Bottom Hole Assembly

( BHA )
BHA In Case The Vertical Drilling.

1-Slick BHA :
Bit D/C D/P .

2-Pendulum BHA .

Bit One Or More Stabilizer


D/C HWDP D/P

3-Packed Hole BHA.


A- Mild Crocked Hole Packed BHA.

BIT One Stabilizer.

B- Medium Crocked Hole Packed BHA.

Bit Tow Stabilizer

C- Saver Crocked Hole Packed BHA

Bit Three Stabilizer


BHA In Case The Direction Drilling.

1-For Build Up Section :


Bit Near Bit Stabilizer Tow or more
Non Magnetic D/C Stabilizer 3 D/C
Stabilizer required number of D/C
HWDP D/P

2- For Hold Section :


Bit Near Bit SUB Non Magnetic D/C
Stabilizer 3 D/C
Stabilizer required number of D/C
HWDP D/P

3- For Drop Off Section :


]

Bit Non Magnetic D/C Stabilizer


D/C Stabilizer 3 D/C
Stabilizer required number of D/C
HWDP D/P