Vous êtes sur la page 1sur 143

2018

GIS INSTALLATION
REPORT

Prepared by:
Eng. Mohamed Mustafa Elgweiny
followed by:
Eng. Ali Abo ashour (site manager)
Checked by:
Eng. Tawfik Elsaid (project manager)
‫ محمد مصطفى الجوينى‬.‫م‬

Uptown Cairo Project


Mokattam, Cairo – Egypt

Zahraa El Mokattam 220/22 KV GIS


Substation

(2*75 MVA) Power Transformers

Client : Emaar Misr for Development S.A.E.

Supervision : Shaker Consultancy Group

Contractor : Consortium: (KN / HHI)

Page 1
‫ محمد مصطفى الجوينى‬.‫م‬

Table of contents

Table of contents ............................................................................................................................................. 2


General information and specifications for GIS................................................................................................ 3
 General specifications.......................................................................................................................... 3
 GIS main components information ....................................................................................................... 4
 GIS sub components information. ...................................................................................................... 21
2. General requirements for GIS installation. ................................................................................................ 30
 Preparation of Site Condition ............................................................................................................. 30
 Preparation for Installation ................................................................................................................. 31
 Ground marking and Transportation sequence. ................................................................................ 33
 Transportation process ...................................................................................................................... 35
3. Installation process. .................................................................................................................................. 36
 Initial assembly process ..................................................................................................................... 36
 Docking process ................................................................................................................................ 39
 Vacuum and SF6 gas works .............................................................................................................. 43
4. Accessories installation .............................................................................................................................. 46
 Earthing shield ................................................................................................................................... 46
 Linkage bars ...................................................................................................................................... 47
 Platforms ............................................................................................................................................ 47
 Supports............................................................................................................................................. 48
 Cables work ....................................................................................................................................... 49
5. Schematic diagram for OHTL Bay. ............................................................................................................ 50
 List of contents ................................................................................................................................... 50
 External wire specification ................................................................................................................. 50
 SLD, layout, interlock, internal arrangement and sf6 system ............................................................. 50
 DC and AC systems........................................................................................................................... 50
 Closing and tripping circuits for C.B ................................................................................................... 50
 Closing and opining circuits for D.S and E.S ..................................................................................... 50
 Alarms, indicators, monitoring and control circuits ............................................................................. 50
 C.Ts and V.Ts wiring.......................................................................................................................... 50

Page 2
‫ محمد مصطفى الجوينى‬.‫م‬

General information and specifications for GIS

 General specifications

maximum voltage / Nominal voltage 245kv rms / 220kv rms

Entrance and out let Through GIB

Rated current for bus bar 2000 A

Rated short time withstand current 50KA / 1sec

Maximum ambient temperature 50 ºC

C.B 7 bar
Rated gas pressure
Others 5 bar

C.B 6.5 bar


Minimum gas pressure
others 4.5 bar

2 OHTL

2 Transformers

No. of bays 5 bays+3 future 1 Bus coupler

2 future
underground cable
bays
1 transformer future
bay

Page 3
‫ محمد مصطفى الجوينى‬.‫م‬

 GIS main components information

 Bays single line diagram (SLD).

 Double bus bar single breaker system.

 7 LCCs panels.

 4 voltage transformers for each bus bar.

Page 4
‫م‪ .‬محمد مصطفى الجوينى‬

‫‪Page 5‬‬
‫ محمد مصطفى الجوينى‬.‫م‬

1. Circuit breaker (C.B).

 Circuit breaker is designed to protect the circuit


from damage caused by excess current from an
overload or short circuit. Its basic function is to
interrupt current flow after a fault is detected.

 Rated voltage 245KV.


 Rated current 1600A except bus coupler
2000A.
 Short circuit 50KA /1s
 Rated gas pressure 7 bars.
 First stage leak alarm 6.7 bar.
 Second stage leak alarm 6.5 bar.
 Bursting pressure of relief 15 bars.

 Circuit breaker components.


1. Close coil
2. Two trip coils
3. Mechanism box per phase.
4. Position indicator (open or close)
5. Operation Counter
6. Spring indicator (Charged or
Discharged)
7. Charging Hand (crank)
8. Charging motor
9. Spring for close coil
10. Spring for trip coils
11. Terminal blocks
12. Connection socket
13. Close push Button
14. Open push Button
15. Movable and fixed contacts.

Page 6
‫م‪ .‬محمد مصطفى الجوينى‬

‫‪Page 7‬‬
‫ محمد مصطفى الجوينى‬.‫م‬

 Mechanical operation for CB per phase.


1. Charge the spring.
2. Press at close push button (close order).
3. Press at trip push button (open order).
4. Close time around 65ms.
5. Trip time around 25ms.
6. The charged spring is enough to operate both close and open orders.

 CB SITE TEST.

1. Contact resistance (mΩ).

 By inject 100A DC and measuring the voltage, and then get the resistance.

Micro-ohm
meter

Resistance must be less than 20 MΩ.

Page 8
‫ محمد مصطفى الجوينى‬.‫م‬

2. Timing test

 This test to be done to determine the close and open time for circuit breaker

 This test is done for all electrical D.S / E.S.

Page 9
‫ محمد مصطفى الجوينى‬.‫م‬

2. Disconnector switches (D.S) and Earthing switch (E.S).

 Used to isolate or connect circuits for maintenance, test, and load transfer and operation reliability.
 Each phase in separate compartment with or without E.S.
 In each bay there are one or more D.S depend on its function.
 Operation of D.S / E.S done off load.

D.S (Q1) E.S (Q51) D.S (Q2)


E.S (Q52) D.S (Q9)
E.S (Q8)

 Rated voltage 245KV.


 Rated current 1600A except bus coupler 2000A.
 Short circuit 50KA /1s
 Rated gas pressure 5 bars.
 First stage leak alarm 4.7 bar.
 Second stage leak alarm 4.5 bar.
 Bursting pressure of relief 10 bars.

Page 10
‫ محمد مصطفى الجوينى‬.‫م‬

 Disconnector and Earth switch components.

1. Main box for 3phases


2. Dc motor
3. Moving Mechanism
4. Open limit switch
5. Close limit switch
6. Door limit switch
7. Selector switch (operate and lock)
8. Terminal block
9. Socket
10. Mechanism per phase
11. Link rods between 3 phases the Mechanism

Page 11
‫ محمد مصطفى الجوينى‬.‫م‬

 Mechanical operation for (DS/E.S).

1. Open the door.


2. Put selector on operate position.
3. Check lock pin appear or No.
4. When Appears, you must release interlock.
5. Insert manual handle.
6. Check position (open or close).
7. Follow operation direction mark.
8. Remove handling.
9. Close the door.
10. Close operation time around 2.5: 3 s the three phase mechanisms operate
simultaneously at same time by Linked operation rods.

 Difference between (E.S) and (DS).

1. Isolate the mechanism by plastic material.


2. Isolate the bolts by plastic material.
3. Copper plate to connect mechanism to body (enclosure).

Page 12
‫ محمد مصطفى الجوينى‬.‫م‬

4. E.S rod is conductor (metallic) opposite to D.S which is insulator.

E.S D.S
Metallic rod isolator rod

3. High speed earthing switches


(HSES).
 Same components as E.S but include
hydraulic piston (damper).

 Mechanical operation for


(HSES).

 The motor charges piston and the


piston suddenly perform the operation
of main.

 contacts at smaller time than normal


ES (very short time) Used at overhead
transmission line or long underground
cable for fast discharge

Page 13
‫ محمد مصطفى الجوينى‬.‫م‬

 Mechanical interlock between DS (Q9) with ES (Q8).

 Used allow for one equipment only closing D.S or E.S.

Mechanical inter lock

4. Local control cubical (LCC).

 The local control of GIS equipment through LCC panel.

 All signals of V.Ts, C.Ts, and position indicators of (C.B, D.S, E.S...)
transferred to LCC panel by L.V cables.

 These signals transferred to control and protection panels from LCC


panels by L.V cables.

Page 14
‫ محمد مصطفى الجوينى‬.‫م‬

 LCC components:

1. Mimic diagram.

2. Annunciator.

3. Ammeters, voltmeters, multi meters.

4. Terminal blocks, Wiring.

5. Push buttons / selector switches.


Annunciator, push bottoms, selectors
6. Test switch.

7. Heaters.

8. MCB (AC/DC/VT).

9. Contactors, Auxiliary relay

10. Timer

11. Ventilation fans.

12. Semaphore
Ammeters, voltmeters, test switch
13. Lamps

14. Thermostat

 Operation Procedures from LCC:

1. All MCB close


2. All signal DC and AC ok
3. Interlock ok
4. Block operation ok
5. Indication ok
6. Put selector switch at local

 Operation DS , ES and CB at test position


Mimic diagram, semaphore, selectors
7. Put selector switch at emergency

 Operation CB at normal operation

8. Push the push button for operate

Page 15
‫ محمد مصطفى الجوينى‬.‫م‬

 Relationship between LCC with other panels.

Page 16
‫ محمد مصطفى الجوينى‬.‫م‬

5. Current transformer (C.T).

 Measurement of current in small values available


through secondary windings to connected to
measuring and protection devices.

 CT Components:

1. Primary winding (main conductor)


2. Secondary winding (coils)
3. Pushing for secondary Terminal
4. Terminal block with sliding links
5. Test switch for core measurement at LCC.

 Types:

 According to class:

1. Class (5P20, 5P10) for protection.


2. Class (0.5CL) for Measurement.

 According to secondary ratio:

1. 1A for numerical relays


2. 5A for mechanical and static relays
3. 2A for special use (winding temperature indicator)

 According to location:

1. Around bushing BCT


2. Switch gear CT
3. Outdoor CT

 CT connection

 Facility for shorting CT


 Facility for use any ratio
 Facility for reverse polarity
 Facility for Earthing CT

Page 17
‫ محمد مصطفى الجوينى‬.‫م‬

 Terminal block connection.

 C.T site tests:

1. Polarity test
2. Ratio test
3. Exciting current characteristic test
4. Megger test

 Technical data:

Page 18
‫ محمد مصطفى الجوينى‬.‫م‬

6. Voltage transformer (V.T, P.T).

 Measurement of voltage in small values available through


secondary windings connected to measuring and protection
devices.

 VT Components:

1. Primary winding.
2. Secondary winding.
3. MCB with auxiliary contact on secondary side.
4. Terminal block.
5. Hand Earthing for primary winding at CCVT.
6. Manual Isolating DS for underground Bays.

 Types:

1. GIS type(Inductive) VT
2. Outdoor type (coupling capacitive voltage transformer)
CCVT

 Technical data:

 Terminal block connection

 C.T site tests:

1. Ratio test
2. Megger test

Page 19
‫ محمد مصطفى الجوينى‬.‫م‬

7. Gas isolated bus (GIB).

 There are two methods to Connect between


OHTL and transformer bays inside GIS room
with outdoor gantry and transformer
respectively.

1. Gas isolated bus (GIB)


2. Underground cable

 In our case:

 GIB for the current OHTL, transformer


bays.
 Underground Cables for future bays.

 GIB or cables connect with gantry or


transformer bushing through SF6/air bushing.

 GIB divided to two parts inside and outside GIS room.

 Inside part connect to GIS equipment.


 Outside part connect to SF6/air bushing.

8. Air / SF6 bushing.

 SF6/air bushing to be installed after installation the gantry to avoid any damage due to gantry installation
process.
 There are 12 bushings for 4 circuits.

Page 20
‫ محمد مصطفى الجوينى‬.‫م‬

 GIS sub components information.

 Bays gas sections schemes.

Page 21
‫ محمد مصطفى الجوينى‬.‫م‬

 Normal pressure for C.B = 7 bar


 Normal pressure for other compartment =5 bar
 Minimum pressure for C.B = 6.5 bar
 Minimum pressure for other compartment =4.5 bar

Page 22
‫ محمد مصطفى الجوينى‬.‫م‬

1. Pressure disc.

 This device used to release SF6 gas when its pressure increases inside the compartment.
 It is fabricated from aluminum and must be replaced after damage.

2. Absorbent zeoram.

 This material used to absorb humidity from SF6; it must be used for each compartment.
 It’s attached to pressure disc flange or man holes covers which used for cleaning.
 This material must change directly before vacuum process or after open its flange.

Page 23
‫ محمد مصطفى الجوينى‬.‫م‬

3. Pressure gauges.

 Used to monitor the pressure of SF6 gas inside the gas section.
 Have two contacts:

1- alarm contact when the pressure reaches to first stage.


2- Trip contact when the pressure reaches to second stage.

4. Insulation spacer (gas tight).

 Used to isolate gas between two sections supporting the conductors centralized.
 Marked by yellow color from outside.

Page 24
‫ محمد مصطفى الجوينى‬.‫م‬

5. Insulation spacer (gas through).

 Used to supporting the conductors centralized.


 Marked by silver color from outside.

6. Ultra high frequency partial discharge sensor (UHF PD).

 Used to measure the partial discharge for check wave around conductor symmetrical without distortion.
 The PD test is applied at 1.2 design voltage per phase.
 Acceptance criteria: less than 5pC.

Page 25
‫ محمد مصطفى الجوينى‬.‫م‬

7. Non return valve (normally open).

 Used to connect between SF6 gas inside the enclosure and gas gauge and to link between multi
compartments to become one gas section.

8. Non return valve (normally closed).

 Used to vacuum process, gas filling and test point (dew point).

Page 26
‫ محمد مصطفى الجوينى‬.‫م‬

9. Inspection windows.

 Used for inspection of moving mechanism and inside area of each compartment.
 Do not look inside which mechanism is operating.

Page 27
‫ محمد مصطفى الجوينى‬.‫م‬

10. SF6 GAS. (SULFUR HEXAFLORIDE)

 Advantages:

 SF6 is non-flammable
 Electrical insulating capability is much higher
than air
 SF6-Gas is a cooling gas
 New and clean SF6 is NOT poisonous
 SF6 is chemically stable
 SF6 has approx. 5,7x higher density than air

This cylinder is ≈ 600 KG


and ≈ 23 bar

Page 28
‫ محمد مصطفى الجوينى‬.‫م‬

11. Supporting insulators

 Supporting conductors
 fixed in the center of the enclosure

12. Conductor.

 Conductor s fabricated from pure aluminum in tubular shape


 Enclosure outer bay 322mm
 Enclosure thickness 8mm
 Conductor 93mm
 Enclosure thickness 10mm

Page 29
‫ محمد مصطفى الجوينى‬.‫م‬

2. General requirements for GIS installation.


 Preparation of Site Condition
 Access road should be backfilled, compacted and settled for safely received package boxes before
transportation and slope road ground near the main entrance before transportation.

 Lighting fixtures should be installed before GIS installation.

 Painted the Epoxy paint on the floor

 Installing and loading test for over-head crane for GIS equipment transportation inside GIS room.

Page 30
‫ محمد مصطفى الجوينى‬.‫م‬

 Closed all opening holes by wooden plate and Fabricated of temporary door or the perpetually door (roll
up door) must be installed; that should be done before transportation for keeping to clean room condition
& safety.

 Check and prepare tools for installation completely.

 Tools for tightening and assembly, lifting and erection and for unpacking Vacuum cleaner for
installation.

 Arrangement of transportation equipment

 Hi‐dro crane : for lifting GIS equipment.


 hand‐lift : in order to easy for transportation of GIS equipment into GIS room.
 Fork‐lift : in order to easy and fast for transportation of GIS equipment.
 Steel pipes : for carrying of GIS main‐body equipment.
 Hydraulic jack : for adjust the height and level of equipment.

 Preparation for Installation


 Checking boxes

 Before start the installation process we should check the equipment boxes if there are any
damage or loose.

 Man power.

 The requested man power depends on bays number and time available for mission, in normal
conditions 4Technicians, 4 helpers, 1 erection engineer and 1project engineer.

Page 31
‫ محمد مصطفى الجوينى‬.‫م‬

 Transportation and equipment arrangement plan.

 In the beginning erection engineer should study the packing list and its drawings to can put
suitable transportation plan and arrangement for equipment in GIS room, erection schedule is
depend on this study.
 All required documents like inspection and test plan (ITP), method of statements and tools
certificates…etc.). Should be prepared.

 Preparation of vacuum pump at the least two sets and prepares the vacuum hose and torr gauge.

 Fabricated of shelf should be installed before starting the erection to arrange and keeps installation
materials, prepare fabricated of shim plates for adjusted of alignment each of thickness like (1mm, 2mm,
3mm), Preparing the wooden plates for protecting the GIS equipment.

Page 32
‫ محمد مصطفى الجوينى‬.‫م‬

 Ground marking and Transportation sequence.


 Check the finishing condition and embedded plate position according to the foundation plan and
measure height on each of embedded plate surface.

 Marking center line on the embedded plate surface floor for positioning of main-body equipment and
draw the main bus and datum line of each bay

 Ground marking executed according to layout drawing and civil drawings that contain all dimensions of
equipment and distance between them.

 The basic lines in ground marking are X-axis and Y-axis which representative of C.Bs centers and
transformer GIB holes centers respectively.

1.Surveyor takes several points on X-axis and Y-axis lines, and then start connects between these
points making these 2 lines.

2.Draw parallel and vertically lines according to drawings.

3.These lines representative of bus bar line, center of bus coupler C.B, all C.Bs positions
points and M/B supports which hold the V.Ts.

4.Then take height and level of plates take in consideration that, bus coupler plate is the
reference level.

5.Using shim plates with different thickness we can


adjust the level between plates.

Page 33
‫م‪ .‬محمد مصطفى الجوينى‬

‫‪Page 34‬‬
‫ محمد مصطفى الجوينى‬.‫م‬

 Transportation process
 After revise and compare the packing list drawings with packing list and boxes, start transport the boxes
and unpacking the equipment then arrange this equipment inside GIS room according to the installation
process.

 The amount of equipment to be transported inside GIS room is determined on the basis of the area of
GIS room, so the transportation process may divide to more than one stage.

 In general the transportation and arrangement process is executed as follow:

 Each C.B to be moved near to its final position


 Each D.S, E.S, C.Ts and V.Ts moved near to its breaker (bay)
 Each bus bar and support moved near to its final position.

 Plate form and all accessories after installation of main equipment

Page 35
‫ محمد مصطفى الجوينى‬.‫م‬

3. Installation process.
 Initial assembly process
 After arrange the equipment and completely close all doors, windows and holes, start the installation
process as follow:
 Install of each C.B equipment without any docking between bays or any ground welding
 Install of C.T, D.S, E.S, supports and bus bars for each C.B.

Installing of C.Ts with Installing of D.S/E.S with


C.B C.B

Notes:

 C.T and D.S compartment may be in one compartment or separate depend on them size.

One compartment Separate compartment

Page 36
‫ محمد مصطفى الجوينى‬.‫م‬

 Some compartment needs to assembly its conductor before installing.

 Installation starts by remove the transportation cover then replace gasket by a new one, and cleaning
the spacer, flange, gasket and conductor by alcohol and wipes.

Page 37
‫ محمد مصطفى الجوينى‬.‫م‬

 Replace the old grease of flange (yellow grease) and conductor contact positions (white grease) with
new grease.

 After preparing the flange of equipment for assembling cover it till assembling it.
.

Page 38
‫ محمد مصطفى الجوينى‬.‫م‬

 After assembling the C.B equipment, it become ready to install and temporary welding in ground.

 Docking process

 There are two methods two to docking the bays together as follow:

1. Install all C.Bs in it positions and temporary welding, then start assembling the equipment of (bay1)
in direction to the extension for future bays, then bus bars and GIB reach to AIR/SF6 bushing.

2. Just install bus coupler C.B and temporary welded then start assembling the equipment and docking
it to this C.B from it both sides to the final sides of GIS (used method).

 Sequence of docking regarding to method (no.2)

 After assembling the equipment of each C.B and welded the bus coupler C.B start docking the bays
together.

 Note that: the amount of assembling equipment with C.B depends on the capacity of overhead
crane and Available empty space.

Page 39
‫ محمد مصطفى الجوينى‬.‫م‬

 In our case:

 Capacity of overhead crane = 6.3 tons


 No empty space

 So C.B assembled with:

 C.Ts.
 D.S/E.S.
 Supports for D.S/E.S.
 Bus bar in one side.

 After welded bus coupler C.B by temporary welding:

1. Assembling the tie bus bar with bus coupler


2. Install the D.S/E.S for sections in the both sides B.C
3. Install the D.S/E.S for V.Ts in the both sides of B.C

1 2 3

Page 40
‫ محمد مصطفى الجوينى‬.‫م‬

4. Docking transformer
bays with V.Ts sections
in the both sides

5. Docking the OHTL bays with


transformer bays in the both sides

6. Installing of V.Ts in the both sides

 In our case V.Ts installation


postponed after H.V test.

Page 41
‫ محمد مصطفى الجوينى‬.‫م‬

7. Gas isolated bus (GIB)

8. SF6 / AIR bushing

Page 42
‫ محمد مصطفى الجوينى‬.‫م‬

 Vacuum and SF6 gas works

 Vacuum work

 After welding a bay start opening the flange of absorbent


zeoram and add new silica gel for all separate champers.

 All tools and equipment are already prepared


(DILO MACHINE, ADAPTER and HOSES).

 Then connect the hose of (DILO MACHINE) to non-return


valve (normally closed) and running the machine.

 Vacuum continue at least 1 hour at 1torr (1mmHg),


but the actual process reach to 3 hours at (0.45 torr).

Notes:

 Vacuum process can do to each phase separately but to


save time we use adapter to execute the process for the
three phases one time. (One hose from machine to
adapter and three from adapter to phases).

 For C.B compartment the vacuum period from 20 to 24


hours to can reach to (0.6mm bar/0.45torr) but other
compartment as same as mentioned above.

 The vacuum period and value depend on the machine


capacity and age, so period and value of vacuum process
are inverse related depend on one another as follow:

 If the vacuum value can increase more the period


is decrease also.

 In the begging of vacuum process the value of vacuum is


out of range, wait just few minutes then the value appear
of machine in range of 100 m bar then start gradually
decrease till machine capacity (0.6m bar).

 In case of opening any compartment for any reason it


should be replace the silica gel and take vacuum again.

 We use Green Sticker to sign the vacuumed compartment


from other.

Page 43
‫ محمد مصطفى الجوينى‬.‫م‬

 Gas filling

 After vacuum process of each compartment start the gas filling process directly.

 The same tools as vacuum in addition to gas filling device and SF6 gas cylinder.

 Connect the gas filling device to cylinder and other side to adapter or to DILO machine and then to
adapter select gas filling function from multi functions selector in DILO machine.

 Open valve cylinder and gas filling device then control the gas pressure by gas regulator.
 As a first stage of gas filling continue filling to 1bar.
The second stage continues to final value 7 bar for C.B, 5 bar for others.

Page 44
‫ محمد مصطفى الجوينى‬.‫م‬

Notes:

 As the vacuum process the gas filling process can do to each phase separately but to save time
we use adapter to execute the process for the three phases one time. (One hose from machine
to adapter and three from adapter to phases).

 We use red sticker to sign the vacuumed compartment


from other.

 When the pressure inside the cylinder decrease, gas temperature decrease and gas freezes, so
we use the compressor in DILO machine.

 Gas filling process carried out to all compartment in stages of different pressures not one time to
save the barrier spacer condition although it bear the pressure difference but for more
confirmation.

 Gas test

 Gas leakage test

 Used to check tightness for pipes and


enclosure
 Device mane :Portable Gas leak detector
 Continuous sound alarm meaning gas
leakages

 Dew point test

 Used to check humidity for gas to clarify


 Insulating gas efficiency
 Device mane :Portable dew point meter

 Acceptance criteria

 C.B parts: Dew point less than150 PPM


Volume
 Others: Dew point less than 300 PPM
Volume below.

Page 45
‫ محمد مصطفى الجوينى‬.‫م‬

4. Accessories installation

 Earthing shield

 There are already installed earhing shields with equipment like E.S bars and its shields, but the main
earthing bars needs to be assembled in site and installed.

 There are several types of earthings connection bars shapes depend on its position.

 These shapes are assembled from earthing accessories.

Page 46
‫ محمد مصطفى الجوينى‬.‫م‬

 Linkage bars

 Linkage bars between the mechanism and phase’s movable part are assembled and installed in site.
 There are two types of length and two types contact point.
 These linkages contain flexible joint to adjust the required space.

 Platforms

 Firstly unpacking the platform box then start arranges and numbering its parts regarding to drawings.
 Start assembling these parts according to drawings.

Page 47
‫ محمد مصطفى الجوينى‬.‫م‬

 Supports

 As plat form;

 Firstly unpacking the platform box then start arranges and numbering its parts regarding to drawings.

 Start assembling these parts according to drawings.

Page 48
‫ محمد مصطفى الجوينى‬.‫م‬

 Cables work

 Cable tray

 As plat form;

 Firstly unpacking the trays box then start arranges its parts regarding to drawings.
 There are several lengths and dimensions of trays, we use the suitable part according to its function
and position regarding to drawings.

 Cable termination

 After installed the cable trays, start the cable


termination process according to cable list
schedule.

Page 49
‫ محمد مصطفى الجوينى‬.‫م‬

5. Schematic diagram for OHTL Bay.

 Including:
 List of contents

 External wire specification

 SLD, layout, interlock, internal arrangement and sf6 system

 DC and AC systems

 Closing and tripping circuits for C.B

 Closing and opining circuits for D.S and E.S

 Alarms, indicators, monitoring and control circuits

 C.Ts and V.Ts wiring

Page 50
S CHEMATIC DIAGRAM FOR GIS LCC

SPECIFICATION 245kV 50kA GIS GIS BAY NAME OHTL 1

CONTRACT NUMBER GIS BAY REFERENCE NO. D01

HHI REFERENCE NO. 16316 REVISION NO. 04


PROJECT NAME ZAHRAA EL-MOKATTAM
220/22kV GIS SUBSTATION

HEAVY INDUSTRIES CO.,LTD.

A3_B_COVER A3(420mm * 297mm)


1 2 3 4 5 6 7 8

Project

A A

DRAWING LIST

REVISION
SHEET NO DESCRIPTION
REV.0 REV.1 REV.2 REV.3 REV.4

1 COVER 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018


Reference DWG NO. DWG DATE REV.

2 LIST OF CONTENTS 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018


B B
3 LIST OF CONTENTS 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

4 LIST OF CONTENTS 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

5 LIST OF CONTENTS 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

6 INTERNAL WIRE SPECIFICATION 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

7 EXTERNAL WIRE SPECIFICATION 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

8 FERRULING SYSTEM 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018


EMPLOYER / DEVELOPER

9 SYMBOL LEGEND 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018


C C
10 SF6 GAS SCHEME DIAGRAM 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

11 220kV GIS SINGLE LINE DIAGRAM 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

PROJECT MANAGER.
12 INTERLOCK DIAGRAM FOR T/L 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

13 LCC LAYOUT FOR T/L 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

14 LCC MIMIC DIAGRAM FOR T/L 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

15 LCC ANNUNCIATOR LIST 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018 SUPERVISION CONSULTANT

16 INTERNAL ARRANGEMENT OF T/L (1) 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018


D D
17 INTERNAL ARRANGEMENT OF T/L (2) 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

18 DC POWER SUPPLY 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018


04 24.JAN.2018 REVISED AS PER COMMENT
01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018 03 10.AUG.2017 REVISED AS PER COMMENT
19 DC POWER SUPPLY 02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
20 AC POWER SUPPLY 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018 REV. DATE ISSUED TO / FOR :

01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018 CONTRACTOR: CONSORTIUM( KN / HHI )


21 CB CLOSE CONTROL

22 CB TRIP 1 CONTROL 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

23 CB TRIP 2 CONTROL 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018


E
01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018 E
24 CB MOTOR CONTROL

25 CB MOTOR POWER 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

26 CB MECHANISM 1 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

27 CB MECHANISM 2 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


28 BUS DS(-Q1) CONTROL 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018
DRAWING TITLE:

29 BUS DS(-Q1) MECHANISM 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018


LIST OF CONTENTS
30 BUS DS(-Q2) CONTROL 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018
F Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EA 2 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

DRAWING LIST

REVISION
SHEET NO DESCRIPTION
REV.0 REV.1 REV.2 REV.3 REV.4

31 BUS DS(-Q2) MECHANISM 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018


Reference DWG NO. DWG DATE REV.

32 LINE DS(-Q9) CONTROL 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018


B B
33 LINE DS(-Q9) MECHANISM 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

34 WORK ES(-Q51) CONTROL 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

35 WORK ES(-Q51) MECHANISM 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

36 WORK ES(-Q52) CONTROL 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

37 WORK ES(-Q52) MECHANISM 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

38 LINE ES(-Q8) CONTROL 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018


EMPLOYER / DEVELOPER

39 LINE ES(-Q8) MECHANISM 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018


C C
40 MULTIPLY CONTACT 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

41 MULTIPLY CONTACT 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

PROJECT MANAGER.
42 MULTIPLY CONTACT 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

43 OPERATING CONDITION 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

44 DS/ES INCOMPLETE CONDITION 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

45 INTERLOCK (CB) 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018 SUPERVISION CONSULTANT

46 INTERLOCK (BUS DS) 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018


D D
47 INTERLOCK (LINE DS/ES) 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

48 GAS MONITORING 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018


04 24.JAN.2018 REVISED AS PER COMMENT
01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018 03 10.AUG.2017 REVISED AS PER COMMENT
49 GAS MONITORING 02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
50 GAS MONITORING 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018 REV. DATE ISSUED TO / FOR :

01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018 CONTRACTOR: CONSORTIUM( KN / HHI )


51 GAS MONITORING

52 GAS MONITORING 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

53 GAS MONITORING 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018


E
01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018 E
54 POSITION INDICATOR

55 POSITION INDICATOR 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

56 HEATER CONTROL 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

57 HEATER CONTROL 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


58 ANNUNCIATOR (H1) 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018
DRAWING TITLE:

59 ANNUNCIATOR (H1) 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018


LIST OF CONTENTS
60 ANNUNCIATOR (H1) 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018
F Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EA 3 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

DRAWING LIST

REVISION
SHEET NO DESCRIPTION
REV.0 REV.1 REV.2 REV.3 REV.4

61 ANNUNCIATOR (H1) 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018


Reference DWG NO. DWG DATE REV.

62 ANNUNCIATOR (H1) 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018


B B
63 ANNUNCIATOR (H1) 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

64 ANNUNCIATOR (H1) 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

65 METERING (1) 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

66 METERING (2) 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

67 REMOTE 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

68 REMOTE 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018


EMPLOYER / DEVELOPER

69 REMOTE 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018


C C
70 CURRENT TRANSFORMER 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

71 CURRENT TRANSFORMER 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

PROJECT MANAGER.
72 CURRENT TRANSFORMER 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

73 SWITCH 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

74 SWITCH 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

75 SWITCH 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018 SUPERVISION CONSULTANT

76 SWITCH 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018


D D
77 PARTS LIST FOR LCC 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

78 PARTS LIST FOR LCC 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018


04 24.JAN.2018 REVISED AS PER COMMENT
01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018 03 10.AUG.2017 REVISED AS PER COMMENT
79 PARTS LIST FOR LCC 02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
80 PARTS LIST FOR LCC 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018 REV. DATE ISSUED TO / FOR :

01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018 CONTRACTOR: CONSORTIUM( KN / HHI )


81 PARTS LIST FOR LCC

82 PARTS LIST FOR LCC 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

83 PARTS LIST FOR LCC 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018


E
01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018 E
84 PARTS LIST FOR MECHANISM

85 PARTS LIST FOR MECHANISM 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

86 PARTS LIST FOR MECHANISM 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

87 PARTS LIST FOR MECHANISM 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


88 PARTS LIST FOR MECHANISM 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018
DRAWING TITLE:

89 PARTS LIST FOR MECHANISM 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018


LIST OF CONTENTS
90 PARTS LIST FOR MECHANISM 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018
F Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EA 4 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

DRAWING LIST

REVISION
SHEET NO DESCRIPTION
REV.0 REV.1 REV.2 REV.3 REV.4

91 PARTS LIST FOR TERMINAL BLOCK 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018
Reference DWG NO. DWG DATE REV.

92 PARTS LIST FOR TERMINAL BLOCK 01.SEP.2016 19.JUN.2017 09.AUG.2017 10.AUG.2017 24.JAN.2018
B B

EMPLOYER / DEVELOPER

C C

PROJECT MANAGER.

SUPERVISION CONSULTANT

D D

04 24.JAN.2018 REVISED AS PER COMMENT


03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

E
E

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DRAWING TITLE:

LIST OF CONTENTS

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EA 5 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

WIRE SPECIFICATION

WIRE WIRE NO. MARK ADDITIONAL MARK


KINDS OF WIRE TERMINAL LUG REMARK
INSULATION LETTER
INSULATION COLOR SIZE SLEEVE COLOR MARKING SLEEVE COLOR MARKING
CAP COLOR
AC XHHW/SIS BLACK 2.5mm² WHITE BLUE WIRE NO. N/A N/A N/A
Reference DWG NO. DWG DATE REV.

