DWG DATE REV.
92 PARTS LIST FOR TERMINAL BLOCK 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018
B B
EMPLOYER / DEVELOPER
C C
PROJECT MANAGER.
SUPERVISION CONSULTANT
D D
E
E
LIST OF CONTENTS
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EA 5 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
WIRE SPECIFICATION
DC XHHW/SIS GRAY 2.5mm² WHITE BLUE WIRE NO. N/A N/A N/A
B CIRCUIT B
CONTROL
TRIP XHHW/SIS GRAY 2.5mm² WHITE RED WIRE NO. RED N/A N/A
ALARM XHHW/SIS GRAY 2.5mm² WHITE BLUE WIRE NO. N/A N/A N/A BLADE TYPE
DC(+) XHHW/SIS GRAY 2.5mm² WHITE BLUE WIRE NO. WHITE BLACK +
DC(-) XHHW/SIS GRAY 2.5mm² WHITE BLUE WIRE NO. WHITE BLACK -
AC(A) XHHW/SIS RED 2.5mm² WHITE BLUE WIRE NO. WHITE BLACK A
POWER
SUPPLY EMPLOYER / DEVELOPER
AC(B) XHHW/SIS YELLOW 2.5mm² WHITE BLUE WIRE NO. WHITE BLACK B
C C
AC(C) XHHW/SIS BLUE 2.5mm² WHITE BLUE WIRE NO. WHITE BLACK C BLADE TYPE
AC(N) XHHW/SIS GREEN 2.5mm² WHITE BLUE WIRE NO. WHITE BLACK N
PROJECT MANAGER.
A XHHW/SIS RED 6.0mm² WHITE BLUE WIRE NO. WHITE BLACK A
N XHHW/SIS GREEN 4.0mm² WHITE BLUE WIRE NO. WHITE BLACK N BLADE TYPE
REV. DATE ISSUED TO / FOR :
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EB 6 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
MUTI-CABLE SPECIFICATION
DC COPPER
A FR-CCV-SB XLPE 24 CORES 2.5SQMM BLACK BRAID
Reference DWG NO. DWG DATE REV.
CONTROL CIRCUIT
B B
C COPPER C
E HEATER CONTROL FR-CCV-SB XLPE 2 CORES 4.0SQMM BLACK
BRAID
FR-CCV-SB : Flame retardant control cross linked polyethylene sheathed cable PROJECT MANAGER.
- Rated Voltage : 0.6/1KV
- Heat resistant temperature : 90 degrees ( By Standard of UL)
- Conductor : Plain or Tinned annealed copper wire
SUPERVISION CONSULTANT
D GAS MONITORING D
B A LOCAL
BOX
CONTROL
B
CUBICLE 04 24.JAN.2018 REVISED AS PER COMMENT
LOCAL 03 10.AUG.2017 REVISED AS PER COMMENT
SECONDARY BOX 02 09.AUG.2017 REVISED AS PER COMMENT
C CONTROL 01
00
19.JUN.2017
01.SEP.2016
REVISED AS PER COMMENT
FOR APPROVAL
OF CT
CUBICLE REV. DATE ISSUED TO / FOR :
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EB 7 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
B B
DETAILS
TERMINAL TYPE 6 3 4 5
K201-14 / X1-79
1 2
1 WIRE FERRULING
INTERNAL
A. WHITE SLEEVE WITH BLACK LETTERS
WIRING X21
2 ADDITIONAL MARKING 1 1
2 2 DETAIL "A"
3 LETTERS DIRECTION
3 3
RING TYPE BLADE TYPE 4 INSULATED CAP EMPLOYER / DEVELOPER
A. TRIP : RED
4 4 TERMINAL
B. OTHERS : BLUE BLOCK
C 5 TERMINAL C
K201-13 / X1-71
K201-13 / X1-71
6 WIRE
TERMINAL BLOCK PVC DUCT EXTERNAL WIRING
PVC
DUCT
DETAIL "A"
PROJECT MANAGER.
X1-71 / K201-13
-X1
-K201
X1-71 / K201-13 71
72
73
MULTI CORE CABLE
13 21 31 43 74 GROUND WIRE
CABLE GLAND SUPERVISION CONSULTANT
75 BOTTOM PLATE
-K201 (FOR GLAND)
DETAIL "B"
76
D 14 22 33 44 D
77
78
K201-14 / X1-79
E
E
FERRULING SYSTEM
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EB 8 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
DISCONNECTOR OPERATED LIMIT SWITCH DIODE HORN Reference DWG NO. DWG DATE REV.
BY MOTOR SPRING MECHANICALLY OPERATED
B B
EARTHING SWITCH
BREAK CONTACT TIMER RESISTOR
OPERATED BY MOTOR SPRING
SUPERVISION CONSULTANT
MINIATURE CIRCUIT BREAKER THERMOSTAT GIS EQUIPMENT BOUNDARY REV. DATE ISSUED TO / FOR :
E
E
EXTERNAL EQUIPMENT
OTHER LCC
SYMBOL LEGEND
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EB 9 OF 92 04
1 2 3 4 5 6 7 8
Project
A OHTL1 A
(=D01) NOTE
G01-05C M DS
(-Q9) (DS,ES,CT) SECOND STAGE LEAK ALARM
4.5 Bar
AØ (VT, BUS,etc) (PRESSURE FAILURE)
G01-04A
BØ ES
G01-04B
(-Q52) * ACCURACY RANGE : ±1% (at 20°C), ±2.5% (at -20°C ~ 60°C)
CØ M
G01-04C
C5 EMPLOYER / DEVELOPER
C4 3. GAS SECTION NUMBER OF GAS MONITORING IS AS FOLLOWS
C C3
CT (-T1) DESCRIPTION C
C2
C1
G X X - X X A
PHASE MARKING
AØ
G01-00C
4. BURSTING PRESSURE OF PRESSURE RELIEF DEVICE
CB : 15 Bar
AØ OTHERS : 10 Bar
G01-03A
BØ
G01-03B
ES SUPERVISION CONSULTANT
CØ LEGEND
G01-03C
M
(-Q51)
SYMBOL DESCRIPTION
D D
NON-RETURN VALVE (NORMALLY OPEN)
UHF PD SENSOR
E
E
G07-08C
G01-01C
G07-08B
G01-01B
G07-08A
G01-01A
G01-02C
G01-09B
G01-02B
G01-09A
G01-02A
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EB 10 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
-Q8 -Q8
M HS 50kA/1s M HS 50kA/1s M M
-Q9 -Q9
1600A M 1600A M M M
50kA/1s 50kA/1s
-Q52 -Q52
50kA/1s 50kA/1s
M M
M M
Reference DWG NO. DWG DATE REV.
P2 P2
C5 C5
B C4
245kV 2000A
C4 B
C3 -Q0 C3
-T1 50kA/1s -T1
C2 C2
C1 C1
P1 P1
P1 C1 C1 P1
-T3 -T4
245kV 1600A C2 C2 245kV 1600A
-Q0 -Q0
50kA/1s -T15 -T16 50kA/1s
P2 P2
-Q51 -Q51
50kA/1s -Q51 -Q52 50kA/1s
M M M M M M
50kA/1s 50kA/1s
-Q25 -Q55
M 50kA/1s -Q35 M 50kA/1s -Q65
-Q3 50kA/1s -Q5 50kA/1s
2000A M
-Q11 -Q21 2000A M
-Q31
M M 50kA/1s 2000A M M
2000A 50kA/1s M M
2000A M M M M
-Q1 -Q2 -Q15 -Q45 -Q1 -Q2
1600A 50kA/1s -Q1 -Q2 50kA/1s 1600A 50kA/1s
1600A M 50kA/1s M 50kA/1s 1600A
50kA/1s M 2000A 2000A M HS M
50kA/1s M M HS
50kA/1s 50kA/1s 50kA/1s 50kA/1s
EMPLOYER / DEVELOPER
245kV, 2000A, 50kA, 1s, 50Hz, BB-II -Q12 -Q22 -Q32
2000A M HS 2000A 2000A M HS
-Q16 -Q46
C -Q1 M M -Q2
M 50kA/1s
50kA/1s 50kA/1s
M 50kA/1s
-Q1 M M -Q2
50kA/1s
M M
C
1600A 1600A -Q4 -Q6 1600A 1600A
50kA/1s 50kA/1s M
2000A -Q36 M
2000A 50kA/1s 50kA/1s -Q66
50kA/1s 50kA/1s 50kA/1s 50kA/1s
M M M
-Q26 -Q56
-Q51 M 50kA/1s M 50kA/1s -Q51
50kA/1s 50kA/1s
C5 800-400/1A 5P30 - ≤ 2.5-1.25 Ω - 60-30 VA 11. FIRST POLE TO CLEAR FACTOR : 1.3
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EB 11 OF 92 04
1 2 3 4 5 6 7 8
Project
OHTL 1
A
(=D01) A
CLOSE /REMOTE
B
-Q9 DS -Q1
/OPEN
- C - - - - - - - C C C C C BUS TRANSFER B
P1
- - C - C - - - - - - - - - TEST
- - - - - - - - - - - - - - INTERLOCK BYPASS
245kV 1600A LOCAL
O O - - - O - - - - - - - SUPERVISION CONSULTANT
-Q0 CLOSE &REMOTE
ES -Q52
50kA/1s /OPEN
LOCAL - - - - - - - - - - - - - - INTERLOCK BYPASS
D D
LOCAL
CLOSE &REMOTE - - O O O - O - - - - - - -
-Q51 DS -Q9
/OPEN
50kA/1s LOCAL - - - - - - - - - - - - - - INTERLOCK BYPASS
M 04 24.JAN.2018 REVISED AS PER COMMENT
LOCAL 03 10.AUG.2017 REVISED AS PER COMMENT
CLOSE &REMOTE - - - - - O - - - - - - - - LINE DEAD 02
01
09.AUG.2017
19.JUN.2017
REVISED AS PER COMMENT
REVISED AS PER COMMENT
ES -Q8 00 01.SEP.2016 FOR APPROVAL
/OPEN
LOCAL - - - - - - - - - - - - - - INTERLOCK BYPASS REV. DATE ISSUED TO / FOR :
M M * REMARK
-Q1 -Q2 O : OPEN STATE
C : CLOSED STATE
E 1600A 1600A - : NO RELATION E
50kA/1s 50kA/1s
* FOLLOWING CONDITIONS SHALL BE SATISFIED ALSO.
1. DISCONNECTING SWICHES ARE NOT INTERMEDIATE POSITION.
BB-I 2. MECH. DOOR FOR MANUAL OPERATION IS NOT OPENED.
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EB 12 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
FILTER
&MESH
VENTILATION
COVER H1
ANNUNCIATOR
UC625 CH40
Reference DWG NO. DWG DATE REV.
S11
CONTROL LOCATION SELECTION
S1 S2 S3 S4 S5
CB MOTOR CB MOTOR INTERLOCK BYPASS
B B
LAMP TEST HEATER TEST
LOCK - USE LONG RUN RESET INTERLOCK - RELEASE
BUS BAR - I
G01-08 G01-01
BUS BAR - II
G01-09 G01-02
S12
BUS DS BUS DS
VM1
Q1 Q2
BUS DS BUS DS
SF6 GAS SE
R DE R E
VO
Q1 Q2
W ME
T
O R
O
P
ER
COMPARTMENT
N/P
GIS N/P
WORK ES
Q51
WORK ES
Q51
G01-03
CIRCUIT BREAKER
Q0
CIRCUIT BREAKER
2250 mm
Q0
G01-00
F8A1
F8A2
S2C-H11L
S2C-H11L
STOPPER
STOPPER
S2C-H6R
S2C-H6R
WORK ES
Q52
WORK ES
Q52
G01-04
LINE DS
Q9
LINE DS
Q9
F8D1
F8D2
F8D3
F8D4
G01-05
S2C-H11L
S2C-H11L
S2C-H11L
S2C-H11L
STOPPER
STOPPER
S2C-H6R
S2C-H6R
S2C-H6R
S2C-H6R
S2C-A2
LINE ES
Q8
LINE ES
Q8
G01-07
EMPLOYER / DEVELOPER
F8D5
F8D6
F8D7
C C
S2C-H11L
S2C-H11L
S2C-H11L
STOPPER
STOPPER
S2C-H6R
S2C-H6R
S2C-H6R
GAS TO AIR
BUSHING
PROJECT MANAGER.
HEATER
8. OUT DOOR OPENING ANGLE 170˚
INNER DOOR OPENING ANGLE 90˚
1600 mm
1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
BOTTOM VIEW
DRAWING TITLE:
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EB 13 OF 92 04
1 2 3 4 5 6 7 8
Project
A -M4
UC625 CH40 10 5. S1 : SELECTOR SWITCH Reference DWG NO. DWG DATE REV.
(CB MOTOR OPERATION)
B B
5 8
6. S2 : PUSH BUTTON SWITCH
S11
CONTROL LOCATION SELECTION
(CB MOTOR LONG RUN RESET)
S1 S2 S3 S4 S5
9
4
(INTERLOCK - RELEASE)
6 7
8. S4 : PUSH BUTTON SWITCH
G01-08 G01-01
BUS BAR - I
(LAMP TEST)
1
BUS BAR - II
9. S5 : PUSH BUTTON SWITCH
G01-09 G01-02
(HEATER TEST)
10. ANNUNCIATOR
BUS DS BUS DS
Q1 Q2
BUS DS
Q1
BUS DS
Q2 EMPLOYER / DEVELOPER
2
C 11. OUTLET SOCKET (AC 220V) C
3
12. OUTLET SOCKET (AC 380V)
WORK ES
Q51
WORK ES
Q51
G01-03
PROJECT MANAGER.
CIRCUIT BREAKER
Q0
CIRCUIT BREAKER
Q0
G01-00
WORK ES
Q52
WORK ES
Q52
G01-04
SUPERVISION CONSULTANT
LINE DS
Q9
LINE DS
Q9
D G01-05 D
WORK ES
Q53
WORK ES
Q53
G01-06
E
E
STORAGE BOX SOCKET OUTLET SOCKET OUTLET
FOR PLUG AC 380V (3-PH) AC 220V (1-PH)
11
12
F
MOUNTING PLATE Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG
SPEC. : UC625-40YW-HH-024D-R-M3
MANUFACTURER : RTK
A REMARKS A
RTK
INSTRUMENTS
1 5 9 13 17 21 25 29 33 37
DS/ES MOTOR
CB MOTOR G01-00 GAS G01-04 GAS G01-08 GAS MAIN DC
RUNNING DC SUPPLY G01-02 GAS G01-06 GAS
LONG RUN LOW 1 LOW 1 LOW 1 SPARE SPARE
TIME MCB TRIP/OFF LOW 2 LOW 2 SUPPLY FAIL
AND STOP (ALARM) (ALARM) (ALARM)
EXCEEDED Reference DWG NO. DWG DATE REV.
