SPP DOC 202: DESIGN SERVICES Main

Study online at quizlet.com/_1exwly

1. project definition 6 PHASES OF REGULAR SERVICES 9. Contract assist owner in filing the required
phase, schematic (PSDCBC) Document documents to secure approval of
design phase, design Phase government authorities
development phase,
10. Construction prepares change orders, gathers and turns
contract documents
Phase over to thw Owner written guarantees
phase, bidding or
required of the Contractor and Sub-
negotiation phase,
Contractors.
construction phase
11. Construction makes periodic visits to the project site to
2. Project Definition consults with owner, gathers relevant
Phase familiarize himself with the general
Phase information and data, reviews and
progress and quality of work and to
refines space requirements and
ascertain that the work is proceeding in
translates them into an architectural
accordance with the Contract Documents
program, prepares initial statement
of probably construction cost 12. Contractor's The architect shall not be required to make
Failure, exhaustive or continuous 8-hour on-site
3. Schematic Design Prepares initial line drawings
construction supervision to check on the quality of the
Phase representing design studies leading
work, contract work involved and shall not be held
to a recommended solution,
documents responsible for the ______ to carry out the _____
including a general description of
in accordance with the _____
the project, submits to the owner a
statement of the probable project 13. separate full- should more extensive inspection or full-
construction cost (SPPCC) based on time supervisor time 8 hour construction supervision be
current cost parameters required by the Client, a __ shall be hired