DC XHHW/SIS GRAY 2.5mm² WHITE BLUE WIRE NO. N/A N/A N/A
B CIRCUIT B
CONTROL
TRIP XHHW/SIS GRAY 2.5mm² WHITE RED WIRE NO. RED N/A N/A

ALARM XHHW/SIS GRAY 2.5mm² WHITE BLUE WIRE NO. N/A N/A N/A BLADE TYPE

DC(+) XHHW/SIS GRAY 2.5mm² WHITE BLUE WIRE NO. WHITE BLACK +

DC(-) XHHW/SIS GRAY 2.5mm² WHITE BLUE WIRE NO. WHITE BLACK -

AC(A) XHHW/SIS RED 2.5mm² WHITE BLUE WIRE NO. WHITE BLACK A
POWER
SUPPLY EMPLOYER / DEVELOPER
AC(B) XHHW/SIS YELLOW 2.5mm² WHITE BLUE WIRE NO. WHITE BLACK B
C C
AC(C) XHHW/SIS BLUE 2.5mm² WHITE BLUE WIRE NO. WHITE BLACK C BLADE TYPE

AC(N) XHHW/SIS GREEN 2.5mm² WHITE BLUE WIRE NO. WHITE BLACK N
PROJECT MANAGER.
A XHHW/SIS RED 6.0mm² WHITE BLUE WIRE NO. WHITE BLACK A

CT B XHHW/SIS YELLOW 6.0mm² WHITE BLUE WIRE NO. WHITE BLACK B


SECONDARY
CIRCUIT C XHHW/SIS BLUE 6.0mm² WHITE BLUE WIRE NO. WHITE BLACK C
SUPERVISION CONSULTANT
N XHHW/SIS GREEN 6.0mm² WHITE BLUE WIRE NO. WHITE BLACK N RING TYPE

D A XHHW/SIS RED BLUE WIRE NO. WHITE BLACK A D


4.0mm² WHITE

VT B XHHW/SIS YELLOW 4.0mm² WHITE BLUE WIRE NO. WHITE BLACK B


SECONDARY 04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
CIRCUIT C XHHW/SIS BLUE 4.0mm² WHITE BLUE WIRE NO. WHITE BLACK C 02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL

N XHHW/SIS GREEN 4.0mm² WHITE BLUE WIRE NO. WHITE BLACK N BLADE TYPE
REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )


GROUND XHHW/SIS GREEN 4.0mm² WHITE BLUE WIRE NO. WHITE BLACK EARTH

XHHW ( Cross-linked Polyethylene High Heat-resistant Water-resistant )


E
- Rated Voltage : 600/1000V E
- Heat resistant temperature : 90℃ (By Standard of UL)
- Conductor : Plain or Tinned annealed copper wire
Power supply circuit is defined as circuit from power supply to MCB.
N/A : Not applicable
1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
DRAWING TITLE:

INTERNAL WIRE SPECIFICATION

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EB 6 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

MUTI-CABLE SPECIFICATION

NO. CROSS- COLOR


NO KINDS OF WIRING SPEC. INSULATION OF CORES SECTIONAL AREA OF SHEATH SHIELD REMARK

DC COPPER
A FR-CCV-SB XLPE 24 CORES 2.5SQMM BLACK BRAID
Reference DWG NO. DWG DATE REV.
CONTROL CIRCUIT
B B

FR-CCV-SB XLPE 6 CORES 2.5SQMM BLACK COPPER


B GAS CONTROL CIRCUIT
BRAID

FR-CCV-SB XLPE 6 CORES 6.0SQMM BLACK COPPER


C CT CONTROL CIRCUIT
BRAID

FR-CCV-SB XLPE 6 CORES 4.0SQMM BLACK COPPER


D VT CONTROL CIRCUIT
BRAID
EMPLOYER / DEVELOPER

C COPPER C
E HEATER CONTROL FR-CCV-SB XLPE 2 CORES 4.0SQMM BLACK
BRAID

FR-CCV-SB : Flame retardant control cross linked polyethylene sheathed cable PROJECT MANAGER.
- Rated Voltage : 0.6/1KV
- Heat resistant temperature : 90 degrees ( By Standard of UL)
- Conductor : Plain or Tinned annealed copper wire

SUPERVISION CONSULTANT

D GAS MONITORING D
B A LOCAL
BOX
CONTROL
B
CUBICLE 04 24.JAN.2018 REVISED AS PER COMMENT
LOCAL 03 10.AUG.2017 REVISED AS PER COMMENT
SECONDARY BOX 02 09.AUG.2017 REVISED AS PER COMMENT
C CONTROL 01
00
19.JUN.2017
01.SEP.2016
REVISED AS PER COMMENT
FOR APPROVAL
OF CT
CUBICLE REV. DATE ISSUED TO / FOR :

A MECHANISM OF CONTRACTOR: CONSORTIUM( KN / HHI )


DISCONNECTOR &
D
SECONDARY BOX E EARTHING SWITCH
OF VT E
E
E

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DRAWING TITLE:

EXTERNAL WIRE SPECIFICATION

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EB 7 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

DETAILS OF FERRULING DETAILS OF CABLE CONNECTION

Reference DWG NO. DWG DATE REV.

B B

DETAILS

TERMINAL TYPE 6 3 4 5

K201-14 / X1-79

1 2

1 WIRE FERRULING
INTERNAL
A. WHITE SLEEVE WITH BLACK LETTERS
WIRING X21
2 ADDITIONAL MARKING 1 1
2 2 DETAIL "A"
3 LETTERS DIRECTION
3 3
RING TYPE BLADE TYPE 4 INSULATED CAP EMPLOYER / DEVELOPER
A. TRIP : RED
4 4 TERMINAL
B. OTHERS : BLUE BLOCK
C 5 TERMINAL C
K201-13 / X1-71

K201-13 / X1-71

6 WIRE
TERMINAL BLOCK PVC DUCT EXTERNAL WIRING

PVC
DUCT

DETAIL "A"
PROJECT MANAGER.
X1-71 / K201-13
-X1
-K201
X1-71 / K201-13 71

72

73
MULTI CORE CABLE
13 21 31 43 74 GROUND WIRE
CABLE GLAND SUPERVISION CONSULTANT
75 BOTTOM PLATE
-K201 (FOR GLAND)
DETAIL "B"
76
D 14 22 33 44 D
77

78

X1-79 / K201-14 CABLE ENTRY HOLE


79
GROUND BUS-BAR
04 24.JAN.2018 REVISED AS PER COMMENT
80 X1-79 / K201-14 03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
DETAIL "B" 00 01.SEP.2016 FOR APPROVAL
BOTTOM PLATE
REV. DATE ISSUED TO / FOR :
K201-14 / X1-79

K201-14 / X1-79

CONTRACTOR: CONSORTIUM( KN / HHI )

E
E

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DRAWING TITLE:

FERRULING SYSTEM

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EB 8 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

SYMBOLS DESCRIPTION SYMBOLS DESCRIPTION SYMBOLS DESCRIPTION SYMBOLS DESCRIPTION

CIRCUIT BREAKER LIMIT SWITCH


RELAY COIL INDICATOR
OPERATED BY HYDRAULIC MECHANICALLY OPERATED

DISCONNECTOR OPERATED LIMIT SWITCH DIODE HORN Reference DWG NO. DWG DATE REV.
BY MOTOR SPRING MECHANICALLY OPERATED
B B

DISCONNECTOR OPERATED BY MOTOR MAKE CONTACT THERMAL RELAY HEATER

EARTHING SWITCH
BREAK CONTACT TIMER RESISTOR
OPERATED BY MOTOR SPRING

EARLY MAKE CONTACT


CURRENT TRANSFORMER MECHANICALLY OPERATED COUNTER ILLUMICATION
EMPLOYER / DEVELOPER

C LATE BREAK CONTACT C


VOLTAGE TRANSFORMER MECHANICALLY OPERATED ANNUNCIATOR OUTLET

SURGE ARRESTER A AMMETER PLUG & SOCKET PROJECT MANAGER.


DELAYED MAKE CONTACT

CABLE HEAD V VOLTMETER CONDUCTOR


DELAYED BREAK CONTACT

SUPERVISION CONSULTANT

MAKE CONTACT DENSITY M DIRECT CURRENT MOTOR


SF6/AIR BUSHING P
CONNECTION
D METER D

EARTH BREAK CONTACT DENSITY M INDUCTION MOTOR


P
EXTERNAL EQUIPMENT BOUNDARY
METER 3 PHASE 04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL

MINIATURE CIRCUIT BREAKER THERMOSTAT GIS EQUIPMENT BOUNDARY REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

OPERATED BY KEY OPERATING MECHANIAM

E
E
EXTERNAL EQUIPMENT

OTHER LCC

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DRAWING TITLE:

SYMBOL LEGEND

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EB 9 OF 92 04
1 2 3 4 5 6 7 8

Project

A OHTL1 A

(=D01) NOTE

1. RATED GAS PRESSURE


CB : 7 Bar
G/A BUSHING
MAIN BUS : 5 Bar
G01-07A

OTHERS : 5 Bar
BØ -Z1
G01-07B

2. SETTING PRESSURE(at 20°C) OF DENSITY MONITOR IS AS FOLLOWS
G01-07C
SF6 GAS PRESSURE Reference DWG NO. DWG DATE REV.
AØ EQUIPMENT DESCRIPTION
G01-06A (20°C)
B BØ
FIRST STAGE LEAK ALARM B
G01-06B
6.7 Bar
CØ (RE-FILLING STAGE)
G01-06C
M HS CB
SECOND STAGE LEAK ALARM
G01-05A

HSES 6.5 Bar
(PRESSURE FAILURE)
BØ (-Q8)
G01-05B FIRST STAGE LEAK ALARM
OTHERS 4.7 Bar
(RE-FILLING STAGE)

G01-05C M DS
(-Q9) (DS,ES,CT) SECOND STAGE LEAK ALARM
4.5 Bar
AØ (VT, BUS,etc) (PRESSURE FAILURE)
G01-04A
BØ ES
G01-04B
(-Q52) * ACCURACY RANGE : ±1% (at 20°C), ±2.5% (at -20°C ~ 60°C)
CØ M
G01-04C
C5 EMPLOYER / DEVELOPER
C4 3. GAS SECTION NUMBER OF GAS MONITORING IS AS FOLLOWS
C C3
CT (-T1) DESCRIPTION C
C2

C1
G X X - X X A
PHASE MARKING

G01-00A GAS COMPARTMENT NO.


GIS BAY NO. PROJECT MANAGER.


G01-00B CB (-Q0)

G01-00C
4. BURSTING PRESSURE OF PRESSURE RELIEF DEVICE
CB : 15 Bar
AØ OTHERS : 10 Bar
G01-03A

G01-03B
ES SUPERVISION CONSULTANT
CØ LEGEND
G01-03C
M
(-Q51)

SYMBOL DESCRIPTION
D D
NON-RETURN VALVE (NORMALLY OPEN)

NON-RETURN VALVE (NORMALLY CLOSED)


04 24.JAN.2018 REVISED AS PER COMMENT
M M DS GAS PRESSURE MONITOR 03 10.AUG.2017 REVISED AS PER COMMENT
DS 02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
(-Q1) (-Q2) INSULATION SPACER (GAS TIGHT) 00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :
INSULATION SPACER (GAS THROUGH)
CONTRACTOR: CONSORTIUM( KN / HHI )
245kV, 2000A, 50kA, 1s, 50Hz, BB-I
ABSORBENT ZEORAM

RUPTURE DISC (PRESSURE RELIEF DEVICE)


AØ BØ CØ AØ BØ CØ

UHF PD SENSOR
E
E
G07-08C

G01-01C
G07-08B

G01-01B
G07-08A

G01-01A

245kV, 2000A, 50kA, 1s, 50Hz, BB-II


1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
DRAWING TITLE:
AØ BØ CØ AØ BØ CØ

SF6 GAS SCHEME DIAGRAM


G01-09C

G01-02C
G01-09B

G01-02B
G01-09A

G01-02A

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EB 10 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

OHTL 1 BUS COUPLER MBP-1 OHTL 2 MBP-2 FUTURE FUTURE


(=D01) (=D03) (=DMP1) (=D05) (=DMP2) (=D07) (=D08)
-Z1 -Z1 -Z2 -Z2

-Q8 -Q8
M HS 50kA/1s M HS 50kA/1s M M

-Q9 -Q9
1600A M 1600A M M M

50kA/1s 50kA/1s
-Q52 -Q52
50kA/1s 50kA/1s
M M
M M
Reference DWG NO. DWG DATE REV.
P2 P2
C5 C5

B C4
245kV 2000A
C4 B
C3 -Q0 C3
-T1 50kA/1s -T1
C2 C2
C1 C1
P1 P1
P1 C1 C1 P1
-T3 -T4
245kV 1600A C2 C2 245kV 1600A
-Q0 -Q0
50kA/1s -T15 -T16 50kA/1s
P2 P2

-Q51 -Q51
50kA/1s -Q51 -Q52 50kA/1s
M M M M M M
50kA/1s 50kA/1s
-Q25 -Q55
M 50kA/1s -Q35 M 50kA/1s -Q65
-Q3 50kA/1s -Q5 50kA/1s
2000A M
-Q11 -Q21 2000A M
-Q31
M M 50kA/1s 2000A M M
2000A 50kA/1s M M
2000A M M M M
-Q1 -Q2 -Q15 -Q45 -Q1 -Q2
1600A 50kA/1s -Q1 -Q2 50kA/1s 1600A 50kA/1s
1600A M 50kA/1s M 50kA/1s 1600A
50kA/1s M 2000A 2000A M HS M
50kA/1s M M HS
50kA/1s 50kA/1s 50kA/1s 50kA/1s

245kV, 2000A, 50kA, 1s, 50Hz, BB-I


M M M

EMPLOYER / DEVELOPER
245kV, 2000A, 50kA, 1s, 50Hz, BB-II -Q12 -Q22 -Q32
2000A M HS 2000A 2000A M HS
-Q16 -Q46
C -Q1 M M -Q2
M 50kA/1s
50kA/1s 50kA/1s
M 50kA/1s
-Q1 M M -Q2
50kA/1s
M M
C
1600A 1600A -Q4 -Q6 1600A 1600A
50kA/1s 50kA/1s M
2000A -Q36 M
2000A 50kA/1s 50kA/1s -Q66
50kA/1s 50kA/1s 50kA/1s 50kA/1s
M M M
-Q26 -Q56
-Q51 M 50kA/1s M 50kA/1s -Q51
50kA/1s 50kA/1s

-Q0 245kV 1600A -Q0 245kV 1600A


50kA/1s -T25 -T26 50kA/1s PROJECT MANAGER.
P1 P1
C1 C1
C2 C2
-T2 C3 -T2 C3
C4 C4
C5 C5
M
P2 P2
M M

-Q52 -Q52 SUPERVISION CONSULTANT


50kA/1s 50kA/1s

-Z1 -Z1 -Z1


D D
TR 1 TR 2 FUTURE
(=D02) (=D04) (=D06)

04 24.JAN.2018 REVISED AS PER COMMENT


1. LEGEND FOR EACH EQUIPMENT 2. TECHNICAL DATA FOR CT 3. TECHNICAL DATA FOR VT 4. SUMMARIZED SPECIFICATION 03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
SYMBOL EQUIPMENT NAME REMARK SPECIFICATION PT NO. TYPE WIND 1. RATED VOLTAGE : 245 kV 01 19.JUN.2017 REVISED AS PER COMMENT
VOLTAGE RATIO CLASS BURDEN
LOCATION CT No. RATIO NO. 00 01.SEP.2016 FOR APPROVAL
MOTOR SPRING
CIRCUIT BREAKER CLASS Vk Rct @75°C Im BURDEN REV. DATE ISSUED TO / FOR :
MECHANISM 1'st 220/ √3kV : 100/ √3V 0.2 100 VA 2. RATED FREQUENCY : 50 Hz
M -T15
DISCONNECTING SWITCH MOTOR MECHANISM C1 1600-800/1A 5P30 - ‎≤ 5.0-2.5 Ω - 60-30 VA
-T16 1PH,
2'nd 220/ √3kV : 100/ √3V 3P 200 VA 3. RATED CURRENT : 2000 / 1600 A CONTRACTOR: CONSORTIUM( KN / HHI )
M -T25 INDUCTIVE
EARTHING SWITCH MOTOR MECHANISM C2 1600-800/1A 5P30 - ‎≤ 5.0-2.5 Ω - 60-30 VA -T26
OHTL
3'rd 220/ √3kV : 100/ √3V 3P 200 VA 4. RATED POWER FREQUENCY WITHSTAND VOLTAGE : 460 / 530 kV
HS HIGH SPEED EARTHING SWITCH MOTOR SPRING FEEDER -T1 C3 1600-800/1A 0.2FS5 - ‎≤ 6.2-3.1 Ω - 30-15 VA
M
MECHANISM (D01, D05)
C4 1600-800/1A 5P30 - ‎≤ 5.0-2.5 Ω - 60-30 VA 5. RATED LIGHTNING IMPULSE WITHSTAND VOLTAGE : 1050 / 1200 kV
VOLTAGE TRANSFORMER (1PH) INDUCTIVE TYPE
RING AND BUSHING C5 1600-800/1A 5P30 - ‎≤ 5.0-2.5 Ω - 60-30 VA 6. RATED SHORT-TIME WITHSTAND CURRENT : 50 kA
CURRENT TRANSFORMER
TYPE CT
E GAS TO AIR BUSHING
(CONDENSER TYPE) Z1 C1 800-400/1A 5P30 - ‎≤ 2.5-1.25 Ω - 60-30 VA 7. RATED DURATION :1s
E
CABLE HEAD BOX (FOR FUTURE BAY) Z2 800/1A ≥ 1200 V ‎≤ 2.0 Ω ≤ 60.0 mA
TR C2 PX - 8. RATED PEAK WITHSTAND CURRENT : 125 kA
FEEDER -T2 400/1A ≥ 600 V ‎≤ 1.0 Ω ≤ 120.0 mA
(D02, D04) 9. RATED SF6 GAS PRESSURE at 20℃(CB / Others) : 7.0 / 5.0 bar.G
C3 800-400/1A 5P30 - ‎≤ 2.5-1.25 Ω - 60-30 VA
10. RATED CONTROL VOLTAGE (DC / AC) : 220 Vdc / 220 Vac
C4 800-400/1A 0.2FS5 - ‎≤ 1.8-0.9 Ω - 30-15 VA

C5 800-400/1A 5P30 - ‎≤ 2.5-1.25 Ω - 60-30 VA 11. FIRST POLE TO CLEAR FACTOR : 1.3

C1 2000-1000/1A 5P30 - ‎≤ 11.2-5.6 Ω - 60-30 VA 12. PAINTING COLOR : RAL 7032


-T3
BUS C2 2000-1000/1A 5P30 - ‎≤ 11.2-5.6 Ω - 60-30 VA
COUPLER 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
(D03) C1 2000-1000/1A 0.2FS5 - ‎≤ 6.3-3.3 Ω - 30-15 VA
-T4
DRAWING TITLE:
C2 2000-1000/1A 5P30 - ‎≤ 11.2-5.6 Ω - 60-30 VA

220kV GIS SINGLE LINE DIAGRAM

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EB 11 OF 92 04
1 2 3 4 5 6 7 8

Project
OHTL 1
A
(=D01) A

-Z1 STATUS OF THE RELATED EQUIPMENT


EQUIPMENT
CONTROL T/L =D01 B/C =D03 REMARK
REF.
DS DS ES CB ES DS ES ES ES DS DS DS CB DS
-Q8 -Q1 -Q2 -Q51 -Q0 -Q52 -Q9 -Q8 -Q15 -Q16 -Q11 -Q12 -Q1 -Q0 -Q2
M HS 50kA/1s - O O O O - - O - - - - - -
LOCAL Reference DWG NO. DWG DATE REV.

CLOSE /REMOTE
B
-Q9 DS -Q1
/OPEN
- C - - - - - - - C C C C C BUS TRANSFER B

1600A M LOCAL - - - - - - - - - - - - - - INTERLOCK BYPASS


50kA/1s O - O O O - - - O - - - - -
LOCAL
-Q52
CLOSE /REMOTE
50kA/1s DS -Q2
/OPEN
C - - - - - - - - C C C C C BUS TRANSFER
M
P2
LOCAL - - - - - - - - - - - - - - INTERLOCK BYPASS
LOCAL
C5 CLOSE &REMOTE O O - - - O - - - - - - - -
ES -Q51
/OPEN
LOCAL - - - - - - - - - - - - - - INTERLOCK BYPASS EMPLOYER / DEVELOPER
C4
C C - - - - C - - - - - - - - C
REMOTE
-T1 C3
- C - - - C - - - - - - - -
C2 CB -Q0 CLOSE C - - - - C - - - - - - - -
EMERGENCY LOCAL CLOSE PROJECT MANAGER.
C1 LOCAL - C - - - C - - - - - - - -

P1
- - C - C - - - - - - - - - TEST

- - - - - - - - - - - - - - INTERLOCK BYPASS
245kV 1600A LOCAL
O O - - - O - - - - - - - SUPERVISION CONSULTANT
-Q0 CLOSE &REMOTE
ES -Q52
50kA/1s /OPEN
LOCAL - - - - - - - - - - - - - - INTERLOCK BYPASS
D D
LOCAL
CLOSE &REMOTE - - O O O - O - - - - - - -
-Q51 DS -Q9
/OPEN
50kA/1s LOCAL - - - - - - - - - - - - - - INTERLOCK BYPASS
M 04 24.JAN.2018 REVISED AS PER COMMENT
LOCAL 03 10.AUG.2017 REVISED AS PER COMMENT
CLOSE &REMOTE - - - - - O - - - - - - - - LINE DEAD 02
01
09.AUG.2017
19.JUN.2017
REVISED AS PER COMMENT
REVISED AS PER COMMENT
ES -Q8 00 01.SEP.2016 FOR APPROVAL
/OPEN
LOCAL - - - - - - - - - - - - - - INTERLOCK BYPASS REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

M M * REMARK
-Q1 -Q2 O : OPEN STATE
C : CLOSED STATE
E 1600A 1600A - : NO RELATION E
50kA/1s 50kA/1s
* FOLLOWING CONDITIONS SHALL BE SATISFIED ALSO.
1. DISCONNECTING SWICHES ARE NOT INTERMEDIATE POSITION.
BB-I 2. MECH. DOOR FOR MANUAL OPERATION IS NOT OPENED.

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


BB-II
DRAWING TITLE:

INTERLOCK DIAGRAM FOR T/L

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EB 12 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

220kV GIS LCC (=D01)


OHTL 1

FILTER
&MESH

VENTILATION
COVER H1
ANNUNCIATOR

UC625 CH40
Reference DWG NO. DWG DATE REV.
S11
CONTROL LOCATION SELECTION

S1 S2 S3 S4 S5
CB MOTOR CB MOTOR INTERLOCK BYPASS

B B
LAMP TEST HEATER TEST
LOCK - USE LONG RUN RESET INTERLOCK - RELEASE

AM1 AM2 AM3


AMMETER 1 AMMETER 2 AMMETER 3

BUS BAR - I
G01-08 G01-01

BUS BAR - II
G01-09 G01-02

S12
BUS DS BUS DS
VM1
Q1 Q2
BUS DS BUS DS
SF6 GAS SE
R DE R E
VO
Q1 Q2

W ME
T

O R
O

P
ER
COMPARTMENT
N/P
GIS N/P

WORK ES
Q51
WORK ES
Q51

G01-03

CIRCUIT BREAKER
Q0
CIRCUIT BREAKER

2250 mm
Q0

G01-00

F8A1

F8A2
S2C-H11L

S2C-H11L
STOPPER

STOPPER
S2C-H6R

S2C-H6R
WORK ES
Q52
WORK ES
Q52

G01-04

LINE DS
Q9
LINE DS
Q9

F8D1

F8D2

F8D3

F8D4
G01-05

S2C-H11L

S2C-H11L

S2C-H11L

S2C-H11L
STOPPER

STOPPER
S2C-H6R

S2C-H6R

S2C-H6R

S2C-H6R
S2C-A2
LINE ES
Q8
LINE ES
Q8

GIS N/P G01-06

G01-07
EMPLOYER / DEVELOPER

F8D5

F8D6

F8D7
C C

S2C-H11L

S2C-H11L

S2C-H11L
STOPPER

STOPPER
S2C-H6R

S2C-H6R

S2C-H6R
GAS TO AIR
BUSHING

STORAGE BOX SOCKET OUTLET SOCKET OUTLET


FOR PLUG AC 380V (3-PH) AC 220V (1-PH)

PROJECT MANAGER.

1600 mm 850 mm SUPERVISION CONSULTANT

FRONT VIEW SIDE VIEW INTERNAL DOOR INTERNAL DOOR


D D
( LEFT SIDE) ( RIGHT SIDE)

04 24.JAN.2018 REVISED AS PER COMMENT


03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
PANEL SPEICIFICATION 01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

1. PROTECTION DEGREE IP 54 CONTRACTOR: CONSORTIUM( KN / HHI )


2. PAINT COLOR RAL 7032
3. MIMIC COLOR 220kV: RAL 1016 (YELLOW)
EARTHING: RAL 9005 (BLACK)
4. MATERIAL COLD ROLLED STEEL SHEET
850 mm 5. THICKNESS PANEL - 2.3mm
E 6. EARTHING BUS BAR MATERIAL BOTTOM & INDOOR PLATE - 3.2mm
E
7. EARTHING BUS BAR SIZE CU
30mm X 5T

HEATER
8. OUT DOOR OPENING ANGLE 170˚
INNER DOOR OPENING ANGLE 90˚

1600 mm
1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
BOTTOM VIEW
DRAWING TITLE:

LCC LAYOUT FOR T/L

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EB 13 OF 92 04
1 2 3 4 5 6 7 8

Project

A -M4

1. MIMIC BUS (220kV: RAL 1016 (YELLOW))


(EARTHING: RAL 9005 (BLACK))
2. CONTROL SWITCH (OPEN - CLOSE)
3. POSITOIN INDICATOR (LED TYPE)
H1
ANNUNCIATOR
4. S11: CONTROL SWITCH WITH KEY
(LOCAL - REMOTE)

UC625 CH40 10 5. S1 : SELECTOR SWITCH Reference DWG NO. DWG DATE REV.
(CB MOTOR OPERATION)
B B
5 8
6. S2 : PUSH BUTTON SWITCH
S11
CONTROL LOCATION SELECTION
(CB MOTOR LONG RUN RESET)
S1 S2 S3 S4 S5

7. S3 : SELECTOR SWITCH WITH KEY


CB MOTOR CB MOTOR INTERLOCK BYPASS
LAMP TEST HEATER TEST
LOCK - USE LONG RUN RESET INTERLOCK - RELEASE

9
4
(INTERLOCK - RELEASE)
6 7
8. S4 : PUSH BUTTON SWITCH
G01-08 G01-01
BUS BAR - I
(LAMP TEST)
1
BUS BAR - II
9. S5 : PUSH BUTTON SWITCH
G01-09 G01-02

(HEATER TEST)
10. ANNUNCIATOR
BUS DS BUS DS
Q1 Q2
BUS DS
Q1
BUS DS
Q2 EMPLOYER / DEVELOPER
2
C 11. OUTLET SOCKET (AC 220V) C
3
12. OUTLET SOCKET (AC 380V)
WORK ES
Q51
WORK ES
Q51

G01-03
PROJECT MANAGER.
CIRCUIT BREAKER
Q0
CIRCUIT BREAKER
Q0

G01-00

WORK ES
Q52
WORK ES
Q52

G01-04
SUPERVISION CONSULTANT

LINE DS
Q9
LINE DS
Q9

D G01-05 D
WORK ES
Q53
WORK ES
Q53

G01-06

04 24.JAN.2018 REVISED AS PER COMMENT


G01-07 03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :
GAS TO AIR
BUSHING
CONTRACTOR: CONSORTIUM( KN / HHI )

E
E
STORAGE BOX SOCKET OUTLET SOCKET OUTLET
FOR PLUG AC 380V (3-PH) AC 220V (1-PH)

11

12

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DRAWING TITLE:

LCC MIMIC DIAGRAM FOR T/L

F
MOUNTING PLATE Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME (FRONT SIDE OF RIGHT DOOR) ACTION


A
Project No.:
008006400
Scale : CHECKED :
S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EB 14 OF 92 04
1 2 3 4 5 6 7 8

MAKER : 40CHANNEL Project

SPEC. : UC625-40YW-HH-024D-R-M3
MANUFACTURER : RTK
A REMARKS A

RTK
INSTRUMENTS
1 5 9 13 17 21 25 29 33 37

DS/ES MOTOR
CB MOTOR G01-00 GAS G01-04 GAS G01-08 GAS MAIN DC
RUNNING DC SUPPLY G01-02 GAS G01-06 GAS
LONG RUN LOW 1 LOW 1 LOW 1 SPARE SPARE
TIME MCB TRIP/OFF LOW 2 LOW 2 SUPPLY FAIL
AND STOP (ALARM) (ALARM) (ALARM)
EXCEEDED Reference DWG NO. DWG DATE REV.

B B
2 6 10 14 18 22 26 30 34 38

CB MOTOR DS/ES G01-01 GAS G01-05 GAS G01-09 GAS


AC SUPPLY G01-03 GAS G01-07 GAS AUX. AC
OVER LOAD SWITCHING LOW 1 LOW 1 LOW 1 SPARE SPARE
FAIL LOW 2 LOW 2 SUPPLY FAIL
AND STOP INCOMPLETE (ALARM) (ALARM) (ALARM)

3 7 11 15 19 23 27 31 35 39

SUPPLY 1
CB MOTOR G01-02 GAS G01-06 GAS G01-00 GAS
INTERLOCK 220VDC G01-04 GAS G01-08 GAS SPARE SUPPLY 2
SPRING LOW 1 LOW 1 LOW 2 SPARE EMPLOYER / DEVELOPER
BY-PASS ON SUPPLY 1 FAIL LOW 2 LOW 2
UNCHARGED/LOCK (ALARM) (ALARM) (LOCKOUT)
C C

4 8 12 16 20 24 28 32 36 40
TEST

G01-03 GAS G01-07 GAS ACK


POLE AC SUPPLY 220VDC G01-01 GAS G01-05 GAS G01-09 GAS PROJECT MANAGER.
LOW 1 LOW 1 SPARE SPARE
DISCREPANCY MCB TRIP/OFF SUPPLY 2 FAIL LOW 2 LOW 2 LOW 2 MUTE
(ALARM) (ALARM)
RESET

UC625 SUPERVISION CONSULTANT

D D

INPUT OUTPUT INPUT OUTPUT INPUT OUTPUT


CH. COLOR CONTACT CONTACT REMARKS CH. COLOR CONTACT CONTACT REMARKS CH. COLOR CONTACT CONTACT REMARKS

1 (YELLOW) NO NO RESPONSE TIME : 5ms 16 (YELLOW) NO NO RESPONSE TIME : 5sec 31 (YELLOW) NO NO RESPONSE TIME : 5sec 04
03
24.JAN.2018
10.AUG.2017
REVISED AS PER COMMENT
REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
2 (YELLOW) NO NO RESPONSE TIME : 5ms 17 (YELLOW) NO NO RESPONSE TIME : 5sec 32 (YELLOW) NO NO RESPONSE TIME : 5sec 01
00
19.JUN.2017
01.SEP.2016
REVISED AS PER COMMENT
FOR APPROVAL
REV. DATE ISSUED TO / FOR :
3 (YELLOW) NO NO RESPONSE TIME : 5ms 18 (YELLOW) NO NO RESPONSE TIME : 5sec 33 (YELLOW) NO NO RESPONSE TIME : 5ms
CONTRACTOR: CONSORTIUM( KN / HHI )
4 (YELLOW) NO NO RESPONSE TIME : 5ms 19 (YELLOW) NO NO RESPONSE TIME : 5sec 34 (YELLOW) NO NO RESPONSE TIME : 5ms

5 (YELLOW) NO NO RESPONSE TIME : 5ms 20 (YELLOW) NO NO RESPONSE TIME : 5sec 35 (YELLOW) NO NO RESPONSE TIME : 5ms

6 (YELLOW) NO NO RESPONSE TIME : 5ms 21 (YELLOW) NO NO RESPONSE TIME : 5sec 36 (YELLOW) NO NO RESPONSE TIME : 5ms
E
7 (YELLOW) NO NO RESPONSE TIME : 5ms 22 (YELLOW) NO NO RESPONSE TIME : 5sec 37 (YELLOW) NO NO RESPONSE TIME : 5ms E

8 (YELLOW) NO NO RESPONSE TIME : 5ms 23 (YELLOW) NO NO RESPONSE TIME : 5sec 38 (YELLOW) NO NO RESPONSE TIME : 5ms

9 (YELLOW) NO NO RESPONSE TIME : 5ms 24 (YELLOW) NO NO RESPONSE TIME : 5sec 39 (YELLOW) NO NO RESPONSE TIME : 5ms

10 (YELLOW) NO NO RESPONSE TIME : 5ms 25 (YELLOW) NO NO RESPONSE TIME : 5sec 40 (YELLOW) NO NO RESPONSE TIME : 5ms

11 (YELLOW) NO NO RESPONSE TIME : 5ms 26 (YELLOW) NO NO RESPONSE TIME : 5sec


1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
12 (YELLOW) NO NO RESPONSE TIME : 5ms 27 (YELLOW) NO NO RESPONSE TIME : 5sec
DRAWING TITLE:

13 (YELLOW) NO NO RESPONSE TIME : 5sec 28 (YELLOW) NO NO RESPONSE TIME : 5sec


LCC ANNUNCIATOR LIST
14 (YELLOW) NO NO RESPONSE TIME : 5sec 29 (YELLOW) NO NO RESPONSE TIME : 5sec

F Drawing Number : PREPARED : F


15 (YELLOW) NO NO RESPONSE TIME : 5sec 30 (YELLOW) NO NO RESPONSE TIME : 5sec
PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EB 15 OF 92 04
F
E
B

C
A

D
-M2

DRAWING NUMBER

16316 01 EB
DUCT 80x100
1

16OF
PHOENIX
PHOENIX

PHOENIX
PHOENIX
PHOENIX
PHOENIX
PHOENIX
PHOENIX
PHOENIX

SHEET NO.
01~30

XA
XD
XH
01~20 01~25 01~30

XAD

MANUFACTURER/VENDER NAME
3
2
1

2
1
2
1
3
2
1

92
04
REV NO.
DUCT 80x100 DUCT 80x100

PHOENIX
PHOENIX
PHOENIX

X0

01~20 01~20 01~20 01~200

X0C(B)

X0C(C)
X0C(A)

2
1
2
1
2
1
9
8
7
6
5
4
3
2
1

20
19
18
17
16
15
14
13
12
11
10
DUCT 80x100
2

-M1

DUCT 80x100 DUCT 100x100

PHOENIX PHOENIX PHOENIX PHOENIX

AF09-30-10-13
KQ1C AF09-30-10-13 KQ0C CR-M230AC4 KA1

PHOENIX
PHOENIX
PHOENIX
CA4-22M

X1
01~15 01~80

X1C
KDN-220DC PHOENIX
KQ0

1
8
7
6
5
4
3
2
1
AF09-30-10-13 NF22E-13
CA4-22M KQ1T K101A CR-M220DC4 KD1

AF09-30-10-13 NF22E-13 CR-M220DC4 KD2


CA4-22M KQ2C K101B
KDN-220DC
DUCT 80x100 KQ0.1 CR-M220DC4 KD3
AF09-30-10-13 NF22E-13
CA4-22M KQ2T K101C
CR-M220DC4 KD4
60 AF09-30-10-13
CA4-22M KQ9C AF09-30-10-13 KQ0T1 CR-M220DC4 KD5
KDN-220DC
KQ1

PHOENIX
PHOENIX
PHOENIX

X2
01~15 01~80 AF09-30-10-13 NF40E-13 CR-M220DC4 KD6

X2C
CA4-22M KQ9T CA4-40N K47A

1
8
7
6
5
4
3
2
1
3

CR-M220DC4 KD7
AF09-30-10-13
CA4-22M KQ51C AF09-30-10-13 KQ0T2
KDN-220DC CR-M220DC4 KG1.1
KQ2 AF09-30-10-13 NF40E-13
DUCT 80x100 CA4-22M KQ51T CA4-40N K47B KG1.2
CR-M220DC4

AF09-30-10-13
CA4-22M KQ52C AF09-30-10-13 K88MA CR-M220DC4 KG2.1
KDN-220DC
KQ9 AF09-30-10-13 CR-M220DC4 KG2.2
CA4-22M KQ52T AF09-30-10-13 K88MB

PHOENIX
PHOENIX
PHOENIX

X8

01~15 01~80 KG3.1

X8C
CR-M220DC4
AF09-30-10-13

1
8
7
6
5
4
3
2
1

CA4-22M KQ8C AF09-30-10-13 K88MC


CR-M220DC4 KG3.2
KDN-220DC
KQ51 AF09-30-10-13 MT-32/2H5
CA4-22M KQ8T F49A CR-M220DC4 KG4.1

DUCT 80x100 NF22E-13 MT-32/2H5 CR-M220DC4 KG4.2


K202 F49B
KDN-220DC CR-M220DC4 KG5.1
KQ52 AF09-22-00-13 MT-32/2H5
CA4-22E K201 F49C
CR-M220DC4 KG5.2
PHOENIX
NF40E-13

PHOENIX
PHOENIX
PHOENIX

NF22E-13
X9

01~15 01~80 K203 KG6.1

X9C
K102 CR-M220DC4
CA4-22N

1
8
7
6
5
4
3
2
1

AF09-22-00-13 CR-M220DC4 KG6.2


K205 NF40E-13
K49
DUCT 80x100
DUCT 80x100
DUCT 80x100
DUCT 80x100

DUCT 100x100

AF09-22-00-13 CR-M220DC4 KG7.1


80x100 CA4-22E K204 NF22E-13
CA4-22N K103
DUCT 80x100 CR-M220DC4 KG7.2
PHOENIX
NF40E-13
4

KL1 NF40E-13
K104 CR-M220DC4 KG8.1
PHOENIX
KDN-220DC NF40E-13 KG8.2
KQ8 KL2 CR-M220DC4
AT8N
PG-08 K102T

PHOENIX
PHOENIX
PHOENIX

01~15 01~80 CR-M220DC4 KG9.1


X51

NF40E-13

X51C
PHOENIX KL9

1
8
7
6
5
4
3
2
1

AT8N CR-M220DC4 KG9.2


PG-08 K203T
NF40E-13 PHOENIX

KL51
AT8N CR-M230AC4 KA2
PG-08 K204T
NF40E-13
DUCT 80x100 KL8
AT8N CR-M230AC4 KA3
NF40E-13 PG-08 T47A
CA4-40N KLR KA4
CR-M230AC4
AT8N PHOENIX

NF22E-13 PG-08 T48B


CA4-22N KG0.1 HRN-37 K501
PHOENIX
PHOENIX
PHOENIX

01~15 01~80
X52

X52C

AT8N HRN-37 K502


1
8
7
6
5
4
3
2
1

NF22E-13 PG-08 T88 HRN-37 K503


CA4-13N KG0.2 PHOENIX

PHOENIX

NF22E-13
CA4-13N KG0.2A
DUCT 80x100 NF22E-13
CA4-13N KG0.2B PHOENIX

NF40E-13 NF40E-13
CA4-40N K11 CA4-40N KHTS

NF40E-13 NF40E-13
PHOENIX
PHOENIX

XS

01~65 CA4-40N K11.1 KHTS1


6
5
4
3
2
1

PHOENIX
PHOENIX
5

DUCT 80x100 DUCT 100x100 = L880


-M3

DUCT 80x100
PHOENIX
PHOENIX
PHOENIX

XG

01~130 01~60
XA2

9
8
7
6
5
4
3
2
1
6
5
4
3
2
1

13
12
11
10
6

DUCT 80x100
DUCT 80x100

B
C
A

D
PHOENIX
PHOENIX
PHOENIX
PHOENIX

01~40
ACTION

01~100 01~90
XR2
XR1
XA1

9
8
7
6
5
4
3
2
1
9
8
7
6
5
4
3
2
1

10

4
3
2
1

DUCT 80x100
00
01
02
03
04

REV.
7

Project

A3
Project No.:
DATE
Reference DWG

01.SEP.2016
24.JAN.2018

19.JUN.2017
09.AUG.2017
10.AUG.2017

DRAWING TITLE:

Drawing Number :

Sheet Size : Rev. :


04
008006400
PROJECT MANAGER.
EMPLOYER / DEVELOPER

SUPERVISION CONSULTANT

Scale :

Plot Date:
ISSUED TO / FOR :

PK55-SD-EL-GS-14
CONTRACTOR: CONSORTIUM( KN / HHI )

01.SEP.2016
NO. DWG

FOR APPROVAL
8

REVISED AS PER COMMENT


REVISED AS PER COMMENT
REVISED AS PER COMMENT
REVISED AS PER COMMENT

CHECKED :
PREPARED :
DATE

APPROVED :
S.Y.JANG
INTERNAL ARRANGEMENT OF T/L (1)

K.H.SONG

C.Y.HONG
1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
REV.