B B
2 6 10 14 18 22 26 30 34 38
3 7 11 15 19 23 27 31 35 39
SUPPLY 1
CB MOTOR G01-02 GAS G01-06 GAS G01-00 GAS
INTERLOCK 220VDC G01-04 GAS G01-08 GAS SPARE SUPPLY 2
SPRING LOW 1 LOW 1 LOW 2 SPARE EMPLOYER / DEVELOPER
BY-PASS ON SUPPLY 1 FAIL LOW 2 LOW 2
UNCHARGED/LOCK (ALARM) (ALARM) (LOCKOUT)
C C
4 8 12 16 20 24 28 32 36 40
TEST
D D
1 (YELLOW) NO NO RESPONSE TIME : 5ms 16 (YELLOW) NO NO RESPONSE TIME : 5sec 31 (YELLOW) NO NO RESPONSE TIME : 5sec 04
03
24.JAN.2018
10.AUG.2017
REVISED AS PER COMMENT
REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
2 (YELLOW) NO NO RESPONSE TIME : 5ms 17 (YELLOW) NO NO RESPONSE TIME : 5sec 32 (YELLOW) NO NO RESPONSE TIME : 5sec 01
00
19.JUN.2017
01.SEP.2016
REVISED AS PER COMMENT
FOR APPROVAL
REV. DATE ISSUED TO / FOR :
3 (YELLOW) NO NO RESPONSE TIME : 5ms 18 (YELLOW) NO NO RESPONSE TIME : 5sec 33 (YELLOW) NO NO RESPONSE TIME : 5ms
CONTRACTOR: CONSORTIUM( KN / HHI )
4 (YELLOW) NO NO RESPONSE TIME : 5ms 19 (YELLOW) NO NO RESPONSE TIME : 5sec 34 (YELLOW) NO NO RESPONSE TIME : 5ms
5 (YELLOW) NO NO RESPONSE TIME : 5ms 20 (YELLOW) NO NO RESPONSE TIME : 5sec 35 (YELLOW) NO NO RESPONSE TIME : 5ms
6 (YELLOW) NO NO RESPONSE TIME : 5ms 21 (YELLOW) NO NO RESPONSE TIME : 5sec 36 (YELLOW) NO NO RESPONSE TIME : 5ms
E
7 (YELLOW) NO NO RESPONSE TIME : 5ms 22 (YELLOW) NO NO RESPONSE TIME : 5sec 37 (YELLOW) NO NO RESPONSE TIME : 5ms E
8 (YELLOW) NO NO RESPONSE TIME : 5ms 23 (YELLOW) NO NO RESPONSE TIME : 5sec 38 (YELLOW) NO NO RESPONSE TIME : 5ms
9 (YELLOW) NO NO RESPONSE TIME : 5ms 24 (YELLOW) NO NO RESPONSE TIME : 5sec 39 (YELLOW) NO NO RESPONSE TIME : 5ms
10 (YELLOW) NO NO RESPONSE TIME : 5ms 25 (YELLOW) NO NO RESPONSE TIME : 5sec 40 (YELLOW) NO NO RESPONSE TIME : 5ms
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EB 15 OF 92 04
F
E
B
C
A
D
-M2
DRAWING NUMBER
16316 01 EB
DUCT 80x100
1
16OF
PHOENIX
PHOENIX
PHOENIX
PHOENIX
PHOENIX
PHOENIX
PHOENIX
PHOENIX
PHOENIX
SHEET NO.
01~30
XA
XD
XH
01~20 01~25 01~30
XAD
MANUFACTURER/VENDER NAME
3
2
1
2
1
2
1
3
2
1
92
04
REV NO.
DUCT 80x100 DUCT 80x100
PHOENIX
PHOENIX
PHOENIX
X0
X0C(B)
X0C(C)
X0C(A)
2
1
2
1
2
1
9
8
7
6
5
4
3
2
1
20
19
18
17
16
15
14
13
12
11
10
DUCT 80x100
2
-M1
AF09-30-10-13
KQ1C AF09-30-10-13 KQ0C CR-M230AC4 KA1
PHOENIX
PHOENIX
PHOENIX
CA4-22M
X1
01~15 01~80
X1C
KDN-220DC PHOENIX
KQ0
1
8
7
6
5
4
3
2
1
AF09-30-10-13 NF22E-13
CA4-22M KQ1T K101A CR-M220DC4 KD1
PHOENIX
PHOENIX
PHOENIX
X2
01~15 01~80 AF09-30-10-13 NF40E-13 CR-M220DC4 KD6
X2C
CA4-22M KQ9T CA4-40N K47A
1
8
7
6
5
4
3
2
1
3
CR-M220DC4 KD7
AF09-30-10-13
CA4-22M KQ51C AF09-30-10-13 KQ0T2
KDN-220DC CR-M220DC4 KG1.1
KQ2 AF09-30-10-13 NF40E-13
DUCT 80x100 CA4-22M KQ51T CA4-40N K47B KG1.2
CR-M220DC4
AF09-30-10-13
CA4-22M KQ52C AF09-30-10-13 K88MA CR-M220DC4 KG2.1
KDN-220DC
KQ9 AF09-30-10-13 CR-M220DC4 KG2.2
CA4-22M KQ52T AF09-30-10-13 K88MB
PHOENIX
PHOENIX
PHOENIX
X8
X8C
CR-M220DC4
AF09-30-10-13
1
8
7
6
5
4
3
2
1
PHOENIX
PHOENIX
PHOENIX
NF22E-13
X9
X9C
K102 CR-M220DC4
CA4-22N
1
8
7
6
5
4
3
2
1
DUCT 100x100
KL1 NF40E-13
K104 CR-M220DC4 KG8.1
PHOENIX
KDN-220DC NF40E-13 KG8.2
KQ8 KL2 CR-M220DC4
AT8N
PG-08 K102T
PHOENIX
PHOENIX
PHOENIX
NF40E-13
X51C
PHOENIX KL9
1
8
7
6
5
4
3
2
1
KL51
AT8N CR-M230AC4 KA2
PG-08 K204T
NF40E-13
DUCT 80x100 KL8
AT8N CR-M230AC4 KA3
NF40E-13 PG-08 T47A
CA4-40N KLR KA4
CR-M230AC4
AT8N PHOENIX
01~15 01~80
X52
X52C
PHOENIX
NF22E-13
CA4-13N KG0.2A
DUCT 80x100 NF22E-13
CA4-13N KG0.2B PHOENIX
NF40E-13 NF40E-13
CA4-40N K11 CA4-40N KHTS
NF40E-13 NF40E-13
PHOENIX
PHOENIX
XS
PHOENIX
PHOENIX
5
DUCT 80x100
PHOENIX
PHOENIX
PHOENIX
XG
01~130 01~60
XA2
9
8
7
6
5
4
3
2
1
6
5
4
3
2
1
13
12
11
10
6
DUCT 80x100
DUCT 80x100
B
C
A
D
PHOENIX
PHOENIX
PHOENIX
PHOENIX
01~40
ACTION
01~100 01~90
XR2
XR1
XA1
9
8
7
6
5
4
3
2
1
9
8
7
6
5
4
3
2
1
10
4
3
2
1
DUCT 80x100
00
01
02
03
04
REV.
7
Project
A3
Project No.:
DATE
Reference DWG
01.SEP.2016
24.JAN.2018
19.JUN.2017
09.AUG.2017
10.AUG.2017
DRAWING TITLE:
Drawing Number :
SUPERVISION CONSULTANT
Scale :
Plot Date:
ISSUED TO / FOR :
PK55-SD-EL-GS-14
CONTRACTOR: CONSORTIUM( KN / HHI )
01.SEP.2016
NO. DWG
FOR APPROVAL
8
CHECKED :
PREPARED :
DATE
APPROVED :
S.Y.JANG
INTERNAL ARRANGEMENT OF T/L (1)
K.H.SONG
C.Y.HONG
1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
REV.
F
E
B
C
A
D
1 2 3 4 5 6 7 8
Project
A A
PHOENIX
B 3
B
4
5
6
7
8
9
PHOENIX
PHOENIX
10
11
12
13
14
15
16
17
18
PHOENIX
PHOENIX
19
20 EMPLOYER / DEVELOPER
21
22
C 23
24 C
25
26
27
PHOENIX
545 PHOENIX
28
29
30 PROJECT MANAGER.
-M4
31
32
DUCT 60X80 33
34
35
36
PHOENIX
PHOENIX
37
38
39
40
SUPERVISION CONSULTANT
41
DUCT 60X80 42
43
44
45
D PHOENIX
D
DUCT 60X80
DUCT 60X80
922
PHOENIX
XC2
DUCT 60X80
TH
HTS
1
PHOENIX
E
PHOENIX
PHOENIX
PHOENIX
DUCT 40X80
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EB 17 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
+ - + - + -
B B
-XD 2 -XD 11 -XD 1 -XD 10 -XD 3 -XD 12 -XD 7 -XD 16 -XD 4 -XD 13 -XD 5 -XD 14
3 1 3 1 3 1 3 1 EMPLOYER / DEVELOPER
-F8D1 -F8D2 -F8D3 -F8D4
C C
S202M-K6UC 4 2 S202M-K6UC 4 2 S202M-K16UC 4 2 S202M-K16UC 4 2
S2C-H11L S2C-A2 S2C-H11L S2C-H11L
C1
-F8D2 PROJECT MANAGER.
C2
23
-K203
/43.E6 24
SUPERVISION CONSULTANT
D D
21
-K202
/43.E2
22
04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
1 3 5 7 9 11 00 01.SEP.2016 FOR APPROVAL
-S11 REMOTE -S11 REMOTE -S11 REMOTE REV. DATE ISSUED TO / FOR :
REMOTE_F3
REMOTE_F4
4 8 12 CONTRACTOR: CONSORTIUM( KN / HHI )
(+)220V_F1
(+)220V_F2
(+)220V_F3
(+)220V_F4
(-)220V_F1
(-)220V_F2
(-)220V_F3
(-)220V_F4
LOCAL_F2
LOCAL_F3
LOCAL_F4
/75.B2 /75.B2 /75.B2
E
E
48.B1 48.E1 28.B1 28.A1 28.B1 28.E1 21.B1 21.A1 21.B1 21.E1 22.B1 22.A1 22.B1 22.E1
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 18 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
+ - + -
B B
3 1 3 1 3 1 EMPLOYER / DEVELOPER
-F8D5 -F8D6 -F8D7
C S202M-K16UC 4 2 S202M-K16UC 4 2 S202M-K16UC 4 2 C
S2C-H11L S2C-H11L S2C-H11L
PROJECT MANAGER.
SUPERVISION CONSULTANT
D D
(+)220V_F5
(+)220V_F6
(+)220V_F7
CONTRACTOR: CONSORTIUM( KN / HHI )
(-)220V_F5
(-)220V_F6
(-)220V_F7
/75.B3 /75.B3
LOCAL_F5
E
E
23.B1 23.A1 23.A1 23.E1 24.B1 24.E1 25.A1 25.E1
13 14 13 14 13 14
1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
21 22 /68.D4 21 22 /68.D5 21 22 /68.D5
34 31 /64.B6 34 31 /64.B6 34 31 /64.B6 DRAWING TITLE:
32 32 32
DC POWER SUPPLY
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 19 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
A N A B C N
-XA 1 -XA 3 -XA 2 -XA 4 -XA 5-XA 7-XA 9-XA 11 -XA 6-XA 8-XA 10-XA 12 Reference DWG NO. DWG DATE REV.
B B
3 1 1 3 5 7N
-F8A1 -F8A2
S202M-K6UC 4 2 S203M-K32NA 2 4 6 8N
S2C-H11L EMPLOYER / DEVELOPER
S2C-H11L
C C
PROJECT MANAGER.
SUPERVISION CONSULTANT
A1 1 4 (32A) A1 A1
2
-KA2 -KA3 -KA4
N220V_F1
A220V_F1
56.A1 56.E1
E
HEATING & ANNUNCIATOR SOCKET OUTLET E
AC SUPPLY AC (3Φ 380V & 1Φ 220V) SUPPLY
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 20 OF 92 04
1 2 3 4 5 6 7 8
Project
CB CLOSE CLOSE CIRCUIT (A) CLOSE CIRCUIT (B) CLOSE CIRCUIT (C)
A A
+Remote Control Panel +Protection Panel
R3 -XR1 9
-XR1 13
(-)220V_F3
/ 18.E5
1L1 2T1 /21.B3
14 13 /21.C4 14 13 /21.C5 14 13 /21.C6 14 11 /64.C4
3L2 4T2 /21.B4 12
21 22 /21.C3 21 22 /21.C4 21 22 /21.C5
5L3 6T3 /21.B5 24 21
31 32 31 32 31 32
13 14 22 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
43 44 43 44 43 44
34 31 /68.D6
32 DRAWING TITLE:
44 41
42 CB CLOSE CONTROL
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 21 OF 92 04
1 2 3 4 5 6 7 8
Project
1 13 23 33
-SQ0 -K47A -X0 1 -X0 3 -X0 5
-K47A -K47A
OPEN 2 /22.E6 14 /22.E6 /22.E6 -Q0(A) -J2 -Q0(B)-J2 -Q0(C) -J2
24 34 1 1 1
/73.B3
A4 A4 A4
-S1 -S1 -S1
A04 A04 A04
-J2 2 -J2 2 -J2 2
-X0C(A) 5 -X0C(A) 6 -X0C(B) 5 -X0C(B) 6 -X0C(C) 5 -X0C(C) 6
-X0 2 -X0 4 -X0 6
EMPLOYER / DEVELOPER
-Q0(A) -J1 5 -J1 6 -Q0(B) -J1 5 -J1 6 -Q0(C) -J1 5 -J1 6
C * A2 * B2 * A2 * B2 * A2 * B2 C
-S1 -S1 -S1
* A02 B02
* A02 B02
* A02 B02
-X0 35 -X0 37 -X0 39
-X1 1
3 -X1 1
3 -X1 1
3 -Q0(A) -J2 13 -Q0(B)-J2 13 -Q0(C) -J2 13
-52T1
* -52T1
* -52T1
* B5 B5 B5 PROJECT MANAGER.
-XR1 17
A1 A1 7 A1
-KQ0T1 -XR1 20 -K47A -T47A -KD4
OPEN A2 POLE A2 POLE 2 CB TRIP1 A2
E DISCREPANCY DESCREPANCY POWER
E
(SET:100mSEC) SUPPLY
(-)220V_F4 -XR1 21
/ 18.E6
(+)220V_F5
/ 19.E2
LOCAL_F5
/ 19.E2 1L1 3L2 5L3
-KQ0T2 -KQ0T2 -KQ0T2 -XS 2
/23.E1 2T1 /23.E1 4T2 /23.E1 6T3
Reference DWG NO. DWG DATE REV.
B B
5
-X0 7 -X0 9 -X0 11
-SQ0
-Q0(A) -J2 3 -Q0(B)-J2 3 -J2
-Q0(C) 3
OPEN 6
/73.B3 13 23 33 A5 A5 A5
-K47B -K47B -K47B -S1 -S1 -S1
/23.E5 14 /23.E5 24 /23.E5 34 A05 A05 A05
-J2 4 -J2 4 -J2 4
-X0 8 -X0 10 -X0 12
-52T2
* -52T2
* -52T2
* B06 B06 B06
PROJECT MANAGER.
