# of probability levels
5
Very low 5%
Low 10%
Medium 30%
High 50%
On this sheet you determine your probability scale, a single one for the risks.
You can choose 5 to 7 levels of probability; just type it on cell A2 and the values on cells B5 onward.
Upper Limit for a Low Severity Risk 0.16
Lower limit for a High Severity Risk 0.40
Probability
Very low Low
Impact 0.05 0.1
Very Low 0.1 0.01 0.01
Low 0.3 0.02 0.03
Medium 0.5 0.03 0.05
High 0.7 0.04 0.07
Very High 0.9 0.05 0.09
On this sheet you determine the limits for severity (probability times impact) on cells B1 and B2.
By changing the risk dimension on the dropbox, you can see how it relates to each one of them
Medium High Very High
0.3 0.5 0.7
0.03 0.05 0.07
0.09 0.15 0.21
0.15 0.25 0.35
0.21 0.35 0.49
0.27 0.45 0.63
2
Schedule
Cost
Environment
Safety
# of Risk Dimensions On this sheet you will insert the impact scale for the risks. The st
4 # of dimensions and typing it on cell A2, you can type the dimen
Dimension names After that, you can circle through the panels, where you can cha
Schedule You will, of course, type the impact value on the column next to
Cost
Environment
Safety
Name
# of impact levels
(3 through 5)
Impact Description
Very Low
Low
Medium
High
Very High
Name
# of impact levels
(3 through 5)
Impact Description
Very Low
Low
Medium
High
Very High
e for the risks. The starting point would be clearing the forms by pressing the "Clear Forms" button. After deciding the
can type the dimension names below cell A4. After that, you should press the button "Redo Forms."
, where you can change the number of impact levels (from 3 up to 5) and describe the impact.
the column next to the description
Very Low
0.1 0.1
Low
0.3 0.3
Medium
0.5 0.5
High
0.7 0.7
Very High
0.9 0.9
Very Low
0.1 0.1
Low
0.3 0.3
Medium
0.5 0.5
High
0.7 0.7
Very High
0.9 0.9
Name 0
# of impact 5
(3 through 5)
Very Low
Low
Medium
High
Very High
Name 0
# of impact 5
(3 through 5)
Very Low
Low
Medium
High
Very High
3.6
1
# Risk Cause Event Consequence Type (O/T) Probability Schedule
Impact RiskProbability
Severity
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
2 3 4
Probability Severity
Cost Environment Safety Impact score Severity
score Score
Low Low Medium 0.1 1.2 0.12 Low
Very High High High 0.3 2.8 0.84 High
0.1 0.7 0.07 Low
Very High 0.3 1.6 0.48 High
0 0 0 -
0 0 0 -
0 0 0 -
0 0 0 -
0 0 0 -
0 0 0 -
Here you have the heart of the sheet. You must fill in the description
event and consequence (columns B, C and D). After that, you must a
or an opportunity. Then you should determine probabilty and impac
considering the scale you used on the sheets "Probability Scale" and
You can enter the response plan and strategy in columns U and V. A
the probability and impacts after the response plan.
It's a good idea to click the button "Adjust Columns" to show column
those that will not be used on this exercise.
The graph shows the regions for low, medium and high severity. If y
"Add Risk to Map," you can choose a risk to be added to the graph.
90% 100%
1 2 3 4
Response Strategy Probability Schedule Probability Impact
Cost Environment Safety
Plan score score
Mitigate Low Very Low Very Low Very Low Very Low 0.1 0.4
Mitigate Very low Medium Very High High High 0.05 2.8
Enhance Medium High 0.3 0.7
Transfer Low High 0.1 0.7
0 0
0 0
0 0
0 0
0 0
0 0