F
E
B

C
A

D
1 2 3 4 5 6 7 8

Project

A A

PHOENIX

XC1 Reference DWG NO. DWG DATE REV.


1
2

B 3
B
4
5
6

7
8
9

PHOENIX

PHOENIX

10
11
12

13
14
15

16
17
18

PHOENIX

PHOENIX

19
20 EMPLOYER / DEVELOPER
21

22

C 23
24 C
25
26
27

PHOENIX

545 PHOENIX

28
29
30 PROJECT MANAGER.
-M4
31
32
DUCT 60X80 33

34
35
36

PHOENIX

PHOENIX

37
38
39

40
SUPERVISION CONSULTANT
41
DUCT 60X80 42

43
44
45

D PHOENIX
D
DUCT 60X80

DUCT 60X80
922

PHOENIX

XM 04 24.JAN.2018 REVISED AS PER COMMENT


DUCT 60X80
03 10.AUG.2017 REVISED AS PER COMMENT
1
2
02 09.AUG.2017 REVISED AS PER COMMENT
3 01 19.JUN.2017 REVISED AS PER COMMENT
4 00 01.SEP.2016 FOR APPROVAL
PHOENIX
REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )


PHOENIX

XC2

DUCT 60X80
TH
HTS

1
PHOENIX

E
PHOENIX
PHOENIX

PHOENIX

DUCT 40X80

MOUNTING PLATE MOUNTING PLATE MOUNTING PLATE


(REAR SIDE OF LEFT DOOR) (INSIDE OF LEFT) (INSIDE OF RIGHT) 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
DRAWING TITLE:

INTERNAL ARRANGEMENT OF T/L (2)

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EB 17 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

=DC DIST =DC DIST =DC DIST


DC 220V DC 220V DC 220V

+ - + - + -

Reference DWG NO. DWG DATE REV.

B B

-XD 2 -XD 11 -XD 1 -XD 10 -XD 3 -XD 12 -XD 7 -XD 16 -XD 4 -XD 13 -XD 5 -XD 14

3 1 3 1 3 1 3 1 EMPLOYER / DEVELOPER
-F8D1 -F8D2 -F8D3 -F8D4
C C
S202M-K6UC 4 2 S202M-K6UC 4 2 S202M-K16UC 4 2 S202M-K16UC 4 2
S2C-H11L S2C-A2 S2C-H11L S2C-H11L

C1
-F8D2 PROJECT MANAGER.

C2
23
-K203
/43.E6 24

SUPERVISION CONSULTANT

D D
21
-K202
/43.E2
22
04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
1 3 5 7 9 11 00 01.SEP.2016 FOR APPROVAL
-S11 REMOTE -S11 REMOTE -S11 REMOTE REV. DATE ISSUED TO / FOR :

2/75.B2 6/75.B2 10/75.B2


REMOTE_F2

LOCAL LOCAL LOCAL

REMOTE_F3

REMOTE_F4
4 8 12 CONTRACTOR: CONSORTIUM( KN / HHI )
(+)220V_F1

(+)220V_F2

(+)220V_F3

(+)220V_F4
(-)220V_F1

(-)220V_F2

(-)220V_F3

(-)220V_F4
LOCAL_F2

LOCAL_F3

LOCAL_F4
/75.B2 /75.B2 /75.B2

E
E
48.B1 48.E1 28.B1 28.A1 28.B1 28.E1 21.B1 21.A1 21.B1 21.E1 22.B1 22.A1 22.B1 22.E1

SIGNAL LAMP & DS/ES MOTOR & CB CLOSE CB TRIP1


ALARM INTERLOCK DC SUPPLY DC SUPPLY
DC SUPPLY DC SUPPLY

13 14 C1 C2 /18.C3 13 14 13 14 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


21 22 /68.D3 21 22 /68.D4 21 22 /68.D4
13 14 DRAWING TITLE:
34 31 /64.B4 34 31 /64.B5 34 31 /64.B5
32 21 22 /68.D4 32 32
34 31 /64.B4
DC POWER SUPPLY
32
F Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 18 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

=DC DIST =DC DIST

+ - + -

-XD 6 -XD 15 -XD 21 -XD 22


Reference DWG NO. DWG DATE REV.

B B

-XD 8 -XD 17 -XD 9 -XD 18

3 1 3 1 3 1 EMPLOYER / DEVELOPER
-F8D5 -F8D6 -F8D7
C S202M-K16UC 4 2 S202M-K16UC 4 2 S202M-K16UC 4 2 C
S2C-H11L S2C-H11L S2C-H11L

PROJECT MANAGER.

SUPERVISION CONSULTANT

D D

04 24.JAN.2018 REVISED AS PER COMMENT


03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
21 23 01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
-S11 -S11 REV. DATE ISSUED TO / FOR :
LOCAL 22 REMOTE 24
REMOTE_F5

(+)220V_F5

(+)220V_F6

(+)220V_F7
CONTRACTOR: CONSORTIUM( KN / HHI )
(-)220V_F5

(-)220V_F6

(-)220V_F7
/75.B3 /75.B3
LOCAL_F5

E
E
23.B1 23.A1 23.A1 23.E1 24.B1 24.E1 25.A1 25.E1

CB TRIP 2 CB MOTOR CONTROL CB MOTOR POWER


DC SUPPLY DC SUPPLY DC SUPPLY

13 14 13 14 13 14
1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
21 22 /68.D4 21 22 /68.D5 21 22 /68.D5
34 31 /64.B6 34 31 /64.B6 34 31 /64.B6 DRAWING TITLE:

32 32 32
DC POWER SUPPLY

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 19 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

A N A B C N

-XA 1 -XA 3 -XA 2 -XA 4 -XA 5-XA 7-XA 9-XA 11 -XA 6-XA 8-XA 10-XA 12 Reference DWG NO. DWG DATE REV.

B B

3 1 1 3 5 7N
-F8A1 -F8A2
S202M-K6UC 4 2 S203M-K32NA 2 4 6 8N
S2C-H11L EMPLOYER / DEVELOPER
S2C-H11L

C C

PROJECT MANAGER.

SUPERVISION CONSULTANT

(772 13) (5 552 89)


-SOCKET(3-PH)
D -SOCKET(1-PH) D
1 2

A1 1 4 (32A) A1 A1
2
-KA2 -KA3 -KA4
N220V_F1
A220V_F1

04 24.JAN.2018 REVISED AS PER COMMENT


SOCKET
(16A) 3 SOCKET SOCKET 03 10.AUG.2017 REVISED AS PER COMMENT
A2 A2 A2 02 09.AUG.2017 REVISED AS PER COMMENT
OUTLET OUTLET OUTLET 01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
CONTROL u=220V AC CONTROL CONTROL
u=380V AC REV. DATE ISSUED TO / FOR :
SUPPLY 1-phase SUPPLY SUPPLY
3-phase
CONTRACTOR: CONSORTIUM( KN / HHI )

56.A1 56.E1

E
HEATING & ANNUNCIATOR SOCKET OUTLET E
AC SUPPLY ‎AC (3Φ 380V & 1Φ 220V) SUPPLY

13 14 14 11 /64.C2 7N 8N /20.C4 14 11 /64.C2 14 11 /64.C3


21 22 /68.D1 12 13 14 12 12
34 31 /64.B2 24 21 /68.D2 24 21 /68.D2 24 21 /68.D3
21 22 /68.D2
32 22 22 22
34 31 /64.B2 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
34 31 32 34 31 34 31
32 32 32 DRAWING TITLE:
44 41 44 41 44 41
42 42 42 AC POWER SUPPLY

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 20 OF 92 04
1 2 3 4 5 6 7 8

Project

CB CLOSE CLOSE CIRCUIT (A) CLOSE CIRCUIT (B) CLOSE CIRCUIT (C)

A A
+Remote Control Panel +Protection Panel

-XR1 1 -XR1 2 -XR1 86 87 88 -XR1 14 -XR1 15 -XR1 16


REMOTE_F3
/ 18.E5
(+)220V_F3
/ 18.E5
LOCAL_F3
/ 18.E4 1L1 3L2 5L3
-KQ0C -KQ0C -KQ0C Reference DWG NO. DWG DATE REV.
/21.E1 2T1 /21.E1 4T2 /21.E1 6T3
B B
3
-SQ0 -X0C(A) 3 1 -X0C(B) 3 1 -X0C(C) 3 1
CLOSE 4
/73.B3 -Q0(A) -J1 3 -J1 1 -Q0(B) -J1 3 -J1 1 -Q0(C) -J1 3 -J1 1

B4 LA1 B4 LA1 B4 LA1


CB INT.1 CB INT(CRP).1 -S1 -S1 -S1
/ 45.A1 / 45.A5
CB INT(CRP).2 B04 LA01 B04 LA01 B04 LA01
CB INT.2
/ 45.E1 / 45.E5 -X1 1 -X1 1 -X1 1
1 1 1
-XR1 3
-52C -52C -52C EMPLOYER / DEVELOPER
=CRP 2 2 2
C -X1 2 -X1 2 -X1 2 C
86 RY
-J1 4 -J1 2 -J1 4 -J1 2 -J1 4 -J1 2

-XR1 4 -X0C(A) 4 2 -X0C(B) 4 2 -X0C(C) 4 2


PROJECT MANAGER.
21 14 21 14 21 14
-K101A -K101A -K101B -K101B -K101C
-K101C
-XR1 5 /21.E3
22 /21.E3 13
/21.E5
22 /21.E5 13
/21.E6
22 /21.E6 13
22 32 62
-XR1 6 -K102 -K102 -K102
/24.E3 /24.E3 /24.E3
21 31 61 SUPERVISION CONSULTANT
31 61
-XR1 7 21
-KG0.2 -KG0.2 -KG0.2
/48.E4 /48.E4
D -XR1 8 /48.E4
22 32 62 D

R3 -XR1 9

-K201 04 24.JAN.2018 REVISED AS PER COMMENT


/43.E5 R4 03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
-XR1 10 01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
R4 REV. DATE ISSUED TO / FOR :
-K205 -XR1 11
CONTRACTOR: CONSORTIUM( KN / HHI )
/44.E2 R3 -XR1 12
A1 A1 A1 A1 A1
-KQ0C -K101A -K101B -K101C -KD3
CLOSE A2 ANTI-PUMPING A2 ANTI-PUMPING A2 ANTI-PUMPING A2 CB CLOSE A2
E POWER
E
SUPPLY

-XR1 13
(-)220V_F3
/ 18.E5
1L1 2T1 /21.B3
14 13 /21.C4 14 13 /21.C5 14 13 /21.C6 14 11 /64.C4
3L2 4T2 /21.B4 12
21 22 /21.C3 21 22 /21.C4 21 22 /21.C5
5L3 6T3 /21.B5 24 21
31 32 31 32 31 32
13 14 22 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
43 44 43 44 43 44
34 31 /68.D6
32 DRAWING TITLE:

44 41
42 CB CLOSE CONTROL

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 21 OF 92 04
1 2 3 4 5 6 7 8

Project

PHASE-A PHASE-B PHASE-C


CB OPEN TRIP 1 TRIP 1 TRIP 1 POLE DISCREPANCY 1
A A
+Remote Control Panel +Protection Panel

-XR2 1 2 23 24 25 -XR2 3 4 5 -XR2 6 7 8 -XR2 9 10 11


REMOTE_F4
/ 18.E6
(+)220V_F4
/ 18.E6
LOCAL_F4
/ 18.E6 -XS 1
1L1 3L2 5L3
Reference DWG NO. DWG DATE REV.
-KQ0T1 -KQ0T1 -KQ0T1
/22.E1 2T1 /22.E1 4T2 /22.E1
B 6T3 B

1 13 23 33
-SQ0 -K47A -X0 1 -X0 3 -X0 5
-K47A -K47A
OPEN 2 /22.E6 14 /22.E6 /22.E6 -Q0(A) -J2 -Q0(B)-J2 -Q0(C) -J2
24 34 1 1 1
/73.B3
A4 A4 A4
-S1 -S1 -S1
A04 A04 A04
-J2 2 -J2 2 -J2 2
-X0C(A) 5 -X0C(A) 6 -X0C(B) 5 -X0C(B) 6 -X0C(C) 5 -X0C(C) 6
-X0 2 -X0 4 -X0 6
EMPLOYER / DEVELOPER
-Q0(A) -J1 5 -J1 6 -Q0(B) -J1 5 -J1 6 -Q0(C) -J1 5 -J1 6
C * A2 * B2 * A2 * B2 * A2 * B2 C
-S1 -S1 -S1
* A02 B02
* A02 B02
* A02 B02
-X0 35 -X0 37 -X0 39
-X1 1
3 -X1 1
3 -X1 1
3 -Q0(A) -J2 13 -Q0(B)-J2 13 -Q0(C) -J2 13

-52T1
* -52T1
* -52T1
* B5 B5 B5 PROJECT MANAGER.

2 2 2 -S1 -S1 -S1


-X1 4 -X1 4 -X1 4 B05 B05 B05
-J1* 7 -J1* 7 -J1* 7 -J2 14 -J2 14 -J2 14

-X0 36 -X0 38 -X0 40


-X0C(A) 7 -X0C(B) 7 -X0C(C) 7
21 31 61 SUPERVISION CONSULTANT

-KG0.2A -KG0.2A -KG0.2A


/48.E4 /48.E4 /48.E4
D 22 32 62 D

-XR1 17

4 3 04 24.JAN.2018 REVISED AS PER COMMENT


-XR1 18 03 10.AUG.2017 REVISED AS PER COMMENT
-T47A 02
01
09.AUG.2017
19.JUN.2017
REVISED AS PER COMMENT
REVISED AS PER COMMENT
/22.E6 1 00 01.SEP.2016 FOR APPROVAL
-XR1 19 REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

A1 A1 7 A1
-KQ0T1 -XR1 20 -K47A -T47A -KD4
OPEN A2 POLE A2 POLE 2 CB TRIP1 A2
E DISCREPANCY DESCREPANCY POWER
E
(SET:100mSEC) SUPPLY

(-)220V_F4 -XR1 21
/ 18.E6

13 14 /22.B3 3 1 /22.D5 14 11 /64.C4


12 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
23 24 /22.B4 4
1L1 2T1 /22.B3 24 21 DRAWING TITLE:
3L2 4T2 /22.B4 33 34 /22.B5 6 8 22
43 44 /59.B3 5
5L3 6T3 /22.B5 34 31 /68.D6 CB TRIP 1 CONTROL
53 54 /68.B3 32
13 14 [NOTE] PLEASE REFER TO CLOUDED PART. TRIP CIRCUIT 63 64 44 41
Drawing Number : PREPARED : F
F SUPERVISION RELAYS WILL BE CONNECTED TO THIS PART. 73 74 42
PK55-SD-EL-GS-14 K.H.SONG
83 84
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 22 OF 92 04
1 2 3 4 5 6 7 8

PHASE-A PHASE-B PHASE-C Project


CB OPEN TRIP 2 TRIP 2 TRIP 2 POLE DISCREPANCY 2

+Remote Control Panel +Protection Panel


A A

-XR2 12 -XR2 13 26 27 28 -XR2 14 15 16


-XR2 17 18 19 -XR2 20 21 22
REMOTE_F5
/ 19.E2

(+)220V_F5
/ 19.E2
LOCAL_F5
/ 19.E2 1L1 3L2 5L3
-KQ0T2 -KQ0T2 -KQ0T2 -XS 2
/23.E1 2T1 /23.E1 4T2 /23.E1 6T3
Reference DWG NO. DWG DATE REV.

B B
5
-X0 7 -X0 9 -X0 11
-SQ0
-Q0(A) -J2 3 -Q0(B)-J2 3 -J2
-Q0(C) 3
OPEN 6
/73.B3 13 23 33 A5 A5 A5
-K47B -K47B -K47B -S1 -S1 -S1
/23.E5 14 /23.E5 24 /23.E5 34 A05 A05 A05
-J2 4 -J2 4 -J2 4
-X0 8 -X0 10 -X0 12

-X0C(A) 8 -X0C(A) 9 -X0C(B) 8 -X0C(B) 9 -X0C(C) 8 -X0C(C) 9


EMPLOYER / DEVELOPER
-Q0(A) -J1 8 -J1 9 -Q0(B) -J1 8 -J1 9 -Q0(C) -J1 8 -J1 9
C * A3 * B3 * A3 * B3 * A3 * B3 -X0 41 -X0 43 -X0 45
C
-S1 -S1 -S1 -Q0(A) -J2 15 -Q0(B)-J2 15 -J2
-Q0(C) 15
B6 B6 B6
* A03 B03
* A03 B03
* A03 B03
-S1 -S1 -S1
-X1 1
5 -X1 1
5 -X1 1
5

-52T2
* -52T2
* -52T2
* B06 B06 B06
PROJECT MANAGER.
-J2 16 -J2 16 -J2 16
2 2 2 -X0 42 -X0 44 -X0 46
-X1 6 -X1 6 -X1 6
* * *
-J1 10 -J1 10 -J1 10

-X0C(A) 10 -X0C(B) 10 -X0C(C) 10


SUPERVISION CONSULTANT
21 31 61
-KG0.2B -KG0.2B -KG0.2B
/48.E5 /48.E5 /48.E5
D 22 32 62 D

-XR1 22
4 3
04 24.JAN.2018 REVISED AS PER COMMENT
-T48B 03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
/23.E6 1 01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :
-XR1 23
CONTRACTOR: CONSORTIUM( KN / HHI )

A1 A1 7 A1
-KQ0T2 -K47B -T48B -KD5
OPEN
-XR1 24
POLE POLE CB TRIP2
A2 A2 2 A2
E DISCREPANCY DESCREPANCY POWER
E
(SET:100mSEC) SUPPLY

(-)220V_F5 -XR1 25
/ 19.E3

1L1 2T1 /23.B3 13 14 /23.B3 3 1 /23.D5 14 11 /64.C6 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
3L2 4T2 /23.B4 23 24 /23.B4 4 12
DRAWING TITLE:
5L3 6T3 /23.B5 33 34 /23.B5 6 8 24 21
5 22
13 14 [NOTE] PLEASE REFER TO CLOUDED PART. TRIP CIRCUIT 43 44 /59.B3
34 31 /68.D6
CB TRIP 2 CONTROL
53 54 /68.B3 32
SUPERVISION RELAYS WILL BE CONNECTED TO THIS PART. 63 64
F 44 41 Drawing Number : PREPARED : F
73 74 42 PK55-SD-EL-GS-14 K.H.SONG
83 84 ACTION Project No.: Scale : CHECKED :
MANUFACTURER/VENDER NAME
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 23 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

(+)220V_F6
/ 19.E4

1 Reference DWG NO. DWG DATE REV.


97 97
-S1 3 13 4 3
B -F49A -F49C B
USE 2 /25.B2 /25.B5 -S2 -K88MB -K102T
/75.C5 98 98 /24.E2
/75.D5 4 14 /24.E4 1
97 4 3 13 13
-F49B -T88 -K88MA -K88MC
-X0C(A) 13 15 -X0C(B) 13 15 -X0C(C) 13 15 /25.B3 /24.E6 14 /24.E1 /24.E3
98 1 14 14
-Q0(A) -J1 13 -J1 15 -Q0(B) -J1 13 -J1 15 -Q0(C) -J1 13 -J1 15
-K103
/24.E5 13
c c c
-LS1 c
-LS1 c
-LS1 c
d d d
-LS2 -LS2 -LS2 EMPLOYER / DEVELOPER
c d c d c d
C -LS3 -LS3 -LS3 C
d d d

-J1 14 -J1 16 -J1 14 -J1 16 -J1 14 -J1 16


PROJECT MANAGER.
-X0C(A) 14 16 -X0C(B) 14 16 -X0C(C) 14 16

SUPERVISION CONSULTANT

D D
95 95 95
-F49A -F49B -F49C
/25.B2 /25.B3 /25.B5 04 24.JAN.2018 REVISED AS PER COMMENT
96 96 96
03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
22 32 62 00 01.SEP.2016 FOR APPROVAL
-K103 -K103 -K103 REV. DATE ISSUED TO / FOR :
/24.E5 /24.E5 /24.E5
21 31 61 CONTRACTOR: CONSORTIUM( KN / HHI )

A1 A1 A1 A1 7 A1 A1 7 A1 A1
-K88MA -K88MB -K88MC -K102 -K102T -K49 -K103 -T88 -K104 -KD6
CB MOTOR A2 CB MOTOR A2 CB MOTOR A2 CB MOTOR A2 SPRING 2 CB MOTOR A2 CB MOTOR A2 MOTOR 2 CB MOTOR A2 CB MOTOR A2
E OPERATION OPERATION OPERATION SPRING UNCHARGED OVER LOAD LONG RUN LONG RUN SPRING CONTROL
E
UNCHARGED SET:30sec SET:1Min CHARGING SUPPLY
FAULTY

(-)220V_F6
/ 19.E4

1L1 2T1 /25.B2 1L1 2T1 /25.B3 1L1 2T1 /25.B5 13 14 3 1 /24.B6 13 14 /59.B2 14 13 /24.B5 3 1 /24.B5 13 14 /59.B3 14 11 /64.C5
3L2 4T2 3L2 4T2 3L2 4T2 22 21 /21.D3 4 23 24 /68.B2 22 21 /24.E1 4 23 24 /68.B3 12
24 21 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
5L3 6T3 /25.E2 5L3 6T3 /25.E3 5L3 6T3 /25.E5 32 31 /21.D4 6 8 33 34 32 31 /24.E2 6 8 33 34
5 5 22
13 14 /24.B5 13 14 /24.B5 13 14 /24.B6 43 44 43 44 43 44 /59.B1 43 44 DRAWING TITLE:
34 31 /68.D6
53 54 53 54 /68.B2 32 CB MOTOR CONTROL
62 61 /21.D5 62 61 /24.E3 44 41
71 72 71 72 42
F 83 84 83 84 Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 24 OF 92 04
1 2 3 4 5 6 7 8

Project

A A
CB MOTOR OPERATION CB MOTOR OPERATION CB MOTOR OPERATION
(A PHASE) (B PHASE) (C PHASE)

(+)220V_F7
/ 19.E5

1L1 1L1 1L1


-K88MA -K88MB -K88MC
/24.E1 2T1 /24.E2 2T1 /24.E3 2T1

Reference DWG NO. DWG DATE REV.


1 1 1

B -F49A -F49B -F49C B


/25.D2 2 /25.D3 2 /25.D5 2
SET: 5A SET: 5A SET: 5A

-X0C(A) 11 -X0C(B) 11 -X0C(C) 11

-Q0(A) -J1 11 -Q0(B) -J1 11 -Q0(C) -J1 11


-OUTLET_A -OUTLET_B -OUTLET_C
/26.A5 (16A) /26.C5 (16A) /26.E5 (16A)
-X1 7 1 2 -X1 7 1 2 -X1 7 1 2
u=220V AC u=220V AC u=220V AC
3 3 3
-S13 -X1 9 10
-S13 -X1 9 10
-S13 -X1 9 10
DC 1 5 DC 1 5 DC 1 5
4 4 4
/26.B4 -S13 -S13 /26.C4 -S13 -S13 /26.E4 -S13 -S13 EMPLOYER / DEVELOPER
AC 2 AC 6 AC 2 AC 6 AC 2 AC 6
C /26.B4 /26.B5 /26.C4 /26.C5 /26.E4 /26.E5
C

M1 M1 M1

M M M
-M1 -M1 -M1 PROJECT MANAGER.

M01 M01 M01

7 7 7
-S13 -S13 -S13
DC 8 DC 8 DC 8 SUPERVISION CONSULTANT
/26.B4 /26.C4 /26.E4
-X1 8 -X1 8 -X1 8

D -J1 12 -J1 12 -J1 12 D

-X0C(A) 12 -X0C(B) 12 -X0C(C) 12

04 24.JAN.2018 REVISED AS PER COMMENT


5 5 5 03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
-F49A -F49B -F49C 01
00
19.JUN.2017
01.SEP.2016
REVISED AS PER COMMENT
FOR APPROVAL
/25.B3 /25.B5 A1
/25.B2 6 6 6 REV. DATE ISSUED TO / FOR :
-KD7
CONTRACTOR: CONSORTIUM( KN / HHI )
CB MOTOR A2
POWER
5L3 5L3 5L3 SUPPLY
-K88MA -K88MB -K88MC
/24.E1 6T3 /24.E2 6T3 /24.E3 6T3
E
(-)220V_F7 E
/ 19.E5

14 11 /64.C5
12
24 21 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
22 DRAWING TITLE:
34 31 /68.D7
32 CB MOTOR POWER
44 41
42
F Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 25 OF 92 04
1 2 3 4 5 6 7 8

/22.D3

/23.D3

/25.D2

/56.D5
/21.C3

/21.C3

/22.C3

/22.C3

/23.C3

/23.C3

/24.C1

/24.C1
/21.B3

/21.B3

/25.B2

/24.B1

/24.B1

/56.B5
Project

-X0C(A) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 -XH 9 12

-W1 1 2 3 6 4 5 7 8 9 10 11 12 13 14 15 16 -W4 1 2
A A
-Q0(A)
-J1 -OUTLET_A -J1 -JA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2
LA1 B4 * A2 * B2 * * A3 * B3 * /25.B2
1 2 (16A)
u=220V AC c
-S1 -X1 7 8
-LS1 c
LA01 B04 A02 B02 A03 B03 -X1 9 10
d
-X1 1 2 * * 3 7 1 5
c -LS2 1
-X1 3 4 5 6
-S13 -S13 -S13 -S13 d
* * DC 4 DC 8 AC 2 AC 6
-LS3 -HT
/25.C2 /25.D2 /25.C2 /25.C3 d
2
M1 Reference DWG NO. DWG DATE REV.

B 1 1 1 M B
-M1
-52C -52T1 -52T2
DC 2 DC 2 DC 2 M01
220V, 60 220V, 60 220V, 60
Ohm Ohm Ohm

/22.D4

/23.D4

/25.D3

/56.D5
/21.C5

/21.C4

/22.C4

/22.C4

/23.C4

/23.C4

/24.C2

/24.C2
/21.B5

/21.B4

/25.B3

/24.B2

/24.B2

/56.B5
-X0C(B) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 -XH 10 13

-W2 1 2 3 6 4 5 7 8 9 10 11 12 13 14 15 16 -W5 1 2
EMPLOYER / DEVELOPER
-Q0(B)
C -J1 -OUTLET_B -J1 -JA C
1 2 3 4 *5 *6 *7 * 8 * 9 * 10 11 12
/25.B4 (16A)
13 14 15 16 1 2
LA1 B4 A2 B2 A3 B3 1 2
u=220V AC c
-S1 -X1 7 8
-LS1 c
LA01 B04 A02 B02 A03 B03 -X1 9 10
-X1 1 2 * * 3 7 1 5 d
c -LS2 1
PROJECT MANAGER.
-X1 3 4 5 6
-S13 -S13 -S13 -S13 d
* * DC 4 DC 8 AC 2 AC 6
-LS3 -HT
/25.C3 /25.D3 /25.C4 /25.C4 d
2
M1

1 1 1 M SUPERVISION CONSULTANT
-M1
-52C -52T1 -52T2
DC 2 DC 2 DC 2
D 220V, 60 220V, 60 220V, 60 M01 D
Ohm Ohm Ohm
/22.D5

/23.D5

/25.D5

/56.D6
/21.C6

/21.C5

/22.C5

/22.C5

/23.C5

/23.C5

/24.C3

/24.C3
/21.B6

/21.B5

/25.B5

/24.B3

/24.B3

/56.B6
04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
-X0C(C) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 -XH 11 14 00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

-W3 1 2 3 6 4 5 7 8 9 10 11 12 13 14 15 16 -W6 1 2 CONTRACTOR: CONSORTIUM( KN / HHI )

-Q0(C)
-J1 -OUTLET_C -J1 -JA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1 2
LA1 B4 * A2 * B2 * * A3 * B3 * /25.B6
1 2 (16A)
u=220V AC c
E -S1 -X1 7 8
-LS1 E
LA01 B04 B02 B03 -X1 9 10 c
A02 A03
d
-X1 1 2 * * 3 7 1 5 c -LS2 1
-X1 3 4 5 6
-S13 -S13 d
-S13 -S13 -LS3
AC -HT
DC 4 DC 8 2 AC 6
/25.C6 /25.C6 d
/25.C5 /25.D5 2

M1
1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
1 1 1 M
* * -M1 DRAWING TITLE:
-52C -52T1 -52T2
DC 2 DC 2 DC 2
CB MECHANISM 1
220V, 60 220V, 60 220V, 60 M01
Ohm Ohm Ohm Drawing Number : PREPARED : F
F
PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 26 OF 92 04
1 2 3 4 5 6 7 8

Project

INTERLOCK WITH

INTERLOCK WITH

INTERLOCK WITH
LATCHED RELAY

LATCHED RELAY
FOR MULTIPLY

FOR MULTIPLY
OPEN/CLOSE

OPEN/CLOSE
INDICATION

INDICATION
CB TRIP1

CB TRIP2

CB TRIP1

CB TRIP2
/67.B1 REMOTE

/67.B2 REMOTE
CIRCUIT

CIRCUIT
CICUIT

CICUIT

Q9

Q1

Q2
A A

/22.C6

/23.C5

/46.C2

/46.C5
/22.B6

/23.B5

/54.B3

/40.B3

/54.B3

/40.B4

/47.B2
-X0 1 7 13 19 25 31 35 41 47 53 59 65 69 73 77 81 85 89 93 97 101 105 109 113 117 121 125 129
-W7 1 3 5 7 9 11 13 15 17 21 19 23 -W10 1 3 5 7 9 11 13 15 17 21 19 23 -W13 1 3 5 7

-Q0(A)
-J2 1 3 5 7 9 11 13 15 17 19 21 23-J3 1 3 5 7 9 11 13 15 17 19 21 23-J4 1 3 5 7
A4 A5 A6 A7 A8 LB1 B5 B6 B7 B8 B9 LA1 A2 A3 A4 A5 A6 A7 A8 LB1 B2 B3 B4 B5 B6 B7 B8 B9
-S1 -S2
Reference DWG NO. DWG DATE REV.
A04 A05 A06 A07 A08 LB01 B05 B06 B07 B08 B09 LA01 A02 A03 A04 A05 A06 A07 A08 LB01 B02 B03 B04 B05 B06 B07 B08 B09

B -J2 2 4 6 8 10 12 14 16 18 20 22 24-J3 2 4 6 8 10 12 14 16 18 20 22 24-J4 2 4 6 8 B

-W7 2 4 6 8 10 12 14 16 18 22 20 24-W10 2 4 6 8 10 12 14 16 18 22 20 24 -W13 2 4 6 8

-X0 2 8 14 20 26 32 36 42 48 54 60 66 70 74 78 82 86 90 94 98 102 106 110 114 118 122 126 130


CB TRIP1

CB TRIP2

CB TRIP1

CB TRIP2
/67.B2 REMOTE

/67.B3 REMOTE
CIRCUIT

CIRCUIT
CICUIT

CICUIT
/22.C6

/23.C6
/22.B6

/23.B6

-X0 3 9 15 21 27 37 43 49 55 61
EMPLOYER / DEVELOPER
-W8 1 3 5 7 9 11 13 15 17 21 19 23 -W11 1 3 5 7 9 11 13 15 17 21 19 23 -W14 1 3 5 7

C C
-Q0(B)
-J2 1 3 5 7 9 11 13 15 17 19 21 23-J3 1 3 5 7 9 11 13 15 17 19 21 23-J4 1 3 5 7
A4 A5 A6 A7 A8 LB1 B5 B6 B7 B8 B9 LA1 A2 A3 A4 A5 A6 A7 A8 LB1 B2 B3 B4 B5 B6 B7 B8 B9
-S1 -S2
PROJECT MANAGER.
A04 A05 A06 A07 A08 LB01 B05 B06 B07 B08 B09 LA01 A02 A03 A04 A05 A06 A07 A08 LB01 B02 B03 B04 B05 B06 B07 B08 B09

-J2 2 4 6 8 10 12 14 16 18 20 22 24-J3 2 4 6 8 10 12 14 16 18 20 22 24-J4 2 4 6 8

-W8 2 4 6 8 10 12 14 16 18 22 20 24-W11 2 4 6 8 10 12 14 16 18 22 20 24 -W14 2 4 6 8

-X0 4 10 16 22 28 33 38 44 50 56 62 67 71 75 79 83 87 91 95 99 103 107 111 115 119 123 127 131


SUPERVISION CONSULTANT
CB TRIP1

CB TRIP2

CB TRIP1

CB TRIP2
/67.B3 REMOTE

/67.B4 REMOTE
CIRCUIT

CIRCUIT
CICUIT

CICUIT

D D
/22.C6

/23.C6
/22.B6

/23.B6

-X0 5 11 17 23 29 39 45 51 57 63
04 24.JAN.2018 REVISED AS PER COMMENT
-W9 1 3 5 7 9 11 13 15 17 21 19 23 -W12 1 3 5 7 9 11 13 15 17 21 19 23 -W15 1 3 5 7 03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
-Q0(C) REV. DATE ISSUED TO / FOR :
-J2 1 3 5 7 9 11 13 15 17 19 21 23-J3 1 3 5 7 9 11 13 15 17 19 21 23-J4 1 3 5 7
CONTRACTOR: CONSORTIUM( KN / HHI )
A4 A5 A6 A7 A8 LB1 B5 B6 B7 B8 B9 LA1 A2 A3 A4 A5 A6 A7 A8 LB1 B2 B3 B4 B5 B6 B7 B8 B9
-S1 -S2
A04 A05 A06 A07 A08 LB01 B05 B06 B07 B08 B09 LA01 A02 A03 A04 A05 A06 A07 A08 LB01 B02 B03 B04 B05 B06 B07 B08 B09

-J2 2 4 6 8 10 12 14 16 18 20 22 24-J3 2 4 6 8 10 12 14 16 18 20 22 24-J4 2 4 6 8


E
E
-W9 2 4 6 8 10 12 14 16 18 22 20 24-W12 2 4 6 8 10 12 14 16 18 22 20 24 -W15 2 4 6 8

-X0 6 12 18 24 30 34 40 46 52 58 64 68 72 76 80 84 88 92 96 100 104 108 112 116 120 124 128 132

-X0 133 135 137 139 141 143 145 147 -X0 149 151 153 155 157 159 161 163

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


L13 L11 L14 L12 L9 L7 L10 L8 R8 R10 R7 R9 R12 R14 R11 R13 L13 L11 L14 L12 L9 L7 L10 L8 R8 R10 R7 R9 R12 R14 R11 R13 DRAWING TITLE:

-KQ0 -KQ0.1 CB MECHANISM 2


/40.E3 L3 L4 L5 L6 R6 R5 R4 R3 /40.E4 L3 L4 L5 L6 R6 R5 R4 R3

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG
-X0 134 136 138 140 142 144 146 148 -X0 150 152 154 156 158 160 162 164 ACTION Project No.: Scale : CHECKED :
MANUFACTURER/VENDER NAME
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 27 OF 92 04
1 2 3 4 5 6 7 8

Project

BUS DS (BB-1) BUS DS (BB-1) MANUAL BUS DS (BB-1)


CLOSE OPEN OPERATION MOTOR OPERATION
A +CRP A

-XR1 26 -XR1 27 -XR1 28


REMOTE_F2 REMOTE_F2
/ 18.E3 / 30.A1
(+)220V_F2 (+)220V_F2
/ 18.E3 / 30.B1
LOCAL_F2 LOCAL_F2
/ 18.E3 / 30.B1

Reference DWG NO. DWG DATE REV.