-J2 16 -J2 16 -J2 16
2 2 2 -X0 42 -X0 44 -X0 46
-X1 6 -X1 6 -X1 6
* * *
-J1 10 -J1 10 -J1 10
-XR1 22
4 3
04 24.JAN.2018 REVISED AS PER COMMENT
-T48B 03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
/23.E6 1 01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :
-XR1 23
CONTRACTOR: CONSORTIUM( KN / HHI )
A1 A1 7 A1
-KQ0T2 -K47B -T48B -KD5
OPEN
-XR1 24
POLE POLE CB TRIP2
A2 A2 2 A2
E DISCREPANCY DESCREPANCY POWER
E
(SET:100mSEC) SUPPLY
(-)220V_F5 -XR1 25
/ 19.E3
1L1 2T1 /23.B3 13 14 /23.B3 3 1 /23.D5 14 11 /64.C6 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
3L2 4T2 /23.B4 23 24 /23.B4 4 12
DRAWING TITLE:
5L3 6T3 /23.B5 33 34 /23.B5 6 8 24 21
5 22
13 14 [NOTE] PLEASE REFER TO CLOUDED PART. TRIP CIRCUIT 43 44 /59.B3
34 31 /68.D6
CB TRIP 2 CONTROL
53 54 /68.B3 32
SUPERVISION RELAYS WILL BE CONNECTED TO THIS PART. 63 64
F 44 41 Drawing Number : PREPARED : F
73 74 42 PK55-SD-EL-GS-14 K.H.SONG
83 84 ACTION Project No.: Scale : CHECKED :
MANUFACTURER/VENDER NAME
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 23 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
(+)220V_F6
/ 19.E4
SUPERVISION CONSULTANT
D D
95 95 95
-F49A -F49B -F49C
/25.B2 /25.B3 /25.B5 04 24.JAN.2018 REVISED AS PER COMMENT
96 96 96
03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
22 32 62 00 01.SEP.2016 FOR APPROVAL
-K103 -K103 -K103 REV. DATE ISSUED TO / FOR :
/24.E5 /24.E5 /24.E5
21 31 61 CONTRACTOR: CONSORTIUM( KN / HHI )
A1 A1 A1 A1 7 A1 A1 7 A1 A1
-K88MA -K88MB -K88MC -K102 -K102T -K49 -K103 -T88 -K104 -KD6
CB MOTOR A2 CB MOTOR A2 CB MOTOR A2 CB MOTOR A2 SPRING 2 CB MOTOR A2 CB MOTOR A2 MOTOR 2 CB MOTOR A2 CB MOTOR A2
E OPERATION OPERATION OPERATION SPRING UNCHARGED OVER LOAD LONG RUN LONG RUN SPRING CONTROL
E
UNCHARGED SET:30sec SET:1Min CHARGING SUPPLY
FAULTY
(-)220V_F6
/ 19.E4
1L1 2T1 /25.B2 1L1 2T1 /25.B3 1L1 2T1 /25.B5 13 14 3 1 /24.B6 13 14 /59.B2 14 13 /24.B5 3 1 /24.B5 13 14 /59.B3 14 11 /64.C5
3L2 4T2 3L2 4T2 3L2 4T2 22 21 /21.D3 4 23 24 /68.B2 22 21 /24.E1 4 23 24 /68.B3 12
24 21 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
5L3 6T3 /25.E2 5L3 6T3 /25.E3 5L3 6T3 /25.E5 32 31 /21.D4 6 8 33 34 32 31 /24.E2 6 8 33 34
5 5 22
13 14 /24.B5 13 14 /24.B5 13 14 /24.B6 43 44 43 44 43 44 /59.B1 43 44 DRAWING TITLE:
34 31 /68.D6
53 54 53 54 /68.B2 32 CB MOTOR CONTROL
62 61 /21.D5 62 61 /24.E3 44 41
71 72 71 72 42
F 83 84 83 84 Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 24 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
CB MOTOR OPERATION CB MOTOR OPERATION CB MOTOR OPERATION
(A PHASE) (B PHASE) (C PHASE)
(+)220V_F7
/ 19.E5
M1 M1 M1
M M M
-M1 -M1 -M1 PROJECT MANAGER.
7 7 7
-S13 -S13 -S13
DC 8 DC 8 DC 8 SUPERVISION CONSULTANT
/26.B4 /26.C4 /26.E4
-X1 8 -X1 8 -X1 8
14 11 /64.C5
12
24 21 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
22 DRAWING TITLE:
34 31 /68.D7
32 CB MOTOR POWER
44 41
42
F Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 25 OF 92 04
1 2 3 4 5 6 7 8
/22.D3
/23.D3
/25.D2
/56.D5
/21.C3
/21.C3
/22.C3
/22.C3
/23.C3
/23.C3
/24.C1
/24.C1
/21.B3
/21.B3
/25.B2
/24.B1
/24.B1
/56.B5
Project
-X0C(A) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 -XH 9 12
-W1 1 2 3 6 4 5 7 8 9 10 11 12 13 14 15 16 -W4 1 2
A A
-Q0(A)
-J1 -OUTLET_A -J1 -JA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2
LA1 B4 * A2 * B2 * * A3 * B3 * /25.B2
1 2 (16A)
u=220V AC c
-S1 -X1 7 8
-LS1 c
LA01 B04 A02 B02 A03 B03 -X1 9 10
d
-X1 1 2 * * 3 7 1 5
c -LS2 1
-X1 3 4 5 6
-S13 -S13 -S13 -S13 d
* * DC 4 DC 8 AC 2 AC 6
-LS3 -HT
/25.C2 /25.D2 /25.C2 /25.C3 d
2
M1 Reference DWG NO. DWG DATE REV.
B 1 1 1 M B
-M1
-52C -52T1 -52T2
DC 2 DC 2 DC 2 M01
220V, 60 220V, 60 220V, 60
Ohm Ohm Ohm
/22.D4
/23.D4
/25.D3
/56.D5
/21.C5
/21.C4
/22.C4
/22.C4
/23.C4
/23.C4
/24.C2
/24.C2
/21.B5
/21.B4
/25.B3
/24.B2
/24.B2
/56.B5
-X0C(B) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 -XH 10 13
-W2 1 2 3 6 4 5 7 8 9 10 11 12 13 14 15 16 -W5 1 2
EMPLOYER / DEVELOPER
-Q0(B)
C -J1 -OUTLET_B -J1 -JA C
1 2 3 4 *5 *6 *7 * 8 * 9 * 10 11 12
/25.B4 (16A)
13 14 15 16 1 2
LA1 B4 A2 B2 A3 B3 1 2
u=220V AC c
-S1 -X1 7 8
-LS1 c
LA01 B04 A02 B02 A03 B03 -X1 9 10
-X1 1 2 * * 3 7 1 5 d
c -LS2 1
PROJECT MANAGER.
-X1 3 4 5 6
-S13 -S13 -S13 -S13 d
* * DC 4 DC 8 AC 2 AC 6
-LS3 -HT
/25.C3 /25.D3 /25.C4 /25.C4 d
2
M1
1 1 1 M SUPERVISION CONSULTANT
-M1
-52C -52T1 -52T2
DC 2 DC 2 DC 2
D 220V, 60 220V, 60 220V, 60 M01 D
Ohm Ohm Ohm
/22.D5
/23.D5
/25.D5
/56.D6
/21.C6
/21.C5
/22.C5
/22.C5
/23.C5
/23.C5
/24.C3
/24.C3
/21.B6
/21.B5
/25.B5
/24.B3
/24.B3
/56.B6
04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
-X0C(C) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 -XH 11 14 00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :
-Q0(C)
-J1 -OUTLET_C -J1 -JA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2
LA1 B4 * A2 * B2 * * A3 * B3 * /25.B6
1 2 (16A)
u=220V AC c
E -S1 -X1 7 8
-LS1 E
LA01 B04 B02 B03 -X1 9 10 c
A02 A03
d
-X1 1 2 * * 3 7 1 5 c -LS2 1
-X1 3 4 5 6
-S13 -S13 d
-S13 -S13 -LS3
AC -HT
DC 4 DC 8 2 AC 6
/25.C6 /25.C6 d
/25.C5 /25.D5 2
M1
1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
1 1 1 M
* * -M1 DRAWING TITLE:
-52C -52T1 -52T2
DC 2 DC 2 DC 2
CB MECHANISM 1
220V, 60 220V, 60 220V, 60 M01
Ohm Ohm Ohm Drawing Number : PREPARED : F
F
PK55-SD-EL-GS-14 K.H.SONG
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 26 OF 92 04
1 2 3 4 5 6 7 8
Project
INTERLOCK WITH
INTERLOCK WITH
INTERLOCK WITH
LATCHED RELAY
LATCHED RELAY
FOR MULTIPLY
FOR MULTIPLY
OPEN/CLOSE
OPEN/CLOSE
INDICATION
INDICATION
CB TRIP1
CB TRIP2
CB TRIP1
CB TRIP2
/67.B1 REMOTE
/67.B2 REMOTE
CIRCUIT
CIRCUIT
CICUIT
CICUIT
Q9
Q1
Q2
A A
/22.C6
/23.C5
/46.C2
/46.C5
/22.B6
/23.B5
/54.B3
/40.B3
/54.B3
/40.B4
/47.B2
-X0 1 7 13 19 25 31 35 41 47 53 59 65 69 73 77 81 85 89 93 97 101 105 109 113 117 121 125 129
-W7 1 3 5 7 9 11 13 15 17 21 19 23 -W10 1 3 5 7 9 11 13 15 17 21 19 23 -W13 1 3 5 7
-Q0(A)
-J2 1 3 5 7 9 11 13 15 17 19 21 23-J3 1 3 5 7 9 11 13 15 17 19 21 23-J4 1 3 5 7
A4 A5 A6 A7 A8 LB1 B5 B6 B7 B8 B9 LA1 A2 A3 A4 A5 A6 A7 A8 LB1 B2 B3 B4 B5 B6 B7 B8 B9
-S1 -S2
Reference DWG NO. DWG DATE REV.
A04 A05 A06 A07 A08 LB01 B05 B06 B07 B08 B09 LA01 A02 A03 A04 A05 A06 A07 A08 LB01 B02 B03 B04 B05 B06 B07 B08 B09
CB TRIP2
CB TRIP1
CB TRIP2
/67.B2 REMOTE
/67.B3 REMOTE
CIRCUIT
CIRCUIT
CICUIT
CICUIT
/22.C6
/23.C6
/22.B6
/23.B6
-X0 3 9 15 21 27 37 43 49 55 61
EMPLOYER / DEVELOPER
-W8 1 3 5 7 9 11 13 15 17 21 19 23 -W11 1 3 5 7 9 11 13 15 17 21 19 23 -W14 1 3 5 7
C C
-Q0(B)
-J2 1 3 5 7 9 11 13 15 17 19 21 23-J3 1 3 5 7 9 11 13 15 17 19 21 23-J4 1 3 5 7
A4 A5 A6 A7 A8 LB1 B5 B6 B7 B8 B9 LA1 A2 A3 A4 A5 A6 A7 A8 LB1 B2 B3 B4 B5 B6 B7 B8 B9
-S1 -S2
PROJECT MANAGER.
A04 A05 A06 A07 A08 LB01 B05 B06 B07 B08 B09 LA01 A02 A03 A04 A05 A06 A07 A08 LB01 B02 B03 B04 B05 B06 B07 B08 B09
CB TRIP2
CB TRIP1
CB TRIP2
/67.B3 REMOTE
/67.B4 REMOTE
CIRCUIT
CIRCUIT
CICUIT
CICUIT
D D
/22.C6
/23.C6
/22.B6
/23.B6
-X0 5 11 17 23 29 39 45 51 57 63
04 24.JAN.2018 REVISED AS PER COMMENT
-W9 1 3 5 7 9 11 13 15 17 21 19 23 -W12 1 3 5 7 9 11 13 15 17 21 19 23 -W15 1 3 5 7 03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
-Q0(C) REV. DATE ISSUED TO / FOR :
-J2 1 3 5 7 9 11 13 15 17 19 21 23-J3 1 3 5 7 9 11 13 15 17 19 21 23-J4 1 3 5 7
CONTRACTOR: CONSORTIUM( KN / HHI )
A4 A5 A6 A7 A8 LB1 B5 B6 B7 B8 B9 LA1 A2 A3 A4 A5 A6 A7 A8 LB1 B2 B3 B4 B5 B6 B7 B8 B9
-S1 -S2
A04 A05 A06 A07 A08 LB01 B05 B06 B07 B08 B09 LA01 A02 A03 A04 A05 A06 A07 A08 LB01 B02 B03 B04 B05 B06 B07 B08 B09
-X0 6 12 18 24 30 34 40 46 52 58 64 68 72 76 80 84 88 92 96 100 104 108 112 116 120 124 128 132
-X0 133 135 137 139 141 143 145 147 -X0 149 151 153 155 157 159 161 163
Project
B B
2T1 2T1
1
3 -KQ1T -KQ1C
-SQ1 -SQ1 /28.C2 1L1 /28.C2 1L1
CLOSE OPEN 2
4
/73.C3 /73.C3
3L2 3L2
-KQ1T -KQ1C
/28.C2 4T2 /28.C2 4T2
14 14
-KQ1C -KQ1T
/28.C2 13 /28.C2 13
EMPLOYER / DEVELOPER
C C
21
A1 A1 -KQ1C
-KQ1C -KQ1T /28.C2
22
CLOSE A2 OPEN A2 22 PROJECT MANAGER.
-KQ1T
/28.C2
21
-X1C 1 -X1C 2 -X1C 3 -X1C 5 7
-Q1 -Q1
-J1 1 -J1 2 -J1 3 -J1 5 -J1 7
1 c
c c SUPERVISION CONSULTANT
-ILM -DS2 M1
-LSA -LSB 2 a
d
d d M
D -M -DS2 D
a a a
b
-DS1 -LSA -LSB
OPERATION M01
b b b
2 1 04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
-PS 02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
-J1 4 -J1 6
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :
44 44 44 6T3 6T3
(-)220V_F2 (-)220V_F2
/ 18.E4 / 30.E1
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 28 OF 92 04
1 2 3 4 5 6 7 8
Project
/28.D2
/28.D2
/28.D4
/28.D5
/28.D5
/57.D1
/57.B1
/28.E4
/28.E5
A -X1C 1 2 3 4 5 6 7 8 9 -XH 21 15 A
-W2 1 2 3 4 5 6 7 8 9 -W4 1 2
-Q1
c c -DS2 a c
-LSA -LSB d -DS2 -DS1
OPERATION
Reference DWG NO. DWG DATE REV.
d d 1 b d
1
B -PS B
-ILM M1
2 1
DC220V, 2
6.2W, M -HT
-M
9200 Ohm
DC220V, 2
350W
a a a M01
-DS1 -LSA -LSB
b b b
EMPLOYER / DEVELOPER
C C
INTERLOCK WITH
INTERLOCK WITH
Q0 CLOSE (REMOTE)
DS/ES INCOMPLETE
Q0 CLOSE (LOCAL)
INTERLOCK WITH
INTERLOCK WITH
INTERLOCK WITH
INTERLOCK WITH
INTERLOCK WITH
INTERLOCK
COUPLING
LATCHED RELAY
LATCHED RELAY
FOR MULTIPLY
FOR MULTIPLY
OPEN/CLOSE
OPEN/CLOSE
INDICATION
INDICATION
CONDITION
Q15
Q11
PROJECT MANAGER.
Q51, Q52
/67.B4 REMOTE
/67.E1 REMOTE
/67.B5 REMOTE
/67.E2 REMOTE
=D03/66.C4
=D03/70.B1
=D03/67.B3
Q2
Q2
/45.B5
/54.B3
/41.B2
/54.B4
/41.B2
/44.B1
/46.B6
/45.B3
/46.B4
/47.B3
-X1 1 3 5 7 9 11 13 15 17 19 21 23 -X1 25 27 29 31 33 35 37 39 41 43 45 47
SUPERVISION CONSULTANT
-W1 1 3 5 7 9 11 13 15 17 19 21 23 -W3 1 3 5 7 9 11 13 15 17 19 21 23
D D
-Q1 -J2 1 3 5 7 9 11 13 15 17 19 21 23 -Q1 -J3 1 3 5 7 9 11 13 15 17 19 21 23
A1 A2 A3 A4 A5 B1 B2 B3 B4 B5 B6 Wc1 A1 A2 A3 A4 A5 A6 B1 B2 B3 B4 B5 B6
-S1 -S2 04
03
24.JAN.2018
10.AUG.2017
REVISED AS PER COMMENT
REVISED AS PER COMMENT
A01 A02 A03 A04 A05 B01 B02 B03 B04 B05 B06 Wc01 A01 A02 A03 A04 A05 A06 B01 B02 B03 B04 B05 B06 02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
-J2 2 4 6 8 10 12 14 16 18 20 22 24 -J3 2 4 6 8 10 12 14 16 18 20 22 24 REV. DATE ISSUED TO / FOR :
-X1 2 4 6 8 10 12 14 16 18 20 22 24 -X1 26 28 30 32 34 36 38 40 42 44 46 48
E
E
-X1 49 51 53 55 57 59 61 63
L13 L11 L14 L12 L9 L7 L10 L8 R8 R10 R7 R9 R12 R14 R11 R13
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 29 OF 92 04
1 2 3 4 5 6 7 8
Project
2T1 2T1
B B
-KQ2T -KQ2C
3 1 /30.C2 /30.C2
1L1 1L1
-SQ2 -SQ2
CLOSE 4 OPEN 2 3L2 3L2
/73.D3 /73.D3
-KQ2T -KQ2C
/30.C2 4T2 /30.C2 4T2
14 14
-KQ2C -KQ2T
/30.C2 13 /30.C2 13
EMPLOYER / DEVELOPER
C C
21
A1 A1 -KQ2C
-KQ2C -KQ2T /30.C2
22
CLOSE A2 OPEN A2 22 PROJECT MANAGER.
