Vous êtes sur la page 1sur 4

L LINEA DE CONDUCCION POR GRAVEDAD

H 497.4
L 72
Q 1.75 0.00175
n 0.009 acero galvanizado

1.- DIAMETRO TEORICO


S=𝐻/� �=(3.21 𝑄𝑛/𝑆^(1/2) )^(3/8)
6.908333333
0.017043 m
1.70 cm
2.- CALCULAR LONGITUDES

6654.067351 L1=
D1= 2 0.0508 K1

30862.21702 L2=
D2= 1.5 0.0381 K2

hf1=𝐾𝑄^2 � -134.849273
∑ 497.4 SI CUMPLE EL
hf2=𝐾𝑄^2 � 632.2492729

Sf1=ℎ𝑓1/�1 0.020378081

Sf2=ℎ𝑓2/�2 0.09451554

LONGITUDES Y PULGADAS DE LA TUBERIA


L in
-6617.36849 2
6689.368492 1.5
0.67 in ≈ 2.0 in

-6617.3684922 ∑ 72

6689.3684922

SI CUMPLE EL H
DISEÑE LA LINEA DE CONDUCCION POR GRAVEDAD CON LOS SIGUIENTES DATOS
H 497.4
L 7237.13
Q 1.75 0.00175
n 0.009 acero galvanizado

1.- DIAMETRO TEORICO


S=𝐻/� �=(3.21 𝑄𝑛/𝑆^(1/2) )^(3/8)
0.068728902
0.040453 m
4.05 cm
2.- CALCULAR LONGITUDES

K1 =(10.293𝑛^2)/�^(16/3)
6654.067351 L1=
D1= 2 0.0508

K2 =(10.293𝑛^2)/�^(16/3) L2=
D2= 1.5 0.0381

hf1=𝐾𝑄^2 � 497.4
∑ 497.4 SI CUMPLE EL
hf2=𝐾𝑄^2 � 0

Sf1=ℎ𝑓1/�1 0.020378081

Sf2=ℎ𝑓2/�2

LONGITUDES Y PULGADAS DE LA TUBERIA


L in
24408.57869 2
0 1.5
1.59 in ≈ 2.0 in

24408.578688 ∑ 24408.57869

L2=

SI CUMPLE EL H

Vous aimerez peut-être aussi