B B
2T1 2T1
1
3 -KQ1T -KQ1C
-SQ1 -SQ1 /28.C2 1L1 /28.C2 1L1
CLOSE OPEN 2
4
/73.C3 /73.C3
3L2 3L2
-KQ1T -KQ1C
/28.C2 4T2 /28.C2 4T2
14 14
-KQ1C -KQ1T
/28.C2 13 /28.C2 13
EMPLOYER / DEVELOPER

C C
21
A1 A1 -KQ1C
-KQ1C -KQ1T /28.C2
22
CLOSE A2 OPEN A2 22 PROJECT MANAGER.
-KQ1T
/28.C2
21
-X1C 1 -X1C 2 -X1C 3 -X1C 5 7

-Q1 -Q1
-J1 1 -J1 2 -J1 3 -J1 5 -J1 7
1 c
c c SUPERVISION CONSULTANT
-ILM -DS2 M1
-LSA -LSB 2 a
d
d d M
D -M -DS2 D
a a a
b
-DS1 -LSA -LSB
OPERATION M01
b b b
2 1 04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
-PS 02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
-J1 4 -J1 6
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

-X1C 4 -X1C 6 CONTRACTOR: CONSORTIUM( KN / HHI )

44 44 44 6T3 6T3

E -KL1 -KQ1C -KQ1T -KQ1C -KQ1T


/46.E3 43 /28.C2 43 /28.C2 43 /28.C2 5L3 /28.C2 5L3 E

(-)220V_F2 (-)220V_F2
/ 18.E4 / 30.E1

2T1 1L1 /28.B5 2T1 1L1 /28.B4


4T2 3L2 /28.B5 4T2 3L2 /28.B4
1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
6T3 5L3 /28.E5 6T3 5L3 /28.E6
DRAWING TITLE:
14 13 /28.C1 14 13 /28.C3
21 22 /28.C5 22 21 /28.C5 BUS DS(-Q1) CONTROL
31 32 31 32
44 43 /28.E3 44 43 /28.E4
F 53 54 /43.B2 53 54 /43.B2
Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 28 OF 92 04
1 2 3 4 5 6 7 8

Project

/28.D2

/28.D2

/28.D4

/28.D5

/28.D5

/57.D1
/57.B1
/28.E4

/28.E5
A -X1C 1 2 3 4 5 6 7 8 9 -XH 21 15 A

-W2 1 2 3 4 5 6 7 8 9 -W4 1 2

-Q1

-J1 1 2 3 4 5 6 7 -J1 8 9 -JA 1 2

c c -DS2 a c
-LSA -LSB d -DS2 -DS1
OPERATION
Reference DWG NO. DWG DATE REV.
d d 1 b d
1
B -PS B
-ILM M1
2 1
DC220V, 2
6.2W, M -HT
-M
9200 Ohm
DC220V, 2
350W
a a a M01
-DS1 -LSA -LSB
b b b

EMPLOYER / DEVELOPER

C C

INTERLOCK WITH

INTERLOCK WITH
Q0 CLOSE (REMOTE)

DS/ES INCOMPLETE

Q0 CLOSE (LOCAL)
INTERLOCK WITH

INTERLOCK WITH

INTERLOCK WITH

INTERLOCK WITH

INTERLOCK WITH
INTERLOCK
COUPLING
LATCHED RELAY

LATCHED RELAY
FOR MULTIPLY

FOR MULTIPLY
OPEN/CLOSE

OPEN/CLOSE
INDICATION

INDICATION

CONDITION
Q15

Q11
PROJECT MANAGER.

Q51, Q52
/67.B4 REMOTE

/67.E1 REMOTE

/67.B5 REMOTE

/67.E2 REMOTE

=D03/66.C4

=D03/70.B1

=D03/67.B3
Q2

Q2
/45.B5

/54.B3

/41.B2

/54.B4

/41.B2

/44.B1

/46.B6

/45.B3

/46.B4

/47.B3
-X1 1 3 5 7 9 11 13 15 17 19 21 23 -X1 25 27 29 31 33 35 37 39 41 43 45 47
SUPERVISION CONSULTANT
-W1 1 3 5 7 9 11 13 15 17 19 21 23 -W3 1 3 5 7 9 11 13 15 17 19 21 23

D D
-Q1 -J2 1 3 5 7 9 11 13 15 17 19 21 23 -Q1 -J3 1 3 5 7 9 11 13 15 17 19 21 23

A1 A2 A3 A4 A5 B1 B2 B3 B4 B5 B6 Wc1 A1 A2 A3 A4 A5 A6 B1 B2 B3 B4 B5 B6
-S1 -S2 04
03
24.JAN.2018
10.AUG.2017
REVISED AS PER COMMENT
REVISED AS PER COMMENT
A01 A02 A03 A04 A05 B01 B02 B03 B04 B05 B06 Wc01 A01 A02 A03 A04 A05 A06 B01 B02 B03 B04 B05 B06 02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
-J2 2 4 6 8 10 12 14 16 18 20 22 24 -J3 2 4 6 8 10 12 14 16 18 20 22 24 REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )


-W1 2 4 6 8 10 12 14 16 18 20 22 24 -W3 2 4 6 8 10 12 14 16 18 20 22 24

-X1 2 4 6 8 10 12 14 16 18 20 22 24 -X1 26 28 30 32 34 36 38 40 42 44 46 48
E
E

-X1 49 51 53 55 57 59 61 63

L13 L11 L14 L12 L9 L7 L10 L8 R8 R10 R7 R9 R12 R14 R11 R13

-KQ1 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


/41.E2 L3 L4 L5 L6 R6 R5 R4 R3 DRAWING TITLE:

BUS DS(-Q1) MECHANISM


-X1 50 52 54 56 58 60 62 64
F Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 29 OF 92 04
1 2 3 4 5 6 7 8

Project

BUS DS (BB-2) BUS DS (BB-2) MANUAL BUS DS (BB-2)


CLOSE OPEN OPERATION MOTOR OPERATION
A +CRP A

-XR1 29 -XR1 30 -XR1 31


REMOTE_F2 REMOTE_F2
/ 28.A6 / 32.A1
(+)220V_F2 (+)220V_F2
/ 28.B6 / 32.B1
LOCAL_F2 LOCAL_F2
/ 28.B6 / 32.B1

Reference DWG NO. DWG DATE REV.

2T1 2T1
B B
-KQ2T -KQ2C
3 1 /30.C2 /30.C2
1L1 1L1
-SQ2 -SQ2
CLOSE 4 OPEN 2 3L2 3L2
/73.D3 /73.D3
-KQ2T -KQ2C
/30.C2 4T2 /30.C2 4T2

14 14
-KQ2C -KQ2T
/30.C2 13 /30.C2 13

EMPLOYER / DEVELOPER

C C
21
A1 A1 -KQ2C
-KQ2C -KQ2T /30.C2
22
CLOSE A2 OPEN A2 22 PROJECT MANAGER.
-KQ2T
/30.C2
21
-X2C 1 -X2C 2 -X2C 3 -X2C 5 7

-Q2 -Q2
-J1 1 -J1 2 -J1 3 -J1 5 -J1 7
1
c
c c SUPERVISION CONSULTANT
-ILM -DS2 M1
-LSA -LSB 2 a
d
d d M
D -M -DS2 D
a a a
b
-DS1 -LSA -LSB
OPERATION M01
b b b
2 1 04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
-PS 02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
-J1 4 -J1 6
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

-X2C 4 -X2C 6 CONTRACTOR: CONSORTIUM( KN / HHI )

44 44 44 6L3 6T3

E -KL2 -KQ2C -KQ2T -KQ2C -KQ2T


/46.E6 43 /30.C2 43 /30.C2 43 /30.C2 5T3 /30.C2 5L3 E

(-)220V_F2 (-)220V_F2
/ 28.E6 / 32.E1

2T1 1L1 /30.B5 2T1 1L1 /30.B4


4T2 3L2 /30.B5 4T2 3L2 /30.B4
1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
5L3 6T3 6T3 5L3 /30.E6
DRAWING TITLE:
14 13 /30.C1 14 13 /30.C3
21 22 /30.C5 22 21 /30.C5 BUS DS(-Q2) CONTROL
31 32 31 32
44 43 /30.E3 44 43 /30.E4
F 53 54 /43.B3 53 54 /43.B3
Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG
6L3 5T3 /30.E5
MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 30 OF 92 04
1 2 3 4 5 6 7 8

Project

/30.D2

/30.D2

/30.D4

/30.D5

/30.D5

/57.D2
/57.B2
/30.E4

/30.E5
-X2C 1 2 3 4 5 6 7 8 9 -XH 22 16
A A
-W2 1 2 3 4 5 6 7 8 9 -W4 1 2

-Q2

-J1 1 2 3 4 5 6 7 -J1 8 9 -JA 1 2

c
c c a c
-DS2
-LSA -LSB d OPERATION -DS2 -DS1
d d 1 b d
Reference DWG NO. DWG DATE REV.
1 -PS
M1
B -ILM 2 1 B
DC220V, 2 M -HT
6.2W, -M
9200 Ohm DC220V, 2
a 350W
a a M01
-DS1
-LSA -LSB
b
b b

EMPLOYER / DEVELOPER

C C

INTERLOCK WITH

INTERLOCK WITH
Q0 CLOSE (REMOTE)

DS/ES INCOMPLETE

Q0 CLOSE (LOCAL)
INTERLOCK WITH

INTERLOCK WITH

INTERLOCK WITH

INTERLOCK WITH

INTERLOCK WITH
INTERLOCK
COUPLING
LATCHED RELAY

LATCHED RELAY
FOR MULTIPLY

FOR MULTIPLY
OPEN/CLOSE

OPEN/CLOSE
INDICATION

INDICATION

CONDITION
Q16

Q12
PROJECT MANAGER.

Q51, Q52
/67.B5 REMOTE

/67.E2 REMOTE

/67.B6 REMOTE

/67.E3 REMOTE

=D03/68.C2

=D03/70.C1

=D03/67.B5
Q1

Q1
/45.B6

/54.B4

/41.B3

/54.B4

/41.B4

/44.B2

/46.B3

/45.B3

/46.B1

/47.B3
-X2 1 3 5 7 9 11 13 15 17 19 21 23 -X2 25 27 29 31 33 35 37 39 41 43 45 47
SUPERVISION CONSULTANT
-W1 1 3 5 7 9 11 13 15 17 19 21 23 -W3 1 3 5 7 9 11 13 15 17 19 21 23

D D
-Q2 -J2 1 3 5 7 9 11 13 15 17 19 21 23 -Q2 -J3 1 3 5 7 9 11 13 15 17 19 21 23

A1 A2 A3 A4 A5 B1 B2 B3 B4 B5 B6 Wc1 A1 A2 A3 A4 A5 A6 B1 B2 B3 B4 B5 B6
-S1 -S2 04
03
24.JAN.2018
10.AUG.2017
REVISED AS PER COMMENT
REVISED AS PER COMMENT
A01 A02 A03 A04 A05 B01 B02 B03 B04 B05 B06 Wc01 A01 A02 A03 A04 A05 A06 B01 B02 B03 B04 B05 B06 02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
-J2 2 4 6 8 10 12 14 16 18 20 22 24 -J3 2 4 6 8 10 12 14 16 18 20 22 24 REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )


-W1 2 4 6 8 10 12 14 16 18 20 22 24 -W3 2 4 6 8 10 12 14 16 18 20 22 24

-X2 2 4 6 8 10 12 14 16 18 20 22 24 -X2 26 28 30 32 34 36 38 40 42 44 46 48
E
E

-X2 49 51 53 55 57 59 61 63

L13 L11 L14 L12 L9 L7 L10 L8 R8 R10 R7 R9 R12 R14 R11 R13

-KQ2 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


/41.E3 L3 L4 L5 L6 R6 R5 R4 R3 DRAWING TITLE:

BUS DS(-Q2) MECHANISM


-X2 50 52 54 56 58 60 62 64
F Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 31 OF 92 04
1 2 3 4 5 6 7 8

Project

LINE DS LINE DS MANUAL LINE DS


CLOSE OPEN OPERATION MOTOR OPERATION
A +CRP A

-XR1 32 -XR1 33 -XR1 34

REMOTE_F2 REMOTE_F2
/ 30.A6 / 34.A1
(+)220V_F2 (+)220V_F2
/ 30.B6 / 34.B1
LOCAL_F2 LOCAL_F2
/ 30.B6 / 34.B1

Reference DWG NO. DWG DATE REV.

2T1 2T1
B B
-KQ9T -KQ9C
1 /32.C2 1L1 /32.C2 1L1
3
-SQ9 -SQ9
OPEN 3L2 3L2
CLOSE 4 2
/73.E3 /73.E3 -KQ9T -KQ9C
/32.C2 4T2 /32.C2 4T2

14 14
-KQ9C -KQ9T
/32.C2 13 /32.C2 13
EMPLOYER / DEVELOPER

C C
21
A1 A1 -KQ9C
-KQ9C -KQ9T /32.C2
22
CLOSE A2 OPEN A2 22 PROJECT MANAGER.
-KQ9T
/32.C2
21
-X9C 1 -X9C 2 -X9C 3 -X9C 5 7

-Q9 -Q9
-J1 1 -J1 2 -J1 3 -J1 5 -J1 7
1
c c c SUPERVISION CONSULTANT
-ILM M1
-LSA -LSB -DS2
2 a
d d d
D M -DS2 D
a a a
-M
b
-DS1 -LSA -LSB
OPERATION M01
b b b
2 1 04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
-PS 02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
-J1 4 -J1 6
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

-X9C 4 -X9C 6 CONTRACTOR: CONSORTIUM( KN / HHI )

44 44 44 6T3 6T3

E -KL9 -KQ9C -KQ9T -KQ9C -KQ9T


/47.E2 43 /32.C2 43 /32.C2 43 /32.C2 5L3 /32.C2 5L3 E

(-)220V_F2 (-)220V_F2
/ 30.E6 / 34.E1

2T1 1L1 /32.B5 2T1 1L1 /32.B4


4T2 3L2 /32.B5 4T2 3L2 /32.B4
1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
6T3 5L3 /32.E5 6T3 5L3 /32.E6
DRAWING TITLE:
14 13 /32.C1 14 13 /32.C3
21 22 /32.C5 22 21 /32.C5 LINE DS(-Q9) CONTROL
31 32 31 32
44 43 /32.E3 44 43 /32.E4
F 53 54 /43.B4 53 54 /43.B4
Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 32 OF 92 04
1 2 3 4 5 6 7 8

Project

/32.D2

/32.D2

/32.D4

/32.D5

/32.D5

/57.D2
/57.B2
/32.E4

/32.E5
-X9C 1 2 3 4 5 6 7 8 9 -XH 23 17
A A
1 2 3 4 5 6 7 8 9 -W4 1 2
-W2

-Q9

-J1 1 2 3 4 5 6 7 -J1 8 9 -JA 1 2

c
c c -DS2 a c
-LSA -LSB d OPERATION -DS2 -DS1
d d 1 b d Reference DWG NO. DWG DATE REV.
1 -PS
B M1 B
-ILM 2 1
DC220V, 2 M -HT
6.2W, -M
9200 Ohm DC220V, 2
a 350W
a a M01
-DS1
-LSA -LSB
b
b b

EMPLOYER / DEVELOPER
Q0 CLOSE (REMOTE)

DS/ES INCOMPLETE
C C

Q0 CLOSE (LOCAL)
INTERLOCK WITH

INTERLOCK WITH

INTERLOCK WITH

INTERLOCK WITH
LATCHED RELAY

LATCHED RELAY
FOR MULTIPLY

FOR MULTIPLY
OPEN/CLOSE

OPEN/CLOSE
INDICATION

INDICATION

CONDITION

Q51, Q52
/67.D1 REMOTE

/67.D2 REMOTE

Q8
PROJECT MANAGER.

/45.C3

/47.C3
/45.B5

/54.B5

/41.B5

/54.B5

/41.B5

/44.B2

/47.B4
-X9 1 3 5 7 9 11 13 15 17 19 21 23 -X9 25 27 29 31 33 35 37 39 41 43 45 47
-W1 1 3 5 7 9 11 13 15 17 19 21 23 -W3 1 3 5 7 9 11 13 15 17 19 21 23

SUPERVISION CONSULTANT

-Q9 -Q9
-J2 1 3 5 7 9 11 17 13 15 19 21 23 -J3 1 3 5 7 9 11 13 15 17 19 21 23
D D
A1 A2 A3 A4 A5 B1 B2 B3 B4 B5 B6 Wc1 A1 A2 A3 A4 A5 A6 B1 B2 B3 B4 B5 B6
-S1 -S2
A01 A02 A03 A04 A05 B01 B02 B03 B04 B05 B06 Wc01 A01 A02 A03 A04 A05 A06 B01 B02 B03 B04 B05 B06
04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
-J2 2 4 6 8 10 12 18 14 16 20 22 24 -J3 2 4 6 8 10 12 14 16 18 20 22 24 02
01
09.AUG.2017
19.JUN.2017
REVISED AS PER COMMENT
REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
-W1 2 4 6 8 10 12 14 16 18 20 22 24 -W3 2 4 6 8 10 12 14 16 18 20 22 24 REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

-X9 2 4 6 8 10 12 14 16 18 20 22 24 -X9 26 28 30 32 34 36 38 40 42 44 46 48

E
E

-X9 49 51 53 55 57 59 61 63

L13 L11 L14 L12 L9 L7 L10 L8 R8 R10 R7 R9 R12 R14 R11 R13

-KQ9
/41.E5
1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
L3 L4 L5 L6 R6 R5 R4 R3
DRAWING TITLE:

LINE DS(-Q9) MECHANISM


-X9 50 52 54 56 58 60 62 64

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 33 OF 92 04
1 2 3 4 5 6 7 8

Project

WORK ES WORK ES MANUAL WORK ES


CLOSE OPEN OPERATION MOTOR OPERATION
A +CRP A

-XR1 35 -XR1 36 -XR1 37


REMOTE_F2 REMOTE_F2
/ 32.A6 / 36.A1

(+)220V_F2 (+)220V_F2
/ 32.B6 / 36.B1
LOCAL_F2 LOCAL_F2
/ 32.B6 / 36.B1

Reference DWG NO. DWG DATE REV.

2T1 2T1
B B
-KQ51T -KQ51C
1 /34.C2 1L1 /34.C2 1L1
3
-SQ51 -SQ51
OPEN 3L2 3L2
CLOSE 4 2
/74.B3 /74.B3 -KQ51T -KQ51C
/34.C2 4T2 /34.C2 4T2

14 14
-KQ51C -KQ51T
/34.C2 13 /34.C2 13
EMPLOYER / DEVELOPER

C C
21
A1 A1 -KQ51C
-KQ51C -KQ51T /34.C2
22
CLOSE A2 OPEN A2 22 PROJECT MANAGER.
-KQ51T
/34.C2
21
-X51C 1 -X51C 2 -X51C 3 -X51C 5 7

-Q51 -Q51
-J1 1 -J1 2
1 -J1 3 -J1 5 -J1 7

c c -ILM c SUPERVISION CONSULTANT


-DS2 M1
-LSA -LSB 2
a
d d d
D M -DS2 D
a a a
-M
b
-DS1 -LSA -LSB
OPERATION M01
b b b
2 1 04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
-PS 02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
-J1 4 -J1 6
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

-X51C 4 -X51C 6 CONTRACTOR: CONSORTIUM( KN / HHI )

44 44 44 6T3 6T3

E -KL51 -KQ51C -KQ51T -KQ51C -KQ51T


/47.E3 43 /34.C2 43 /34.C2 43 /34.C2 5L3 /34.C2 5L3 E

(-)220V_F2 (-)220V_F2
/ 32.E6 / 36.E1

2T1 1L1 /34.B5 2T1 1L1 /34.B4


4T2 3L2 /34.B5 4T2 3L2 /34.B4
1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
6T3 5L3 /34.E5 6T3 5L3 /34.E6
DRAWING TITLE:
14 13 /34.C1 14 13 /34.C3
21 22 /34.C5 22 21 /34.C5 WORK ES(-Q51) CONTROL
31 32 31 32
44 43 /34.E3 44 43 /34.E4
F 53 54 /43.B4 53 54 /43.B5
Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 34 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

/34.D2

/34.D2

/34.D4

/34.D5

/34.D5

/57.D3
/57.B3
/34.E4

/34.E5
-X51C 1 2 3 4 5 6 7 8 9 -XH 24 18

-W2 1 2 3 4 5 6 7 8 9 -W4 1 2

-Q51
-J1 1 2 3 4 5 6 7 -J1 8 9 -JA 1 2

c
Reference DWG NO. DWG DATE REV.
-DS2
c c d a c
B B
-LSA -LSB OPERATION -DS2 -DS1
d d 1 b d
1
-PS
-ILM M1
2 1
DC220V, 2
6.2W, M -HT
-M
9200 Ohm
DC220V, 2
a 350W
a a M01
-DS1
-LSA -LSB
b
b b
EMPLOYER / DEVELOPER

C C

DS/ES INCOMPLETE

Q0 CLOSE (LOCAL)
INTERLOCK WITH

INTERLOCK WITH

INTERLOCK WITH

INTERLOCK WITH
PROJECT MANAGER.
LATCHED RELAY

LATCHED RELAY
FOR MULTIPLY

FOR MULTIPLY
OPEN/CLOSE

OPEN/CLOSE
INDICATION

INDICATION

CONDITION
/67.D2 REMOTE

/67.D3 REMOTE

Q1

Q2

Q9
/46.D1

/46.D4
/45.C4
/54.B6

/42.B2

/54.B6

/42.B2

/44.B3

/47.B2
SUPERVISION CONSULTANT

-X51 1 3 5 7 9 11 13 15 17 19 21 23 -X51 25 27 29 31 33 35 37 39 41 43 45 47
-W1 1 3 5 7 9 11 13 15 17 19 21 23 -W3 1 3 5 7 9 11 13 15 17 19 21 23
D D

-Q51 -Q51
-J2 1 3 5 7 9 11 13 15 17 19 21 23 -J3 1 3 5 7 9 11 13 15 17 19 21 23 04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
A1 A2 A3 A4 A5 B1 B2 B3 B4 B5 B6 Wc1 A1 A2 A3 A4 A5 A6 B1 B2 B3 B4 B5 B6 01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
-S1 -S2 REV. DATE ISSUED TO / FOR :
A01 A02 A03 A04 A05 B01 B02 B03 B04 B05 B06 Wc01 A01 A02 A03 A04 A05 A06 B01 B02 B03 B04 B05 B06
CONTRACTOR: CONSORTIUM( KN / HHI )
-J2 2 4 6 8 10 12 14 16 18 20 22 24 -J3 2 4 6 8 10 12 14 16 18 20 22 24

-W1 2 4 6 8 10 12 14 16 18 20 22 24 -W3 2 4 6 8 10 12 14 16 18 20 22 24

E
E
-X51 2 4 6 8 10 12 14 16 18 20 22 24 -X51 26 28 30 32 34 36 38 40 42 44 46 48

-X51 49 51 53 55 57 59 61 63

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


L13 L11 L14 L12 L9 L7 L10 L8 R8 R10 R7 R9 R12 R14 R11 R13
DRAWING TITLE:
-KQ51
/42.E2 L3 L4 L5 L6 R6 R5 R4 R3 WORK ES(-Q51) MECHANISM

F Drawing Number : PREPARED : F


-X51 50 52 54 56 58 60 62 64 PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 35 OF 92 04
1 2 3 4 5 6 7 8

Project

WORK ES WORK ES MANUAL WORK ES


CLOSE OPEN OPERATION MOTOR OPERATION
A +CRP A

-XR1 38 -XR1 39 -XR1 40


REMOTE_F2 REMOTE_F2
/ 34.A6 / 38.A1

(+)220V_F2 (+)220V_F2
/ 34.B6 / 38.B1
LOCAL_F2 LOCAL_F2
/ 34.B6 / 38.B1

Reference DWG NO. DWG DATE REV.

2T1 2T1
B B
-KQ52T -KQ52C
1 /36.C2 1L1 /36.C2 1L1
3
-SQ52 -SQ52
OPEN 3L2 3L2
CLOSE 4 2
/74.C3 /74.C3 -KQ52T -KQ52C
/36.C2 4T2 /36.C2 4T2

14 14
-KQ52C -KQ52T
/36.C2 13 /36.C2 13
EMPLOYER / DEVELOPER

C C
21
A1 A1 -KQ52C
-KQ52C -KQ52T /36.C2
22
CLOSE A2 OPEN A2 22 PROJECT MANAGER.
-KQ52T
/36.C2
21
-X52C 1 -X52C 2 -X52C 3 -X52C 5 7

-Q52 -Q52
-J1 1 -J1 2 -J1 3 -J1 5 -J1 7
1
c c c SUPERVISION CONSULTANT
-ILM -DS2 M1
-LSA -LSB a
2 d
d d M
D -M -DS2 D
a a a
b
-DS1 -LSA -LSB
OPERATION M01
b b b
2 1 04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
-PS 02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
-J1 4 -J1 6
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

-X52C 4 -X52C 6 CONTRACTOR: CONSORTIUM( KN / HHI )

34 44 44 6T3 6T3

E -KL51 -KQ52C -KQ52T -KQ52C -KQ52T


/47.E3 34 /36.C2 43 /36.C2 43 /36.C2 5L3 /36.C2 5L3 E

(-)220V_F2 (-)220V_F2
/ 34.E6 / 38.E1

2T1 1L1 /36.B5 2T1 1L1 /36.B4


4T2 3L2 /36.B5 4T2 3L2 /36.B4
1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
6T3 5L3 /36.E5 6T3 5L3 /36.E6
DRAWING TITLE:
14 13 /36.C1 14 13 /36.C3
21 22 /36.C5 22 21 /36.C5 WORK ES(-Q52) CONTROL
31 32 31 32
44 43 /36.E3 44 43 /36.E4
F 53 54 /43.B5 53 54 /43.B5
Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 36 OF 92 04
1 2 3 4 5 6 7 8

Project

/36.D2

/36.D2

/36.D4

/36.D5

/36.D5

/57.D3
/57.B3
/36.E4

/36.E5
A A
-X52C 1 2 3 4 5 6 7 8 9 -XH 25 19

-W2 1 2 3 4 5 6 7 8 9 -W4 1 2

-Q52
-J1 1 2 3 4 5 6 7 -J1 8 9 -JA 1 2

c
-DS2
c c d a c
-LSA -LSB OPERATION -DS2 -DS1 Reference DWG NO. DWG DATE REV.
d d 1 b d
B 1 B
-PS
-ILM M1
2 1
DC220V, 2
6.2W, M -HT
-M
9200 Ohm
DC220V, 2
a 350W
a a M01
-DS1
-LSA -LSB
b
b b

EMPLOYER / DEVELOPER

C C

DS/ES INCOMPLETE

Q0 CLOSE (LOCAL)
INTERLOCK WITH

INTERLOCK WITH

INTERLOCK WITH

INTERLOCK WITH
LATCHED RELAY

LATCHED RELAY
FOR MULTIPLY

FOR MULTIPLY
OPEN/CLOSE

OPEN/CLOSE
INDICATION

INDICATION

CONDITION
/67.D3 REMOTE

/67.D4 REMOTE

PROJECT MANAGER.

Q1

Q2

Q9
/46.D1

/46.D4
/45.C4
/55.B2

/42.B3

/55.B2

/42.B4

/44.B3

/47.B2
-X52 1 3 5 7 9 11 13 15 17 19 21 23 -X52 25 27 29 31 33 35 37 39 41 43 45 47
-W1 1 3 5 7 9 11 13 15 17 19 21 23 -W3 1 3 5 7 9 11 13 15 17 19 21 23
SUPERVISION CONSULTANT

D -Q52
-J2 -Q52
-J3 D
1 3 5 7 9 11 13 15 17 19 21 23 1 3 5 7 9 11 13 15 17 19 21 23

A1 A2 A3 A4 A5 B1 B2 B3 B4 B5 B6 Wc1 A1 A2 A3 A4 A5 A6 B1 B2 B3 B4 B5 B6
-S1 -S2 04 24.JAN.2018 REVISED AS PER COMMENT
A01 A02 A03 A04 A05 B01 B02 B03 B04 B05 B06 Wc01 A01 A02 A03 A04 A05 A06 B01 B02 B03 B04 B05 B06 03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
-J2 2 4 6 8 10 12 14 16 18 20 22 24 -J3 2 4 6 8 10 12 14 16 18 20 22 24 00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

-W1 2 4 6 8 10 12 14 16 18 20 22 24 -W3 2 4 6 8 10 12 14 16 18 20 22 24 CONTRACTOR: CONSORTIUM( KN / HHI )

-X52 2 4 6 8 10 12 14 16 18 20 22 24 -X52 26 28 30 32 34 36 38 40 42 44 46 48

E
E

-X52 49 51 53 55 57 59 61 63

L13 L11 L14 L12 L9 L7 L10 L8 R8 R10 R7 R9 R12 R14 R11 R13 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
-KQ52 DRAWING TITLE:

/42.E3 L3 L4 L5 L6 R6 R5 R4 R3
WORK ES(-Q52) MECHANISM

F -X52 50 52 54 56 58 60 62 64 Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 37 OF 92 04
1 2 3 4 5 6 7 8

Project
LINE ES LINE ES MANUAL LINE ES
CLOSE OPEN OPERATION MOTOR OPERATION

A +CRP A

-XR1 41 -XR1 42 -XR1 43

REMOTE_F2
/ 36.A6
(+)220V_F2 (+)220V_F2
/ 36.B6 / 40.A1
LOCAL_F2
/ 36.B6

Reference DWG NO. DWG DATE REV.

B B

3 1

-SQ8 -SQ8 2T1 2T1


CLOSE 4
OPEN 2 -KQ8C -KQ8T
/74.D3 /74.D3 /38.C2 /38.C2
1L1 1L1

6T3 6T3
-KQ8C -KQ8T
/38.C2 5L3 /38.C2 5L3
EMPLOYER / DEVELOPER

C C

A1 A1
-KQ8C -KQ8T
CLOSE A2 OPEN A2
PROJECT MANAGER.