-KQ2T
/30.C2
21
-X2C 1 -X2C 2 -X2C 3 -X2C 5 7
-Q2 -Q2
-J1 1 -J1 2 -J1 3 -J1 5 -J1 7
1
c
c c SUPERVISION CONSULTANT
-ILM -DS2 M1
-LSA -LSB 2 a
d
d d M
D -M -DS2 D
a a a
b
-DS1 -LSA -LSB
OPERATION M01
b b b
2 1 04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
-PS 02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
-J1 4 -J1 6
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :
44 44 44 6L3 6T3
(-)220V_F2 (-)220V_F2
/ 28.E6 / 32.E1
Project
/30.D2
/30.D2
/30.D4
/30.D5
/30.D5
/57.D2
/57.B2
/30.E4
/30.E5
-X2C 1 2 3 4 5 6 7 8 9 -XH 22 16
A A
-W2 1 2 3 4 5 6 7 8 9 -W4 1 2
-Q2
c
c c a c
-DS2
-LSA -LSB d OPERATION -DS2 -DS1
d d 1 b d
Reference DWG NO. DWG DATE REV.
1 -PS
M1
B -ILM 2 1 B
DC220V, 2 M -HT
6.2W, -M
9200 Ohm DC220V, 2
a 350W
a a M01
-DS1
-LSA -LSB
b
b b
EMPLOYER / DEVELOPER
C C
INTERLOCK WITH
INTERLOCK WITH
Q0 CLOSE (REMOTE)
DS/ES INCOMPLETE
Q0 CLOSE (LOCAL)
INTERLOCK WITH
INTERLOCK WITH
INTERLOCK WITH
INTERLOCK WITH
INTERLOCK WITH
INTERLOCK
COUPLING
LATCHED RELAY
LATCHED RELAY
FOR MULTIPLY
FOR MULTIPLY
OPEN/CLOSE
OPEN/CLOSE
INDICATION
INDICATION
CONDITION
Q16
Q12
PROJECT MANAGER.
Q51, Q52
/67.B5 REMOTE
/67.E2 REMOTE
/67.B6 REMOTE
/67.E3 REMOTE
=D03/68.C2
=D03/70.C1
=D03/67.B5
Q1
Q1
/45.B6
/54.B4
/41.B3
/54.B4
/41.B4
/44.B2
/46.B3
/45.B3
/46.B1
/47.B3
-X2 1 3 5 7 9 11 13 15 17 19 21 23 -X2 25 27 29 31 33 35 37 39 41 43 45 47
SUPERVISION CONSULTANT
-W1 1 3 5 7 9 11 13 15 17 19 21 23 -W3 1 3 5 7 9 11 13 15 17 19 21 23
D D
-Q2 -J2 1 3 5 7 9 11 13 15 17 19 21 23 -Q2 -J3 1 3 5 7 9 11 13 15 17 19 21 23
A1 A2 A3 A4 A5 B1 B2 B3 B4 B5 B6 Wc1 A1 A2 A3 A4 A5 A6 B1 B2 B3 B4 B5 B6
-S1 -S2 04
03
24.JAN.2018
10.AUG.2017
REVISED AS PER COMMENT
REVISED AS PER COMMENT
A01 A02 A03 A04 A05 B01 B02 B03 B04 B05 B06 Wc01 A01 A02 A03 A04 A05 A06 B01 B02 B03 B04 B05 B06 02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
-J2 2 4 6 8 10 12 14 16 18 20 22 24 -J3 2 4 6 8 10 12 14 16 18 20 22 24 REV. DATE ISSUED TO / FOR :
-X2 2 4 6 8 10 12 14 16 18 20 22 24 -X2 26 28 30 32 34 36 38 40 42 44 46 48
E
E
-X2 49 51 53 55 57 59 61 63
L13 L11 L14 L12 L9 L7 L10 L8 R8 R10 R7 R9 R12 R14 R11 R13
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 31 OF 92 04
1 2 3 4 5 6 7 8
Project
REMOTE_F2 REMOTE_F2
/ 30.A6 / 34.A1
(+)220V_F2 (+)220V_F2
/ 30.B6 / 34.B1
LOCAL_F2 LOCAL_F2
/ 30.B6 / 34.B1
2T1 2T1
B B
-KQ9T -KQ9C
1 /32.C2 1L1 /32.C2 1L1
3
-SQ9 -SQ9
OPEN 3L2 3L2
CLOSE 4 2
/73.E3 /73.E3 -KQ9T -KQ9C
/32.C2 4T2 /32.C2 4T2
14 14
-KQ9C -KQ9T
/32.C2 13 /32.C2 13
EMPLOYER / DEVELOPER
C C
21
A1 A1 -KQ9C
-KQ9C -KQ9T /32.C2
22
CLOSE A2 OPEN A2 22 PROJECT MANAGER.
-KQ9T
/32.C2
21
-X9C 1 -X9C 2 -X9C 3 -X9C 5 7
-Q9 -Q9
-J1 1 -J1 2 -J1 3 -J1 5 -J1 7
1
c c c SUPERVISION CONSULTANT
-ILM M1
-LSA -LSB -DS2
2 a
d d d
D M -DS2 D
a a a
-M
b
-DS1 -LSA -LSB
OPERATION M01
b b b
2 1 04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
-PS 02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
-J1 4 -J1 6
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :
44 44 44 6T3 6T3
(-)220V_F2 (-)220V_F2
/ 30.E6 / 34.E1
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 32 OF 92 04
1 2 3 4 5 6 7 8
Project
/32.D2
/32.D2
/32.D4
/32.D5
/32.D5
/57.D2
/57.B2
/32.E4
/32.E5
-X9C 1 2 3 4 5 6 7 8 9 -XH 23 17
A A
1 2 3 4 5 6 7 8 9 -W4 1 2
-W2
-Q9
c
c c -DS2 a c
-LSA -LSB d OPERATION -DS2 -DS1
d d 1 b d Reference DWG NO. DWG DATE REV.
1 -PS
B M1 B
-ILM 2 1
DC220V, 2 M -HT
6.2W, -M
9200 Ohm DC220V, 2
a 350W
a a M01
-DS1
-LSA -LSB
b
b b
EMPLOYER / DEVELOPER
Q0 CLOSE (REMOTE)
DS/ES INCOMPLETE
C C
Q0 CLOSE (LOCAL)
INTERLOCK WITH
INTERLOCK WITH
INTERLOCK WITH
INTERLOCK WITH
LATCHED RELAY
LATCHED RELAY
FOR MULTIPLY
FOR MULTIPLY
OPEN/CLOSE
OPEN/CLOSE
INDICATION
INDICATION
CONDITION
Q51, Q52
/67.D1 REMOTE
/67.D2 REMOTE
Q8
PROJECT MANAGER.
/45.C3
/47.C3
/45.B5
/54.B5
/41.B5
/54.B5
/41.B5
/44.B2
/47.B4
-X9 1 3 5 7 9 11 13 15 17 19 21 23 -X9 25 27 29 31 33 35 37 39 41 43 45 47
-W1 1 3 5 7 9 11 13 15 17 19 21 23 -W3 1 3 5 7 9 11 13 15 17 19 21 23
SUPERVISION CONSULTANT
-Q9 -Q9
-J2 1 3 5 7 9 11 17 13 15 19 21 23 -J3 1 3 5 7 9 11 13 15 17 19 21 23
D D
A1 A2 A3 A4 A5 B1 B2 B3 B4 B5 B6 Wc1 A1 A2 A3 A4 A5 A6 B1 B2 B3 B4 B5 B6
-S1 -S2
A01 A02 A03 A04 A05 B01 B02 B03 B04 B05 B06 Wc01 A01 A02 A03 A04 A05 A06 B01 B02 B03 B04 B05 B06
04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
-J2 2 4 6 8 10 12 18 14 16 20 22 24 -J3 2 4 6 8 10 12 14 16 18 20 22 24 02
01
09.AUG.2017
19.JUN.2017
REVISED AS PER COMMENT
REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
-W1 2 4 6 8 10 12 14 16 18 20 22 24 -W3 2 4 6 8 10 12 14 16 18 20 22 24 REV. DATE ISSUED TO / FOR :
-X9 2 4 6 8 10 12 14 16 18 20 22 24 -X9 26 28 30 32 34 36 38 40 42 44 46 48
E
E
-X9 49 51 53 55 57 59 61 63
L13 L11 L14 L12 L9 L7 L10 L8 R8 R10 R7 R9 R12 R14 R11 R13
-KQ9
/41.E5
1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
L3 L4 L5 L6 R6 R5 R4 R3
DRAWING TITLE:
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 33 OF 92 04
1 2 3 4 5 6 7 8
Project
(+)220V_F2 (+)220V_F2
/ 32.B6 / 36.B1
LOCAL_F2 LOCAL_F2
/ 32.B6 / 36.B1
2T1 2T1
B B
-KQ51T -KQ51C
1 /34.C2 1L1 /34.C2 1L1
3
-SQ51 -SQ51
OPEN 3L2 3L2
CLOSE 4 2
/74.B3 /74.B3 -KQ51T -KQ51C
/34.C2 4T2 /34.C2 4T2
14 14
-KQ51C -KQ51T
/34.C2 13 /34.C2 13
EMPLOYER / DEVELOPER
C C
21
A1 A1 -KQ51C
-KQ51C -KQ51T /34.C2
22
CLOSE A2 OPEN A2 22 PROJECT MANAGER.
-KQ51T
/34.C2
21
-X51C 1 -X51C 2 -X51C 3 -X51C 5 7
-Q51 -Q51
-J1 1 -J1 2
1 -J1 3 -J1 5 -J1 7
44 44 44 6T3 6T3
(-)220V_F2 (-)220V_F2
/ 32.E6 / 36.E1
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 34 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
/34.D2
/34.D2
/34.D4
/34.D5
/34.D5
/57.D3
/57.B3
/34.E4
/34.E5
-X51C 1 2 3 4 5 6 7 8 9 -XH 24 18
-W2 1 2 3 4 5 6 7 8 9 -W4 1 2
-Q51
-J1 1 2 3 4 5 6 7 -J1 8 9 -JA 1 2
c
Reference DWG NO. DWG DATE REV.
-DS2
c c d a c
B B
-LSA -LSB OPERATION -DS2 -DS1
d d 1 b d
1
-PS
-ILM M1
2 1
DC220V, 2
6.2W, M -HT
-M
9200 Ohm
DC220V, 2
a 350W
a a M01
-DS1
-LSA -LSB
b
b b
EMPLOYER / DEVELOPER
C C
DS/ES INCOMPLETE
Q0 CLOSE (LOCAL)
INTERLOCK WITH
INTERLOCK WITH
INTERLOCK WITH
INTERLOCK WITH
PROJECT MANAGER.
LATCHED RELAY
LATCHED RELAY
FOR MULTIPLY
FOR MULTIPLY
OPEN/CLOSE
OPEN/CLOSE
INDICATION
INDICATION
CONDITION
/67.D2 REMOTE
/67.D3 REMOTE
Q1
Q2
Q9
/46.D1
/46.D4
/45.C4
/54.B6
/42.B2
/54.B6
/42.B2
/44.B3
/47.B2
SUPERVISION CONSULTANT
-X51 1 3 5 7 9 11 13 15 17 19 21 23 -X51 25 27 29 31 33 35 37 39 41 43 45 47
-W1 1 3 5 7 9 11 13 15 17 19 21 23 -W3 1 3 5 7 9 11 13 15 17 19 21 23
D D
-Q51 -Q51
-J2 1 3 5 7 9 11 13 15 17 19 21 23 -J3 1 3 5 7 9 11 13 15 17 19 21 23 04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
A1 A2 A3 A4 A5 B1 B2 B3 B4 B5 B6 Wc1 A1 A2 A3 A4 A5 A6 B1 B2 B3 B4 B5 B6 01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
-S1 -S2 REV. DATE ISSUED TO / FOR :
A01 A02 A03 A04 A05 B01 B02 B03 B04 B05 B06 Wc01 A01 A02 A03 A04 A05 A06 B01 B02 B03 B04 B05 B06
CONTRACTOR: CONSORTIUM( KN / HHI )
-J2 2 4 6 8 10 12 14 16 18 20 22 24 -J3 2 4 6 8 10 12 14 16 18 20 22 24
-W1 2 4 6 8 10 12 14 16 18 20 22 24 -W3 2 4 6 8 10 12 14 16 18 20 22 24
E
E
-X51 2 4 6 8 10 12 14 16 18 20 22 24 -X51 26 28 30 32 34 36 38 40 42 44 46 48
-X51 49 51 53 55 57 59 61 63
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 35 OF 92 04
1 2 3 4 5 6 7 8
Project
(+)220V_F2 (+)220V_F2
/ 34.B6 / 38.B1
LOCAL_F2 LOCAL_F2
/ 34.B6 / 38.B1
2T1 2T1
B B
-KQ52T -KQ52C
1 /36.C2 1L1 /36.C2 1L1
3
-SQ52 -SQ52
OPEN 3L2 3L2
CLOSE 4 2
/74.C3 /74.C3 -KQ52T -KQ52C
/36.C2 4T2 /36.C2 4T2
14 14
-KQ52C -KQ52T
/36.C2 13 /36.C2 13
EMPLOYER / DEVELOPER
C C
21
A1 A1 -KQ52C
-KQ52C -KQ52T /36.C2
22
CLOSE A2 OPEN A2 22 PROJECT MANAGER.
-KQ52T
/36.C2
21
-X52C 1 -X52C 2 -X52C 3 -X52C 5 7
-Q52 -Q52
-J1 1 -J1 2 -J1 3 -J1 5 -J1 7
1
c c c SUPERVISION CONSULTANT
-ILM -DS2 M1
-LSA -LSB a
2 d
d d M
D -M -DS2 D
a a a
b
-DS1 -LSA -LSB
OPERATION M01
b b b
2 1 04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
-PS 02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
-J1 4 -J1 6
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :
34 44 44 6T3 6T3
(-)220V_F2 (-)220V_F2
/ 34.E6 / 38.E1
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 36 OF 92 04
1 2 3 4 5 6 7 8
Project
/36.D2
/36.D2
/36.D4
/36.D5
/36.D5
/57.D3
/57.B3
/36.E4
/36.E5
A A
-X52C 1 2 3 4 5 6 7 8 9 -XH 25 19
-W2 1 2 3 4 5 6 7 8 9 -W4 1 2
-Q52
-J1 1 2 3 4 5 6 7 -J1 8 9 -JA 1 2
c
-DS2
c c d a c
-LSA -LSB OPERATION -DS2 -DS1 Reference DWG NO. DWG DATE REV.
d d 1 b d
B 1 B
-PS
-ILM M1
2 1
DC220V, 2
6.2W, M -HT
-M
9200 Ohm
DC220V, 2
a 350W
a a M01
-DS1
-LSA -LSB
b
b b
EMPLOYER / DEVELOPER
C C
DS/ES INCOMPLETE
Q0 CLOSE (LOCAL)
INTERLOCK WITH
INTERLOCK WITH
INTERLOCK WITH
INTERLOCK WITH
LATCHED RELAY
LATCHED RELAY
FOR MULTIPLY
FOR MULTIPLY
OPEN/CLOSE
OPEN/CLOSE
INDICATION
INDICATION
CONDITION
/67.D3 REMOTE
/67.D4 REMOTE
PROJECT MANAGER.
