Vous êtes sur la page 1sur 9

TM 4217

NATURAL GAS ENGINEERING


WEEKLY PROJECT TOPICS #9
PIPELINE
“ECOPETRO”
GROUP 18
Name : Nur Rahmi SR (12215092)
Nevi Cahya Winofa (12215093)
Christofer Devlin (12215094)
Bayu Aji Purbantanu (12215095)
Muhammad Haidar Rochim (12215096)
Lecturer : Prof. Ir. Doddy Abdassah, M.Sc., Ph.D.
Dedy Irawan, ST, MT
Ir. Leksono Mucharam, M. Sc., Ph.D
Ir. Utjok WR Siagian, M. Sc., Ph.D
Silvya Dewi Rahmawati S.Si,M.Si,Ph.D
Assistant : Kharisma Idea
Steven Chandra
Hanif Farrastama Yoga
Submission Date : 2nd of March 2019

PETROLEUM ENGINEERING STUDY PROGRAM


FACULTY OF MINING AND PETROLEUM ENGINEERING
INSTITUT TEKNOLOGI BANDUNG
2019
LIST OF CONTENT

LIST OF CONTENT ..................................................................................................................................... i


FIGURE LIST ............................................................................................................................................. ii
TABLE LIST ............................................................................................................................................... 1
CHAPTER I INTRODUCTION ..................................................................................................................... 2
1.1 Problem Statement ........................................................................................................................ 2
CHAPTER II DISCUSSION .......................................................................................................................... 3
2.1 Reserve calculation Workflow ........................................................................................................ 3
2.1.1 Deterministic Method ............................................................. Error! Bookmark not defined.
2.1.2 Probabilistic Method ............................................................... Error! Bookmark not defined.
2.2 Procedure and Result ..................................................................................................................... 3
2.2.1 Reserve Definition and Classification ...................................... Error! Bookmark not defined.
2.2.2 Reserve Calculation ................................................................. Error! Bookmark not defined.
2.2.2.1 Deterministic Method .......................................................... Error! Bookmark not defined.
2.2.2.2 Probabilistic Method ............................................................ Error! Bookmark not defined.
CHAPTER III CLOSING .............................................................................................................................. 5
3.1Conclusion ....................................................................................................................................... 6
3.2Team Work Evaluation .................................................................................................................... 6
3.3Reference ........................................................................................................................................ 6

i
FIGURE LIST

Figure 1. Flow Chart of Deterministic Method ........................................ Error! Bookmark not defined.

Figure 2. Flow Chart of Probabilistic Method .......................................... Error! Bookmark not defined.

Figure 3. Deterministic Method Schematic ............................................. Error! Bookmark not defined.

Figure 4. GWC based on Model ............................................................... Error! Bookmark not defined.

Figure 5. GWC based on RFT .................................................................... Error! Bookmark not defined.

Figure 6. Lateral Boundaries Input ........................................................... Error! Bookmark not defined.

Figure 7. Lateral Boundaries Model ......................................................... Error! Bookmark not defined.

Figure 8. PVT Data Input .......................................................................... Error! Bookmark not defined.

Figure 9. Distribution for Probabilistic Method ....................................... Error! Bookmark not defined.

Figure 10. Monte Carlo Simulation .......................................................... Error! Bookmark not defined.

Figure 11. Result of Monte Carlo Simulation ........................................... Error! Bookmark not defined.

ii
TABLE LIST

Table 1. Deterministic Method Results .......................................................... Error! Bookmark not defined.

1
CHAPTER I INTRODUCTION

1.1 Problem Statement

Based on previous projects, obtained:


1. Pipeline network design from a field to production facility location.
2. Pipeline network design from production facility location to market place.

2
CHAPTER II DISCUSSION

2.1 Pipeline design Workflow

2.2 Procedure and Result

In X field, There are three existing wells ( TM-1, TM-2, TM-3), and from the best case well IN-2, IN-4
were added. The gathering station located in the middle of 5 wells near TM-1 with the red dot in
Figure 1.

GS

Because flow from TM-3 to gathering station pass through TM-1, TM-1 and TM-3 can be made into
one source. Choke is use for every source from each well to maintain the flowrate and wellhead
pressure. The flow from each source gather in joint J before entering three phase separator. Output
gas from separator are delivered to the market that has distance 30 km or 98425.2 ft. Because far
distance to the market, Compressor is needed to raise the pressure and help deliver the produced
gas, while the condensate and produced water went into treatment facility.

3
4
CHAPTER III CLOSING

5
1.1 Conclusion

3.2 Team Work Evaluation


Our team has done a great communication, and dividing job description:

Nur Rahmi SR Petrel correction


Nevi Cahya Winofa Finalization report
Christofer Devlin Probabilistic method
Bayu Aji Purbantanu Finalization report
Muhammad Haidar Rochim Deterministic method

3.3 Reference
Ariadji, Tutuka. Perencanaan Pengembangan Lapangan Migas. 2016. Bandung:
Penerbit ITB

Vous aimerez peut-être aussi