-X8C 1 -X8C 2 -X8C 3 -X8C 5

-Q8 -J1 -J1


1 2 3 5
B1 A5 c SUPERVISION CONSULTANT
-S1 -DS2 M1
B01 A05 d
D M D
a 1 -M
-DS1 -ILM -PS
b 2 OPERATION M01
04 24.JAN.2018 REVISED AS PER COMMENT
2 1 03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT

-J1 4 -J1 6 01
00
19.JUN.2017
01.SEP.2016
REVISED AS PER COMMENT
FOR APPROVAL
REV. DATE ISSUED TO / FOR :
-X8C 6
-X8C 4 CONTRACTOR: CONSORTIUM( KN / HHI )

44 14 14 4T2 4T2

E -KL8 -KQ8C -KQ8T -KQ8C -KQ8T


/47.E4 43 /38.C2 13 /38.C2 13 /38.C2 3L2 /38.C2 3L2 E

(-)220V_F2 (-)220V_F2
/ 36.E6 / 40.E1

2T1 1L1 /38.B5 2T1 1L1 /38.B5


4T2 3L2 /38.E5 4T2 3L2 /38.E5
1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
6T3 5L3 /38.C1 6T3 5L3 /38.C3
DRAWING TITLE:
14 13 /38.E4 14 13 /38.E4
21 22 21 22 LINE ES(-Q8) CONTROL
31 32 31 32
43 44 43 44
F 53 54 /43.B3 53 54 /43.B3
Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 38 OF 92 04
1 2 3 4 5 6 7 8

Project

/57.D4
/38.C2

/38.C2

/38.C3

/38.C5

/57.B4
/38.E4

/38.E5
A A
-X8C 1 2 3 4 5 6 7 8 -XH 26 20

-W1 1 2 3 4 5 6 23 24 -W3 1 2

-Q8
-J1 1 2 3 4 5 6 -J1 23 24
-JA 1 2

B1 A5 c c
Reference DWG NO. DWG DATE REV.
-S1 -DS2 OPERATION -DS1
B B01 A05 d 1 d B
M1
-PS 1
OPERATION 2 M
-M -HT
DC220V,
2
1 210W
a M01
-DS1 -ILM
b DC220V, 2
5.94W,
9200 Ohm

EMPLOYER / DEVELOPER

C C

INTERLOCK WITH
LATCHED RELAY

LATCHED RELAY
FOR MULTIPLY

FOR MULTIPLY
OPEN/CLOSE

OPEN/CLOSE
INDICATION

INDICATION
/67.D4 REMOTE

/67.D5 REMOTE

PROJECT MANAGER.

Q9
/47.C2
/55.B3

/42.B5

/55.B3

/42.B5

-X8 1 3 5 7 9 11 13 15 -X8 17 19 21 23 25 27 29 31 33 35 37 39

SUPERVISION CONSULTANT
-W1 7 9 11 13 15 17 19 21 -W2 1 3 5 7 9 11 13 15 17 19 21 23

D D

-Q8 -Q8
-J1 7 9 11 13 15 17 19 21 -J2 1 3 5 7 9 11 13 15 17 19 21 23

A1 A2 A3 A4 B2 B3 B4 B5 A1 A2 A3 A4 A5 A6 B1 B2 B3 B4 B5 B6 04 24.JAN.2018 REVISED AS PER COMMENT


03 10.AUG.2017 REVISED AS PER COMMENT
-S1 -S2 02
01
09.AUG.2017
19.JUN.2017
REVISED AS PER COMMENT
REVISED AS PER COMMENT
A01 A02 A03 A04 B02 B03 B04 B05 A01 A02 A03 A04 A05 A06 B01 B02 B03 B04 B05 B06 00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :
-J1 8 10 12 14 16 18 20 22 -J2 2 4 6 8 10 12 14 16 18 20 22 24
CONTRACTOR: CONSORTIUM( KN / HHI )

-W1 8 10 12 14 16 18 20 22 -W2 2 4 6 8 10 12 14 16 18 20 22 24

E
E
-X8 2 4 6 8 10 12 14 16 -X8 18 20 22 24 26 28 30 32 34 36 38 40

-X8 41 43 45 47 49 51 53 55

L13 L11 L14 L12 L9 L7 L10 L8 R8 R10 R7 R9 R12 R14 R11 R13 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
-KQ8 DRAWING TITLE:

/42.E5 L3 L4 L5 L6 R6 R5 R4 R3
LINE ES(-Q8) MECHANISM

F -X8 42 44 46 48 50 52 54 56 Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 39 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

/ 38.B6
(+)220V_F2 (+)220V_F2 / 41.A1

Reference DWG NO. DWG DATE REV.


-X0 73 105
B B
-Q0(A)-J3 3 -J3 19
A3 B3
-S2
A03 B03
-J3 4 -J3 20

-X0 74 106

-Q0(B)-J3 3 -J3 19
A3 B3
-S2
A03 B03
-J3 4 -J3 20
EMPLOYER / DEVELOPER

C -X0 75 107 C
-Q0(C)-J3 3 -J3 19
A3 B3
-S2
A03 B03 PROJECT MANAGER.
-J3 4 -J3 20

-X0 76 108

SUPERVISION CONSULTANT

D D

04 24.JAN.2018 REVISED AS PER COMMENT


03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )


L1 R1 L1 R1
-KQ0 -KQ0.1
CB L2 R2 CB L2 R2
-Q0 -Q0
MULTIPLY MULTIPLY
E
E

/ 38.E6
(-)220V_F2 (-)220V_F2 / 41.E1

L11 L3 /27.F2 L11 L3 /27.F4


L13 L13
L12 L4 /27.F2 L12 L4 /27.F4
L14 L14
L7 L5 /27.F2 L7 L5 /27.F4 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
L9 L9
L8 L6 /27.F3 L8 L6 /27.F5 DRAWING TITLE:

L10 L10
R10 R6 /27.F3 R10 R6 /27.F5 MULTIPLY CONTACT
R8 R8
R9 R5 /27.F3 R9 R5 /27.F5 Drawing Number : PREPARED : F
F R7 R7 PK55-SD-EL-GS-14 K.H.SONG
R14 R4 /27.F3 R14 R4 /27.F5
MANUFACTURER/VENDER NAME R12 R12 ACTION Project No.: Scale : CHECKED :
R13 R3 /27.F3 R13 R3 /27.F5
A
008006400 S.Y.JANG
B
R11 R11 Sheet Size : Rev. : Plot Date: APPROVED :
C
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 40 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

/ 40.A6
(+)220V_F2 (+)220V_F2 / 42.A1

-X1 9 19 -X2 9 19 -X9 7 17


Reference DWG NO. DWG DATE REV.
-Q1 9 -J2 19 -Q2 9 -J2 19 -Q9 -J2 7 -J2 15
B B
A5 B5 A5 B5 A4 B4
-S1 -S1 -S1
A05 B05 A05 B05 A04 B04

10 -J2 20 10 -J2 20 -J2 8 -J2 16

-X1 10 20 -X2 10 20 -X9 8 18

EMPLOYER / DEVELOPER

C C

PROJECT MANAGER.

SUPERVISION CONSULTANT

D D

04 24.JAN.2018 REVISED AS PER COMMENT


03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :
L1 R1 L1 R1 L1 R1
CONTRACTOR: CONSORTIUM( KN / HHI )
-KQ1 -KQ2 -KQ9
BUS DS L2 R2 BUS DS L2 R2 LINE DS L2 R2
-Q1 -Q2 -Q9
MULTIPLY MULTIPLY MULTIPLY

E
(-)220V_F2 (-)220V_F2 E
/ 40.E6 / 42.E1

L11 L3 /29.F1 L11 L3 /31.F1 L11 L3 /33.F1


L13 L13 L13
L12 L4 /29.F1 L12 L4 /31.F1 L12 L4 /33.F1
L14 L14 L14
L7 L5 /29.F2 L7 L5 /31.F2 L7 L5 /33.F2
L9 L9 L9
L8 L6 /31.F2 L8 L6 /33.F2 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
L8 L6 /29.F2
L10 L10 L10
DRAWING TITLE:
R10 R6 /29.F2 R10 R6 /31.F2 R10 R6 /33.F2
R8
R8 R8 MULTIPLY CONTACT
R9 R5 /29.F2 R9 R5 /31.F2 R9 R5 /33.F2
R7 R7 R7
F R14 R4 /29.F2 R14 R4 /31.F2 R14 R4 /33.F2 Drawing Number : PREPARED : F
R12 R12 R12 PK55-SD-EL-GS-14 K.H.SONG

R13 R3 /29.F3 R13 R3 /31.F3 R13 R3 /33.F3 ACTION Project No.: Scale : CHECKED :
MANUFACTURER/VENDER NAME
R11 R11 R11 A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 41 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

/ 41.A6
(+)220V_F2 (+)220V_F2 / 43.B1

-X51 7 -X51 17 -X52 7 -X52 17 -X8 7 -X8 13 Reference DWG NO. DWG DATE REV.

B -Q51-J2 7 -J2 17 -Q52-J2 7 -J2 17 -Q8 -J1 13 -J1 19


B
A4 B4 A4 B4 A4 B4
-S1 -S1 -S1
A04 B04 A04 B04 A04 B04

-J2 8 -J2 18 -J2 8 -J2 18 -J1 14 -J1 20

-X51 8 -X51 18 -X52 8 -X52 18 -X8 8 -X8 14

EMPLOYER / DEVELOPER

C C

PROJECT MANAGER.

SUPERVISION CONSULTANT

D D

04 24.JAN.2018 REVISED AS PER COMMENT


03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
L1 R1 L1 R1 L1 R1 REV. DATE ISSUED TO / FOR :
-KQ51 -KQ52 -KQ8 CONTRACTOR: CONSORTIUM( KN / HHI )
WORK ES L2 R2 WORK ES L2 R2 LINE ES L2 R2
-Q51 -Q52 -Q8
MULTIPLY MULTIPLY MULTIPLY

E
(-)220V_F2 (-)220V_F2 E
/ 41.E6 / 43.E1

L11 L3 /35.F1 L11 L3 /37.F1 L11 L3 /39.F1


L13 L13 L13
L12 L4 /35.F1 L12 L4 /37.F1 L12 L4 /39.F2
L14 L14 L14
L7 L5 /35.F2 L7 L5 /37.F2 L7 L5 /39.F2
L9 L9 L9
L8 L6 /35.F2 L8 L6 /37.F2 L8 L6 /39.F2 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
L10 L10 L10
DRAWING TITLE:
R10 R6 /35.F2 R10 R6 /37.F2 R10 R6 /39.F2
R8 R8 R8 MULTIPLY CONTACT
R9 R5 /35.F2 R9 R5 /37.F2 R9 R5 /39.F2
R7 R7 R7
F R14 R4 /35.F3 R14 R4 /37.F2 R14 R4 /39.F3 Drawing Number : PREPARED : F
R12 R12 R12 PK55-SD-EL-GS-14 K.H.SONG
R13 R3 /35.F3 R13 R3 /37.F3 R13 R3 /39.F3 ACTION Project No.: Scale : CHECKED :
MANUFACTURER/VENDER NAME
R11 R11 R11 A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 42 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

DOUBLE
INTERLOCKING

/ 42.A6
(+)220V_F2 (+)220V_F2 / 44.B1

-XS 3 Reference DWG NO. DWG DATE REV.

B =DMP1 B
13 53 53 53 53 53 53 53 53 53 53 53 53 4 3
-XS 3
-K201
13
-KQ1C -KQ1T -KQ2C -KQ2T -KQ8C -KQ8T -KQ9C -KQ9T -KQ51C -KQ51T -KQ52C -KQ52T -K203T
/43.E5 /28.C2
14 54/28.C2 54 /30.C2 54/30.C2 54 /38.C2 54/38.C2 54/32.C2 54 /32.C2 54 /34.C2 54/34.C2 54 /36.C2 54 /36.C2 54 /43.E2 1
-K213
=DMP1/47.E6 14

-XS 4

-XS 4

EMPLOYER / DEVELOPER

C C

43 PROJECT MANAGER.
-K201
/43.E5 44

13
-K202
/43.E2 14 SUPERVISION CONSULTANT

D D

=DMP1/47.B1
04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )


-XS 5
7
A1 7 A1 A1
-K202 -K201 -K201 -K203
-K203T /43.E5 8
DOUBLE A2 DS/ES 2 DS/ES A2 DS/ES A2
E INTERLOCKING MOTOR MOTOR MOTOR
-XS 6 E
RUNNING OPERATING RUNNING
TIME EXCEEDED
EXCEEDED
/ 42.E6
(-)220V_F2 SET:5SEC (-)220V_F2 / 44.E1

13 14 /43.D2 3 1 /43.B6 1 2 13 14 /59.B4


21 22 /18.D3 4 R3 R4 /21.D1 23 24 /18.D3
1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
31 32 6 8 R5 R6 33 34 /68.B4
43 44 5 7 8 /43.E5 43 44 DRAWING TITLE:

13 14 /43.B2
OPERATING CONDITION
21 22
31 32
F 43 44 /43.C2 Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 43 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

/ 43.B6
(+)220V_F2 (+)220V_F2 / 46.A1

Reference DWG NO. DWG DATE REV.


-X1 23 -X2 23 -X9 23 -X51 23 -X52 23
B B
-Q1 -J2 23 -Q2 -J2 23 -Q9 -J2 23 -Q51 -J2 23 -Q52 -J2 23

Wc1 Wc1 Wc1 Wc1 Wc1 4 3

-S1 -S1 -S1 -S1 -S1 -K204T


/29.D3 /31.D3 /33.D3 /35.D3 /37.D3 /44.E1 1
Wc01 Wc01 Wc01 Wc01 Wc01

-J2 24 -J2 24 -J2 24 -J2 24 -J2 24

-X1 24 -X2 24 -X9 24 -X51 24 -X52 24

EMPLOYER / DEVELOPER

C C

PROJECT MANAGER.

SUPERVISION CONSULTANT

D D

04 24.JAN.2018 REVISED AS PER COMMENT


03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
-XS 7 9 00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :
1 R5
-K205 CONTRACTOR: CONSORTIUM( KN / HHI )
/44.E2 2 R6
7 A1 A1
-XS 8 10
-K204T -K205 -K204
DS/ES 2 DS/ES A2 DS/ES A2
E SWITCH SWITCH SWITCH
E
INCOMPLTE INCOMPLETE INCOMPLETE
SET : 5sec FAIL

/ 43.E6
(-)220V_F2 (-)220V_F2 / 46.F1

3 1 /44.B4 1 2 /44.E2 1 2 /59.B5


4 R4 R3 /21.E1 R3 R4
1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
6 8 R5 R6 /44.E3 R5 R6
5 7 8 /68.B5 7 8 /68.B6 DRAWING TITLE:

13 14
DS/ES INCOMPLETE CONDITION
21 22
31 32
F 43 44 Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 44 OF 92 04
1 2 3 4 5 6 7 8

Project

CB CLOSE (LOCAL) CB CLOSE (REMOTE)


A A

/ 21.C1
CB INT.1 / 21.C2
CB INT(CRP).1
-XS 12

-X1 1 -X2 1
-XS 11
-Q1 -J2 1 -Q2 -J2 1
A1 A1
-S1 -S1 Reference DWG NO. DWG DATE REV.
A01 A01
B B
-J2 2 -J2 2
13
-X1 29 -X2 29 -X1 2 -X2 2
-KLR -Q1 -J3 5 -Q2 -J3 5
/47.E5 -X9 1
14 A3 A3
-Q9 -J2 1
-S2 -S2 A1
A03 A03 -S1
-J3 6 -J3 6 A01
-X1 30 -X2 30 -X51 25
-J2 2
-Q51-J3 1
-X9 29 A1
-X9 2

-Q9 -J3 5
-S2 EMPLOYER / DEVELOPER
A3
A01
C -S2 C
-J3 2
A03
-X51 26
-J3 6
-X52 25
-X9 30
-Q52-J3 1
PROJECT MANAGER.
A1
-S2
A01
-J3 2

-X52 26
SUPERVISION CONSULTANT

D D

04 24.JAN.2018 REVISED AS PER COMMENT


03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

E
E
-XS 50

/ 21.C1
CB INT.2 / 21.C2
CB INT(CRP).2

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DRAWING TITLE:

INTERLOCK (CB)

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 45 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

BUS DS(-Q1) INTERLOCK


BUS DS(-Q2) INTERLOCK

(+)220V_F2 (+)220V_F2
/ 44.B6 / 47.A1

-XS 13 -XS 22

-X2 37 -X2 25 -X1 37 -X1 25


Reference DWG NO. DWG DATE REV.
-Q2 -J3 13 -Q2 -J3 1 -Q1 -J3 13 -Q1 -J3 1
B1 A1 B1 A1
B B
-S2 -S2 -S2 -S2
B01 A01 B01 A01
-J3 14 -J3 2 -J3 14 -J3 2
-XS 18 -XS 27
-X2 38 -X2 26
-X1 38 -X1 26

-XS 14 =D03 -XS 23 =D03


-X11 25 -X11 27
=D03 -X0 121 -Q11-J3 1 =D03 -X0 125 -Q11-J3 3
23
-X15 45 A1 -X16 45 A2
-KLR -Q0(A)-J4 3 -J4
-Q0(A) 5
33
/47.E5 -Q15-J3 21 B7 -S2 -Q16-J3 21 B8 -S2
24 -KLR
B5 =D03/52.D4 A01 B5 =D03/52.D4 A02 EMPLOYER / DEVELOPER
-S2 /47.E5 -S2
-S2 -J3 2 34 -S2 -J3 4
C B07 B08 C
=D03/44.E6 B05 -XS 16 =D03/48.E6 B05 -J4 -XS 25
-J4 4 -X11 26 6 -X11 28
-J3 22 -J3 22
-X15 46 -X0 122 =D03 -X16 46 -X0 126 =D03
-Q0(B)-J4 3
-XS1 1 -XS 19 -J4
-Q0(B) 5 -XS1 3 -XS 28 PROJECT MANAGER.
B7 B8
13 23
-XS 15 -S2 -XS 24 -S2
-KBL -XS 20 -KBL -XS 29
B07 B08
=D03/69.E2 14 =D03/69.E2 24
-X51 37 -J4 4 -X51 39 -J4 6
-Q51-J3 13 -XS1 2 =D03 -Q51-J3 15 -XS1 4 =D03
B1 -X0 123
-X12 25 B2 -X0 127
-X12 27
SUPERVISION CONSULTANT
-S2 -Q0(C)-J4 3 -Q12-J3 1 -S2 -Q12-J3 3
A1
-J4
-Q0(C) 5
A2
B01 B7 B02
B8
D -J3 14 -S2 -XS 17 -S2 -J3 16 -XS 26 -S2 D
=D03/54.D4
-S2 =D03/54.D4
-X51 38 B07 A01 -X51 40 A02
B08
-J4 -J3 2
-J4 -J3 4
-X52 37 4 -X52 39 6
-X12 26 -X12 28 04 24.JAN.2018 REVISED AS PER COMMENT
-Q52-J3 13 -X0 124 -Q52-J3 15
-X0 128 03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
B1 B2 01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
-S2 -S2 REV. DATE ISSUED TO / FOR :
B01 -XS 21 B02 -XS 30
CONTRACTOR: CONSORTIUM( KN / HHI )
-J3 14 -J3 16
-X52 38 -X52 40

E
E

A1 A1
-KL1 -KL2
INTERLOCK A2 INTERLOCK A2
(-)220V_F2 (-Q1) (-Q2) (-)220V_F2
/ 44.E6 / 47.E1
1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
DRAWING TITLE:

13 14 13 14 INTERLOCK (BUS DS)


23 24 23 24
33 34
F 33 34 Drawing Number : PREPARED : F
44 43 /28.E3 44 43 /30.E3 PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 46 OF 92 04
1 2 3 4 5 6 7 8

Project

A A
LINE DS(-Q9) INTERLOCK WORK ES(-Q51, -Q52) INTERLOCK LINE ES(-Q8) INTERLOCK INTERLOCK RELEASE

(+)220V_F2
/ 46.A7

-XS 31 -XS 34 -XS 37

-X52 41 -X0 117 -X1 39 -X9 37


17
-Q52-J3 17 -J4
-Q0(A) 1 -Q1 -J3 16 -Q9 -J3 13
B3 B6 B2 B1 -S11 Reference DWG NO. DWG DATE REV.
LOCAL 18
-S2 -S2 -S2 -S2 /75.B3
B B03 B06 B01 B
B02
-J3 18 -J4 2 -J3 15 -J3 14 1
43 -X52 42 53 -X1 40 63 -X9 38
-S3
-X0 118
-X2 39
-KLR -X51 41 -KLR -KLR RELEASE 2
/47.E5 44 -Q51-J3 17 -J4
-Q0(B) 1 /47.E5 54 -Q2 -J3 16 /47.E5 64
16 18 /75.C2
B3 B6 B2 -K501
/66.E4 15
-S2 -S2 -S2
B03 B06 B02
16 18
-J3 18 -J4 2 -J3 15
-K502
-X51 42 -X2 40
/66.E4
-X0 119 15
-X8 29 -X9 39 EMPLOYER / DEVELOPER
-Q8 -J2 13 -J4
-Q0(C) 1 -Q9 -J2 16 16 18
C C
B1 B6 B2 -K503
/66.E4 15
-S2 -S2 -S2
B01 B06 B02
-J2 14 -J4 2 -J3 15 -XS 38
PROJECT MANAGER.
-X8 30 -X9 40
-X0 120 -XS 39

-XS 32
-XS 40
-XS 33
+REMOTE
SUPERVISION CONSULTANT
VOLTAGE
DEAD
D D
-XS 35 -XS 41

-XS 36
-XS 42
04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
-XS 43 01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

E A1 A1 A1 A1 A1
E
-KL9 -KL51 -KL8 -KLR -KD2
INTERLOCK A2 INTERLOCK A2 INTERLOCK A2 INTERLOCK A2 DS/ES A2
(-Q9) (-Q51,-Q52) (-Q8) RELEASE MOTOR &
(-)220V_F2 INTERLOCK
/ 46.F7
SUPPLY

13 14 /45.B2 14 11 /64.C4
13 14 13 14 13 14
12
23 24 23 24 23 24 /46.C1
23 24 24 21
33 34 /46.C4 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
33 34 33 34 33 34 22
44 43 /34.E3 44 43 /38.E3 43 44 /47.B1 34 31 /68.D5 DRAWING TITLE:
44 43 /32.E3
34 34 /36.E3 53 54 /47.B3 32
63 64 /47.B4 44 41 INTERLOCK (LINE DS/ES)
73 74 /59.B5 42

F 83 84 /68.B5 Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 47 OF 92 04
1 2 3 4 5 6 7 8

Project

- LOW STAGE 1 : UNDER 6.7 Bar


- LOW STAGE 2 : UNDER 6.5 Bar
A A
SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE
LOW STAGE 1 LOW STAGE 1 LOW STAGE 1
(G01-00A) (G01-00B) (G01-00C)
SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE
LOW STAGE 2 LOW STAGE 2 LOW STAGE 2
(G01-00A) (G01-00B) (G01-00C)
/ 18.E2
(+)220V_F1 (+)220V_F1 / 49.B1

Reference DWG NO. DWG DATE REV.


-XG 1 2 -XG 3 4 -XG 5 6
B -W1 1 3 -W2 1 3 -W3 1 3 B

-G01_00A -G01_00B -G01_00C


1 3 1 3 1 3
P P P P P P
(6.7Bar) 2 (6.5Bar) 4 (6.7Bar) 2 (6.5Bar) 4 (6.7Bar) 2 (6.5Bar) 4
GAUGE GAUGE GAUGE GAUGE GAUGE GAUGE

-W1 2 4 -W2 2 4 -W3 2 4

-XG 61 64 -XG 62 65 -XG 63 66


EMPLOYER / DEVELOPER

C C

PROJECT MANAGER.

SUPERVISION CONSULTANT

D D

04 24.JAN.2018 REVISED AS PER COMMENT


03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

A1 A1 A1 A1
-KG0.1 -KG0.2 -KG0.2A -KG0.2B
CB GAS A2 CB GAS A2 CB GAS LEAK A2 CB GAS LEAK A2
E PRESSURE PRESSURE STAGE2 STAGE2
E
STAGE 1 STAGE 2

/ 18.E2
(-)220V_F1 (-)220V_F1 / 49.E1

13 14 /60.B4 13 14 /61.B5 13 14 13 14
21 22 21 22 /21.D3 21 22 /22.D3 21 22 /23.D3
1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
31 32 31 32 /21.D4 31 32 /22.D4 31 32 /23.D4
43 44 /69.B2 43 44 /69.E2 43 44 43 44 DRAWING TITLE:

53 54 53 54 53 54 53 54
GAS MONITORING
61 62 61 62 /21.D5 61 62 /22.D5 61 62 /23.D5
71 72 71 72 71 72 71 72
F 83 84 81 82 81 82 81 82 Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 48 OF 92 04
1 2 3 4 5 6 7 8

Project

- LOW STAGE 1 : UNDER 4.7 Bar


- LOW STAGE 2 : UNDER 4.5 Bar

A A

SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE
LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2
(G01-01A) (G01-01B) (G01-01C) (G01-02A) (G01-02B) (G01-02C)

/ 48.B6
(+)220V_F1 (+)220V_F1 / 50.B1

-XG 7 8 9 10 11 12 13 14 15 16 17 18
Reference DWG NO. DWG DATE REV.
-W4 1 3 -W5 1 3 -W6 1 3 -W7 1 3 -W8 1 3 -W9 1 3
B B

-G01_01A -G01_01B -G01_01C -G01_02A -G01_02B -G01_02C


1 3 1 3 1 3 1 3 1 3 1 3
P P P P P P P P P P P P
(4.7Bar) 2 (4.5Bar) 4 (4.7Bar) 2 (4.5Bar) 4 (4.7Bar) 2 (4.5Bar) 4 (4.7Bar) 2 (4.5Bar) 4 (4.7Bar) 2 (4.5Bar) 4 (4.7Bar) 2 (4.5Bar) 4
GAUGE GAUGE GAUGE GAUGE GAUGE GAUGE GAUGE GAUGE GAUGE GAUGE GAUGE GAUGE

-W4 2 4 -W5 2 4 -W6 2 4 -W7 2 4 -W8 2 4 -W9 2 4

-XG 67 70 68 71 69 72 73 76 74 77 75 78

EMPLOYER / DEVELOPER

C C

PROJECT MANAGER.

SUPERVISION CONSULTANT

D D

04 24.JAN.2018 REVISED AS PER COMMENT


03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

A1 A1 A1 A1
-KG1.1 -KG1.2 -KG2.1 -KG2.2
01 GAS A2 01 GAS A2 02 GAS A2 02 GAS A2
E PRESSURE PRESSURE PRESSURE PRESSURE
E
STAGE 1 STAGE 2 STAGE 1 STAGE 2

/ 48.E6
(-)220V_F1 (-)220V_F1 / 50.E1

14 11 /60.B5 14 11 /61.B6 14 11 /60.B5 14 11 /62.B1


12 12 12 12
24 21 /69.B2 24 21 /69.E2 24 21 /69.B3 24 21 /69.E3 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
22 22 22 22 DRAWING TITLE:
34 31 34 31 34 31 34 31
32 32 32 32 GAS MONITORING
44 41 44 41 44 41 44 41
42 42 42 42
F Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 49 OF 92 04
1 2 3 4 5 6 7 8

Project

- LOW STAGE 1 : UNDER 4.7 Bar


- LOW STAGE 2 : UNDER 4.5 Bar
A A

SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE
LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2
(G01-03A) (G01-03B) (G01-03C) (G01-04A) (G01-04B) (G01-04C)

/ 49.B6
(+)220V_F1 (+)220V_F1 / 51.B1

-XG 19 20 21 22 23 24 25 26 27 28 29 30
Reference DWG NO. DWG DATE REV.
-W10 1 3 -W11 1 3 -W12 1 3 -W13 1 3 -W14 1 3 -W15 1 3
B B

-G01_03A -G01_03B -G01_03C -G01_04A -G01_04B -G01_04C


1 3 1 3 1 3 1 3 1 3 1 3
P P P P P P P P P P P P
(4.7Bar) 2 (4.5Bar) 4 (4.7Bar) 2 (4.5Bar) 4 (4.7Bar) 2 (4.5Bar) 4 (4.7Bar) 2 (4.5Bar) 4 (4.7Bar) 2 (4.5Bar) 4 (4.7Bar) 2 (4.5Bar) 4
GAUGE GAUGE GAUGE GAUGE GAUGE GAUGE GAUGE GAUGE GAUGE GAUGE GAUGE GAUGE

-W10 2 4 -W11 2 4 -W12 2 4 -W13 2 4 -W14 2 4 -W15 2 4

-XG 79 82 80 83 81 84 85 88 86 89 87 90

EMPLOYER / DEVELOPER

C C

PROJECT MANAGER.

SUPERVISION CONSULTANT

D D

04 24.JAN.2018 REVISED AS PER COMMENT


03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

A1 A1 A1 A1
-KG3.1 -KG3.2 -KG4.1 -KG4.2
03 GAS A2 03 GAS A2 04 GAS A2 04 GAS A2
E PRESSURE PRESSURE PRESSURE PRESSURE
E
STAGE 1 STAGE 2 STAGE 1 STAGE 2

/ 49.E6
(-)220V_F1 (-)220V_F1 / 51.E1

14 11 /60.B6 14 11 /62.B2 14 11 /61.B1 14 11 /62.B3


12 12 12 12
24 21 /69.B3 24 21 /69.E3 24 21 /69.B4 24 21 /69.E4 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
22 22 22 22 DRAWING TITLE:
34 31 34 31 34 31 34 31
32 32 32 32 GAS MONITORING
44 41 44 41 44 41 44 41
42 42 42 42
F Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 50 OF 92 04
1 2 3 4 5 6 7 8

Project

- LOW STAGE 1 : UNDER 4.7 Bar


- LOW STAGE 2 : UNDER 4.5 Bar
A A

SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE
LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2
(G01-05A) (G01-05B) (G01-05C) (G01-06A) (G01-06B) (G01-06C)

/ 50.B6
(+)220V_F1 (+)220V_F1 / 52.B1

-XG 31 32 33 34 35 36 37 38 39 40 41 42
Reference DWG NO. DWG DATE REV.
-W16 1 3 -W17 1 3 -W18 1 3 -W19 1 3 -W20 1 3 -W21 1 3
B B

-G01_05A -G01_05B -G01_05C -G01_06A -G01_06B -G01_06C


1 3 1 3 1 3 1 3 1 3 1 3
P P P P P P P P P P P P
(4.7Bar) 2 (4.5Bar) 4 (4.7Bar) 2 (4.5Bar) 4 (4.7Bar) 2 (4.5Bar) 4 (4.7Bar) 2 (4.5Bar) 4 (4.7Bar) 2 (4.5Bar) 4 (4.7Bar) 2 (4.5Bar) 4
GAUGE GAUGE GAUGE GAUGE GAUGE GAUGE GAUGE GAUGE GAUGE GAUGE GAUGE GAUGE

-W16 2 4 -W17 2 4 -W18 2 4 -W19 2 4 -W20 2 4 -W21 2 4

-XG 91 94 92 95 93 96 97 100 98 101 99 102

EMPLOYER / DEVELOPER

C C

PROJECT MANAGER.

SUPERVISION CONSULTANT

D D

04 24.JAN.2018 REVISED AS PER COMMENT


03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

A1 A1 A1 A1
-KG5.1 -KG5.2 -KG6.1 -KG6.2
05 GAS A2 05 GAS A2 06 GAS A2 06 GAS A2
E PRESSURE PRESSURE PRESSURE PRESSURE
E
STAGE 1 STAGE 2 STAGE 1 STAGE 2

/ 50.E6
(-)220V_F1 (-)220V_F1 / 52.E1

14 11 /61.B2 14 11 /62.B3 14 11 /61.B3 14 11 /62.B4


12 12 12 12
24 21 /69.B4 24 21 /69.E4 24 21 /69.B4 24 21 /69.E4 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
22 22 22 22 DRAWING TITLE:
34 31 34 31 34 31 34 31
32 32 32 32 GAS MONITORING
44 41 44 41 44 41 44 41
42 42 42 42
F Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 51 OF 92 04
1 2 3 4 5 6 7 8

Project

- LOW STAGE 1 : UNDER 4.7 Bar


- LOW STAGE 2 : UNDER 4.5 Bar
A A

SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE
LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2
(G01-07A) (G01-07B) (G01-07C) (G07-08A) (G01-08B) (G01-08C)

/ 51.B6
(+)220V_F1 (+)220V_F1 / 53.B1

-XG 43 44 45 46 47 48 49 50 51 52 53 54
Reference DWG NO. DWG DATE REV.
-W22 1 3 -W23 1 3 -W24 1 3 -W25 1 3 -W26 1 3 -W27 1 3
B B

-G01_07A -G01_07B -G01_07C -G01_08A -G01_08B -G01_08C


1 3 1 3 1 3 1 3 1 3 1 3
P P P P P P P P P P P P
(4.7Bar) 2 (4.5Bar) 4 (4.7Bar) 2 (4.5Bar) 4 (4.7Bar) 2 (4.5Bar) 4 (4.7Bar) 2 (4.5Bar) 4 (4.7Bar) 2 (4.5Bar) 4 (4.7Bar) 2 (4.5Bar) 4
GAUGE GAUGE GAUGE GAUGE GAUGE GAUGE GAUGE GAUGE GAUGE GAUGE GAUGE GAUGE

-W22 2 4 -W23 2 4 -W24 2 4 -W25 2 4 -W26 2 4 -W27 2 4

-XG 103 106 104 107 105 108 109 112 110 113 111 114

EMPLOYER / DEVELOPER

C C

PROJECT MANAGER.

SUPERVISION CONSULTANT

D D

04 24.JAN.2018 REVISED AS PER COMMENT


03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

A1 A1 A1 A1
-KG7.1 -KG7.2 -KG8.1 -KG8.2
07 GAS A2 07 GAS A2 08 GAS A2 08 GAS A2
E PRESSURE PRESSURE PRESSURE PRESSURE
E
STAGE 1 STAGE 2 STAGE 1 STAGE 2

/ 51.E6
(-)220V_F1 (-)220V_F1 / 53.E1

14 11 /61.B3 14 11 /62.B5 14 11 /61.B4 14 11 /62.B5


12 12 12 12
24 21 /69.B5 24 21 /69.E5 24 21 /69.B5 24 21 /69.E5 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
22 22 22 22 DRAWING TITLE:
34 31 34 31 34 31 34 31
32 32 32 32 GAS MONITORING
44 41 44 41 44 41 44 41
42 42 42 42
F Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 52 OF 92 04
1 2 3 4 5 6 7 8

Project

- LOW STAGE 1 : UNDER 4.7 Bar


A - LOW STAGE 2 : UNDER 4.5 Bar A

SF6 GAS PRESSURE SF6 GAS PRESSURE SF6 GAS PRESSURE


LOW STAGE 1,2 LOW STAGE 1,2 LOW STAGE 1,2
(G01-09A) (G01-09B) (G01-09C)

/ 52.B6
(+)220V_F1 (+)220V_F1 / 54.B1

-XG 55 56 57 58 59 60 Reference DWG NO. DWG DATE REV.

