4. Alternate Solutions
Tying back the final homework to the first, its highlighted again that issue lies in the low productivity of the
knowledge workers as seen by the organization. Therefore, the under mentioned alternatives tend to address that
concern as an umbrella term and relate the stated objectives and alternatives in that light. Adaption of any
alternative(s), by the management is/are not only expected to increase the organizational value but value as seen by
The team at the present is not working on any predefined set system for churning out the builds but a single person’s
i.e. Project Engineer (PE) plan to accommodate the customer needs while still maintaining the illusion of being lean
and managing the pressure on the team in a best possible way. Unfortunately, only so much could be done by the PE
and in some cases his/her team tagging with the TPM. Therefore, there is need for introduction of the agile centric
process within the team, which has over the years proved to be addressing the knowledge worker’s low productivity.
Scrum in this case is suggested to be introduced within the team. It’s based on the principal of empiricism, not as a
product development technique but as a product development management framework for addressing the complex
adaptive problems, envisioning incrementally iterative development and improvement at its core, which is exactly
what the team is lacking at the present. This option is expected to address the stated objectives of reducing
micromanagement within the organization and delegating the decision making to the grass root level, with just
enough touch of the management to keep the team streamlined yet not overpowering the individual autonomy of
the knowledge worker which is at the core to his/her productivity for the organization. Additionally, the same is
expected to have a positive effect on the knowledge sharing practices of the team, where the pressure on the team
wouldn’t be as much as it is right now therefore reducing the attrition rate and extending out the opportunities
within the team to grow as knowledgeable workers rather than striving for fancy designatory titles to be associated
The implementation of the scrum, being empirical in nature, differs throughout the organizations but the core values
and designations of the expected hierarchy/roles and the principles of transparency, inspection and adaptation
remains the same. Thus, with each component of the scrum serving a predefined and specific role, the predictability
4.1.1 Consequences
The team at the present is working without any specific structure of the team therefore lacking therein the factor of
agile mentality, which shall be the most important for the field they are dealing with. Metaphorically Scrum
equivalent to that of writing a book but not in a go rather dividing the book into different chapters each of defined
maximum length and committing to delivering one chapter at a time, so that the valuable feedback received from the
stakeholders of the book could be incorporated at a stage where that expectation could be carried out throughout
the rest of the book contrary to having the whole be readjusted were it to be written in a go and presented
afterwards. Thus, its comparable to divide and rule concept in this fashion, but from a positive viewpoint.
Application of the same is going to bring with it three important pillars of scrum i.e. transparency, inspection and
adaptation. Unlike the present, where the team dynamics is only decided by a person or two at maximum and flown
to the rest of the team, transparency here calls for the availability of all the required information to the team
members as they relate to the information, which does include the inclusion of individual contributors during the
planning phases of build. Thus, there would be same understanding of what needs be accomplished which defines
the value for "Done" as something that every member knows as to what the required deliverable at the end of the
sprint is. Inspection and adaptation would both based on the mentality of having the real time data to be used as
feedback for having a positive effect on the velocity, where velocity is the metric used for assigning a weight to an
item in the sprint backlog. Thus, introduction of scrum within the team not only limits the number of titles allotted to
the team to be majorly three i.e. Product Owner (PO), Scrum Master (SM) and development team but also brings
with it some of the most important following characteristics, which aligns with the stated objectives of organizational
Cross functional team so as to not be dependent on any one person for his/her skills rather at least two people
are equipped with a skill set to help facilitate the sprint success, were there be any absences from member
Individual developmental team members may have specific expertise, but the accountability lies with the team as
4.1.2 Advantages/Disadvantages:
To reduce micro management This alternative is directly affecting the objective, for scrum explicitly limits the
Metric: Number of responsibilities for role of the management when deciding how much work is going to be done by
management to 5 major points the developmental team, but it delegates that decision to the team by involving
Target: Reduce until next month to 5 them in at least the sprint planning. Furthermore, Scrum Master (SM), apart
major responsibilities from many other responsibilities is the management's eyes into the
developmental team and vice versa, therefore limiting the management through
a formal bridge to not let them micromanage, therefore disrupting the team
dynamics. This gives them the ability to concentrate on much of their remaining
job scope.
To increase employee autonomy Employee autonomy is at the heart of Scrum. Therefore, the designated roles are
Metric: Avg # of roles and responsibilities restricted to 3 i.e. Product Owner (PO), Scrum Master (SM) and Developmental
Target: To reduce to 5 major and generic Team, while responsibilities of each are mentioned as Appendix A, thereby
immediately depicting autonomy
To improve knowledge sharing practices Knowledge sharing is a consequence of the adopting scrum for the team
Metric: Avg # mentors/mentee for each strength is strictly limited. The team strength has to be no less than three and no
employee greater than nine, were the PO and SM also performing the developmental
Target: Increase by 20% by end of quarter work. Reason being that less than three put the sprint in jeopardy due to a
relatively greater amount of work needed be done and greater than nine
requires a relatively higher amount of coordination, generating complexity for
the empirical process management. This gives a lot of opportunity to the team
members to work cross functionally and thereby avail the opportunity for
mentorship. As it would be a month-long time boxed event at max, the goal of
20% is easily achievable.