Q1
Q2
Q9
/46.D1
/46.D4
/45.C4
/55.B2
/42.B3
/55.B2
/42.B4
/44.B3
/47.B2
-X52 1 3 5 7 9 11 13 15 17 19 21 23 -X52 25 27 29 31 33 35 37 39 41 43 45 47
-W1 1 3 5 7 9 11 13 15 17 19 21 23 -W3 1 3 5 7 9 11 13 15 17 19 21 23
SUPERVISION CONSULTANT
D -Q52
-J2 -Q52
-J3 D
1 3 5 7 9 11 13 15 17 19 21 23 1 3 5 7 9 11 13 15 17 19 21 23
A1 A2 A3 A4 A5 B1 B2 B3 B4 B5 B6 Wc1 A1 A2 A3 A4 A5 A6 B1 B2 B3 B4 B5 B6
-S1 -S2 04 24.JAN.2018 REVISED AS PER COMMENT
A01 A02 A03 A04 A05 B01 B02 B03 B04 B05 B06 Wc01 A01 A02 A03 A04 A05 A06 B01 B02 B03 B04 B05 B06 03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
-J2 2 4 6 8 10 12 14 16 18 20 22 24 -J3 2 4 6 8 10 12 14 16 18 20 22 24 00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :
-X52 2 4 6 8 10 12 14 16 18 20 22 24 -X52 26 28 30 32 34 36 38 40 42 44 46 48
E
E
-X52 49 51 53 55 57 59 61 63
L13 L11 L14 L12 L9 L7 L10 L8 R8 R10 R7 R9 R12 R14 R11 R13 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
-KQ52 DRAWING TITLE:
/42.E3 L3 L4 L5 L6 R6 R5 R4 R3
WORK ES(-Q52) MECHANISM
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 37 OF 92 04
1 2 3 4 5 6 7 8
Project
LINE ES LINE ES MANUAL LINE ES
CLOSE OPEN OPERATION MOTOR OPERATION
A +CRP A
REMOTE_F2
/ 36.A6
(+)220V_F2 (+)220V_F2
/ 36.B6 / 40.A1
LOCAL_F2
/ 36.B6
B B
3 1
6T3 6T3
-KQ8C -KQ8T
/38.C2 5L3 /38.C2 5L3
EMPLOYER / DEVELOPER
C C
A1 A1
-KQ8C -KQ8T
CLOSE A2 OPEN A2
PROJECT MANAGER.
-J1 4 -J1 6 01
00
19.JUN.2017
01.SEP.2016
REVISED AS PER COMMENT
FOR APPROVAL
REV. DATE ISSUED TO / FOR :
-X8C 6
-X8C 4 CONTRACTOR: CONSORTIUM( KN / HHI )
44 14 14 4T2 4T2
(-)220V_F2 (-)220V_F2
/ 36.E6 / 40.E1
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 38 OF 92 04
1 2 3 4 5 6 7 8
Project
/57.D4
/38.C2
/38.C2
/38.C3
/38.C5
/57.B4
/38.E4
/38.E5
A A
-X8C 1 2 3 4 5 6 7 8 -XH 26 20
-W1 1 2 3 4 5 6 23 24 -W3 1 2
-Q8
-J1 1 2 3 4 5 6 -J1 23 24
-JA 1 2
B1 A5 c c
Reference DWG NO. DWG DATE REV.
-S1 -DS2 OPERATION -DS1
B B01 A05 d 1 d B
M1
-PS 1
OPERATION 2 M
-M -HT
DC220V,
2
1 210W
a M01
-DS1 -ILM
b DC220V, 2
5.94W,
9200 Ohm
EMPLOYER / DEVELOPER
C C
INTERLOCK WITH
LATCHED RELAY
LATCHED RELAY
FOR MULTIPLY
FOR MULTIPLY
OPEN/CLOSE
OPEN/CLOSE
INDICATION
INDICATION
/67.D4 REMOTE
/67.D5 REMOTE
PROJECT MANAGER.
Q9
/47.C2
/55.B3
/42.B5
/55.B3
/42.B5
-X8 1 3 5 7 9 11 13 15 -X8 17 19 21 23 25 27 29 31 33 35 37 39
SUPERVISION CONSULTANT
-W1 7 9 11 13 15 17 19 21 -W2 1 3 5 7 9 11 13 15 17 19 21 23
D D
-Q8 -Q8
-J1 7 9 11 13 15 17 19 21 -J2 1 3 5 7 9 11 13 15 17 19 21 23
-W1 8 10 12 14 16 18 20 22 -W2 2 4 6 8 10 12 14 16 18 20 22 24
E
E
-X8 2 4 6 8 10 12 14 16 -X8 18 20 22 24 26 28 30 32 34 36 38 40
-X8 41 43 45 47 49 51 53 55
L13 L11 L14 L12 L9 L7 L10 L8 R8 R10 R7 R9 R12 R14 R11 R13 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
-KQ8 DRAWING TITLE:
/42.E5 L3 L4 L5 L6 R6 R5 R4 R3
LINE ES(-Q8) MECHANISM
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 39 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
/ 38.B6
(+)220V_F2 (+)220V_F2 / 41.A1
-X0 74 106
-Q0(B)-J3 3 -J3 19
A3 B3
-S2
A03 B03
-J3 4 -J3 20
EMPLOYER / DEVELOPER
C -X0 75 107 C
-Q0(C)-J3 3 -J3 19
A3 B3
-S2
A03 B03 PROJECT MANAGER.
-J3 4 -J3 20
-X0 76 108
SUPERVISION CONSULTANT
D D
/ 38.E6
(-)220V_F2 (-)220V_F2 / 41.E1
L10 L10
R10 R6 /27.F3 R10 R6 /27.F5 MULTIPLY CONTACT
R8 R8
R9 R5 /27.F3 R9 R5 /27.F5 Drawing Number : PREPARED : F
F R7 R7 PK55-SD-EL-GS-14 K.H.SONG
R14 R4 /27.F3 R14 R4 /27.F5
MANUFACTURER/VENDER NAME R12 R12 ACTION Project No.: Scale : CHECKED :
R13 R3 /27.F3 R13 R3 /27.F5
A
008006400 S.Y.JANG
B
R11 R11 Sheet Size : Rev. : Plot Date: APPROVED :
C
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 40 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
/ 40.A6
(+)220V_F2 (+)220V_F2 / 42.A1
EMPLOYER / DEVELOPER
C C
PROJECT MANAGER.
SUPERVISION CONSULTANT
D D
E
(-)220V_F2 (-)220V_F2 E
/ 40.E6 / 42.E1
R13 R3 /29.F3 R13 R3 /31.F3 R13 R3 /33.F3 ACTION Project No.: Scale : CHECKED :
MANUFACTURER/VENDER NAME
R11 R11 R11 A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 41 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
/ 41.A6
(+)220V_F2 (+)220V_F2 / 43.B1
-X51 7 -X51 17 -X52 7 -X52 17 -X8 7 -X8 13 Reference DWG NO. DWG DATE REV.
EMPLOYER / DEVELOPER
C C
PROJECT MANAGER.
SUPERVISION CONSULTANT
D D
E
(-)220V_F2 (-)220V_F2 E
/ 41.E6 / 43.E1
Project
A A
DOUBLE
INTERLOCKING
/ 42.A6
(+)220V_F2 (+)220V_F2 / 44.B1
B =DMP1 B
13 53 53 53 53 53 53 53 53 53 53 53 53 4 3
-XS 3
-K201
13
-KQ1C -KQ1T -KQ2C -KQ2T -KQ8C -KQ8T -KQ9C -KQ9T -KQ51C -KQ51T -KQ52C -KQ52T -K203T
/43.E5 /28.C2
14 54/28.C2 54 /30.C2 54/30.C2 54 /38.C2 54/38.C2 54/32.C2 54 /32.C2 54 /34.C2 54/34.C2 54 /36.C2 54 /36.C2 54 /43.E2 1
-K213
=DMP1/47.E6 14
-XS 4
-XS 4
EMPLOYER / DEVELOPER
C C
43 PROJECT MANAGER.
-K201
/43.E5 44
13
-K202
/43.E2 14 SUPERVISION CONSULTANT
D D
=DMP1/47.B1
04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :
13 14 /43.B2
OPERATING CONDITION
21 22
31 32
F 43 44 /43.C2 Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 43 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
/ 43.B6
(+)220V_F2 (+)220V_F2 / 46.A1
EMPLOYER / DEVELOPER
C C
PROJECT MANAGER.
SUPERVISION CONSULTANT
D D
/ 43.E6
(-)220V_F2 (-)220V_F2 / 46.F1
13 14
DS/ES INCOMPLETE CONDITION
21 22
31 32
F 43 44 Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 44 OF 92 04
1 2 3 4 5 6 7 8
Project
/ 21.C1
CB INT.1 / 21.C2
CB INT(CRP).1
-XS 12
-X1 1 -X2 1
-XS 11
-Q1 -J2 1 -Q2 -J2 1
A1 A1
-S1 -S1 Reference DWG NO. DWG DATE REV.
A01 A01
B B
-J2 2 -J2 2
13
-X1 29 -X2 29 -X1 2 -X2 2
-KLR -Q1 -J3 5 -Q2 -J3 5
/47.E5 -X9 1
14 A3 A3
-Q9 -J2 1
-S2 -S2 A1
A03 A03 -S1
-J3 6 -J3 6 A01
-X1 30 -X2 30 -X51 25
-J2 2
-Q51-J3 1
-X9 29 A1
-X9 2
-Q9 -J3 5
-S2 EMPLOYER / DEVELOPER
A3
A01
C -S2 C
-J3 2
A03
-X51 26
-J3 6
-X52 25
-X9 30
-Q52-J3 1
PROJECT MANAGER.
A1
-S2
A01
-J3 2
-X52 26
SUPERVISION CONSULTANT
D D
E
E
-XS 50
/ 21.C1
CB INT.2 / 21.C2
CB INT(CRP).2
INTERLOCK (CB)
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 45 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
(+)220V_F2 (+)220V_F2
/ 44.B6 / 47.A1
-XS 13 -XS 22
E
E
A1 A1
-KL1 -KL2
INTERLOCK A2 INTERLOCK A2
(-)220V_F2 (-Q1) (-Q2) (-)220V_F2
/ 44.E6 / 47.E1
1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
DRAWING TITLE:
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 46 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
LINE DS(-Q9) INTERLOCK WORK ES(-Q51, -Q52) INTERLOCK LINE ES(-Q8) INTERLOCK INTERLOCK RELEASE
(+)220V_F2
/ 46.A7
-XS 32
-XS 40
-XS 33
+REMOTE
SUPERVISION CONSULTANT
VOLTAGE
DEAD
D D
-XS 35 -XS 41
-XS 36
-XS 42
04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
-XS 43 01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :
E A1 A1 A1 A1 A1
E
-KL9 -KL51 -KL8 -KLR -KD2
INTERLOCK A2 INTERLOCK A2 INTERLOCK A2 INTERLOCK A2 DS/ES A2
(-Q9) (-Q51,-Q52) (-Q8) RELEASE MOTOR &
(-)220V_F2 INTERLOCK
/ 46.F7
SUPPLY
13 14 /45.B2 14 11 /64.C4
13 14 13 14 13 14
12
23 24 23 24 23 24 /46.C1
23 24 24 21
33 34 /46.C4 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
33 34 33 34 33 34 22
44 43 /34.E3 44 43 /38.E3 43 44 /47.B1 34 31 /68.D5 DRAWING TITLE:
44 43 /32.E3
34 34 /36.E3 53 54 /47.B3 32
63 64 /47.B4 44 41 INTERLOCK (LINE DS/ES)
73 74 /59.B5 42
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 47 OF 92 04
1 2 3 4 5 6 7 8
Project
C C
PROJECT MANAGER.
SUPERVISION CONSULTANT
D D
A1 A1 A1 A1
-KG0.1 -KG0.2 -KG0.2A -KG0.2B
CB GAS A2 CB GAS A2 CB GAS LEAK A2 CB GAS LEAK A2
E PRESSURE PRESSURE STAGE2 STAGE2
E
STAGE 1 STAGE 2
/ 18.E2
(-)220V_F1 (-)220V_F1 / 49.E1
13 14 /60.B4 13 14 /61.B5 13 14 13 14
21 22 21 22 /21.D3 21 22 /22.D3 21 22 /23.D3
1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
31 32 31 32 /21.D4 31 32 /22.D4 31 32 /23.D4
43 44 /69.B2 43 44 /69.E2 43 44 43 44 DRAWING TITLE:
53 54 53 54 53 54 53 54
GAS MONITORING
61 62 61 62 /21.D5 61 62 /22.D5 61 62 /23.D5
71 72 71 72 71 72 71 72
F 83 84 81 82 81 82 81 82 Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 48 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE
LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2
(G01-01A) (G01-01B) (G01-01C) (G01-02A) (G01-02B) (G01-02C)
/ 48.B6
(+)220V_F1 (+)220V_F1 / 50.B1
-XG 7 8 9 10 11 12 13 14 15 16 17 18
Reference DWG NO. DWG DATE REV.
-W4 1 3 -W5 1 3 -W6 1 3 -W7 1 3 -W8 1 3 -W9 1 3
B B
-XG 67 70 68 71 69 72 73 76 74 77 75 78
EMPLOYER / DEVELOPER
C C
PROJECT MANAGER.
SUPERVISION CONSULTANT
D D
A1 A1 A1 A1
-KG1.1 -KG1.2 -KG2.1 -KG2.2
01 GAS A2 01 GAS A2 02 GAS A2 02 GAS A2
E PRESSURE PRESSURE PRESSURE PRESSURE
E
STAGE 1 STAGE 2 STAGE 1 STAGE 2
/ 48.E6
(-)220V_F1 (-)220V_F1 / 50.E1
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 49 OF 92 04
1 2 3 4 5 6 7 8
Project
SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE
LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2
(G01-03A) (G01-03B) (G01-03C) (G01-04A) (G01-04B) (G01-04C)
/ 49.B6
(+)220V_F1 (+)220V_F1 / 51.B1
-XG 19 20 21 22 23 24 25 26 27 28 29 30
Reference DWG NO. DWG DATE REV.
-W10 1 3 -W11 1 3 -W12 1 3 -W13 1 3 -W14 1 3 -W15 1 3
B B
-XG 79 82 80 83 81 84 85 88 86 89 87 90
EMPLOYER / DEVELOPER
C C
PROJECT MANAGER.
SUPERVISION CONSULTANT
D D
A1 A1 A1 A1
-KG3.1 -KG3.2 -KG4.1 -KG4.2
03 GAS A2 03 GAS A2 04 GAS A2 04 GAS A2
E PRESSURE PRESSURE PRESSURE PRESSURE
E
STAGE 1 STAGE 2 STAGE 1 STAGE 2
/ 49.E6
(-)220V_F1 (-)220V_F1 / 51.E1
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 50 OF 92 04
1 2 3 4 5 6 7 8
Project
SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE
LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2
(G01-05A) (G01-05B) (G01-05C) (G01-06A) (G01-06B) (G01-06C)
/ 50.B6
(+)220V_F1 (+)220V_F1 / 52.B1
-XG 31 32 33 34 35 36 37 38 39 40 41 42
Reference DWG NO. DWG DATE REV.
-W16 1 3 -W17 1 3 -W18 1 3 -W19 1 3 -W20 1 3 -W21 1 3
B B
EMPLOYER / DEVELOPER
C C
PROJECT MANAGER.