B -W28 1 3 -W29 1 3 -W30 1 3 B

-G01_09A -G01_09B -G01_09C


1 3 1 3 1 3
P P P P P P
(4.7Bar) 2 (4.5Bar) 4 (4.7Bar) 2 (4.5Bar) 4 (4.7Bar) 2 (4.5Bar) 4
GAUGE GAUGE GAUGE GAUGE GAUGE GAUGE

-W28 2 4 -W29 2 4 -W30 2 4

-XG 115 118 116 119 117 120

EMPLOYER / DEVELOPER

C C

PROJECT MANAGER.

SUPERVISION CONSULTANT

D D

04 24.JAN.2018 REVISED AS PER COMMENT


03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

A1 A1
-KG9.1 -KG9.2
E 09 GAS A2 09 GAS A2 E
PRESSURE PRESSURE
STAGE 1 STAGE 2

/ 52.E6
(-)220V_F1 (-)220V_F1 / 54.E1

14 11 /61.B5 14 11 /62.B6
12 12
24 21 /69.B6 24 21 /69.E6 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
22 22 DRAWING TITLE:
34 31 34 31
32 32 GAS MONITORING
44 41 44 41
42 42
F Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 53 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

CB(-Q0) BUS DS(-Q1) BUS DS(-Q2) LINE DS(-Q9) WORK ES(-Q51)

/ 53.B6
(+)220V_F1 (+)220V_F1 / 55.B1

-X0 69 101
-X1 3 -X1 13 -X2 3 -X2 13 -X9 3 13 -X51 3 -X51 13
-Q0(A)-J3 1 -J3 17 -Q1 -J2 3 -J2 13 -Q2 -J2 3 -J2 13 -Q9 -J2 3 -J2 17 -Q51-J2 3 -J2 13 Reference DWG NO. DWG DATE REV.
1 A2 B2 A2 B2 A2 B2 A2 B2 A2 B2
B -S4 -S2 -S1 -S1 -S1 -S1 B
CLOSE 2 A02 B02 A02 B02 A02 B02 A02 B02 A02 B02
/75.D2 -J3 -J3
2 18 -J2 4 -J2 14 -J2 4 -J2 14 -J2 4 -J2 18 -J2 4 -J2 14
-XS 51 -X0 70 102
-X1 4 -X1 14 -X2 4 -X2 14 -X9 4 14 -X51 4 -X51 14
-Q0(B)-J3 1 -J3 17
A2 B2
-S2
A02 B02
-J3 2 -J3 18

-X0 71 103
EMPLOYER / DEVELOPER
-Q0(C)-J3 1 -J3 17
C A2 B2 C
-S2
A02 B02
-J3 2 -J3 18

-X0 72 104 PROJECT MANAGER.

SUPERVISION CONSULTANT

D D
(+)220V_F1_1/ 55.D1
-XS 52

13 23 33 43 53 63 73 83 13 23 04 24.JAN.2018 REVISED AS PER COMMENT


03 10.AUG.2017 REVISED AS PER COMMENT
-K11 -K11.1 02 09.AUG.2017 REVISED AS PER COMMENT
/54.E1 14 24 34 44 54 64 74 84 /54.E2 14 24
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )


GREEN

GREEN

GREEN

GREEN

GREEN
RED

RED

RED

RED

RED
A1 A1 X2 X1 X2 X1 X2 X1 X2 X1 X2 X1
-K11 -K11.1
-LQ0 -LQ1 -LQ2 -LQ9 -LQ51
HK-DSPI-GR-220V/S HK-DSPI-GR-220V/R HK-DSPI-GR-220V/R HK-DSPI-GR-220V/R HK-DSPI-GR-220V/R
LAMP TEST A2 LAMP TEST A2 X0 X0 X0 X0 X0
E
E

/ 53.E6
(-)220V_F1 -XS 53 (-)220V_F1 / 55.E1

13 14 /54.D2 13 14 /54.D6
23 24 /54.D3 23 24 /54.D6
1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
33 34 /54.D3 33 34 /55.D2
DRAWING TITLE:
43 44 /54.D4 43 44 /55.D2
53 54 /54.D4 53 54 /55.D3 POSITION INDICATOR
63 64 /54.D5 63 64 /55.D3
73 74 /54.D5 73 74 /56.D2
F Drawing Number : PREPARED : F
83 84 /54.D5 83 84 PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 54 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

WORK ES(-Q52) LINE ES(-Q8)

/ 54.B7
(+)220V_F1 (+)220V_F1 / 58.B1

-X52 3 -X52 13 -X8 3 -X8 9


-Q52-J2 3 -J2 13 -Q8 -J1 9 -J1 15 Reference DWG NO. DWG DATE REV.
A2 B2 A2 B2
B -S1 -S1 B
A02 B02 A02 B02
-J2 4 -J2 14 -J1 10 -J1 16

-X52 4 -X52 14 -X8 4 -X8 10

EMPLOYER / DEVELOPER

C C

PROJECT MANAGER.

SUPERVISION CONSULTANT

D D
/ 54.D7
(+)220V_F1_1

33 43 53 63
04 24.JAN.2018 REVISED AS PER COMMENT
-K11.1 03
02
10.AUG.2017
09.AUG.2017
REVISED AS PER COMMENT
REVISED AS PER COMMENT
/54.E2 34 44 54 64 01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )


GREEN

GREEN
RED

RED

X2 X1 X2 X1
-LQ52 -LQ8
HK-DSPI-GR-220V/R HK-DSPI-GR-220V/R
X0 X0
E
E

/ 54.E7
(-)220V_F1 (-)220V_F1 / 58.E1

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DRAWING TITLE:

POSITION INDICATOR

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 55 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

LIGHTING
HEATER CONTROL CB(-Q0)
DOOR RIGHT DOOR LEFT

/ 20.E1
A220V_F1 A220V_F1 / 57.A1

-XH 1 -XH 2
13 23 33
Reference DWG NO. DWG DATE REV.
-KHTS -KHTS -KHTS
B /56.D3 14 /56.D3 24 /56.D3 34 B

NC NO NC NO

COM
-DS1 -DS2
COM COM
-XH 9 -XH 10 -XH 11

AUTO

MANUAL
OFF
COM -Q0(A) -Q0(B) -Q0(C)
X1 -TH ‎Θ
-S5 SET : 5°C ‎Θ -HTS -JA 1 -JA 1 -JA 1
SET : 80% NC
ON
X2
EMPLOYER / DEVELOPER

C C
1 1 1

-HT -HT -HT


/26.B6 /26.C6 /26.E6
-XH 3 -XH 4 2 2 2
AC220V AC220V AC220V
HEATER HEATER HEATER PROJECT MANAGER.
1 3 -S5
-S5 MECHANISM MECHANISM MECHANISM
/75.E5 2 4 /75.E5

-JA 2 -JA 2 -JA 2

73
-XH 12 -XH 13 -XH 14 SUPERVISION CONSULTANT

-K11.1
D /54.E2 74 -XH 5
D
1 1
1
A1 A1
-IL1 -IL2 -HT
AC220V, 100W -KHTS -KHTS1 04 24.JAN.2018 REVISED AS PER COMMENT
10W 10W 03 10.AUG.2017 REVISED AS PER COMMENT
2 HEATER A2 HEATER A2 02 09.AUG.2017 REVISED AS PER COMMENT
2 2 OPERATING OPERATING 01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

-XH 8 CONTRACTOR: CONSORTIUM( KN / HHI )

/ 20.E2
N220V_F1 N220V_F1 / 57.E1

E
E

13 14 /56.B5 13 14 /57.B4
23 24 /56.B5 23 24
1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
33 34 /56.B6 33 34
DRAWING TITLE:
43 44 /57.B1 43 44
53 54 /57.B2 HEATER CONTROL
63 64 /57.B2
73 74 /57.B3
F Drawing Number : PREPARED : F
83 84 /57.B3 PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 56 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

BUS DS BUS DS LINE DS WORK ES WORK ES LINE ES


-Q1 -Q2 -Q9 -Q51 -Q52 -Q8

/ 56.A6
A220V_F1 A220V_F1 / 58.B1

43 53 63 73 83 13 Reference DWG NO. DWG DATE REV.

-KHTS -KHTS -KHTS -KHTS -KHTS -KHTS1


B /56.D3 /56.D3 /56.D3 /56.D3 /56.D3 B
44 54 64 74 84 /56.D4 14

-XH 21 -XH 22 -XH 23 -XH 24 -XH 25 -XH 26

-Q1 -Q2 -Q9 -Q51 -Q52 -Q8

-JA 1 -JA 1 -JA 1 -JA 1 -JA 1 -JA 1

EMPLOYER / DEVELOPER

C 1 1 1 C
1 1 1
-HT -HT -HT
-HT -HT -HT /35.B5 /37.B6 /39.B5
/29.B5 /31.B6 /33.B5 2 2 2
2 2 2 AC220V AC220V AC220V
AC220V AC220V AC220V
HEATER HEATER HEATER
MECHANISM HEATER MECHANISM PROJECT MANAGER.
MECHANISM MECHANISM MECHANISM
/29.B5 MECHANISM /33.B5
/35.B5 /37.B6 /39.B5
/31.B6

-JA 2 -JA 2 -JA 2 -JA 2 -JA 2 -JA 2

-XH 15 -XH 16 -XH 17 -XH 18 -XH 19 -XH 20 SUPERVISION CONSULTANT

D D

04 24.JAN.2018 REVISED AS PER COMMENT


03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

/ 56.E6
N220V_F1 N220V_F1 / 58.E1

E
E

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DRAWING TITLE:

HEATER CONTROL

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 57 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

/ 55.B6
(+)220V_F1 (+)220V_F1
/ 65.A3

/ 57.A6
A220V_F1
Reference DWG NO. DWG DATE REV.

B B
-XD 19 -XA 13

-H1
1+ 2L
EMPLOYER / DEVELOPER

C C
SUPPLY 1 INPUT

SUPPLY 2 INPUT

L L

SUPPLY 1 INPUT SUPPLY 2 INPUT SIGNAL SUPPLY COMMON PROJECT MANAGER.


FAILURE ALARM FAILURE ALARM FAILURE ALARM ALARM HORN A ALARM HORN B
N N

R1 R2 FC GP HNA HNB
1- 2N SUPERVISION CONSULTANT
S1R S1RC S2R S2RC A B
FG

D -XS 44 45 -XS 46 47 -XS 48 49 1 D


-PE
ANN1.1

ANN1.1

ANN1.2

ANN1.2

-XD 20 -XA 14 04
03
24.JAN.2018
10.AUG.2017
REVISED AS PER COMMENT
REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
64.C5 64.D5 64.C2 64.D2 01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :
A1
CONTRACTOR: CONSORTIUM( KN / HHI )
-KA1
HEATER & A2
ANN.

E
E
/ 55.E6
(-)220V_F1 (-)220V_F1
/ 65.B3

/ 57.E6
N220V_F1

14 11 /64.C1
12
24 21 /68.D2 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
22 DRAWING TITLE:
34 31
32 ANNUNCIATOR (H1)
44 41
42
F Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 58 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

DS/ES MOTOR
CB MOTOR LONG CB MOTOR OVER CB MOTOR SPRING DS/ES SWITCHING INTERLOCK BY-PASS AC SUPPLY MCB
POLE DISCREPANCY RUNNING TIME
RUN AND STOP LOAD AND STOP UNCHARGED/LOCK INCOMPLETE ON TRIP/OFF
EXCEEDED

Reference DWG NO. DWG DATE REV.


-XA1 52
B B
43 13 13 43 43 13 1 73

-K103 -K49 -K104 -K47A -K47B -K203 -K204 -KLR AC_MCB


/24.E5 /24.E4 /22.E6 44 /23.E5 44 /43.E6 /44.E4 2 /47.E5 74
44 14 /24.E6 14 14 64.B2

AC_MCB
64.B2

EMPLOYER / DEVELOPER
-XA1 1 -XA1 2 -XA1 3 -XA1 4 -XA1 51 -XA1 5 -XA1 6 -XA1 7 -XA1 8 -XA1 9 -XA1 10
C C

-H1 1C 11 22 33 44 5C 51 62 73 84

PROJECT MANAGER.

-CH1 -CH2 -CH3 -CH4 -CH5 -CH6 -CH7 -CH8


(YELLOW) (YELLOW) (YELLOW) (YELLOW) (YELLOW) (YELLOW) (YELLOW) (YELLOW)
RESPONSE TIME : 5ms RESPONSE TIME : 5ms RESPONSE TIME : 5ms RESPONSE TIME : 5ms RESPONSE TIME : 5ms RESPONSE TIME : 5ms RESPONSE TIME : 5ms RESPONSE TIME : 5ms SUPERVISION CONSULTANT

D D

1R1 1RC 2R2 2RC 3R3 3RC 4R4 4RC 5R1 5RC 6R2 6RC 7R3 7RC 8R4 8RC 04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

-XA2 1 2 -XA2 3 -XA2 4 -XA2 5 -XA2 6 -XA2 7 -XA2 8 -XA2 9 CONTRACTOR: CONSORTIUM( KN / HHI )

E
E

+SPARE

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DRAWING TITLE:

ANNUNCIATOR (H1)

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 59 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

DC SUPPLY MCB 220VDC SUPPLY 1 220VDC SUPPLY 2 G01-00 GAS LOW 1 G01-01 GAS LOW 1 G01-02 GAS LOW 1 G01-03 GAS LOW 1
AC SUPPLY FAIL
TRIP/OFF FAIL FAIL (ALARM) (ALARM) (ALARM) (ALARM)

-XA1 53 -XA1 54 -XA1 55 -XA1 56


Reference DWG NO. DWG DATE REV.

B B
DC_MCB AC DC_1 DC_2
64.B4 64.E1 64.E3 64.E6 13 12 14 12 14 12 14
-KG0.1 -KG1.1 -KG2.1 -KG3.1
/48.E3 14 /49.E3 /49.E5 /50.E3
11 11 11

DC_MCB AC DC_1 DC_2


64.B4 64.E2 64.E4 64.E6

-XA1 11 -XA1 12 -XA1 13 -XA1 14 -XA1 15 -XA1 16 -XA1 17 -XA1 18 -XA1 19 -XA1 20 EMPLOYER / DEVELOPER

C C

-H1 9C 91 102 113 124 13C 131 142 153 164

PROJECT MANAGER.

-CH9 -CH10 -CH11 -CH12 -CH13 -CH14 -CH15 -CH16


(YELLOW) (YELLOW) (YELLOW) (YELLOW) (YELLOW) (YELLOW) (YELLOW) (YELLOW) SUPERVISION CONSULTANT
RESPONSE TIME : 5ms RESPONSE TIME : 5ms RESPONSE TIME : 5ms RESPONSE TIME : 5ms RESPONSE TIME : 5sec RESPONSE TIME : 5sec RESPONSE TIME : 5sec RESPONSE TIME : 5sec

D D

9R1 9RC 10R2 10RC 11R3 11RC 12R4 12RC 13R1 13RC 14R2 14RC 15R3 15RC 16R4 16RC 04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

-XA2 10 11 -XA2 12 -XA2 13 -XA2 14 -XA2 15 -XA2 16 -XA2 17 -XA2 18 CONTRACTOR: CONSORTIUM( KN / HHI )

E
E

+SPARE

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DRAWING TITLE:

ANNUNCIATOR (H1)

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 60 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

G01-04 GAS LOW 1 G01-05 GAS LOW 1 G01-06 GAS LOW 1 G01-07 GAS LOW 1 G01-08 GAS LOW 1 G01-09 GAS LOW 1 G01-00 GAS LOW 2 G01-01 GAS
(ALARM) (ALARM) (ALARM) (ALARM) (ALARM) (ALARM) (LOCKOUT) LOW 2

Reference DWG NO. DWG DATE REV.

B B

12 14 12 14 12 14 12 14 12 14 12 14 13 12 14
-KG4.1 -KG5.1 -KG6.1 -KG7.1 -KG8.1 -KG9.1 -KG0.2 -KG1.2
/50.E5 /51.E3 /51.E5 /52.E3 /52.E6 /53.E4 /48.E4 14 /49.E3
11 11 11 11 11 11 11

EMPLOYER / DEVELOPER
-XA1 21 -XA1 22 -XA1 23 -XA1 24 -XA1 25 -XA1 26 -XA1 27 -XA1 28 -XA1 29 -XA1 30
C C

-H1 17C 171 182 193 204 21C 211 222 233 244

PROJECT MANAGER.

-CH17 -CH18 -CH19 -CH20 -CH21 -CH22 -CH23 -CH24


(YELLOW) (YELLOW) (YELLOW) (YELLOW) (YELLOW) (YELLOW) (YELLOW) (YELLOW) SUPERVISION CONSULTANT
RESPONSE TIME : 5sec RESPONSE TIME : 5sec RESPONSE TIME : 5sec RESPONSE TIME : 5sec RESPONSE TIME : 5sec RESPONSE TIME : 5sec RESPONSE TIME : 5sec RESPONSE TIME : 5sec

D D

17R1 17RC 18R2 18RC 19R3 19RC 20R4 20RC 21R1 21RC 22R2 22RC 23R3 23RC 24R4 24RC 04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

-XA2 19 20 -XA2 21 -XA2 22 -XA2 23 -XA2 24 -XA2 25 -XA2 26 -XA2 27 CONTRACTOR: CONSORTIUM( KN / HHI )

E
E

+SPARE

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DRAWING TITLE:

ANNUNCIATOR (H1)

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 61 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

G01-02 GAS G01-03 GAS G01-04 GAS G01-05 GAS G01-06 GAS G01-07 GAS G01-08 GAS G01-09 GAS
LOW 2 LOW 2 LOW 2 LOW 2 LOW 2 LOW 2 LOW 2 LOW 2

Reference DWG NO. DWG DATE REV.

B B

12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14
-KG2.2 -KG3.2 -KG4.2 -KG5.2 -KG6.2 -KG7.2 -KG8.2 -KG9.2
/49.E6 11 /50.E3 11 /50.E6 11 /51.E3 11 /51.E6 11 /52.E4 11 /52.E6 11 /53.E5 11

EMPLOYER / DEVELOPER
-XA1 31 -XA1 32 -XA1 33 -XA1 34 -XA1 35 -XA1 36 -XA1 37 -XA1 38 -XA1 39 -XA1 40
C C

-H1 25C 251 262 273 284 29C 291 302 313 324

PROJECT MANAGER.

-CH25 -CH26 -CH27 -CH28 -CH29 -CH30 -CH31 -CH32


(YELLOW) (YELLOW) (YELLOW) (YELLOW) (YELLOW) (YELLOW) (YELLOW) (YELLOW) SUPERVISION CONSULTANT
RESPONSE TIME : 5sec RESPONSE TIME : 5sec RESPONSE TIME : 5sec RESPONSE TIME : 5sec RESPONSE TIME : 5sec RESPONSE TIME : 5sec RESPONSE TIME : 5sec RESPONSE TIME : 5sec

D D

25R1 25RC 26R2 26RC 27R3 27RC 28R4 28RC 29R1 29RC 30R2 30RC 31R3 31RC 32R4 32RC 04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

-XA2 28 29 -XA2 30 -XA2 31 -XA2 32 -XA2 33 -XA2 34 -XA2 35 -XA2 36 CONTRACTOR: CONSORTIUM( KN / HHI )

E
E

+SPARE

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DRAWING TITLE:

ANNUNCIATOR (H1)

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 62 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

SPARE SPARE SPARE SPARE SPARE SPARE SPARE SPARE

Reference DWG NO. DWG DATE REV.


-XA1 58 -XA1 59 -XA1 60 -XA1 61 -XA1 62 -XA1 63 -XA1 64 -XA1 65

B B

EMPLOYER / DEVELOPER

C -XA1 41 -XA1 42 -XA1 43 -XA1 44 -XA1 45 -XA1 46 -XA1 47 -XA1 48 -XA1 49 -XA1 50 C

-H1
33C 331 342 353 364 37C 371 382 393 404

PROJECT MANAGER.

-CH33 -CH34 -CH35 -CH36 -CH37 -CH38 -CH39 -CH40


(YELLOW) (YELLOW) (YELLOW) (YELLOW) (YELLOW) (YELLOW) (YELLOW) (YELLOW) SUPERVISION CONSULTANT
RESPONSE TIME : 5ms RESPONSE TIME : 5ms RESPONSE TIME : 5ms RESPONSE TIME : 5ms RESPONSE TIME : 5ms RESPONSE TIME : 5ms RESPONSE TIME : 5ms RESPONSE TIME : 5ms

D D

04 24.JAN.2018 REVISED AS PER COMMENT


33R1 33RC 34R2 34RC 35R3 35RC 36R4 36RC 37R1 37RC 38R2 38RC 39R3 39RC 40R4 40RC 03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )


-XA2 37 38 -XA2 39 -XA2 40 -XA2 41 -XA2 42 -XA2 43 -XA2 44 -XA2 45

E
E

+SPARE

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DRAWING TITLE:

ANNUNCIATOR (H1)

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 63 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

AC SUPPLY MCB DC SUPPLY MCB


TRIP/OFF TRIP/OFF

59.B6 / AC_MCB 60.B1 / DC_MCB


32 34 32 34 32 34 32 34 32 34 32 34 32 34 32 34 32 34

-F8A1 -F8A2 -F8D1 -F8D2 -F8D3 -F8D4 -F8D5 -F8D6 -F8D7 Reference DWG NO. DWG DATE REV.

/20.C1 31 /20.C4 31 /18.C2 31 /18.C3 31 /18.C4 31 /18.C6 31 /19.C2 31 /19.C4 31 /19.C5 31


B B
59.C6 / AC_MCB
60.C1 / DC_MCB

AC SUPPLY FAIL EMPLOYER / DEVELOPER


220VDC SUPPLY 1 FAIL 220VDC SUPPLY 2 FAIL
C C

ANN1.2
PROJECT MANAGER.
58.D3
12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14 12 14
-KA1 58.D3 -KA2 -KA3 -KA4 -KD1 -KD2 -KD3 -KD4 -KD6 -KD7 ANN1.1 -KD5
/58.E6 /20.D3 /22.E7 11 /24.E7 11 /25.E7 58.D3 /23.E7
11 ANN1.2 11 /20.D5 11 /20.D6 11 /66.B6 11 /47.E6 11 /21.E7 11 11 11

58.D3
ANN1.1
SUPERVISION CONSULTANT

-XA1 66 -XA1 67 -XA1 76 -XA1 77 -XA1 78 -XA1 68 -XA1 69 -XA1 70 -XA1 71 -XA1 72 -XA1 73 -XA1 74 -XA1 75
D D

04 24.JAN.2018 REVISED AS PER COMMENT


03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )


AC AC DC_1 DC_1 DC_2 DC_2
60.B2 60.C2 60.B3 60.C3 60.B3 60.C3

E
E

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DRAWING TITLE:

ANNUNCIATOR (H1)

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 64 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

(+)220V_F1
(-)220V_F1

/ 58.B6

/ 58.E6
66.A2 /
(+)220V_F1

Reference DWG NO. DWG DATE REV.

66.A2 /
B (-)220V_F1 B

-AM1 -AM2 -AM3

7 8 7 8 7 8

16 16 16

15 1 15 1 15 1 EMPLOYER / DEVELOPER

C 14 2 14 2 14 2 C

13 3 13 3 13 3

12 4 12 4 12 4 PROJECT MANAGER.

11 5 11 5 11 5
-TT1

D
8 7
9 9 9
SUPERVISION CONSULTANT
IA_M E
10 9
/ 71.E1 10 10 10
D F
12 11 D

IB_M 14
G 13
/ 71.E2
04 24.JAN.2018 REVISED AS PER COMMENT
16 15 03 10.AUG.2017 REVISED AS PER COMMENT
H 02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
IC_M 18
I 17 6 6 6
REV. DATE ISSUED TO / FOR :
/ 71.E3
CONTRACTOR: CONSORTIUM( KN / HHI )

IN_M
/ 71.E2

E
E
-XM 1 2 3 4

=CONTROL PNL

BKR. FAIL 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DRAWING TITLE:

METERING (1)

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 65 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

(+)220V_F1
(-)220V_F1

/ 65.B6

/ 65.B6
A1
-KD1
SIGNAL LAMP A2
& ALARM
SUPPLY
Reference DWG NO. DWG DATE REV.

B =OUTDOOR CVT(AT OHTL) B


14 11 /64.C3
-VM1 12
24 21
7 8 22
34 31 /68.D5
16 32
44 41
1
-XS 54 -XS 55 -XS 56 -XS 57 42
15

2
14

3
13 EMPLOYER / DEVELOPER
4
C 12 /76.B2 C

5 -S12 -TT1
11
2 1 1 2
A
9
PROJECT MANAGER.

3 4
/76.B3

B
10
6 5
/76.B3

SUPERVISION CONSULTANT
10 9
5 6
/76.B3

C
D 14 13 D
/76.B3

18 17
04 24.JAN.2018 REVISED AS PER COMMENT
19 20 03 10.AUG.2017 REVISED AS PER COMMENT
/76.B3

J 02 09.AUG.2017 REVISED AS PER COMMENT


01 19.JUN.2017 REVISED AS PER COMMENT
22 21 00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :
6
CONTRACTOR: CONSORTIUM( KN / HHI )
A1
~
A2 A1
-K501
E UMAX : 150V ~
UMIN : 30% A2 E
TIME : 1 Sec
-K502
UMAX : 150V A1
UMIN : 30% ~
TIME : 1 Sec
-K503 A2
UMAX : 150V
UMIN : 30%
TIME : 1 Sec
1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
DRAWING TITLE:
18 15 /47.B4
16
18 15 /47.C4 METERING (2)
16
18 15 /47.C4 Drawing Number : PREPARED : F
F 16 PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 66 OF 92 04
1 2 3 4 5 6 7 8

Project

CB(-Q0.A) CB(-Q0.B) CB(-Q0.C) BUS DS(-Q1) BUS DS(-Q2)

A A

-Q0(A) -J2 5 -J2 17 -Q0(B) -J2 5 -J2 17 -Q0(C) -J2 5 -J2 17 -Q1 -J2 5 -J2 15 -Q2 -J2 5 -J2 15

A6 B7 A6 B7 A6 B7 A3 B3 A3 B3

-S1 -S1 -S1 -S1 -S1


A06 B07 A06 B07 A06 B07 A03 B03 A03 B03

-J2 6 -J2 18 -J2 6 -J2 18 -J2 6 -J2 18 -J2 6 -J2 16 -J2 6 -J2 16

-X0 13 14 47 48 -X0 15 16 49 50 -X0 17 18 51 52 -X1 5 6 15 16 -X2 5 6 15 16


Reference DWG NO. DWG DATE REV.

B B

=CRP

SELECTOR SWITCH
LINE ES(-Q9) WORK ES(-Q51) WORK ES(-Q52) LINE ES(-Q8) LOCAL REMOTE

EMPLOYER / DEVELOPER

C C
-Q9 -J2 5 -J2 13 -Q51 -J2 5 -J2 15 -Q52 -J2 5 -J2 15 -Q8 -J1 11 -J1 17
A3 B3 A3 B3 A3 B3 A3 B3 13 15
-S1 -S1 -S1 -S1 -S1 -S11 REMOTE
A03 B03 A03 B03 A03 B03 A03 B03 LOCAL 14/75.B3 16 PROJECT MANAGER.
-J1 /75.B3
-J2 6 -J2 14 -J2 6 -J2 16 -J2 6 -J2 16 -J1 12 18

-X9 5 6 15 16 -X51 5 6 15 16 -X52 5 6 15 16 -X8 5 6 11 12 -XR1 44 -XR1 45 -XR1 46

SUPERVISION CONSULTANT

D D
=CRP

04 24.JAN.2018 REVISED AS PER COMMENT


03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :
BUS DS(-Q1) BUS DS(-Q2)
CONTRACTOR: CONSORTIUM( KN / HHI )

-Q1 -J2 7 -J2 17 -Q2 -J2 7 -J2 17

E A4 B4 A4 B4
E
-S1 -S1 -S1 -S1
A04 B04 A04 B04

-J2 8 -J2 18 -J2 8 -J2 18

-X1 7 8 17 18 -X2 7 8 17 18

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DRAWING TITLE:

REMOTE
=REMOTE
F Drawing Number : PREPARED : F
PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 67 OF 92 04
1 2 3 4 5 6 7 8

Project

A A
CB MOTOR DS/ES MOTOR DS/ES
CB MOTOR CB MOTOR SPRING POLE RUNNING DS/ES SWITCH INTERLOCK SWITCH
LONG RUN & STOP
OVER LOAD CHARGING DESCRIPANCY TIME INCOMPLTE RELEASE INCOMPLETE FAIL
FAULTY EXCEEDED

53 23 23 53 53 33 7 83 7

-K103 -K49 -K104 -K47A -K47B -K203 -K205 -KLR -K204 Reference DWG NO. DWG DATE REV.

/24.E5 /24.E4 /24.E6 /22.E6 /43.E6 /44.E2 /44.E4


B 54 24 24 54 /23.E5 54 34 8 /47.E5 84 8
B

-XR1 47 48 49 50 51 -XR1 52 53 -XR1 54 55 -XR1 56 57 -XR1 58 -XR1 59

EMPLOYER / DEVELOPER
=CRP
C C

PROJECT MANAGER.

AC SUPPLY DC SUPPLY
FAIL FAIL

SUPERVISION CONSULTANT
21 21 21 21 21 21 21 21 21
22 24 22 24 22 24 22 24 32 34 32 34 32 34 32 34 32 34 32 34 32 34
-F8A1 -F8A2 -F8D1 -F8D2 -F8D3 -F8D4 -F8D5 -F8D6 -F8D7
D /20.C1 /20.C4
-KA1 -KA2 -KA3 -KA4 /18.C2 /18.C3 /18.C4 /18.C6 /19.C2 /19.C4 /19.C5
-KD1 -KD2 -KD3 -KD4 -KD5 -KD6 -KD7 D
22 22 /58.E6 22 22 22 22 22 22 22/66.B6
21/20.D3 21/20.D5 21/20.D6 21 /47.E6
31 /21.E7
31 /22.E7
31 /23.E7
31 31/24.E7 31 /25.E7 31

04 24.JAN.2018 REVISED AS PER COMMENT


03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
-XR1 60 -XR1 61 -XR1 62 -XR1 63 REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

REMOTE
E
E

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DRAWING TITLE:

REMOTE

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 68 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

GAS6 GAS PRESSURE


LOW STAGE 1

Reference DWG NO. DWG DATE REV.


43 22 24 22 24 22 24 22 24 22 24 22 24 22 24 22 24 22 24
B -KG0.1 -KG1.1 -KG2.1 -KG3.1 -KG4.1 -KG5.1 -KG6.1 -KG7.1 -KG8.1 -KG9.1 B
/48.E3 44 /49.E3 /49.E5 /50.E3 /50.E5 /51.E3 /51.E5 /52.E3 /52.E6 /53.E4
21 21 21 21 21 21 21 21 21

-XR1 64 65 66 67 68 69 70 71 72 73 74

EMPLOYER / DEVELOPER

C =CRP C

PROJECT MANAGER.

SUPERVISION CONSULTANT
GAS6 GAS PRESSURE
LOW STAGE 2
D D

04 24.JAN.2018 REVISED AS PER COMMENT


03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
43 22 24 22 24 22 24 22 24 22 24 22 24 22 24 22 24 22 24 REV. DATE ISSUED TO / FOR :
-KG0.2 -KG1.2 -KG2.2 -KG3.2 -KG4.2 -KG5.2 -KG6.2 -KG7.2 -KG8.2 -KG9.2 CONTRACTOR: CONSORTIUM( KN / HHI )
/48.E4 44 /49.E3 /49.E6 /50.E3 /50.E6 /51.E3 /51.E6 /52.E4 /52.E6 /53.E5
21 21 21 21 21 21 21 21 21

E
E
-XR1 75 76 77 78 79 80 81 82 83 84 85

=CRP 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DRAWING TITLE:

REMOTE

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 69 OF 92 04
1 2 3 4 5 6 7 8

Project

A T1-C1 T1-C2 A

CLASS : 5P30, 60-30VA CLASS : 5P30, 60-30VA

TAP RATIO TAP RATIO


S1-S3 1600A/1A S1-S3 1600A/1A
S1-S2 800A/1A S1-S2 800A/1A

-T1(C1) -T1(C2)
Reference DWG NO. DWG DATE REV.
P1 P2 P1 P2
B B
‎AΦ A
/ 71.B1
S1 S2 S3 S1 S2 S3
CB SIDE
P1 P2 P1 P2
‎BΦ B
/ 71.B1
S1 S2 S3 S1 S2 S3
CB SIDE
P1 P2 P1 P2
‎CΦ C
/ 71.C1
S1 S2 S3 S1 S2 S3
CB SIDE
EMPLOYER / DEVELOPER

C C
-CTB1(A) -CTB1(B) -CTB1(C) -CTB1(A) -CTB1(B) -CTB1(C)
1 2 3 1 2 3 1 2 3 4 5 6 4 5 6 4 5 6

-W1 1 2 3 -W2 1 2 3 -W3 1 2 3 -W1 4 5 6 -W2 4 5 6 -W3 4 5 6 PROJECT MANAGER.

SUPERVISION CONSULTANT
-XC1 1 2 3 -XC1 4 5 6 -XC1 7 8 9 -XC1 10 11 12 -XC1 13 14 15 -XC1 16 17 18

D D
1 2

-XC2 -XC2
04 24.JAN.2018 REVISED AS PER COMMENT
-E -E 03
02
10.AUG.2017
09.AUG.2017
REVISED AS PER COMMENT
REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

E
E

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DRAWING TITLE:
=BUSBAR PROT.PANEL MAIN ZONE1 =BUSBAR PROT.PANEL MAIN ZONE2
CURRENT TRANSFORMER

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 70 OF 92 04
1 2 3 4 5 6 7 8

Project

A T1-C3 T1-C4 A

CLASS : 0.2FS5, 30-15VA CLASS : 5P30, 60-30VA

TAP RATIO TAP RATIO


S1-S3 1600A/1A S1-S3 1600A/1A
S1-S2 800A/1A S1-S2 800A/1A

-T1(C3) -T1(C4)
Reference DWG NO. DWG DATE REV.
P1 P2 P1 P2
B B
A A
/ 70.B6 / 72.B2
S1 S2 S3 S1 S2 S3

P1 P2 P1 P2
B B
/ 70.B6 / 72.B2
S1 S2 S3 S1 S2 S3

P1 P2 P1 P2
C C
/ 70.C6 / 72.C2
S1 S2 S3 S1 S2 S3

EMPLOYER / DEVELOPER

C C
-CTB1(A) -CTB1(B) -CTB1(C) -CTB1(A) -CTB1(B) -CTB1(C)
7 8 9 7 8 9 7 8 9 10 11 12 10 11 12 10 11 12

-W4 1 2 3 -W5 1 2 3 -W6 1 2 3 -W4 4 5 6 -W5 4 5 6 -W6 4 5 6 PROJECT MANAGER.