Increase customer involvement in planning The Sprint planning is the platform to decide as to what could be done in the
Metric: Avg # of customer attendance upcoming sprint and how would it be done. It's a scrum team wide collaborative
during build planning meeting divided to have no more than two hours a week over the sprint course,
Target: To increase by 50% until next RLmaking it a total of eight in one-month long sprint. It is at this point, that
Delivery customers shall be invited in here to give feedback and be included in these
activities, though it shall not get to jeopardize the essence of the team meeting
where the development team gets to decide what all could be included in the
backlog for the sprint. The inputs used in the sprint planning are the product
backlog, past performance and projected capability of the developmental team
and the latest product increment. The SM ensures the event with providing
coaching to the team for sticking to the allotted time-box. The PO lays outs the
product backlog and defines the success of the sprint by addressing as to what
product backlogs would make up the sprint's success. The developmental team
forecasts the product backlogs, thereby forming the sprint backlog and from it is
carved out the sprint goal. Sprint goal is basically a high-level purpose of why the
sprint is being done in the first place, thereby defining a framework to work in
by absorbing the high-level purpose of, now the sprint backlog. It is pertinent to
mention that it is solely the developmental team, who decides as to what
product back log makes up the sprint back log, obviously with the underpinning
guideline from the PO about the descending business value. The team shall only
include those items from the product backlog to the sprint backlog that are
"ready", meaning as in they are independent, actionable, has a point value
attached to it and a clear definition of the criteria that would render it "done",
thereby defining "done" as seen in scrum. This is the exact point where
customers’ involvement would be most beneficial for the maturity of the
requirements and their projected completion is a knowledge that customer
knows the best.
While there are a lot of advantages associated with scrum as described above, the implementation debate could end
in employees resisting the change if it is perceived that the change is thrust upon them. Therefore, that is one of the
biggest disadvantage associated with the implementation. Obviously only the working methodology would be
restructured within the organization but what could therefore result from this, which would be the biggest
disadvantage to the team as a whole is the deprecating value of “Appreciative Inquiry”, that would be much needed
within this transition. If this were to happen, the most looked forward to aspect i.e. carrying forward all the positive
practices of the team would be left behind, and the team would thereafter need to start from the scratch, which may
well enough result in failure. In a nutshell, there a need to take the whole team onboard with the decision else good
4.3 Alternative 3: Induce a 3-month formal training of employees before they join the organization for the
first
Appendix A
Product Owner
1. The commercial success of the product and who holds the vision about the where to take the product to.
2. Understanding the customer needs and wants and have them be translated into the product backlog
3. Management of the backlog which include clear expression of the product backlog items, their ordering to
achieve the organizational goals and missions, assigning the business value to the product backlog, ensuring the
visibility, transparency and next plan of action for the development team from the product backlog perspective
As part of the same empirical mindset of inspect and adapt, PO is present in the Sprint retrospective as well to
Scrum Master (SM), is a servant-leader of the scrum team unlike the name, which may tend to suggest his/her
managerial bossy role in the team. SM is the management's eyes into the developmental team and vice versa. The
1. Mentoring and coaching the team on the aspects of the scrum theory, practices and rules.
2. Facilitating and suggesting the management the effect of their decisions on the work progress of the
developmental team.
5. Facilitating the daily scrums to the point of having time boxing be implemented, the participation be restricted in
between the developmental team and the removal of the discussed impediments.
6. Facilitating the time boxing in the sprint planning, sprint review and sprint retrospective.
8. SM is the scrum team member, participating in the sprint review as the accountability figure for the scrum
processes.
9. SM must be working with the developmental team in making the artifacts be more transparent
The team member has been explained in the Question 2 under the pretext of the involvement of the same as part of
the developmental team in scrum. There although are some characteristics of the which are worth highlighting in
here: -
1. Each team member is part of the team, no matter what special skills he/she may be having.
2. There are no special titles or designations awarded to the individual within the developmental team as all are
called developers regardless of the expertise, as they are working under the paradigm of the cross functional
team.
3. The team member as part of the development team is responsible for the increments, consequence of the sprint.
4. Team member as part of the development team is responsible for having the for forecasts of the product backlog
be done to result in the sprint backlog and further devising the sprint goal.
Apart from this all the characteristics of the developmental team are applicable to the team member as an individual