SUPERVISION CONSULTANT
D D
A1 A1 A1 A1
-KG5.1 -KG5.2 -KG6.1 -KG6.2
05 GAS A2 05 GAS A2 06 GAS A2 06 GAS A2
E PRESSURE PRESSURE PRESSURE PRESSURE
E
STAGE 1 STAGE 2 STAGE 1 STAGE 2
/ 50.E6
(-)220V_F1 (-)220V_F1 / 52.E1
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 51 OF 92 04
1 2 3 4 5 6 7 8
Project
SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE
LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2
(G01-07A) (G01-07B) (G01-07C) (G07-08A) (G01-08B) (G01-08C)
/ 51.B6
(+)220V_F1 (+)220V_F1 / 53.B1
-XG 43 44 45 46 47 48 49 50 51 52 53 54
Reference DWG NO. DWG DATE REV.
-W22 1 3 -W23 1 3 -W24 1 3 -W25 1 3 -W26 1 3 -W27 1 3
B B
-XG 103 106 104 107 105 108 109 112 110 113 111 114
EMPLOYER / DEVELOPER
C C
PROJECT MANAGER.
SUPERVISION CONSULTANT
D D
A1 A1 A1 A1
-KG7.1 -KG7.2 -KG8.1 -KG8.2
07 GAS A2 07 GAS A2 08 GAS A2 08 GAS A2
E PRESSURE PRESSURE PRESSURE PRESSURE
E
STAGE 1 STAGE 2 STAGE 1 STAGE 2
/ 51.E6
(-)220V_F1 (-)220V_F1 / 53.E1
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 52 OF 92 04
1 2 3 4 5 6 7 8
Project
/ 52.B6
(+)220V_F1 (+)220V_F1 / 54.B1
EMPLOYER / DEVELOPER
C C
PROJECT MANAGER.
SUPERVISION CONSULTANT
D D
A1 A1
-KG9.1 -KG9.2
E 09 GAS A2 09 GAS A2 E
PRESSURE PRESSURE
STAGE 1 STAGE 2
/ 52.E6
(-)220V_F1 (-)220V_F1 / 54.E1
14 11 /61.B5 14 11 /62.B6
12 12
24 21 /69.B6 24 21 /69.E6 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
22 22 DRAWING TITLE:
34 31 34 31
32 32 GAS MONITORING
44 41 44 41
42 42
F Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 53 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
/ 53.B6
(+)220V_F1 (+)220V_F1 / 55.B1
-X0 69 101
-X1 3 -X1 13 -X2 3 -X2 13 -X9 3 13 -X51 3 -X51 13
-Q0(A)-J3 1 -J3 17 -Q1 -J2 3 -J2 13 -Q2 -J2 3 -J2 13 -Q9 -J2 3 -J2 17 -Q51-J2 3 -J2 13 Reference DWG NO. DWG DATE REV.
1 A2 B2 A2 B2 A2 B2 A2 B2 A2 B2
B -S4 -S2 -S1 -S1 -S1 -S1 B
CLOSE 2 A02 B02 A02 B02 A02 B02 A02 B02 A02 B02
/75.D2 -J3 -J3
2 18 -J2 4 -J2 14 -J2 4 -J2 14 -J2 4 -J2 18 -J2 4 -J2 14
-XS 51 -X0 70 102
-X1 4 -X1 14 -X2 4 -X2 14 -X9 4 14 -X51 4 -X51 14
-Q0(B)-J3 1 -J3 17
A2 B2
-S2
A02 B02
-J3 2 -J3 18
-X0 71 103
EMPLOYER / DEVELOPER
-Q0(C)-J3 1 -J3 17
C A2 B2 C
-S2
A02 B02
-J3 2 -J3 18
SUPERVISION CONSULTANT
D D
(+)220V_F1_1/ 55.D1
-XS 52
GREEN
GREEN
GREEN
GREEN
RED
RED
RED
RED
RED
A1 A1 X2 X1 X2 X1 X2 X1 X2 X1 X2 X1
-K11 -K11.1
-LQ0 -LQ1 -LQ2 -LQ9 -LQ51
HK-DSPI-GR-220V/S HK-DSPI-GR-220V/R HK-DSPI-GR-220V/R HK-DSPI-GR-220V/R HK-DSPI-GR-220V/R
LAMP TEST A2 LAMP TEST A2 X0 X0 X0 X0 X0
E
E
/ 53.E6
(-)220V_F1 -XS 53 (-)220V_F1 / 55.E1
13 14 /54.D2 13 14 /54.D6
23 24 /54.D3 23 24 /54.D6
1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
33 34 /54.D3 33 34 /55.D2
DRAWING TITLE:
43 44 /54.D4 43 44 /55.D2
53 54 /54.D4 53 54 /55.D3 POSITION INDICATOR
63 64 /54.D5 63 64 /55.D3
73 74 /54.D5 73 74 /56.D2
F Drawing Number : PREPARED : F
83 84 /54.D5 83 84 PK55-SD-EL-GS-14 K.H.SONG
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 54 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
/ 54.B7
(+)220V_F1 (+)220V_F1 / 58.B1
EMPLOYER / DEVELOPER
C C
PROJECT MANAGER.
SUPERVISION CONSULTANT
D D
/ 54.D7
(+)220V_F1_1
33 43 53 63
04 24.JAN.2018 REVISED AS PER COMMENT
-K11.1 03
02
10.AUG.2017
09.AUG.2017
REVISED AS PER COMMENT
REVISED AS PER COMMENT
/54.E2 34 44 54 64 01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :
GREEN
RED
RED
X2 X1 X2 X1
-LQ52 -LQ8
HK-DSPI-GR-220V/R HK-DSPI-GR-220V/R
X0 X0
E
E
/ 54.E7
(-)220V_F1 (-)220V_F1 / 58.E1
POSITION INDICATOR
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 55 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
LIGHTING
HEATER CONTROL CB(-Q0)
DOOR RIGHT DOOR LEFT
/ 20.E1
A220V_F1 A220V_F1 / 57.A1
-XH 1 -XH 2
13 23 33
Reference DWG NO. DWG DATE REV.
-KHTS -KHTS -KHTS
B /56.D3 14 /56.D3 24 /56.D3 34 B
NC NO NC NO
COM
-DS1 -DS2
COM COM
-XH 9 -XH 10 -XH 11
AUTO
MANUAL
OFF
COM -Q0(A) -Q0(B) -Q0(C)
X1 -TH Θ
-S5 SET : 5°C Θ -HTS -JA 1 -JA 1 -JA 1
SET : 80% NC
ON
X2
EMPLOYER / DEVELOPER
C C
1 1 1
73
-XH 12 -XH 13 -XH 14 SUPERVISION CONSULTANT
-K11.1
D /54.E2 74 -XH 5
D
1 1
1
A1 A1
-IL1 -IL2 -HT
AC220V, 100W -KHTS -KHTS1 04 24.JAN.2018 REVISED AS PER COMMENT
10W 10W 03 10.AUG.2017 REVISED AS PER COMMENT
2 HEATER A2 HEATER A2 02 09.AUG.2017 REVISED AS PER COMMENT
2 2 OPERATING OPERATING 01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :
/ 20.E2
N220V_F1 N220V_F1 / 57.E1
E
E
13 14 /56.B5 13 14 /57.B4
23 24 /56.B5 23 24
1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
33 34 /56.B6 33 34
DRAWING TITLE:
43 44 /57.B1 43 44
53 54 /57.B2 HEATER CONTROL
63 64 /57.B2
73 74 /57.B3
F Drawing Number : PREPARED : F
83 84 /57.B3 PK55-SD-EL-GS-14 K.H.SONG
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 56 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
/ 56.A6
A220V_F1 A220V_F1 / 58.B1
EMPLOYER / DEVELOPER
C 1 1 1 C
1 1 1
-HT -HT -HT
-HT -HT -HT /35.B5 /37.B6 /39.B5
/29.B5 /31.B6 /33.B5 2 2 2
2 2 2 AC220V AC220V AC220V
AC220V AC220V AC220V
HEATER HEATER HEATER
MECHANISM HEATER MECHANISM PROJECT MANAGER.
MECHANISM MECHANISM MECHANISM
/29.B5 MECHANISM /33.B5
/35.B5 /37.B6 /39.B5
/31.B6
D D
/ 56.E6
N220V_F1 N220V_F1 / 58.E1
E
E
HEATER CONTROL
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 57 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
/ 55.B6
(+)220V_F1 (+)220V_F1
/ 65.A3
/ 57.A6
A220V_F1
Reference DWG NO. DWG DATE REV.
B B
-XD 19 -XA 13
-H1
1+ 2L
EMPLOYER / DEVELOPER
C C
SUPPLY 1 INPUT
SUPPLY 2 INPUT
L L
R1 R2 FC GP HNA HNB
1- 2N SUPERVISION CONSULTANT
S1R S1RC S2R S2RC A B
FG
ANN1.1
ANN1.2
ANN1.2
-XD 20 -XA 14 04
03
24.JAN.2018
10.AUG.2017
REVISED AS PER COMMENT
REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
64.C5 64.D5 64.C2 64.D2 01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :
A1
CONTRACTOR: CONSORTIUM( KN / HHI )
-KA1
HEATER & A2
ANN.
E
E
/ 55.E6
(-)220V_F1 (-)220V_F1
/ 65.B3
/ 57.E6
N220V_F1
14 11 /64.C1
12
24 21 /68.D2 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
22 DRAWING TITLE:
34 31
32 ANNUNCIATOR (H1)
44 41
42
F Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 58 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
DS/ES MOTOR
CB MOTOR LONG CB MOTOR OVER CB MOTOR SPRING DS/ES SWITCHING INTERLOCK BY-PASS AC SUPPLY MCB
POLE DISCREPANCY RUNNING TIME
RUN AND STOP LOAD AND STOP UNCHARGED/LOCK INCOMPLETE ON TRIP/OFF
EXCEEDED
AC_MCB
64.B2
EMPLOYER / DEVELOPER
-XA1 1 -XA1 2 -XA1 3 -XA1 4 -XA1 51 -XA1 5 -XA1 6 -XA1 7 -XA1 8 -XA1 9 -XA1 10
C C
-H1 1C 11 22 33 44 5C 51 62 73 84
PROJECT MANAGER.
D D
1R1 1RC 2R2 2RC 3R3 3RC 4R4 4RC 5R1 5RC 6R2 6RC 7R3 7RC 8R4 8RC 04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :
-XA2 1 2 -XA2 3 -XA2 4 -XA2 5 -XA2 6 -XA2 7 -XA2 8 -XA2 9 CONTRACTOR: CONSORTIUM( KN / HHI )
E
E
+SPARE
ANNUNCIATOR (H1)
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 59 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
DC SUPPLY MCB 220VDC SUPPLY 1 220VDC SUPPLY 2 G01-00 GAS LOW 1 G01-01 GAS LOW 1 G01-02 GAS LOW 1 G01-03 GAS LOW 1
AC SUPPLY FAIL
TRIP/OFF FAIL FAIL (ALARM) (ALARM) (ALARM) (ALARM)
B B
DC_MCB AC DC_1 DC_2
64.B4 64.E1 64.E3 64.E6 13 12 14 12 14 12 14
-KG0.1 -KG1.1 -KG2.1 -KG3.1
/48.E3 14 /49.E3 /49.E5 /50.E3
11 11 11
-XA1 11 -XA1 12 -XA1 13 -XA1 14 -XA1 15 -XA1 16 -XA1 17 -XA1 18 -XA1 19 -XA1 20 EMPLOYER / DEVELOPER
C C
PROJECT MANAGER.
D D
9R1 9RC 10R2 10RC 11R3 11RC 12R4 12RC 13R1 13RC 14R2 14RC 15R3 15RC 16R4 16RC 04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :
-XA2 10 11 -XA2 12 -XA2 13 -XA2 14 -XA2 15 -XA2 16 -XA2 17 -XA2 18 CONTRACTOR: CONSORTIUM( KN / HHI )
E
E
+SPARE
ANNUNCIATOR (H1)
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 60 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
G01-04 GAS LOW 1 G01-05 GAS LOW 1 G01-06 GAS LOW 1 G01-07 GAS LOW 1 G01-08 GAS LOW 1 G01-09 GAS LOW 1 G01-00 GAS LOW 2 G01-01 GAS
(ALARM) (ALARM) (ALARM) (ALARM) (ALARM) (ALARM) (LOCKOUT) LOW 2
B B
12 14 12 14 12 14 12 14 12 14 12 14 13 12 14
-KG4.1 -KG5.1 -KG6.1 -KG7.1 -KG8.1 -KG9.1 -KG0.2 -KG1.2
/50.E5 /51.E3 /51.E5 /52.E3 /52.E6 /53.E4 /48.E4 14 /49.E3
11 11 11 11 11 11 11
EMPLOYER / DEVELOPER
-XA1 21 -XA1 22 -XA1 23 -XA1 24 -XA1 25 -XA1 26 -XA1 27 -XA1 28 -XA1 29 -XA1 30
C C
-H1 17C 171 182 193 204 21C 211 222 233 244
PROJECT MANAGER.
D D
17R1 17RC 18R2 18RC 19R3 19RC 20R4 20RC 21R1 21RC 22R2 22RC 23R3 23RC 24R4 24RC 04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :
-XA2 19 20 -XA2 21 -XA2 22 -XA2 23 -XA2 24 -XA2 25 -XA2 26 -XA2 27 CONTRACTOR: CONSORTIUM( KN / HHI )
E
E
+SPARE
ANNUNCIATOR (H1)
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 61 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
G01-02 GAS G01-03 GAS G01-04 GAS G01-05 GAS G01-06 GAS G01-07 GAS G01-08 GAS G01-09 GAS
LOW 2 LOW 2 LOW 2 LOW 2 LOW 2 LOW 2 LOW 2 LOW 2
B B
12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14
-KG2.2 -KG3.2 -KG4.2 -KG5.2 -KG6.2 -KG7.2 -KG8.2 -KG9.2
/49.E6 11 /50.E3 11 /50.E6 11 /51.E3 11 /51.E6 11 /52.E4 11 /52.E6 11 /53.E5 11
EMPLOYER / DEVELOPER
-XA1 31 -XA1 32 -XA1 33 -XA1 34 -XA1 35 -XA1 36 -XA1 37 -XA1 38 -XA1 39 -XA1 40
C C
-H1 25C 251 262 273 284 29C 291 302 313 324
PROJECT MANAGER.
D D
25R1 25RC 26R2 26RC 27R3 27RC 28R4 28RC 29R1 29RC 30R2 30RC 31R3 31RC 32R4 32RC 04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :
-XA2 28 29 -XA2 30 -XA2 31 -XA2 32 -XA2 33 -XA2 34 -XA2 35 -XA2 36 CONTRACTOR: CONSORTIUM( KN / HHI )
E
E
+SPARE
ANNUNCIATOR (H1)
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 62 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
B B
EMPLOYER / DEVELOPER
C -XA1 41 -XA1 42 -XA1 43 -XA1 44 -XA1 45 -XA1 46 -XA1 47 -XA1 48 -XA1 49 -XA1 50 C
-H1
33C 331 342 353 364 37C 371 382 393 404
PROJECT MANAGER.
D D
E
E
+SPARE
ANNUNCIATOR (H1)
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 63 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
-F8A1 -F8A2 -F8D1 -F8D2 -F8D3 -F8D4 -F8D5 -F8D6 -F8D7 Reference DWG NO. DWG DATE REV.
ANN1.2
PROJECT MANAGER.
58.D3
12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14
-KA1 58.D3 -KA2 -KA3 -KA4 -KD1 -KD2 -KD3 -KD4 -KD6 -KD7 ANN1.1 -KD5
/58.E6 /20.D3 /22.E7 11 /24.E7 11 /25.E7 58.D3 /23.E7
11 ANN1.2 11 /20.D5 11 /20.D6 11 /66.B6 11 /47.E6 11 /21.E7 11 11 11
58.D3
ANN1.1
SUPERVISION CONSULTANT
-XA1 66 -XA1 67 -XA1 76 -XA1 77 -XA1 78 -XA1 68 -XA1 69 -XA1 70 -XA1 71 -XA1 72 -XA1 73 -XA1 74 -XA1 75
D D
E
E
ANNUNCIATOR (H1)
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 64 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
(+)220V_F1
(-)220V_F1
/ 58.B6
/ 58.E6
66.A2 /
(+)220V_F1
66.A2 /
B (-)220V_F1 B
7 8 7 8 7 8
16 16 16
15 1 15 1 15 1 EMPLOYER / DEVELOPER
C 14 2 14 2 14 2 C
13 3 13 3 13 3
12 4 12 4 12 4 PROJECT MANAGER.