-XC1 19 20 21 -XC1 22 23 24 -XC1 25 26 27 -XC1 28 29 30 -XC1 31 32 33 -XC1 34 35 36 SUPERVISION CONSULTANT

D D
3 4

-XC2 -XC2
04 24.JAN.2018 REVISED AS PER COMMENT
-E -E 03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

E
E

IA_M IN_M IB_M IC_M


1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea
65.D1 65.E1 65.D1 65.E1
DRAWING TITLE:

CURRENT TRANSFORMER
METERING

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 71 OF 92 04
1 2 3 4 5 6 7 8

Project

A T1-C5 A
CLASS : 5P30, 60-30VA

TAP RATIO
S1-S3 1600A/1A
S1-S2 800A/1A

-T1(C5)
Reference DWG NO. DWG DATE REV.
P1 P2
‎AΦ
B A B
/ 71.B6
S1 S2 S3
LINE SIDE
P1 P2 ‎BΦ
B
/ 71.B6
S1 S2 S3
LINE SIDE
P1 P2 ‎CΦ
C
/ 71.C6
S1 S2 S3
LINE SIDE

EMPLOYER / DEVELOPER

C -CTB1(A) -CTB1(B) -CTB1(C) C


13 14 15 13 14 15 13 14 15

-W7 1 2 3 -W8 1 2 3 -W9 1 2 3


PROJECT MANAGER.

-XC1 37 38 39 -XC1 40 41 42 -XC1 43 44 45


SUPERVISION CONSULTANT

D 5 D
-XC2

-E 04 24.JAN.2018 REVISED AS PER COMMENT


03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

E
E

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea

=RCP DRAWING TITLE:

CURRENT TRANSFORMER

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 72 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

SELECTOR SWITCH
PULLING TURN &
AUTOMATIC
RETURN,

CLOSE

CLOSE

CLOSE
OPEN

OPEN
OPEN
HANDLE-PISTOL,
COLOR-RED
OPEN CLOSE
1 3 5 7 9 11
1 3 5 7 9 11 OPEN
YSDNC3305-64RP20R
-SQ0
CB CLOSE
2 4 6 8 10 12 2 4 6 8 10 12
-Q0

/22.B1

/21.B1

/23.B1
Reference DWG NO. DWG DATE REV.
OPEN/CLOSE
B B

SELECTOR SWITCH
PULLING TURN &
AUTOMATIC

CLOSE

CLOSE
OPEN
OPEN
RETURN,
HANDLE-EGG CLOSE
OPEN 1 3 5 7
1 3 5 7 OPEN
EMPLOYER / DEVELOPER
YSDNC3205-64RE20B -SQ1
CLOSE
C BUS DS 2 4 6 8 2 4 6 8 C

/28.B2

/28.B2
-Q1
OPEN/CLOSE

PROJECT MANAGER.

SELECTOR SWITCH
PULLING TURN &
AUTOMATIC SUPERVISION CONSULTANT
CLOSE

CLOSE
OPEN
OPEN

RETURN,
HANDLE-EGG OPEN CLOSE
1 3 5 7
D 1 3 5 7 OPEN D

YSDNC3205-64RE20B
-SQ2
CLOSE
2 4 6 8 2 4 6 8
BUS DS
/30.B2

/30.B2

04 24.JAN.2018 REVISED AS PER COMMENT


-Q2 03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
OPEN/CLOSE 01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

SELECTOR SWITCH
E PULLING TURN & E
AUTOMATIC
CLOSE

CLOSE
OPEN
OPEN

RETURN,
HANDLE-EGG OPEN CLOSE
1 3 5 7
1 3 5 7 OPEN

YSDNC3205-64RE20B -SQ9
CLOSE
2 4 6 8 2 4 6 8
LINE DS
/32.B2

/32.B2

-Q9 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


OPEN/CLOSE DRAWING TITLE:

SWITCH

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 73 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

SELECTOR SWITCH
PULLING TURN &
AUTOMATIC

CLOSE

CLOSE
OPEN
OPEN
RETURN,
HANDLE-EGG CLOSE
OPEN 1 3 5 7
1 3 5 7 OPEN
Reference DWG NO. DWG DATE REV.
YSDNC3205-64RE20B -SQ51
CLOSE
B 2 4 6 8 2 4 6 8 B
WORK ES

/34.B2

/34.B2
-Q51
OPEN/CLOSE

SELECTOR SWITCH
PULLING TURN &
AUTOMATIC

CLOSE

CLOSE
OPEN
OPEN
RETURN, EMPLOYER / DEVELOPER
HANDLE-EGG CLOSE
OPEN 1 3 5 7
C C
1 3 5 7 OPEN

YSDNC3205-64RE20B -SQ52
CLOSE
WORK ES 2 4 6 8 2 4 6 8

/36.B2

/36.B2
-Q52
OPEN/CLOSE PROJECT MANAGER.

SELECTOR SWITCH SUPERVISION CONSULTANT


PULLING TURN &
AUTOMATIC
CLOSE

CLOSE
OPEN
OPEN

D RETURN, D
HANDLE-EGG CLOSE
OPEN 1 3 5 7
1 3 5 7 OPEN

YSDNC3205-64RE20B -SQ8 04 24.JAN.2018 REVISED AS PER COMMENT


CLOSE 03 10.AUG.2017 REVISED AS PER COMMENT
2 4 6 8 2 4 6 8 02 09.AUG.2017 REVISED AS PER COMMENT
LINE ES
/38.B2

/38.B2

01 19.JUN.2017 REVISED AS PER COMMENT


00 01.SEP.2016 FOR APPROVAL
-Q8
REV. DATE ISSUED TO / FOR :
OPEN/CLOSE
CONTRACTOR: CONSORTIUM( KN / HHI )

E
E

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DRAWING TITLE:

SWITCH

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 74 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

SELECTOR SWITCH
WITH KEY
MANUAL RETURN

REMOTE

REMOTE

REMOTE

REMOTE

REMOTE

REMOTE

REMOTE

REMOTE
WITH KEY

LOCAL

LOCAL

LOCAL

LOCAL

LOCAL

LOCAL

LOCAL
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31
YSKDNC2801-79M20L LOCAL REMOTE
LOCAL Reference DWG NO. DWG DATE REV.
LOCAL - REMOTE (Key removable
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29 31 position)
REMOTE
B SELECTOR B
-S11 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32
2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32
/18.E3

/18.E3

/18.E4

/18.E5

/18.E6

/18.E6

/67.C5

/67.C6

/47.B5

/19.D2

/19.D2
INTERLOCK

KEY SWITCH SELECTOR SWITCH


RELEASE

AUTO-RETURN, 1NO MANUAL RETURN,


USE

LOCK

LOCK
1NC 2NO 2NC LOCK

USE

USE
1 2
KGK-J2R1A KGS-C2M2
INTERLOCK RELEASE LOCK RELEASE LOCK USE EMPLOYER / DEVELOPER
3 4
1 3 (Key removable 1 3 5 7
INTERLOCK 1 2 CB MOTOR 5 6
C position) C
RELEASE -S3 3 4 OPERATION -S1
7 8
2 4 2 4 6 8
/47.B5

/24.B1
PROJECT MANAGER.

PUSH BUTTON SWITCH PUSH BUTTON SWITCH


SELF-RETURN, 1NO SELF-RETURN, 2NO
CLOSE

RESET

RESET
OPEN

1NC, COLOR-BLACK 2NC, COLOR-RED SET RESET


SUPERVISION CONSULTANT

SET
SET
1 2
KGF-CM1B CLOSE OPEN KGF-CM2R 3 4
1 3 1 2 1 3 5 7
D LAMP TEST 5 6 D
-S4 3 4 CB MOTOR LONG -S2
7 8
2 4 RUN RESET 2 4 6 8
/54.B1

/24.B5
04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )


PUSH BUTTON SWITCH
WITH LED LAMP
MANUAL-RETURN,

CLOSE
OPEN
CLOSE OPEN
1NO 1NC, YELLOW
LED 1 2
3 4
E 1 3 X1
KGX-CMV21Y E
-S5 X1 X2
HEATER TEST
2 4 X2
/56.C3

/56.C3

/56.C3

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DRAWING TITLE:

SWITCH

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 75 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

SELECTOR SWITCH
MANUAL RETURN,
HANDLE-CHRYSANTHEMUM,
COLOR-BLACK

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE
1 3 5 7 9 11 13 15 17 19 21 23

YSDNC7602-64MR20B OFF

N
C

C
B

B
A
CA Reference DWG NO. DWG DATE REV.
OFF-AB-BC-CA-AN-BN-CN AB
1 3 5 7 9 11 13 15 17 19 21 23 BC AN
B SELECTOR B
BC
-S12
AB BN CA
2 4 6 8 10 12 14 16 18 20 22 24

/66.C3
AN

/66.D3

/66.D3

/66.D3

/66.D3

/66.D3
OFF CN BN
CN
2 4 6 8 10 12 14 16 18 20 22 24

EMPLOYER / DEVELOPER

C C

PROJECT MANAGER.

SUPERVISION CONSULTANT

D D

04 24.JAN.2018 REVISED AS PER COMMENT


03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

E
E

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DRAWING TITLE:

SWITCH

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EC 76 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

PARTS LIST

DEVICE NAME SYMBOL DESCRIPTION MODEL NUMBER MANUFACTURER ORIGIN SHEET NO

DIGITAL AC AMMETER DM1T-AA21


-AM1 SINGLE PHASE 1A, POWER 100-240VAC/DC, CLASS 0.2, OUTPUT KYONGBO KOREA /65.B3 Reference DWG NO. DWG DATE REV.
4-20MA, RS485

B DIGITAL AC AMMETER DM1T-AA21 B


-AM2 SINGLE PHASE 1A, POWER 100-240VAC/DC, CLASS 0.2, OUTPUT KYONGBO KOREA /65.B4
4-20MA, RS485

DIGITAL AC AMMETER DM1T-AA21


-AM3 SINGLE PHASE 1A, POWER 100-240VAC/DC, CLASS 0.2, OUTPUT KYONGBO KOREA /65.B5
4-20MA, RS485

LIMIT SWITCH YSR1215GW-B


-DS1 YONGSUNG KOREA /56.B1

LIMIT SWITCH YSR1215GW-B


-DS2 YONGSUNG KOREA /56.B1

MINIATURE CIRCUIT BREAKER S202M-K6UC / S2C-H11L / S2C-H6R


-F8A1 2P, 6A, 10KA / 1NO 1NC / 1C ABB GERMANY /20.C1 EMPLOYER / DEVELOPER
HEATING & ANNUNCIATOR
C S203M-K32NA / S2C-H11L / S2C-H6R C
MINIATURE CIRCUIT BREAKER
-F8A2 3P+1N, 32A, 10KA / 1NO 1NC / 1C ABB GERMANY /20.C4
3-PH & 1-PH SOCKET OUTLET

MINIATURE CIRCUIT BREAKER S202M-K6UC / S2C-H11L / S2C-H6R


-F8D1 2P, 6A, 10KA / 1NO 1NC / 1C ABB GERMANY /18.C2
INDICATOR & ALARM
PROJECT MANAGER.
MINIATURE CIRCUIT BREAKER S202M-K6UC / S2C-A2 / S2C-H11L / S2C-H6R
-F8D2 2P, 6A, 10KA / 1NO 1NC / 1C ABB GERMANY /18.C3
DS/ES MOTOR & INTERLOCK

MINIATURE CIRCUIT BREAKER S202M-K16UC / S2C-H11L / S2C-H6R


-F8D3 2P, 16A, 10KA / 1NO 1NC / 1C ABB GERMANY /18.C4
CB CLOSE

MINIATURE CIRCUIT BREAKER S202M-K16UC / S2C-H11L / S2C-H6R SUPERVISION CONSULTANT


-F8D4 2P, 16A, 10KA / 1NO 1NC / 1C ABB GERMANY /18.C6
CB TRIP1

D MINIATURE CIRCUIT BREAKER S202M-K16UC / S2C-H11L / S2C-H6R D


-F8D5 2P, 16A, 10KA / 1NO 1NC / 1C ABB GERMANY /19.C2
CB TRIP2

MINIATURE CIRCUIT BREAKER S202M-K16UC / S2C-H11L / S2C-H6R


-F8D6 2P, 16A, 10KA / 1NO 1NC / 1C ABB GERMANY /19.C4 04 24.JAN.2018 REVISED AS PER COMMENT
INDICATOR & ALARM
03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
MINIATURE CIRCUIT BREAKER S202M-K16UC / S2C-H11L / S2C-H6R 01 19.JUN.2017 REVISED AS PER COMMENT
-F8D7 2P, 16A, 10KA / 1NO 1NC / 1C ABB GERMANY /19.C5 00 01.SEP.2016 FOR APPROVAL
INDICATOR & ALARM REV. DATE ISSUED TO / FOR :

THERMAL RELAY MT-32/2H5 CONTRACTOR: CONSORTIUM( KN / HHI )


-F49A 4~6 LS KOREA /25.B2
CB MOTOR OVERLOAD

THERMAL RELAY MT-32/2H5


-F49B 4~6 LS KOREA /25.B3
CB MOTOR OVERLOAD
E MT-32/2H5
THERMAL RELAY E
-F49C 4~6 LS KOREA /25.B5
CB MOTOR OVERLOAD

ANNUNCIATOR UC625-40YW-HH-024D-R-M3
-H1 40CHANNEL RTK United Kingdom /58.C1
ANNUNCIATOR (1)

SPACER HEATER RSHT 200


-HT ‎100W, 500Ω RARA KOREA /56.D3
LCC

RHC-80 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


HUMIDISTAT
-HTS HUMIDITY RANGE 20~80% RUN ELEC KOREA /56.C3 DRAWING TITLE:
HUMIDITISTATE
PARTS LIST FOR LCC

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 77 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

PARTS LIST

DEVICE NAME SYMBOL DESCRIPTION MODEL NUMBER MANUFACTURER ORIGIN SHEET NO

LED LAMP RLB-10WH


-IL1 AC220~240V, 50/60HZ RUN ELEC KOREA /56.D1 Reference DWG NO. DWG DATE REV.
LCC

B LED LAMP RLB-10WH B


-IL2 AC220~240V, 50/60HZ RUN ELEC KOREA /56.D2
LCC

AUXILIARY RELAY NF40E-13 / CA4-40N


-K11 AC/DC 100~250V, 50/60HZ, 4NO / 4NO ABB FRANCE /54.E1
LAMP TEST

AUXILIARY RELAY NF40E-13 / CA4-40N


-K11.1 AC/DC 100~250V, 50/60HZ, 4NO / 4NO ABB FRANCE /54.E2
LAMP TEST

AUXILIARY RELAY NF40E-13 / CA4-40N


-K47A AC/DC 100~250V, 50/60HZ, 4NO / 4NO ABB FRANCE /22.E6
POLE DISCREPANCY

AUXILIARY RELAY NF40E-13 / CA4-40N


-K47B AC/DC 100~250V, 50/60HZ, 4NO / 4NO ABB FRANCE /23.E5 EMPLOYER / DEVELOPER
POLE DISCREPANCY
C NF40E-13 C
AUXILIARY RELAY
-K49 AC/DC 100~250V, 50/60HZ, 4NO ABB FRANCE /24.E4
CB MOTOR OVER LOAD

MAGNETIC CONTACTOR AF09-30-10-13


-K88MA AC/DC 100~250V, 50/60HZ, 3NO 1NO ABB FRANCE /24.E1
CB MOTOR OPERATION
PROJECT MANAGER.
MAGNETIC CONTACTOR AF09-30-10-13
-K88MB AC/DC 100~250V, 50/60HZ, 3NO 1NO ABB FRANCE /24.E2
CB MOTOR OPERATION

MAGNETIC CONTACTOR AF09-30-10-13


-K88MC AC/DC 100~250V, 50/60HZ, 3NO 1NO ABB FRANCE /24.E3
CB MOTOR OPERATION

AUXILIARY RELAY NF22E-13 SUPERVISION CONSULTANT


-K101A AC/DC 100~250V, 50/60HZ, 2NO 2NC ABB FRANCE /21.E3
ANTI-PUMPING

D AUXILIARY RELAY NF22E-13 D


-K101B AC/DC 100~250V, 50/60HZ, 2NO 2NC ABB FRANCE /21.E5
ANTI-PUMPING

AUXILIARY RELAY NF22E-13


-K101C AC/DC 100~250V, 50/60HZ, 2NO 2NC ABB FRANCE /21.E6 04 24.JAN.2018 REVISED AS PER COMMENT
ANTI-PUMPING
03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
AUXILIARY RELAY NF22E-13 / CA4-22N 01 19.JUN.2017 REVISED AS PER COMMENT
-K102 AC/DC 100~250V, 50/60HZ, 2NO 2NC / 2NO 2NC ABB FRANCE /24.E3 00 01.SEP.2016 FOR APPROVAL
CB MOTOR SPRING UNCHARGED REV. DATE ISSUED TO / FOR :

ON DELAY TIMER (A MODE) AT8N / PG-08 CONTRACTOR: CONSORTIUM( KN / HHI )


-K102T AC 100-240V / DC 24-240V, 2 CHANGE OVER CONTACT AUTONICS KOREA /24.E4
SPRING UNCHARGED

AUXILIARY RELAY NF22E-13 / CA4-22N


-K103 AC/DC 100~250V, 50/60HZ, 2NO 2NC / 2NO 2NC ABB FRANCE /24.E5
CB MOTOR LONG RUN
E NF40E-13
AUXILIARY RELAY E
-K104 AC/DC 100~250V, 50/60HZ, 4NO ABB FRANCE /24.E6
CB MOTOR SPRING CHARGING FAULTY

MAGNETIC CONTACTOR AF09-22-00-13 / CA4-22E


-K201 AC/DC 100~250V, 50/60HZ, 2NO 2NC / 2NO 2NC ABB FRANCE /43.E5
DS/ES MOTOR OPERATING

AUXILIARY RELAY NF22E-13


-K202 AC/DC 100~250V, 50/60HZ, 2NO 2NC ABB FRANCE /43.E2
DOUBLE INTERLOCKING

NF40E-13 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


AUXILIARY RELAY
-K203 AC/DC 100~250V, 50/60HZ, 4NO ABB FRANCE /43.E6 DRAWING TITLE:
DS/ES MOTOR RUNNING EXCEEDED
PARTS LIST FOR LCC

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 78 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

PARTS LIST

DEVICE NAME SYMBOL DESCRIPTION MODEL NUMBER MANUFACTURER ORIGIN SHEET NO

ON DELAY TIMER (A MODE) AT8N / PG-08


-K203T AC 100-240V / DC 24-240V, 2 CHANGE OVER CONTACT AUTONICS KOREA /43.E2 Reference DWG NO. DWG DATE REV.
DS/ES MOTOR RUNNING TIME EXCEEDED

B MAGNETIC CONTACTOR AF09-22-00-13 / CA4-22E B


-K204 AC/DC 100~250V, 50/60HZ, 2NO 2NC / 2NO 2NC ABB FRANCE /44.E4
DS/ES SWITCH INCOMPLETE FAIL

ON DELAY TIMER (A MODE) AT8N / PG-08


-K204T AC 100-240V / DC 24-240V, 2 CHANGE OVER CONTACT AUTONICS KOREA /44.E1
DS/ES SWITCH INCOMPLTE

MAGNETIC CONTACTOR AF09-22-00-13


-K205 AC/DC 100~250V, 50/60HZ, 2NO 2NC ABB FRANCE /44.E2
DS/ES SWITCH INCOMPLETE

VOLTAGE CHECK RELAY HRN-37


-K501 AC24~150V, 1CHANGE OVER CONTACT ELKO CZECH /66.E4
LINE VT (R PHASE) LIVE CONDITION

VOLTAGE CHECK RELAY HRN-37


-K502 AC24~150V, 1CHANGE OVER CONTACT ELKO CZECH /66.E4 EMPLOYER / DEVELOPER
LINE VT (Y PHASE) LIVE CONDITION
C HRN-37 C
VOLTAGE CHECK RELAY
-K503 AC24~150V, 1CHANGE OVER CONTACT ELKO CZECH /66.E4
LINE VT (B PHASE) LIVE CONDITION

CONTROL RELAY CR-M230AC4


-KA1 AC 230V, 4 CHANGEOVER CONTACT ABB POLAND /58.E6
HEATER & ANN.
PROJECT MANAGER.
CONTROL RELAY CR-M230AC4
-KA2 AC 230V, 4 CHANGEOVER CONTACT ABB POLAND /20.D3
SOCKET OUTLET CONTROL SUPPLY ALARM

CONTROL RELAY CR-M230AC4


-KA3 AC 230V, 4 CHANGEOVER CONTACT ABB POLAND /20.D5
SOCKET OUTLET CONTROL SUPPLY ALARM

CONTROL RELAY CR-M230AC4 SUPERVISION CONSULTANT


-KA4 AC 230V, 4 CHANGEOVER CONTACT ABB POLAND /20.D6
SOCKET OUTLET CONTROL SUPPLY ALARM

D CONTROL RELAY CR-M220DC4 D


-KD1 DC 220V, 4 CHANGEOVER CONTACT ABB POLAND /66.B6
SIGNAL LAMP & ALARM SUPPLY ALARM

CONTROL RELAY CR-M220DC4


-KD2 DC 220V, 4 CHANGEOVER CONTACT ABB POLAND /47.E6 04 24.JAN.2018 REVISED AS PER COMMENT
DS/ES MOTOR & INTERLOCK SUPPLY
03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
CONTROL RELAY CR-M220DC4 01 19.JUN.2017 REVISED AS PER COMMENT
-KD3 DC 220V, 4 CHANGEOVER CONTACT ABB POLAND /21.E7 00 01.SEP.2016 FOR APPROVAL
CB CLOSE POWER SUPPLY ALARM REV. DATE ISSUED TO / FOR :

CONTROL RELAY CR-M220DC4 CONTRACTOR: CONSORTIUM( KN / HHI )


-KD4 DC 220V, 4 CHANGEOVER CONTACT ABB POLAND /22.E7
CB TRIP1 POWER SUPPLY ALARM

CONTROL RELAY CR-M220DC4


-KD5 DC 220V, 4 CHANGEOVER CONTACT ABB POLAND /23.E7
CB TRIP2 POWER SUPPLY ALARM
E CR-M220DC4
CONTROL RELAY E
-KD6 DC 220V, 4 CHANGEOVER CONTACT ABB POLAND /24.E7
CB MOTOR CONTROL SUPPLY ALARM

CONTROL RELAY CR-M220DC4


-KD7 DC 220V, 4 CHANGEOVER CONTACT ABB POLAND /25.E7
CB MOTOR POWER SUPPLY ALARM

AUXILIARY RELAY NF22E-13 / CA4-22N


-KG0.1 AC/DC 100~250V, 50/60HZ, 2NO 2NC / 2NO 2NC ABB FRANCE /48.E3
CB GAS PRESSURE STAGE 1

NF22E-13 / CA4-13N 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


AUXILIARY RELAY
-KG0.2 AC/DC 100~250V, 50/60HZ, 2NO 2NC / 1NO 3NC ABB FRANCE /48.E4 DRAWING TITLE:
CB GAS PRESSURE STAGE 2
PARTS LIST FOR LCC

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 79 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

PARTS LIST

DEVICE NAME SYMBOL DESCRIPTION MODEL NUMBER MANUFACTURER ORIGIN SHEET NO

AUXILIARY RELAY NF22E-13 / CA4-13N


-KG0.2A AC/DC 100~250V, 50/60HZ, 2NO 2NC / 1NO 3NC ABB FRANCE /48.E4 Reference DWG NO. DWG DATE REV.
CB GAS LEAK STAGE2

B AUXILIARY RELAY NF22E-13 / CA4-13N B


-KG0.2B AC/DC 100~250V, 50/60HZ, 2NO 2NC / 1NO 3NC ABB FRANCE /48.E5
CB GAS LEAK STAGE2

CONTROL RELAY CR-M220DC4


-KG1.1 DC 220V, 4 CHANGEOVER CONTACT ABB POLAND /49.E3
01 GAS PRESSURE STAGE 1

CONTROL RELAY CR-M220DC4


-KG1.2 DC 220V, 4 CHANGEOVER CONTACT ABB POLAND /49.E3
01 GAS PRESSURE STAGE 2

CONTROL RELAY CR-M220DC4


-KG2.1 DC 220V, 4 CHANGEOVER CONTACT ABB POLAND /49.E5
02 GAS PRESSURE STAGE 1

CONTROL RELAY CR-M220DC4


-KG2.2 DC 220V, 4 CHANGEOVER CONTACT ABB POLAND /49.E6 EMPLOYER / DEVELOPER
02 GAS PRESSURE STAGE 2
C CR-M220DC4 C
CONTROL RELAY
-KG3.1 DC 220V, 4 CHANGEOVER CONTACT ABB POLAND /50.E3
03 GAS PRESSURE STAGE 1

CONTROL RELAY CR-M220DC4


-KG3.2 DC 220V, 4 CHANGEOVER CONTACT ABB POLAND /50.E3
03 GAS PRESSURE STAGE 2
PROJECT MANAGER.
CONTROL RELAY CR-M220DC4
-KG4.1 DC 220V, 4 CHANGEOVER CONTACT ABB POLAND /50.E5
04 GAS PRESSURE STAGE 1

CONTROL RELAY CR-M220DC4


-KG4.2 DC 220V, 4 CHANGEOVER CONTACT ABB POLAND /50.E6
04 GAS PRESSURE STAGE 2

CONTROL RELAY CR-M220DC4 SUPERVISION CONSULTANT


-KG5.1 DC 220V, 4 CHANGEOVER CONTACT ABB POLAND /51.E3
05 GAS PRESSURE STAGE 1

D CONTROL RELAY CR-M220DC4 D


-KG5.2 DC 220V, 4 CHANGEOVER CONTACT ABB POLAND /51.E3
05 GAS PRESSURE STAGE 2

CONTROL RELAY CR-M220DC4


-KG6.1 DC 220V, 4 CHANGEOVER CONTACT ABB POLAND /51.E5 04 24.JAN.2018 REVISED AS PER COMMENT
06 GAS PRESSURE STAGE 1
03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
CONTROL RELAY CR-M220DC4 01 19.JUN.2017 REVISED AS PER COMMENT
-KG6.2 DC 220V, 4 CHANGEOVER CONTACT ABB POLAND /51.E6 00 01.SEP.2016 FOR APPROVAL
06 GAS PRESSURE STAGE 2 REV. DATE ISSUED TO / FOR :

CONTROL RELAY CR-M220DC4 CONTRACTOR: CONSORTIUM( KN / HHI )


-KG7.1 DC 220V, 4 CHANGEOVER CONTACT ABB POLAND /52.E3
07 GAS PRESSURE STAGE 1

CONTROL RELAY CR-M220DC4


-KG7.2 DC 220V, 4 CHANGEOVER CONTACT ABB POLAND /52.E4
07 GAS PRESSURE STAGE 2
E CR-M220DC4
CONTROL RELAY E
-KG8.1 DC 220V, 4 CHANGEOVER CONTACT ABB POLAND /52.E6
08 GAS PRESSURE STAGE 1

CONTROL RELAY CR-M220DC4


-KG8.2 DC 220V, 4 CHANGEOVER CONTACT ABB POLAND /52.E6
08 GAS PRESSURE STAGE 2

CONTROL RELAY CR-M220DC4


-KG9.1 DC 220V, 4 CHANGEOVER CONTACT ABB POLAND /53.E4
09 GAS PRESSURE STAGE 1

CR-M220DC4 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


CONTROL RELAY
-KG9.2 DC 220V, 4 CHANGEOVER CONTACT ABB POLAND /53.E5 DRAWING TITLE:
09 GAS PRESSURE STAGE 2
PARTS LIST FOR LCC

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 80 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

PARTS LIST

DEVICE NAME SYMBOL DESCRIPTION MODEL NUMBER MANUFACTURER ORIGIN SHEET NO

AUXILIARY RELAY NF40E-13 / CA4-40N


-KHTS AC/DC 100~250V, 50/60HZ, 4NO / 4NO ABB FRANCE /56.D3 Reference DWG NO. DWG DATE REV.
HEATER OPERATING

B AUXILIARY RELAY NF40E-13 B


-KHTS1 AC/DC 100~250V, 50/60HZ, 4NO ABB FRANCE /56.D4
HEATER OPERATING

AUXILIARY RELAY NF40E-13


-KL1 AC/DC 100~250V, 50/60HZ, 4NO ABB FRANCE /46.E3
INTERLOCK (-Q1)

AUXILIARY RELAY NF40E-13


-KL2 AC/DC 100~250V, 50/60HZ, 4NO ABB FRANCE /46.E6
INTERLOCK (-Q2)

AUXILIARY RELAY NF40E-13


-KL8 AC/DC 100~250V, 50/60HZ, 4NO ABB FRANCE /47.E4
INTERLOCK (-Q8)

AUXILIARY RELAY NF40E-13


-KL9 AC/DC 100~250V, 50/60HZ, 4NO ABB FRANCE /47.E2 EMPLOYER / DEVELOPER
INTERLOCK (-Q9)
C NF40E-13 C
AUXILIARY RELAY
-KL51 AC/DC 100~250V, 50/60HZ, 4NO ABB FRANCE /47.E3
INTERLOCK (-Q51,-Q52)

AUXILIARY RELAY NF40E-13 / CA4-40N


-KLR AC/DC 100~250V, 50/60HZ, 4NO / 4NO ABB FRANCE /47.E5
INTERLOCK RELEASE
PROJECT MANAGER.
LATCHED RELAY KDN-220DC
-KQ0 8 CHANGE OVER CONTACTS NIEAF-SMITT NETHERLANDS /40.E3
CBMULTIPLY

LATCHED RELAY KDN-220DC


-KQ0.1 8 CHANGE OVER CONTACTS NIEAF-SMITT NETHERLANDS /40.E4
CBMULTIPLY

MAGNETIC CONTACTOR AF09-30-10-13 SUPERVISION CONSULTANT


-KQ0C AC/DC 100~250V, 50/60HZ, 3NO 1NO ABB FRANCE /21.E1
CBCLOSE

D MAGNETIC CONTACTOR AF09-30-10-13 D


-KQ0T1 AC/DC 100~250V, 50/60HZ, 3NO 1NO ABB FRANCE /22.E1
CBOPEN

MAGNETIC CONTACTOR AF09-30-10-13


-KQ0T2 AC/DC 100~250V, 50/60HZ, 3NO 1NO ABB FRANCE /23.E1 04 24.JAN.2018 REVISED AS PER COMMENT
CBOPEN
03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
LATCHED RELAY KDN-220DC 01 19.JUN.2017 REVISED AS PER COMMENT
-KQ1 8 CHANGE OVER CONTACTS NIEAF-SMITT NETHERLANDS /41.E2 00 01.SEP.2016 FOR APPROVAL
BUS DSMULTIPLY REV. DATE ISSUED TO / FOR :

MAGNETIC CONTACTOR AF09-30-10-13 / CA4-22M CONTRACTOR: CONSORTIUM( KN / HHI )


-KQ1C AC/DC 100~250V, 50/60HZ, 3NO 1NO / 2NO 2NC ABB FRANCE /28.C2
BUS DSCLOSE

MAGNETIC CONTACTOR AF09-30-10-13 / CA4-22M


-KQ1T AC/DC 100~250V, 50/60HZ, 3NO 1NO / 2NO 2NC ABB FRANCE /28.C2
BUS DSOPEN
E KDN-220DC
LATCHED RELAY E
-KQ2 8 CHANGE OVER CONTACTS NIEAF-SMITT NETHERLANDS /41.E3
BUS DSMULTIPLY

MAGNETIC CONTACTOR AF09-30-10-13 / CA4-22M


-KQ2C AC/DC 100~250V, 50/60HZ, 3NO 1NO / 2NO 2NC ABB FRANCE /30.C2
BUS DSCLOSE

MAGNETIC CONTACTOR AF09-30-10-13 / CA4-22M


-KQ2T AC/DC 100~250V, 50/60HZ, 3NO 1NO / 2NO 2NC ABB FRANCE /30.C2
BUS DSOPEN

KDN-220DC 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


LATCHED RELAY
-KQ8 8 CHANGE OVER CONTACTS NIEAF-SMITT NETHERLANDS /42.E5 DRAWING TITLE:
LINE ESMULTIPLY
PARTS LIST FOR LCC

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 81 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

PARTS LIST

DEVICE NAME SYMBOL DESCRIPTION MODEL NUMBER MANUFACTURER ORIGIN SHEET NO

MAGNETIC CONTACTOR AF09-30-10-13 / CA4-22M


-KQ8C AC/DC 100~250V, 50/60HZ, 3NO 1NO / 2NO 2NC ABB FRANCE /38.C2 Reference DWG NO. DWG DATE REV.
LINE ESCLOSE

B MAGNETIC CONTACTOR AF09-30-10-13 / CA4-22M B


-KQ8T AC/DC 100~250V, 50/60HZ, 3NO 1NO / 2NO 2NC ABB FRANCE /38.C2
LINE ESOPEN

LATCHED RELAY KDN-220DC


-KQ9 8 CHANGE OVER CONTACTS NIEAF-SMITT NETHERLANDS /41.E5
LINE DSMULTIPLY

MAGNETIC CONTACTOR AF09-30-10-13 / CA4-22M


-KQ9C AC/DC 100~250V, 50/60HZ, 3NO 1NO / 2NO 2NC ABB FRANCE /32.C2
LINE DSCLOSE

MAGNETIC CONTACTOR AF09-30-10-13 / CA4-22M


-KQ9T AC/DC 100~250V, 50/60HZ, 3NO 1NO / 2NO 2NC ABB FRANCE /32.C2
LINE DSOPEN

LATCHED RELAY KDN-220DC


-KQ51 8 CHANGE OVER CONTACTS NIEAF-SMITT NETHERLANDS /42.E2 EMPLOYER / DEVELOPER
WORK ESMULTIPLY
C AF09-30-10-13 / CA4-22M C
MAGNETIC CONTACTOR
-KQ51C AC/DC 100~250V, 50/60HZ, 3NO 1NO / 2NO 2NC ABB FRANCE /34.C2
WORK ESCLOSE

MAGNETIC CONTACTOR AF09-30-10-13 / CA4-22M


-KQ51T AC/DC 100~250V, 50/60HZ, 3NO 1NO / 2NO 2NC ABB FRANCE /34.C2
WORK ESOPEN
PROJECT MANAGER.
LATCHED RELAY KDN-220DC
-KQ52 8 CHANGE OVER CONTACTS NIEAF-SMITT NETHERLANDS /42.E3
WORK ESMULTIPLY