4. Design Development documents consisting of plans, 14. full time When the Architect is requested by the
elevations, sections and other supervision owner to do the ____, his services and fees
drawings, outline specifications, shall be covered separately.
diagrammatic layout of construction 15. condemn work report tot he Client defects and deficiencies
systems, and an updates SPPCC noted in the work of Contractors, and shall
5. Contract Document complete Contract Documents for ____ found failing to conform to the contract
Phase the architectural, structural, documents
electrical, plumbing/ sanitary, 16. Certificates of issues corresponding ___. these certificates
mechanical, electronic and Payment will constitute a certification to the client
communication works. prepares that the work has progressed to the state
Technical Specifications, 7 sets, indicated and that to his best knowledge,
updates SPPCC the quality of work performed by the
6. Bidding Phase prepares bid documents such as contractor is in accordance with the
forms for contract letting, contract documents
documents for construction, forms 17. final issue the ____ certificate of payment to the
for invitation and instruction to contractor
bidders, forms for bidder's
18. Owner's provide full information as to his
proposals, general/ specific
Responsibilities requirements for the Project; when
conditions of contract, etc.
necessary, designate a representative
7. Construction Phase makes decisions on all claims of the authorized to act on his behalf;
owner and contractors on all
19. owner, orders, promptly examine and render decisions
matters relating to the execution and
general pertaining to documents submitted by the
progress of work or the
contractor, Architect to avoid unreasonable delay in
interpretation of the contract
architect the progress of the Architect's work; ___ shall
documents
issue ___ to the ___ only through the ___;
8. Bidding Phase Assist the owner from the early
stage of establishing a list of
prospective contractors
20. owner, furnish or direct the Architect to obtain at __ 28. acoustic, Other services that may be needed in order
certified expense, a ___ of the site, giving, as may be illumination to complete the Project such as services of ___
survey, required ___ and/or ___surveys covering and ___ engineers/specialists, mural painters,
topographical, grades and lines of streets, alleys, sculptors, and other service providers are to
relocation easements, encroachments and related be recommended by the Architect for the
information, boundaries, with dimensions Owner's approval. Costs for these services
and complete data pertaining to existing are to be paid for separately by the Owner
buildings, structures, trees, plants, water and shall be subject to a coordination fee
bodies, wells, excavations/pits, etc. and payable to the Architect.
other improvements and full information as
29. Architect Should a scale model, 3D model and/or
to the available utility/service lines both
walk-thru presentation of the Architect's
public and private;
design be necessary, they are to be
21. zoning ______, clearances, deed/s of restrictions, recommended by the__ for the Owner's
compliances encumbrances and annotations to titles, approval. Costs for these services are to be
association guidelines and standards, and paid for separately by the Owner and shall
soil investigations/test, borings and test be subject to a coordination fee payable to
pits necessary for determining soil and the Architect.
sub-soil conditions.
30. 50 A per diem plus traveling and living expenses
22. Owner's promptly pay for architectural and all other shall be chargeable to the Owner whenever
Responsibilities engineering and allied services required for the Architect or his duly authorized
the Project; representative is required to perform services
at a locality beyond __ km (air, straight line or
23. acoustic, pay for the design and consulting services
radial distance) from his established office as
communication, on ___, ___, ____, and other specialty systems
it appears in the Architect's letterhead
electronic which may be required for the Project;
31. Owner The __ shall pay the Architect for additional
24. legal, auditing, arrange and pay for such ____, ____, ____,___ and
sets of Contract Documents
insurance, other services as may be required for the
counseling Project; 32. time, If the Architect renders additional professional
resources, services due to changes ordered by the
25. reimbursable pay for all ___ incurred in the project and all
drafting, Owner after approval of the Architect's
expenses, VAT taxes including ___ (but not including
office outputs, the owner shall pay the architect for
income tax) that the Government may
extra ___, ____/____, or other ___expenses
impose on the Architect as a result of the
services rendered by the Architect for/ on 33. abandoned, IF the work of the architect is ___ or ____ in
the Project, whether the services were suspended whole or in part, the owner shall pay the
performed as a natural person i.e. an architect for the services rendered
individual practitioner or as a juridical corresponding to the amount due at the stage
entity i.e. as a sole proprietorship, of suspension of abandonment of work
partnership or corporation;
34. design, Once the architect has prepared all the
26. Architect if the Owner observes or otherwise contract documents, the architect has completed the
becomes aware of anything that may documents, detailed ____ and ____ phase of his services,
impair the successful implementation of the 90%, 90% which is equivalent to ___ of his work. When
Project, he must give prompt written notice owner therefore fails to implement the plans
to the ____ and documents for construction as prepared
by the Architect, the architect is entitled to
27. Project The Architect's Fee is based on the ___.
receive as compensation the sum
construction Where the Architect has to render
corresponding to ___ of the architect's fee
cost additional services, additional
compensation shall be required. 35. construction If portions of the building/s are erected at
period, different periods of time, thus increasing the
construction, ____ and Architect's burden of services, charges
6, doubled pertaining to services rendered during the
______ phase shall be adjusted proportionately.
When construction exceed a period of __
months, the fee for the remaining works shall
be ____.
36. specialist If the Owner requires the services of ____, they 41. Project means the cost of the completed building to
consultants shall be engaged with the consent of the Construction the owner including the structure,
Architect. the cost of their services shall be Cost (PCC) plumbing/sanitary and electrical fixtures,
paid for separately by the owner and shall not mechanical equipment, elevators, escalators,
be deducted from architect's fee. air-conditioning system, fire protection
system, alarm and clock system,
37. 203 Should the Owner require the Architect to
communications and electronic system,
design movable or fixed pieces of cabinets
elements attached to the building and all
and other architectural interior (AI) elements,
items indicated in the plans, designs, drawings
site development (SDP) components, urban
and specifications prepared by the architect
design elements, and other items of similar
and his consultants.
nature, the Owner shall pay the Architect in
addition to the Architect's fee. The 42. Project The construction cost of other items planned
compensation shall be based on the Project Construction and designed by the architect, such as
Construction Cost as provided for under the Cost (PCC) architectural interiors and site development
2010 SPP Document __ and its applicable elements and other items of similar nature,
guidelines. additionally planned/designed by the
architect are also part of the __
38. full-time Upon recommendation of the Architect and
construction with the approval of the owner, ____ as will be 43. PCC, current The cost of materials used and the labor for
supervisors, deemed necessary shall be engaged and paid and fair their installation are part of the ___. If these
project, by the owner. if no ___/____ is present, the____ market value items are furnished by the owner below its
construction shall be under the technical control and market cost, the cost of the material and
manager, supervision of the Architect and shall make labor shall nontheless be computed on the
full-time periodic reports to the owner and to the basis of the ____costs
construction architect regarding the progress and quality of
44. Architect, PCC does not include any of the fees for the
supervisor the work done.
Engineer, ____, the ____, the ____- or the salaries of the ____.
39. records of During the progress of work, the owner shall Specialist
expenses, furnish the architect a copy of the____ being Consultants,
summary incurred on the construction. upon completion construction
of the project, the owner shall furnish the inspectors.
architect a copy of the _____ of all cost of labor,
45. construction, project development cost shall include cost
services, materials, equipment, fixtures and all
permits, of the ____ as well as all professional fees, ____,
items used at and for the completion of the
utilities clearances, ____ and cost of acquiring the
construction.
project site/lot, cost of money, etc.
40. general all signboards of the ______, _____, ____ and ____ that
contractor, shall be placed at the project site during the
sub- progress of construction shall be approved by
contractor, the architect as to size, design and contents.
jobbers, after the completion of the project, the owner
dealers, or his building lessee shall consult the
size, architect for the design, ____ of all signboards,
letterings, ____, _____and display boards that will be placed
directories on the exterior or public areas attached to the
building project in order to safeguard the
owner's interest. nothing should be installed
inside or outside of the building that would
compromise its safety and aesthetics.