11 5 11 5 11 5
-TT1
D
8 7
9 9 9
SUPERVISION CONSULTANT
IA_M E
10 9
/ 71.E1 10 10 10
D F
12 11 D
IB_M 14
G 13
/ 71.E2
04 24.JAN.2018 REVISED AS PER COMMENT
16 15 03 10.AUG.2017 REVISED AS PER COMMENT
H 02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
IC_M 18
I 17 6 6 6
REV. DATE ISSUED TO / FOR :
/ 71.E3
CONTRACTOR: CONSORTIUM( KN / HHI )
IN_M
/ 71.E2
E
E
-XM 1 2 3 4
=CONTROL PNL
METERING (1)
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 65 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
(+)220V_F1
(-)220V_F1
/ 65.B6
/ 65.B6
A1
-KD1
SIGNAL LAMP A2
& ALARM
SUPPLY
Reference DWG NO. DWG DATE REV.
2
14
3
13 EMPLOYER / DEVELOPER
4
C 12 /76.B2 C
5 -S12 -TT1
11
2 1 1 2
A
9
PROJECT MANAGER.
3 4
/76.B3
B
10
6 5
/76.B3
SUPERVISION CONSULTANT
10 9
5 6
/76.B3
C
D 14 13 D
/76.B3
18 17
04 24.JAN.2018 REVISED AS PER COMMENT
19 20 03 10.AUG.2017 REVISED AS PER COMMENT
/76.B3
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 66 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
-Q0(A) -J2 5 -J2 17 -Q0(B) -J2 5 -J2 17 -Q0(C) -J2 5 -J2 17 -Q1 -J2 5 -J2 15 -Q2 -J2 5 -J2 15
A6 B7 A6 B7 A6 B7 A3 B3 A3 B3
-J2 6 -J2 18 -J2 6 -J2 18 -J2 6 -J2 18 -J2 6 -J2 16 -J2 6 -J2 16
B B
=CRP
SELECTOR SWITCH
LINE ES(-Q9) WORK ES(-Q51) WORK ES(-Q52) LINE ES(-Q8) LOCAL REMOTE
EMPLOYER / DEVELOPER
C C
-Q9 -J2 5 -J2 13 -Q51 -J2 5 -J2 15 -Q52 -J2 5 -J2 15 -Q8 -J1 11 -J1 17
A3 B3 A3 B3 A3 B3 A3 B3 13 15
-S1 -S1 -S1 -S1 -S1 -S11 REMOTE
A03 B03 A03 B03 A03 B03 A03 B03 LOCAL 14/75.B3 16 PROJECT MANAGER.
-J1 /75.B3
-J2 6 -J2 14 -J2 6 -J2 16 -J2 6 -J2 16 -J1 12 18
SUPERVISION CONSULTANT
D D
=CRP
E A4 B4 A4 B4
E
-S1 -S1 -S1 -S1
A04 B04 A04 B04
-X1 7 8 17 18 -X2 7 8 17 18
REMOTE
=REMOTE
F Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 67 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
CB MOTOR DS/ES MOTOR DS/ES
CB MOTOR CB MOTOR SPRING POLE RUNNING DS/ES SWITCH INTERLOCK SWITCH
LONG RUN & STOP
OVER LOAD CHARGING DESCRIPANCY TIME INCOMPLTE RELEASE INCOMPLETE FAIL
FAULTY EXCEEDED
53 23 23 53 53 33 7 83 7
-K103 -K49 -K104 -K47A -K47B -K203 -K205 -KLR -K204 Reference DWG NO. DWG DATE REV.
EMPLOYER / DEVELOPER
=CRP
C C
PROJECT MANAGER.
AC SUPPLY DC SUPPLY
FAIL FAIL
SUPERVISION CONSULTANT
21 21 21 21 21 21 21 21 21
22 24 22 24 22 24 22 24 32 34 32 34 32 34 32 34 32 34 32 34 32 34
-F8A1 -F8A2 -F8D1 -F8D2 -F8D3 -F8D4 -F8D5 -F8D6 -F8D7
D /20.C1 /20.C4
-KA1 -KA2 -KA3 -KA4 /18.C2 /18.C3 /18.C4 /18.C6 /19.C2 /19.C4 /19.C5
-KD1 -KD2 -KD3 -KD4 -KD5 -KD6 -KD7 D
22 22 /58.E6 22 22 22 22 22 22 22/66.B6
21/20.D3 21/20.D5 21/20.D6 21 /47.E6
31 /21.E7
31 /22.E7
31 /23.E7
31 31/24.E7 31 /25.E7 31
REMOTE
E
E
REMOTE
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 68 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
-XR1 64 65 66 67 68 69 70 71 72 73 74
EMPLOYER / DEVELOPER
C =CRP C
PROJECT MANAGER.
SUPERVISION CONSULTANT
GAS6 GAS PRESSURE
LOW STAGE 2
D D
E
E
-XR1 75 76 77 78 79 80 81 82 83 84 85
REMOTE
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 69 OF 92 04
1 2 3 4 5 6 7 8
Project
A T1-C1 T1-C2 A
-T1(C1) -T1(C2)
Reference DWG NO. DWG DATE REV.
P1 P2 P1 P2
B B
AΦ A
/ 71.B1
S1 S2 S3 S1 S2 S3
CB SIDE
P1 P2 P1 P2
BΦ B
/ 71.B1
S1 S2 S3 S1 S2 S3
CB SIDE
P1 P2 P1 P2
CΦ C
/ 71.C1
S1 S2 S3 S1 S2 S3
CB SIDE
EMPLOYER / DEVELOPER
C C
-CTB1(A) -CTB1(B) -CTB1(C) -CTB1(A) -CTB1(B) -CTB1(C)
1 2 3 1 2 3 1 2 3 4 5 6 4 5 6 4 5 6
SUPERVISION CONSULTANT
-XC1 1 2 3 -XC1 4 5 6 -XC1 7 8 9 -XC1 10 11 12 -XC1 13 14 15 -XC1 16 17 18
D D
1 2
-XC2 -XC2
04 24.JAN.2018 REVISED AS PER COMMENT
-E -E 03
02
10.AUG.2017
09.AUG.2017
REVISED AS PER COMMENT
REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :
E
E
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 70 OF 92 04
1 2 3 4 5 6 7 8
Project
A T1-C3 T1-C4 A
-T1(C3) -T1(C4)
Reference DWG NO. DWG DATE REV.
P1 P2 P1 P2
B B
A A
/ 70.B6 / 72.B2
S1 S2 S3 S1 S2 S3
P1 P2 P1 P2
B B
/ 70.B6 / 72.B2
S1 S2 S3 S1 S2 S3
P1 P2 P1 P2
C C
/ 70.C6 / 72.C2
S1 S2 S3 S1 S2 S3
EMPLOYER / DEVELOPER
C C
-CTB1(A) -CTB1(B) -CTB1(C) -CTB1(A) -CTB1(B) -CTB1(C)
7 8 9 7 8 9 7 8 9 10 11 12 10 11 12 10 11 12
D D
3 4
-XC2 -XC2
04 24.JAN.2018 REVISED AS PER COMMENT
-E -E 03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :
E
E
CURRENT TRANSFORMER
METERING
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 71 OF 92 04
1 2 3 4 5 6 7 8
Project
A T1-C5 A
CLASS : 5P30, 60-30VA
TAP RATIO
S1-S3 1600A/1A
S1-S2 800A/1A
-T1(C5)
Reference DWG NO. DWG DATE REV.
P1 P2
AΦ
B A B
/ 71.B6
S1 S2 S3
LINE SIDE
P1 P2 BΦ
B
/ 71.B6
S1 S2 S3
LINE SIDE
P1 P2 CΦ
C
/ 71.C6
S1 S2 S3
LINE SIDE
EMPLOYER / DEVELOPER
D 5 D
-XC2
E
E
CURRENT TRANSFORMER
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 72 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
SELECTOR SWITCH
PULLING TURN &
AUTOMATIC
RETURN,
CLOSE
CLOSE
CLOSE
OPEN
OPEN
OPEN
HANDLE-PISTOL,
COLOR-RED
OPEN CLOSE
1 3 5 7 9 11
1 3 5 7 9 11 OPEN
YSDNC3305-64RP20R
-SQ0
CB CLOSE
2 4 6 8 10 12 2 4 6 8 10 12
-Q0
/22.B1
/21.B1
/23.B1
Reference DWG NO. DWG DATE REV.
OPEN/CLOSE
B B
SELECTOR SWITCH
PULLING TURN &
AUTOMATIC
CLOSE
CLOSE
OPEN
OPEN
RETURN,
HANDLE-EGG CLOSE
OPEN 1 3 5 7
1 3 5 7 OPEN
EMPLOYER / DEVELOPER
YSDNC3205-64RE20B -SQ1
CLOSE
C BUS DS 2 4 6 8 2 4 6 8 C
/28.B2
/28.B2
-Q1
OPEN/CLOSE
PROJECT MANAGER.
SELECTOR SWITCH
PULLING TURN &
AUTOMATIC SUPERVISION CONSULTANT
CLOSE
CLOSE
OPEN
OPEN
RETURN,
HANDLE-EGG OPEN CLOSE
1 3 5 7
D 1 3 5 7 OPEN D
YSDNC3205-64RE20B
-SQ2
CLOSE
2 4 6 8 2 4 6 8
BUS DS
/30.B2
/30.B2
SELECTOR SWITCH
E PULLING TURN & E
AUTOMATIC
CLOSE
CLOSE
OPEN
OPEN
RETURN,
HANDLE-EGG OPEN CLOSE
1 3 5 7
1 3 5 7 OPEN
YSDNC3205-64RE20B -SQ9
CLOSE
2 4 6 8 2 4 6 8
LINE DS
/32.B2
/32.B2
SWITCH
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 73 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
SELECTOR SWITCH
PULLING TURN &
AUTOMATIC
CLOSE
CLOSE
OPEN
OPEN
RETURN,
HANDLE-EGG CLOSE
OPEN 1 3 5 7
1 3 5 7 OPEN
Reference DWG NO. DWG DATE REV.
YSDNC3205-64RE20B -SQ51
CLOSE
B 2 4 6 8 2 4 6 8 B
WORK ES
/34.B2
/34.B2
-Q51
OPEN/CLOSE
SELECTOR SWITCH
PULLING TURN &
AUTOMATIC
CLOSE
CLOSE
OPEN
OPEN
RETURN, EMPLOYER / DEVELOPER
HANDLE-EGG CLOSE
OPEN 1 3 5 7
C C
1 3 5 7 OPEN
YSDNC3205-64RE20B -SQ52
CLOSE
WORK ES 2 4 6 8 2 4 6 8
/36.B2
/36.B2
-Q52
OPEN/CLOSE PROJECT MANAGER.
CLOSE
OPEN
OPEN
D RETURN, D
HANDLE-EGG CLOSE
OPEN 1 3 5 7
1 3 5 7 OPEN
/38.B2
E
E
SWITCH
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 74 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
SELECTOR SWITCH
WITH KEY
MANUAL RETURN
REMOTE
REMOTE
REMOTE
REMOTE
REMOTE
REMOTE
REMOTE
REMOTE
WITH KEY
LOCAL
LOCAL
LOCAL
LOCAL
LOCAL
LOCAL
LOCAL
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31
YSKDNC2801-79M20L LOCAL REMOTE
LOCAL Reference DWG NO. DWG DATE REV.
LOCAL - REMOTE (Key removable
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 position)
REMOTE
B SELECTOR B
-S11 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32
2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32
/18.E3
/18.E3
/18.E4
/18.E5
/18.E6
/18.E6
/67.C5
/67.C6
/47.B5
/19.D2
/19.D2
INTERLOCK
LOCK
LOCK
1NC 2NO 2NC LOCK
USE
USE
1 2
KGK-J2R1A KGS-C2M2
INTERLOCK RELEASE LOCK RELEASE LOCK USE EMPLOYER / DEVELOPER
3 4
1 3 (Key removable 1 3 5 7
INTERLOCK 1 2 CB MOTOR 5 6
C position) C
RELEASE -S3 3 4 OPERATION -S1
7 8
2 4 2 4 6 8
/47.B5
/24.B1
PROJECT MANAGER.
RESET
RESET
OPEN
SET
SET
1 2
KGF-CM1B CLOSE OPEN KGF-CM2R 3 4
1 3 1 2 1 3 5 7
D LAMP TEST 5 6 D
-S4 3 4 CB MOTOR LONG -S2
7 8
2 4 RUN RESET 2 4 6 8
/54.B1
/24.B5
04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :
CLOSE
OPEN
CLOSE OPEN
1NO 1NC, YELLOW
LED 1 2
3 4
E 1 3 X1
KGX-CMV21Y E
-S5 X1 X2
HEATER TEST
2 4 X2
/56.C3
/56.C3
/56.C3
SWITCH
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 75 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
SELECTOR SWITCH
MANUAL RETURN,
HANDLE-CHRYSANTHEMUM,
COLOR-BLACK
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
1 3 5 7 9 11 13 15 17 19 21 23
YSDNC7602-64MR20B OFF
N
C
C
B
B
A
CA Reference DWG NO. DWG DATE REV.
OFF-AB-BC-CA-AN-BN-CN AB
1 3 5 7 9 11 13 15 17 19 21 23 BC AN
B SELECTOR B
BC
-S12
AB BN CA
2 4 6 8 10 12 14 16 18 20 22 24
/66.C3
AN
/66.D3
/66.D3
/66.D3
/66.D3
/66.D3
OFF CN BN
CN
2 4 6 8 10 12 14 16 18 20 22 24
EMPLOYER / DEVELOPER
C C
PROJECT MANAGER.
SUPERVISION CONSULTANT
D D
E
E
SWITCH
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 76 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
PARTS LIST
ANNUNCIATOR UC625-40YW-HH-024D-R-M3
-H1 40CHANNEL RTK United Kingdom /58.C1
ANNUNCIATOR (1)
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 77 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
PARTS LIST
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 78 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
PARTS LIST
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 79 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
PARTS LIST
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 80 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
PARTS LIST
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 81 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
PARTS LIST
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 82 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
PARTS LIST
OUTLET AC_OUTLET(1Ph)
-SOCKET(1-PH) OUTLET (220Vac, 16A, - 772 13) LEGRAND FRANCE /20.D4 EMPLOYER / DEVELOPER
C AC_OUTLET(3Ph) C
OUTLET
-SOCKET(3-PH) OUTLET (380Vac, 32A, - 5 552 89) LEGRAND FRANCE /20.D5
THERMALSTAT RT-50HT
-TH -10~50°C RUN ELEC KOREA /56.B3
THERMAL STATE 1NO+1NC
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 83 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
SOLENOID COIL
-Q0(A) -52C
CB -Q0(A) CLOSING COIL
DC 220V, 60 Ohm 4CG4382-D HYUNDAI KOREA
Reference DWG NO. DWG DATE REV.
HEATER
-HT
CB -Q0(A)
60W 2KΩ SPR 319-1 RARA KOREA
B B
CONNECTOR
-J1
CB -Q0(A)
M40 WIELAND-24P-M40 WIELAND GERMANY
CONNECTOR
-J2
CB -Q0(A)
M40 WIELAND-24P-M40 WIELAND GERMANY
CONNECTOR
-J3
CB -Q0(A)
M40 WIELAND-24P-M40 WIELAND GERMANY
CONNECTOR
-J4
-Q0(A)
M40 WIELAND-24P-M40 WIELAND GERMANY
EMPLOYER / DEVELOPER
CONNECTOR
-JA M20 WIELAND-5P-M20 WIELAND GERMANY
C CB -Q0(A) C
LIMIT SWITCH
-LS1 10A HSK-10 HYUNDAI KOREA
LIMIT SWITCH
-LS2 10A HSK-10 HYUNDAI KOREA PROJECT MANAGER.