MAGNETIC CONTACTOR AF09-30-10-13 / CA4-22M


-KQ52C AC/DC 100~250V, 50/60HZ, 3NO 1NO / 2NO 2NC ABB FRANCE /36.C2
WORK ESCLOSE

MAGNETIC CONTACTOR AF09-30-10-13 / CA4-22M SUPERVISION CONSULTANT


-KQ52T AC/DC 100~250V, 50/60HZ, 3NO 1NO / 2NO 2NC ABB FRANCE /36.C2
WORK ESOPEN

D SEMAPHORE INDICATOR HK-DSPI-GR-220V/S D


-LQ0 LED TYPE WITH 2 COLOR-RED/GREEN, SQURE HANKUK INSTRUMENT KOREA /54.E3

SEMAPHORE INDICATOR HK-DSPI-GR-220V/R


-LQ1 LED TYPE WITH 2 COLOR-RED/GREEN, ROUND HANKUK INSTRUMENT KOREA /54.E4 04 24.JAN.2018 REVISED AS PER COMMENT
03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
SEMAPHORE INDICATOR HK-DSPI-GR-220V/R 01 19.JUN.2017 REVISED AS PER COMMENT
-LQ2 LED TYPE WITH 2 COLOR-RED/GREEN, ROUND HANKUK INSTRUMENT KOREA /54.E4 00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

SEMAPHORE INDICATOR HK-DSPI-GR-220V/R CONTRACTOR: CONSORTIUM( KN / HHI )


-LQ8 LED TYPE WITH 2 COLOR-RED/GREEN, ROUND HANKUK INSTRUMENT KOREA /55.E3

SEMAPHORE INDICATOR HK-DSPI-GR-220V/R


-LQ9 LED TYPE WITH 2 COLOR-RED/GREEN, ROUND HANKUK INSTRUMENT KOREA /54.E5
E HK-DSPI-GR-220V/R
SEMAPHORE INDICATOR E
-LQ51 LED TYPE WITH 2 COLOR-RED/GREEN, ROUND HANKUK INSTRUMENT KOREA /54.E6

SEMAPHORE INDICATOR HK-DSPI-GR-220V/R


-LQ52 LED TYPE WITH 2 COLOR-RED/GREEN, ROUND HANKUK INSTRUMENT KOREA /55.E2

SELECTOR SWITCH KGS-C2M2


-S1 MANUAL RETURN, 2NO 2NC KG AUTO KOREA /75.C5
CB MOTOR OPERATION

KGF-CM2R 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


PUSH BUTTON SWITCH
-S2 SELF-RETURN, 2NO 2NC, COLOR-RED KG AUTO KOREA /75.D5 DRAWING TITLE:
CB MOTOR LONG RUN RESET
PARTS LIST FOR LCC

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 82 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

PARTS LIST

DEVICE NAME SYMBOL DESCRIPTION MODEL NUMBER MANUFACTURER ORIGIN SHEET NO

KEY SWITCH KGK-J2R1A


-S3 AUTO-RETURN, 1NO 1NC KG AUTO KOREA /75.C2 Reference DWG NO. DWG DATE REV.
INTERLOCK RELEASE

B PUSH BUTTON SWITCH KGF-CM1B B


-S4 SELF-RETURN, 1NO 1NC, COLOR-BLACK KG AUTO KOREA /75.D2
LAMP TEST

PUSH BUTTON SWITCH WITH LED LAMP KGX-CMV21Y


-S5 MANUAL-RETURN, 1NO 1NC, YELLOW LED KG AUTO KOREA /75.E5
HEATER TEST

SELECTOR SWITCH WITH KEY YSKDNC2801-79M20L


-S11 MANUAL RETURN WITH KEY YONGSUNG KOREA /75.B2
LOCAL - REMOTE SELECTOR

SELECTOR SWITCH YSDNC7602-64MR20B


-S12 MANUAL RETURN, HANDLE-CHRYSANTHEMUM, COLOR-BLACK YONG SUNG KOREA /76.B2
OFF-AB-BC-CA-AN-BN-CN SELECTOR

OUTLET AC_OUTLET(1Ph)
-SOCKET(1-PH) OUTLET (220Vac, 16A, - 772 13) LEGRAND FRANCE /20.D4 EMPLOYER / DEVELOPER

C AC_OUTLET(3Ph) C
OUTLET
-SOCKET(3-PH) OUTLET (380Vac, 32A, - 5 552 89) LEGRAND FRANCE /20.D5

SELECTOR SWITCH YSDNC3305-64RP20R


-SQ0 PULLING TURN & AUTOMATIC RETURN, HANDLE-PISTOL, YONGSUNG KOREA /73.B3
CBOPEN/CLOSE / CBOPEN / CLOSE COLOR-RED
PROJECT MANAGER.
SELECTOR SWITCH YSDNC3205-64RE20B
-SQ1 PULLING TURN & AUTOMATIC RETURN, HANDLE-EGG YONGSUNG KOREA /73.C3
BUS DSOPEN/CLOSE

SELECTOR SWITCH YSDNC3205-64RE20B


-SQ2 PULLING TURN & AUTOMATIC RETURN, HANDLE-EGG YONGSUNG KOREA /73.D3
BUS DSOPEN/CLOSE

SELECTOR SWITCH YSDNC3205-64RE20B SUPERVISION CONSULTANT


-SQ8 PULLING TURN & AUTOMATIC RETURN, HANDLE-EGG YONGSUNG KOREA /74.D3
LINE ESOPEN/CLOSE

D SELECTOR SWITCH YSDNC3205-64RE20B D


-SQ9 PULLING TURN & AUTOMATIC RETURN, HANDLE-EGG YONGSUNG KOREA /73.E3
LINE DSOPEN/CLOSE

SELECTOR SWITCH YSDNC3205-64RE20B


-SQ51 PULLING TURN & AUTOMATIC RETURN, HANDLE-EGG YONGSUNG KOREA /74.B3 04 24.JAN.2018 REVISED AS PER COMMENT
WORK ESOPEN/CLOSE
03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
SELECTOR SWITCH YSDNC3205-64RE20B 01 19.JUN.2017 REVISED AS PER COMMENT
-SQ52 PULLING TURN & AUTOMATIC RETURN, HANDLE-EGG YONGSUNG KOREA /74.C3 00 01.SEP.2016 FOR APPROVAL
WORK ESOPEN/CLOSE REV. DATE ISSUED TO / FOR :

ON DELAY TIMER (A MODE) AT8N / PG-08 CONTRACTOR: CONSORTIUM( KN / HHI )


-T47A AC 100-240V / DC 24-240V, 2 CHANGE OVER CONTACT AUTONICS KOREA /22.E6
POLE DESCREPANCY

ON DELAY TIMER (A MODE) AT8N / PG-08


-T48B AC 100-240V / DC 24-240V, 2 CHANGE OVER CONTACT AUTONICS KOREA /23.E6
POLE DESCREPANCY
E AT8N / PG-08
ON DELAY TIMER (A MODE) E
-T88 AC 100-240V / DC 24-240V, 2 CHANGE OVER CONTACT AUTONICS KOREA /24.E6
MOTOR LONG RUN

THERMALSTAT RT-50HT
-TH -10~50°C RUN ELEC KOREA /56.B3
THERMAL STATE 1NO+1NC

TEST SWITCH FT-1 10POLE


-TT1 10 POLE, P-P-P-C-C-C-C-C-C-P ABB USA /65.C2
TEST SWITCH

DM1T-AV22 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DIGITAL AC VOLTMETER
-VM1 SINGLE PHASE AC150V, POWER 100-240VAC/DC, CLASS 0.2, KYONGBO KOREA /66.B2 DRAWING TITLE:
MULTI FUNCTION METER OUTPUT 4-20MA, RS485
PARTS LIST FOR LCC

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 83 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

PARTS LIST MECHANISM A3-S-PART-MECH-005

DEVICE NAME DESIGNATION SPECIFICATION MODEL NUMBER MANUFACTURER ORIGIN

SOLENOID COIL
-Q0(A) -52C
CB -Q0(A) CLOSING COIL
DC 220V, 60 Ohm 4CG4382-D HYUNDAI KOREA
Reference DWG NO. DWG DATE REV.
HEATER
-HT
CB -Q0(A)
‎60W 2KΩ SPR 319-1 RARA KOREA
B B
CONNECTOR
-J1
CB -Q0(A)
M40 WIELAND-24P-M40 WIELAND GERMANY

CONNECTOR
-J2
CB -Q0(A)
M40 WIELAND-24P-M40 WIELAND GERMANY

CONNECTOR
-J3
CB -Q0(A)
M40 WIELAND-24P-M40 WIELAND GERMANY

CONNECTOR
-J4
-Q0(A)
M40 WIELAND-24P-M40 WIELAND GERMANY
EMPLOYER / DEVELOPER
CONNECTOR
-JA M20 WIELAND-5P-M20 WIELAND GERMANY
C CB -Q0(A) C

LIMIT SWITCH
-LS1 10A HSK-10 HYUNDAI KOREA

LIMIT SWITCH
-LS2 10A HSK-10 HYUNDAI KOREA PROJECT MANAGER.

LIMIT SWITCH
-LS3 10A HSK-10 HYUNDAI KOREA

UNIVERSAL MOTOR
-M1
CB -Q0(A)
DC220V, 800W 3CG4457-002 DMK KOREA
SUPERVISION CONSULTANT
OUTLET
-OUTLET_A OUTLET (220Vac, 16A, - 772 13) AC_OUTLET(1Ph) LEGRAND FRANCE
D D
AUXILIARY SWITCH
-S1
CB -Q0(A)
AUXILIARY SWITCH 8NO 9NC 2CG1180-010 YONG SUNG KOREA

AUXILIARY SWITCH 04 24.JAN.2018 REVISED AS PER COMMENT


-S2
CB -Q0(A)
AUXILIARY SWITCH 8NO 9NC 2CG1180-010 YONG SUNG KOREA 03
02
10.AUG.2017
09.AUG.2017
REVISED AS PER COMMENT
REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
SELECTOR SWITCH MANUAL RETURN, HANDLE-COMPASS, REV. DATE ISSUED TO / FOR :
-S13
AC-DC SELECTOR FOR CB MOTOR OPERATION COLOR-BLACK
YSDNC2201-69MO20B YONGSUNG KOREA
CONTRACTOR: CONSORTIUM( KN / HHI )

SOLENOID COIL
-52T1
CB -Q0(A) TRIP COIL 1
DC 220V, 60 Ohm 4CG4382-D HYUNDAI KOREA

SOLENOID COIL
-52T2 DC 220V, 60 Ohm 4CG4382-D HYUNDAI KOREA
E CB -Q0(A) TRIP COIL 2
E
SOLENOID COIL
-Q0(B) -52C
CB -Q0(B) CLOSING COIL
DC 220V, 60 Ohm 4CG4382-D HYUNDAI KOREA

HEATER
-HT
CB -Q0(B)
‎60W 2KΩ SPR 319-1 RARA KOREA

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DRAWING TITLE:

PARTS LIST FOR MECHANISM

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 84 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

PARTS LIST MECHANISM A3-S-PART-MECH-005

DEVICE NAME DESIGNATION SPECIFICATION MODEL NUMBER MANUFACTURER ORIGIN

CONNECTOR
-Q0(B) -J1
CB -Q0(B)
M40 WIELAND-24P-M40 WIELAND GERMANY
Reference DWG NO. DWG DATE REV.
CONNECTOR
-J2
CB -Q0(B)
M40 WIELAND-24P-M40 WIELAND GERMANY
B B
CONNECTOR
-J3
CB -Q0(B)
M40 WIELAND-24P-M40 WIELAND GERMANY

CONNECTOR
-J4
-Q0(B)
M40 WIELAND-24P-M40 WIELAND GERMANY

CONNECTOR
-JA
CB -Q0(B)
M20 WIELAND-5P-M20 WIELAND GERMANY

LIMIT SWITCH
-LS1 10A HSK-10 HYUNDAI KOREA
EMPLOYER / DEVELOPER
LIMIT SWITCH
-LS2 10A HSK-10 HYUNDAI KOREA
C C

LIMIT SWITCH
-LS3 10A HSK-10 HYUNDAI KOREA

UNIVERSAL MOTOR
-M1
CB -Q0(B)
DC220V, 800W 3CG4457-002 DMK KOREA PROJECT MANAGER.

OUTLET
-OUTLET_B OUTLET (220Vac, 16A, - 772 13) AC_OUTLET(1Ph) LEGRAND FRANCE

AUXILIARY SWITCH
-S1
CB -Q0(B)
AUXILIARY SWITCH 8NO 9NC 2CG1180-010 YONG SUNG KOREA
SUPERVISION CONSULTANT
AUXILIARY SWITCH
-S2
CB -Q0(B)
AUXILIARY SWITCH 8NO 9NC 2CG1180-010 YONG SUNG KOREA
D D
SELECTOR SWITCH MANUAL RETURN, HANDLE-COMPASS,
-S13
AC-DC SELECTOR FOR CB MOTOR OPERATION COLOR-BLACK
YSDNC2201-69MO20B YONGSUNG KOREA

SOLENOID COIL 04 24.JAN.2018 REVISED AS PER COMMENT


-52T1
CB -Q0(B) TRIP COIL 1
DC 220V, 60 Ohm 4CG4382-D HYUNDAI KOREA 03
02
10.AUG.2017
09.AUG.2017
REVISED AS PER COMMENT
REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
SOLENOID COIL REV. DATE ISSUED TO / FOR :
-52T2
CB -Q0(B) TRIP COIL 2
DC 220V, 60 Ohm 4CG4382-D HYUNDAI KOREA
CONTRACTOR: CONSORTIUM( KN / HHI )

SOLENOID COIL
-Q0(C) -52C
CB -Q0(C) CLOSING COIL
DC 220V, 60 Ohm 4CG4382-D HYUNDAI KOREA

HEATER
-HT ‎60W 2KΩ SPR 319-1 RARA KOREA
E CB -Q0(C)
E
CONNECTOR
-J1
CB -Q0(C)
M40 WIELAND-24P-M40 WIELAND GERMANY

CONNECTOR
-J2
CB -Q0(C)
M40 WIELAND-24P-M40 WIELAND GERMANY

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DRAWING TITLE:

PARTS LIST FOR MECHANISM

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 85 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

PARTS LIST MECHANISM A3-S-PART-MECH-005

DEVICE NAME DESIGNATION SPECIFICATION MODEL NUMBER MANUFACTURER ORIGIN

CONNECTOR
-Q0(C) -J3
CB -Q0(C)
M40 WIELAND-24P-M40 WIELAND GERMANY
Reference DWG NO. DWG DATE REV.
CONNECTOR
-J4
-Q0(C)
M40 WIELAND-24P-M40 WIELAND GERMANY
B B
CONNECTOR
-JA
CB -Q0(C)
M20 WIELAND-5P-M20 WIELAND GERMANY

LIMIT SWITCH
-LS1 10A HSK-10 HYUNDAI KOREA

LIMIT SWITCH
-LS2 10A HSK-10 HYUNDAI KOREA

LIMIT SWITCH
-LS3 10A HSK-10 HYUNDAI KOREA
EMPLOYER / DEVELOPER
UNIVERSAL MOTOR
-M1 DC220V, 800W 3CG4457-002 DMK KOREA
C CB -Q0(C) C

OUTLET
-OUTLET_C OUTLET (220Vac, 16A, - 772 13) AC_OUTLET(1Ph) LEGRAND FRANCE

AUXILIARY SWITCH
-S1
CB -Q0(C)
AUXILIARY SWITCH 8NO 9NC 2CG1180-010 YONG SUNG KOREA PROJECT MANAGER.

AUXILIARY SWITCH
-S2
CB -Q0(C)
AUXILIARY SWITCH 8NO 9NC 2CG1180-010 YONG SUNG KOREA

SELECTOR SWITCH MANUAL RETURN, HANDLE-COMPASS,


-S13
AC-DC SELECTOR FOR CB MOTOR OPERATION COLOR-BLACK
YSDNC2201-69MO20B YONGSUNG KOREA
SUPERVISION CONSULTANT
SOLENOID COIL
-52T1
CB -Q0(C) TRIP COIL 1
DC 220V, 60 Ohm 4CG4382-D HYUNDAI KOREA
D D
SOLENOID COIL
-52T2
CB -Q0(C) TRIP COIL 2
DC 220V, 60 Ohm 4CG4382-D HYUNDAI KOREA

LIMIT SWITCH 04 24.JAN.2018 REVISED AS PER COMMENT


-Q1 -DS1
BUS DS -Q1 DOOR OPEN
10A HSK-10 HYUNDAI KOREA 03
02
10.AUG.2017
09.AUG.2017
REVISED AS PER COMMENT
REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
LIMIT SWITCH REV. DATE ISSUED TO / FOR :
-DS2
BUS DS -Q1 DOOR OPEN
10A HSK-10 HYUNDAI KOREA
CONTRACTOR: CONSORTIUM( KN / HHI )

HEATER
-HT
BUS DS -Q1
‎60W 2KΩ SPR 319-1 RARA KOREA

SOLENOID COIL
-ILM DC220V, 6.2W, 9200 Ohm 4CS1161-002 HYUNDAI KOREA
E BUS DS -Q1 SOLENODE
E
CONNECTOR
-J1
BUS DS -Q1
M40 WIELAND-24P-M40 WIELAND GERMANY

CONNECTOR
-J2
BUS DS -Q1
M40 WIELAND-24P-M40 WIELAND GERMANY

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DRAWING TITLE:

PARTS LIST FOR MECHANISM

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 86 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

PARTS LIST MECHANISM A3-S-PART-MECH-005

DEVICE NAME DESIGNATION SPECIFICATION MODEL NUMBER MANUFACTURER ORIGIN

CONNECTOR
-Q1 -JA
BUS DS -Q1
M20 WIELAND-5P-M20 WIELAND GERMANY
Reference DWG NO. DWG DATE REV.
LIMIT SWITCH
-LSA
BUS DS -Q1
10A HSK-10 HYUNDAI KOREA
B B
LIMIT SWITCH
-LSB
BUS DS -Q1
10A HSK-10 HYUNDAI KOREA

DC MOTOR
-M
BUS DS -Q1
DC220V, 350W 3CS9676-002 DMK KOREA

KEY SWITCH
-PS
BUS DS -Q1
MANUAL RETURN, 1NO 1NC KH-302K-2105 KUN HEUNG KOREA

AUXILIARY SWITCH
-S1
BUS DS -Q1
AUXILIARY SWITCH 5NO 6NC 1WC 3CS3686-401 HYUNDAI KOREA
EMPLOYER / DEVELOPER
AUXILIARY SWITCH
-S2 AUXILIARY SWITCH 6NO 6NC 3CS3686-601 HYUNDAI KOREA
C BUS DS -Q1 C

LIMIT SWITCH
-Q2 -DS1
BUS DS -Q2 DOOR SWITCH
10A HSK-10 HYUNDAI KOREA

LIMIT SWITCH
-DS2
BUS DS -Q2 DOOR SWITCH
10A HSK-10 HYUNDAI KOREA PROJECT MANAGER.

HEATER
-HT
BUS DS -Q2
‎60W 2KΩ SPR 319-1 RARA KOREA

SOLENOID COIL
-ILM
BUS DS -Q2
DC220V, 6.2W, 9200 Ohm 4CS1161-002 HYUNDAI KOREA
SUPERVISION CONSULTANT
CONNECTOR
-J1
BUS DS -Q2
M40 WIELAND-24P-M40 WIELAND GERMANY
D D
CONNECTOR
-J2
BUS DS -Q2
M40 WIELAND-24P-M40 WIELAND GERMANY

CONNECTOR 04 24.JAN.2018 REVISED AS PER COMMENT


-JA
BUS DS -Q2
M20 WIELAND-5P-M20 WIELAND GERMANY 03
02
10.AUG.2017
09.AUG.2017
REVISED AS PER COMMENT
REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
LIMIT SWITCH REV. DATE ISSUED TO / FOR :
-LSA
BUS DS -Q1
10A HSK-10 HYUNDAI KOREA
CONTRACTOR: CONSORTIUM( KN / HHI )

LIMIT SWITCH
-LSB
BUS DS -Q1
10A HSK-10 HYUNDAI KOREA

DC MOTOR
-M DC220V, 350W 3CS9676-002 DMK KOREA
E BUS DS -Q2
E
KEY SWITCH
-PS
BUS DS -Q1
MANUAL RETURN, 1NO 1NC KH-302K-2105 KUN HEUNG KOREA

AUXILIARY SWITCH
-S1
BUS DS -Q2
AUXILIARY SWITCH 5NO 6NC 1WC 3CS3686-401 HYUNDAI KOREA

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DRAWING TITLE:

PARTS LIST FOR MECHANISM

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 87 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

PARTS LIST MECHANISM A3-S-PART-MECH-005

DEVICE NAME DESIGNATION SPECIFICATION MODEL NUMBER MANUFACTURER ORIGIN

AUXILIARY SWITCH
-Q2 -S2
BUS DS -Q2
AUXILIARY SWITCH 6NO 6NC 3CS3686-601 HYUNDAI KOREA
Reference DWG NO. DWG DATE REV.
LIMIT SWITCH
-Q8 -DS1
LINE ES -Q8
10A HSK-10 HYUNDAI KOREA
B B
HEATER
-HT
LINE ES -Q8
‎60W 2KΩ SPR 319-1 RARA KOREA

SOLENOID COIL
-ILM
LINE ES -Q8
DC220V, 5.94W, 9200 Ohm 3CS1860-005 HYUNDAI KOREA

CONNECTOR
-J1
LINE ES -Q8
M40 WIELAND-24P-M40 WIELAND GERMANY

CONNECTOR
-J2
LINE ES -Q8
M40 WIELAND-24P-M40 WIELAND GERMANY
EMPLOYER / DEVELOPER
CONNECTOR
-JA M20 WIELAND-5P-M20 WIELAND GERMANY
C LINE ES -Q8 C

DC MOTOR
-M
LINE ES -Q8
DC220V, 210W 4CS1267-003 DMK KOREA

KEY SWITCH
-PS
LINE ES -Q8
MANUAL RETURN, 1NO 1NC KH-302K-2105 KUN HEUNG KOREA PROJECT MANAGER.

AUXILIARY SWITCH
-S1
LINE ES -Q8
AUXILIARY SWITCH 5NO 5NC 3CS3686-301 HYUNDAI KOREA

AUXILIARY SWITCH
-S2
LINE ES -Q8
AUXILIARY SWITCH 6NO 6NC 3CS3686-501 HYUNDAI KOREA
SUPERVISION CONSULTANT
LIMIT SWITCH
-Q9 -DS1
LINE DS -Q9
10A HSK-10 HYUNDAI KOREA
D D
LIMIT SWITCH
-DS2
LINE DS -Q9
10A HSK-10 HYUNDAI KOREA

HEATER 04 24.JAN.2018 REVISED AS PER COMMENT


-HT
LINE DS -Q9
‎60W 2KΩ SPR 319-1 RARA KOREA 03
02
10.AUG.2017
09.AUG.2017
REVISED AS PER COMMENT
REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
SOLENOID COIL REV. DATE ISSUED TO / FOR :
-ILM
LINE DS -Q9
DC220V, 6.2W, 9200 Ohm 4CS1161-002 HYUNDAI KOREA
CONTRACTOR: CONSORTIUM( KN / HHI )

CONNECTOR
-J1
LINE DS -Q9
M40 WIELAND-24P-M40 WIELAND GERMANY

CONNECTOR
-J2 M40 WIELAND-24P-M40 WIELAND GERMANY
E
E
CONNECTOR
-J3
LINE DS -Q9
M40 WIELAND-24P-M40 WIELAND GERMANY

CONNECTOR
-JA
LINE DS -Q9
M20 WIELAND-5P-M20 WIELAND GERMANY

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DRAWING TITLE:

PARTS LIST FOR MECHANISM

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 88 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

PARTS LIST MECHANISM A3-S-PART-MECH-005

DEVICE NAME DESIGNATION SPECIFICATION MODEL NUMBER MANUFACTURER ORIGIN

LIMIT SWITCH
-Q9 -LSA
BUS DS -Q1
10A HSK-10 HYUNDAI KOREA
Reference DWG NO. DWG DATE REV.
LIMIT SWITCH
-LSB
BUS DS -Q1
10A HSK-10 HYUNDAI KOREA
B B
DC MOTOR
-M
LINE DS -Q9
DC220V, 350W 3CS9676-002 DMK KOREA

KEY SWITCH
-PS
BUS DS -Q1
MANUAL RETURN, 1NO 1NC KH-302K-2105 KUN HEUNG KOREA

AUXILIARY SWITCH
-S1
LINE DS -Q9
AUXILIARY SWITCH 5NO 6NC 1WC 3CS3686-401 HYUNDAI KOREA

AUXILIARY SWITCH
-S2
LINE DS -Q9
AUXILIARY SWITCH 6NO 6NC 3CS3686-402 HYUNDAI KOREA
EMPLOYER / DEVELOPER
LIMIT SWITCH
-Q51 -DS1 10A HSK-10 HYUNDAI KOREA
C WORK ES -Q51 C

LIMIT SWITCH
-DS2
WORK ES -Q51
10A HSK-10 HYUNDAI KOREA

HEATER
-HT
WORK ES -Q51
‎60W 2KΩ SPR 319-1 RARA KOREA PROJECT MANAGER.

SOLENOID COIL
-ILM
WORK ES -Q51
DC220V, 6.2W, 9200 Ohm 4CS1161-002 HYUNDAI KOREA

CONNECTOR
-J1
WORK ES -Q51
M40 WIELAND-24P-M40 WIELAND GERMANY
SUPERVISION CONSULTANT
CONNECTOR
-J2
WORK ES -Q51
M40 WIELAND-24P-M40 WIELAND GERMANY
D D
CONNECTOR
-J3
WORK ES -Q51
M40 WIELAND-24P-M40 WIELAND GERMANY

CONNECTOR 04 24.JAN.2018 REVISED AS PER COMMENT


-JA
WORK ES -Q51
M20 WIELAND-5P-M20 WIELAND GERMANY 03
02
10.AUG.2017
09.AUG.2017
REVISED AS PER COMMENT
REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
LIMIT SWITCH REV. DATE ISSUED TO / FOR :
-LSA
BUS DS -Q1
10A HSK-10 HYUNDAI KOREA
CONTRACTOR: CONSORTIUM( KN / HHI )

LIMIT SWITCH
-LSB
BUS DS -Q1
10A HSK-10 HYUNDAI KOREA

DC MOTOR
-M DC220V, 350W 3CS9676-002 DMK KOREA
E WORK ES -Q51
E
KEY SWITCH
-PS
BUS DS -Q1
MANUAL RETURN, 1NO 1NC KH-302K-2105 KUN HEUNG KOREA

AUXILIARY SWITCH
-S1
WORK ES -Q51
AUXILIARY SWITCH 5NO 6NC 1WC 3CS3686-401 HYUNDAI KOREA

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DRAWING TITLE:

PARTS LIST FOR MECHANISM

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 89 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

PARTS LIST MECHANISM A3-S-PART-MECH-005

DEVICE NAME DESIGNATION SPECIFICATION MODEL NUMBER MANUFACTURER ORIGIN

AUXILIARY SWITCH
-Q51 -S2
WORK ES -Q51
AUXILIARY SWITCH 6NO 6NC 3CS3686-402 HYUNDAI KOREA
Reference DWG NO. DWG DATE REV.
LIMIT SWITCH
-Q52 -DS1
WORK ES -Q52
10A HSK-10 HYUNDAI KOREA
B B
LIMIT SWITCH
-DS2
WORK ES -Q52
10A HSK-10 HYUNDAI KOREA

HEATER
-HT
WORK ES -Q52
‎60W 2KΩ SPR 319-1 RARA KOREA

SOLENOID COIL
-ILM
WORK ES -Q52
DC220V, 6.2W, 9200 Ohm 4CS1161-002 HYUNDAI KOREA

CONNECTOR
-J1
WORK ES -Q52
M40 WIELAND-24P-M40 WIELAND GERMANY
EMPLOYER / DEVELOPER
CONNECTOR
-J2 M40 WIELAND-24P-M40 WIELAND GERMANY
C WORK ES -Q52 C

CONNECTOR
-J3
WORK ES -Q52
M40 WIELAND-24P-M40 WIELAND GERMANY

CONNECTOR
-JA
WORK ES -Q52
M20 WIELAND-5P-M20 WIELAND GERMANY PROJECT MANAGER.

LIMIT SWITCH
-LSA
BUS DS -Q1
10A HSK-10 HYUNDAI KOREA

LIMIT SWITCH
-LSB
BUS DS -Q1
10A HSK-10 HYUNDAI KOREA
SUPERVISION CONSULTANT
DC MOTOR
-M
WORK ES -Q52
DC220V, 350W 3CS9676-002 DMK KOREA
D D
KEY SWITCH
-PS
BUS DS -Q1
MANUAL RETURN, 1NO 1NC KH-302K-2105 KUN HEUNG KOREA

AUXILIARY SWITCH 04 24.JAN.2018 REVISED AS PER COMMENT


-S1
WORK ES -Q52
AUXILIARY SWITCH 5NO 6NC 1WC 3CS3686-401 HYUNDAI KOREA 03
02
10.AUG.2017
09.AUG.2017
REVISED AS PER COMMENT
REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
AUXILIARY SWITCH REV. DATE ISSUED TO / FOR :
-S2
WORK ES -Q52
AUXILIARY SWITCH 6NO 6NC 3CS3686-402 HYUNDAI KOREA
CONTRACTOR: CONSORTIUM( KN / HHI )

E
E

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DRAWING TITLE:

PARTS LIST FOR MECHANISM

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 90 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

PARTS LIST FOR TERMINAL BLOCK

DEVICE NAME DESCRIPTION MODEL NUMBER Manufacturer ORIGIN Remarks

-X0 TERMINAL BLOCK FOR CB (-Q0) UK 5 N PHOENIX GERMANY

Reference DWG NO. DWG DATE REV.


-X0C(A) TERMINAL BLOCK FOR CB (-Q0) A-PHASE CONTROL UK 5 N PHOENIX GERMANY
B B

-X0C(B) TERMINAL BLOCK FOR CB (-Q0) B-PHASE CONTROL UK 5 N PHOENIX GERMANY

-X0C(C) TERMINAL BLOCK FOR CB (-Q0) C-PHASE CONTROL UK 5 N PHOENIX GERMANY

-X1 TERMINAL BLOCK FOR BUS DS(-Q1) UK 5 N PHOENIX GERMANY

-X1C TERMINAL BLOCK FOR BUS DS(-Q1) CONTROL UK 5 N PHOENIX GERMANY

EMPLOYER / DEVELOPER
-X2 TERMINAL BLOCK FOR BUS DS(-Q2) UK 5 N PHOENIX GERMANY
C C

-X2C TERMINAL BLOCK FOR BUS DS(-Q2) CONTROL UK 5 N PHOENIX GERMANY

-X8 TERMINAL BLOCK FOR LINE ES(-Q8) UK 5 N PHOENIX GERMANY PROJECT MANAGER.

-X8C TERMINAL BLOCK FOR LINE ES(-Q8) CONTROL UK 5 N PHOENIX GERMANY

-X9 TERMINAL BLOCK FOR LINE DS(-Q9) UK 5 N PHOENIX GERMANY


SUPERVISION CONSULTANT

-X9C TERMINAL BLOCK FOR LINE DS(-Q9) CONTROL UK 5 N PHOENIX GERMANY


D D

-X51 TERMINAL BLOCK FOR WORK ES(-Q51) UK 5 N PHOENIX GERMANY

04 24.JAN.2018 REVISED AS PER COMMENT


-X51C TERMINAL BLOCK FOR WORK ES(-Q51) CONTROL UK 5 N PHOENIX GERMANY 03
02
10.AUG.2017
09.AUG.2017
REVISED AS PER COMMENT
REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :
-X52 TERMINAL BLOCK FOR WORK ES(-Q52) UK 5 N PHOENIX GERMANY
CONTRACTOR: CONSORTIUM( KN / HHI )

-X52C TERMINAL BLOCK FOR WORK ES(-Q52) CONTROL UK 5 N PHOENIX GERMANY

-XA TERMINAL BLOCK FOR AC MAIN INPUT UK 16 N PHOENIX CHINA


E
E

-XA1 TERMINAL BLOCK FOR ANNUNCIATOR UT 4-MT PHOENIX GERMANY

-XA2 TERMINAL BLOCK FOR ANNUNCIATOR UT 4-MT PHOENIX GERMANY

-XAD TERMINAL BLOCK FOR 1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DRAWING TITLE:

PARTS LIST FOR TERMINAL BLOCK

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 91 OF 92 04
1 2 3 4 5 6 7 8

Project

A A

PARTS LIST FOR TERMINAL BLOCK

DEVICE NAME DESCRIPTION MODEL NUMBER Manufacturer ORIGIN Remarks

-XC1 TERMINAL BLOCK FOR CT YSCT-03ACS YONGSUNG KOREA

Reference DWG NO. DWG DATE REV.


-XC2 TERMINAL BLOCK FOR CT USST 6-T PHOENIX POLAND
B B

-XD TERMINAL BLOCK FOR DC MAIN INPUT UK 16 N PHOENIX CHINA

-XG TERMINAL BLOCK FOR GAS GAUGE UK 5 N PHOENIX GERMANY

-XH TERMINAL BLOCK FOR HEATER CONTROL UK 5 N PHOENIX GERMANY

-XM TERMINAL BLOCK FOR CT YSCT-04ACS YONGSUNG KOREA

EMPLOYER / DEVELOPER
-XR1 TERMINAL BLOCK FOR REMOTE UK 5 N PHOENIX GERMANY
C C

-XR2 TERMINAL BLOCK FOR PROTECTION TRIP USST 10 PHOENIX POLAND

-XS TERMINAL BLOCK FOR INTERLOCK AND GENERAL UK 5 N PHOENIX GERMANY PROJECT MANAGER.

SUPERVISION CONSULTANT

D D

04 24.JAN.2018 REVISED AS PER COMMENT


03 10.AUG.2017 REVISED AS PER COMMENT
02 09.AUG.2017 REVISED AS PER COMMENT
01 19.JUN.2017 REVISED AS PER COMMENT
00 01.SEP.2016 FOR APPROVAL
REV. DATE ISSUED TO / FOR :

CONTRACTOR: CONSORTIUM( KN / HHI )

E
E

1000, Bangeojinsinhawn-doro, Dong-gu, Ulsan, Korea


DRAWING TITLE:

PARTS LIST FOR TERMINAL BLOCK

F Drawing Number : PREPARED : F


PK55-SD-EL-GS-14 K.H.SONG

MANUFACTURER/VENDER NAME
ACTION Project No.: Scale : CHECKED :
A
008006400 S.Y.JANG
B
C
Sheet Size : Rev. : Plot Date: APPROVED :
DRAWING NUMBER SHEET NO. REV NO.
D A3 04 01.SEP.2016 C.Y.HONG
16316 01 EE 92 OF 92 04