LIMIT SWITCH
-LS3 10A HSK-10 HYUNDAI KOREA
UNIVERSAL MOTOR
-M1
CB -Q0(A)
DC220V, 800W 3CG4457-002 DMK KOREA
SUPERVISION CONSULTANT
OUTLET
-OUTLET_A OUTLET (220Vac, 16A, - 772 13) AC_OUTLET(1Ph) LEGRAND FRANCE
D D
AUXILIARY SWITCH
-S1
CB -Q0(A)
AUXILIARY SWITCH 8NO 9NC 2CG1180-010 YONG SUNG KOREA
SOLENOID COIL
-52T1
CB -Q0(A) TRIP COIL 1
DC 220V, 60 Ohm 4CG4382-D HYUNDAI KOREA
SOLENOID COIL
-52T2 DC 220V, 60 Ohm 4CG4382-D HYUNDAI KOREA
E CB -Q0(A) TRIP COIL 2
E
SOLENOID COIL
-Q0(B) -52C
CB -Q0(B) CLOSING COIL
DC 220V, 60 Ohm 4CG4382-D HYUNDAI KOREA
HEATER
-HT
CB -Q0(B)
60W 2KΩ SPR 319-1 RARA KOREA
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 84 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
CONNECTOR
-Q0(B) -J1
CB -Q0(B)
M40 WIELAND-24P-M40 WIELAND GERMANY
Reference DWG NO. DWG DATE REV.
CONNECTOR
-J2
CB -Q0(B)
M40 WIELAND-24P-M40 WIELAND GERMANY
B B
CONNECTOR
-J3
CB -Q0(B)
M40 WIELAND-24P-M40 WIELAND GERMANY
CONNECTOR
-J4
-Q0(B)
M40 WIELAND-24P-M40 WIELAND GERMANY
CONNECTOR
-JA
CB -Q0(B)
M20 WIELAND-5P-M20 WIELAND GERMANY
LIMIT SWITCH
-LS1 10A HSK-10 HYUNDAI KOREA
EMPLOYER / DEVELOPER
LIMIT SWITCH
-LS2 10A HSK-10 HYUNDAI KOREA
C C
LIMIT SWITCH
-LS3 10A HSK-10 HYUNDAI KOREA
UNIVERSAL MOTOR
-M1
CB -Q0(B)
DC220V, 800W 3CG4457-002 DMK KOREA PROJECT MANAGER.
OUTLET
-OUTLET_B OUTLET (220Vac, 16A, - 772 13) AC_OUTLET(1Ph) LEGRAND FRANCE
AUXILIARY SWITCH
-S1
CB -Q0(B)
AUXILIARY SWITCH 8NO 9NC 2CG1180-010 YONG SUNG KOREA
SUPERVISION CONSULTANT
AUXILIARY SWITCH
-S2
CB -Q0(B)
AUXILIARY SWITCH 8NO 9NC 2CG1180-010 YONG SUNG KOREA
D D
SELECTOR SWITCH MANUAL RETURN, HANDLE-COMPASS,
-S13
AC-DC SELECTOR FOR CB MOTOR OPERATION COLOR-BLACK
YSDNC2201-69MO20B YONGSUNG KOREA
SOLENOID COIL
-Q0(C) -52C
CB -Q0(C) CLOSING COIL
DC 220V, 60 Ohm 4CG4382-D HYUNDAI KOREA
HEATER
-HT 60W 2KΩ SPR 319-1 RARA KOREA
E CB -Q0(C)
E
CONNECTOR
-J1
CB -Q0(C)
M40 WIELAND-24P-M40 WIELAND GERMANY
CONNECTOR
-J2
CB -Q0(C)
M40 WIELAND-24P-M40 WIELAND GERMANY
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 85 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
CONNECTOR
-Q0(C) -J3
CB -Q0(C)
M40 WIELAND-24P-M40 WIELAND GERMANY
Reference DWG NO. DWG DATE REV.
CONNECTOR
-J4
-Q0(C)
M40 WIELAND-24P-M40 WIELAND GERMANY
B B
CONNECTOR
-JA
CB -Q0(C)
M20 WIELAND-5P-M20 WIELAND GERMANY
LIMIT SWITCH
-LS1 10A HSK-10 HYUNDAI KOREA
LIMIT SWITCH
-LS2 10A HSK-10 HYUNDAI KOREA
LIMIT SWITCH
-LS3 10A HSK-10 HYUNDAI KOREA
EMPLOYER / DEVELOPER
UNIVERSAL MOTOR
-M1 DC220V, 800W 3CG4457-002 DMK KOREA
C CB -Q0(C) C
OUTLET
-OUTLET_C OUTLET (220Vac, 16A, - 772 13) AC_OUTLET(1Ph) LEGRAND FRANCE
AUXILIARY SWITCH
-S1
CB -Q0(C)
AUXILIARY SWITCH 8NO 9NC 2CG1180-010 YONG SUNG KOREA PROJECT MANAGER.
AUXILIARY SWITCH
-S2
CB -Q0(C)
AUXILIARY SWITCH 8NO 9NC 2CG1180-010 YONG SUNG KOREA
HEATER
-HT
BUS DS -Q1
60W 2KΩ SPR 319-1 RARA KOREA
SOLENOID COIL
-ILM DC220V, 6.2W, 9200 Ohm 4CS1161-002 HYUNDAI KOREA
E BUS DS -Q1 SOLENODE
E
CONNECTOR
-J1
BUS DS -Q1
M40 WIELAND-24P-M40 WIELAND GERMANY
CONNECTOR
-J2
BUS DS -Q1
M40 WIELAND-24P-M40 WIELAND GERMANY
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 86 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
CONNECTOR
-Q1 -JA
BUS DS -Q1
M20 WIELAND-5P-M20 WIELAND GERMANY
Reference DWG NO. DWG DATE REV.
LIMIT SWITCH
-LSA
BUS DS -Q1
10A HSK-10 HYUNDAI KOREA
B B
LIMIT SWITCH
-LSB
BUS DS -Q1
10A HSK-10 HYUNDAI KOREA
DC MOTOR
-M
BUS DS -Q1
DC220V, 350W 3CS9676-002 DMK KOREA
KEY SWITCH
-PS
BUS DS -Q1
MANUAL RETURN, 1NO 1NC KH-302K-2105 KUN HEUNG KOREA
AUXILIARY SWITCH
-S1
BUS DS -Q1
AUXILIARY SWITCH 5NO 6NC 1WC 3CS3686-401 HYUNDAI KOREA
EMPLOYER / DEVELOPER
AUXILIARY SWITCH
-S2 AUXILIARY SWITCH 6NO 6NC 3CS3686-601 HYUNDAI KOREA
C BUS DS -Q1 C
LIMIT SWITCH
-Q2 -DS1
BUS DS -Q2 DOOR SWITCH
10A HSK-10 HYUNDAI KOREA
LIMIT SWITCH
-DS2
BUS DS -Q2 DOOR SWITCH
10A HSK-10 HYUNDAI KOREA PROJECT MANAGER.
HEATER
-HT
BUS DS -Q2
60W 2KΩ SPR 319-1 RARA KOREA
SOLENOID COIL
-ILM
BUS DS -Q2
DC220V, 6.2W, 9200 Ohm 4CS1161-002 HYUNDAI KOREA
SUPERVISION CONSULTANT
CONNECTOR
-J1
BUS DS -Q2
M40 WIELAND-24P-M40 WIELAND GERMANY
D D
CONNECTOR
-J2
BUS DS -Q2
M40 WIELAND-24P-M40 WIELAND GERMANY
LIMIT SWITCH
-LSB
BUS DS -Q1
10A HSK-10 HYUNDAI KOREA
DC MOTOR
-M DC220V, 350W 3CS9676-002 DMK KOREA
E BUS DS -Q2
E
KEY SWITCH
-PS
BUS DS -Q1
MANUAL RETURN, 1NO 1NC KH-302K-2105 KUN HEUNG KOREA
AUXILIARY SWITCH
-S1
BUS DS -Q2
AUXILIARY SWITCH 5NO 6NC 1WC 3CS3686-401 HYUNDAI KOREA
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 87 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
AUXILIARY SWITCH
-Q2 -S2
BUS DS -Q2
AUXILIARY SWITCH 6NO 6NC 3CS3686-601 HYUNDAI KOREA
Reference DWG NO. DWG DATE REV.
LIMIT SWITCH
-Q8 -DS1
LINE ES -Q8
10A HSK-10 HYUNDAI KOREA
B B
HEATER
-HT
LINE ES -Q8
60W 2KΩ SPR 319-1 RARA KOREA
SOLENOID COIL
-ILM
LINE ES -Q8
DC220V, 5.94W, 9200 Ohm 3CS1860-005 HYUNDAI KOREA
CONNECTOR
-J1
LINE ES -Q8
M40 WIELAND-24P-M40 WIELAND GERMANY
CONNECTOR
-J2
LINE ES -Q8
M40 WIELAND-24P-M40 WIELAND GERMANY
EMPLOYER / DEVELOPER
CONNECTOR
-JA M20 WIELAND-5P-M20 WIELAND GERMANY
C LINE ES -Q8 C
DC MOTOR
-M
LINE ES -Q8
DC220V, 210W 4CS1267-003 DMK KOREA
KEY SWITCH
-PS
LINE ES -Q8
MANUAL RETURN, 1NO 1NC KH-302K-2105 KUN HEUNG KOREA PROJECT MANAGER.
AUXILIARY SWITCH
-S1
LINE ES -Q8
AUXILIARY SWITCH 5NO 5NC 3CS3686-301 HYUNDAI KOREA
AUXILIARY SWITCH
-S2
LINE ES -Q8
AUXILIARY SWITCH 6NO 6NC 3CS3686-501 HYUNDAI KOREA
SUPERVISION CONSULTANT
LIMIT SWITCH
-Q9 -DS1
LINE DS -Q9
10A HSK-10 HYUNDAI KOREA
D D
LIMIT SWITCH
-DS2
LINE DS -Q9
10A HSK-10 HYUNDAI KOREA
CONNECTOR
-J1
LINE DS -Q9
M40 WIELAND-24P-M40 WIELAND GERMANY
CONNECTOR
-J2 M40 WIELAND-24P-M40 WIELAND GERMANY
E
E
CONNECTOR
-J3
LINE DS -Q9
M40 WIELAND-24P-M40 WIELAND GERMANY
CONNECTOR
-JA
LINE DS -Q9
M20 WIELAND-5P-M20 WIELAND GERMANY
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 88 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
LIMIT SWITCH
-Q9 -LSA
BUS DS -Q1
10A HSK-10 HYUNDAI KOREA
Reference DWG NO. DWG DATE REV.
LIMIT SWITCH
-LSB
BUS DS -Q1
10A HSK-10 HYUNDAI KOREA
B B
DC MOTOR
-M
LINE DS -Q9
DC220V, 350W 3CS9676-002 DMK KOREA
KEY SWITCH
-PS
BUS DS -Q1
MANUAL RETURN, 1NO 1NC KH-302K-2105 KUN HEUNG KOREA
AUXILIARY SWITCH
-S1
LINE DS -Q9
AUXILIARY SWITCH 5NO 6NC 1WC 3CS3686-401 HYUNDAI KOREA
AUXILIARY SWITCH
-S2
LINE DS -Q9
AUXILIARY SWITCH 6NO 6NC 3CS3686-402 HYUNDAI KOREA
EMPLOYER / DEVELOPER
LIMIT SWITCH
-Q51 -DS1 10A HSK-10 HYUNDAI KOREA
C WORK ES -Q51 C
LIMIT SWITCH
-DS2
WORK ES -Q51
10A HSK-10 HYUNDAI KOREA
HEATER
-HT
WORK ES -Q51
60W 2KΩ SPR 319-1 RARA KOREA PROJECT MANAGER.
SOLENOID COIL
-ILM
WORK ES -Q51
DC220V, 6.2W, 9200 Ohm 4CS1161-002 HYUNDAI KOREA
CONNECTOR
-J1
WORK ES -Q51
M40 WIELAND-24P-M40 WIELAND GERMANY
SUPERVISION CONSULTANT
CONNECTOR
-J2
WORK ES -Q51
M40 WIELAND-24P-M40 WIELAND GERMANY
D D
CONNECTOR
-J3
WORK ES -Q51
M40 WIELAND-24P-M40 WIELAND GERMANY
LIMIT SWITCH
-LSB
BUS DS -Q1
10A HSK-10 HYUNDAI KOREA
DC MOTOR
-M DC220V, 350W 3CS9676-002 DMK KOREA
E WORK ES -Q51
E
KEY SWITCH
-PS
BUS DS -Q1
MANUAL RETURN, 1NO 1NC KH-302K-2105 KUN HEUNG KOREA
AUXILIARY SWITCH
-S1
WORK ES -Q51
AUXILIARY SWITCH 5NO 6NC 1WC 3CS3686-401 HYUNDAI KOREA
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 89 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
AUXILIARY SWITCH
-Q51 -S2
WORK ES -Q51
AUXILIARY SWITCH 6NO 6NC 3CS3686-402 HYUNDAI KOREA
Reference DWG NO. DWG DATE REV.
LIMIT SWITCH
-Q52 -DS1
WORK ES -Q52
10A HSK-10 HYUNDAI KOREA
B B
LIMIT SWITCH
-DS2
WORK ES -Q52
10A HSK-10 HYUNDAI KOREA
HEATER
-HT
WORK ES -Q52
60W 2KΩ SPR 319-1 RARA KOREA
SOLENOID COIL
-ILM
WORK ES -Q52
DC220V, 6.2W, 9200 Ohm 4CS1161-002 HYUNDAI KOREA
CONNECTOR
-J1
WORK ES -Q52
M40 WIELAND-24P-M40 WIELAND GERMANY
EMPLOYER / DEVELOPER
CONNECTOR
-J2 M40 WIELAND-24P-M40 WIELAND GERMANY
C WORK ES -Q52 C
CONNECTOR
-J3
WORK ES -Q52
M40 WIELAND-24P-M40 WIELAND GERMANY
CONNECTOR
-JA
WORK ES -Q52
M20 WIELAND-5P-M20 WIELAND GERMANY PROJECT MANAGER.
LIMIT SWITCH
-LSA
BUS DS -Q1
10A HSK-10 HYUNDAI KOREA
LIMIT SWITCH
-LSB
BUS DS -Q1
10A HSK-10 HYUNDAI KOREA
SUPERVISION CONSULTANT
DC MOTOR
-M
WORK ES -Q52
DC220V, 350W 3CS9676-002 DMK KOREA
D D
KEY SWITCH
-PS
BUS DS -Q1
MANUAL RETURN, 1NO 1NC KH-302K-2105 KUN HEUNG KOREA
E
E
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 90 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
EMPLOYER / DEVELOPER
-X2 TERMINAL BLOCK FOR BUS DS(-Q2) UK 5 N PHOENIX GERMANY
C C
-X8 TERMINAL BLOCK FOR LINE ES(-Q8) UK 5 N PHOENIX GERMANY PROJECT MANAGER.
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 91 OF 92 04
1 2 3 4 5 6 7 8
Project
A A
EMPLOYER / DEVELOPER
-XR1 TERMINAL BLOCK FOR REMOTE UK 5 N PHOENIX GERMANY
C C
-XS TERMINAL BLOCK FOR INTERLOCK AND GENERAL UK 5 N PHOENIX GERMANY PROJECT MANAGER.
SUPERVISION CONSULTANT
D D
E
E
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 92 OF 92 04