Vous êtes sur la page 1sur 32

Matricula 0 1

1° 22 22
2° 29 22
3° 38 29
4° 39 38
5° 34 39
TOTAL 162 150

BALANCE OFERTA- DEMANDA


DESCRIPCION Año 1 Año 2
Aulas 3 2
Auditorio -1 -1
SS.HH. Alumnos -1 -1
Aula de Computo -1 -1
Biblioteca -1 -1
Sala de Profedores -1 -1
Direccion -1 -1
Archivo -1 -1
Departamento de Educacion Fisica -1 -1
SS-HH Docentes -1 -1
Cerco Perimetrico -1 -1
Portico de Ingreso -1 -1
Drenaje Pluvial -1 -1

DESCRIPCION U.M METRADOS


Demolicion de Aulas y Eliminacion de material m2
604.47
Construccion de PABELLON auditotio,ss.hh,deposito,
escalera primer nivel m2
331.27
Construccion de PABELLON Sala de computo, hall biblioteca
sala de profesores direccion archivo departamento de fisica
ss.hh(2do nivel) m2
331.27
Areas de Circulacion (1er Nivel) m2 75.96
Area de Circulacion,incluido parapedo (2do nivel) m2 56.97
construccion de cerco perimetrico ml 34.15
instalacion de portico de ingreso glb 1.00
Canaletas de drenaje pluvial con rejilla ml 84.4
Moviliarios y eqipos, incluye computadoras glb 1.00
Material didactico para implementacion de Biblioteca glb 1.00
Mitigacion Ambiental glb 1.00
Costo directo
Gastos generales (10%)
utilidades (8%)
Parcial
IGV
Sub Total
Expediente tecnico
Capacitacion para docentes
Implementacion Mejores en la gestion educativa
Supervision
PRESUPUESTO TOTAL

ALTERNATIVA UNICA
COSTO/INDICADOR
A PRECIOS PRIVADOS A PRECIOS SOCIALES
Valor Actual de los costos (1) 2,568,233.50 2,088,449.90
Numero de Alumnos beneficiados durante la vida
util del proyecto (2) 1,147 1,147
costo/efectividad 1/2 2,238.15 1,820.03

DESCRIPCION
U.M METRADOS
Demolicion de Aulas y Eliminacion de material m2 604.47
Construccion de PABELLON auditotio,ss.hh,deposito,
m2
escalera primer nivel 331.27
Construccion de PABELLON Sala de computo, hall biblioteca
sala de profesores direccion archivo departamento de fisica m2
ss.hh(2do nivel)
331.27
Areas de Circulacion (1er Nivel) m2 75.96
Area de Circulacion,incluido parapedo (2do nivel) m2 56.97
construccion de cerco perimetrico ml 34.15
instalacion de portico de ingreso glb 1.00
Canaletas de drenaje pluvial con rejilla ml 84.4
Moviliarios y eqipos, incluye computadoras glb 1.00
Material didactico para implementacion de Biblioteca glb 1.00
Mitigacion Ambiental glb 1.00
Costo directo
Gastos generales (10%)
utilidades (8%)
Parcial
IGV
Sub Total
Expediente tecnico
Capacitacion para docentes
Implementacion Mejores en la gestion educativa
Supervision
PRESUPUESTO TOTAL

DESCRIPCION
U.M METRADOS
Demolicion de Aulas y Eliminacion de material m2
604.47
Construccion de PABELLON auditotio,ss.hh,deposito,
escalera primer nivel m2
331.27
Construccion de PABELLON Sala de computo, hall biblioteca
sala de profesores direccion archivo departamento de fisica m2
ss.hh(2do nivel)
331.27
Areas de Circulacion (1er Nivel) m2 75.96
Area de Circulacion,incluido parapedo (2do nivel) m2 56.97
construccion de cerco perimetrico ml 34.15
instalacion de portico de ingreso glb 1.00
Canaletas de drenaje pluvial con rejilla ml 84.4
Moviliarios y eqipos, incluye computadoras glb 1.00
Material didactico para implementacion de Biblioteca glb 1.00
Mitigacion Ambiental glb 1.00
Costo directo
Gastos generales (10%)
utilidades (8%)
Parcial
IGV
Sub Total
Expediente tecnico
Capacitacion para docentes
Implementacion Mejores en la gestion educativa
Supervision
PRESUPUESTO TOTAL

DESCRIPCION U.M METRADOS


ESTRUTURA

Obras Provicionales 1.00


Obras Preliminares 1.00
Movimiento de Tierras
1.00
Concreto Simple 1.00
Concreto Armado 1.00
ARQUITECTURA

Albañileria 1.00
revoques 1.00
Cielrraso 1.00
Piso 1.00
Contrazocalo 1.00
Aparatos y accesorios Sanitarios 1.00
Revestimientos 1.00
Coberturas 1.00
Carpinteria de Madera 1.00
Carpinteria Metalica 1.00
Cerrajeria 1.00
Pintura 1.00
Vidrios 1.00
Juntas 1.00
INSTALACIONES SANITARIAS

Red Exteriores de Desagues 1.00


Red exteriores de Agua 1.00
Red Interior 1.00
Cisterna (11,5m3) 1.00
Tanque Elevado (6m3) 1.00
Electrobomba 1.00
INSTALACIONES ELECTRICAS

Red de distribucion de baja tension 1.00


Tablero de Distribucion 1.00
CABLE NYY ALIMENTADOR DE TABLEROS DE DISTRIBUCION,
ALUMBRADO, SSHH Y BOMBA DE AGUA
1.00
Costo directo

Gastos generales (9.32%)


utilidades (10%)
Expediente tecnico
Supervision
SUB TOTAL
IGV
TOTAL

DESCRIPCION DURACION METRADOS

PREINVERSION
Elaboracion de estudios 1,5 mes
Preinversion aprobacion 0,5 mes
Estudio de preinversion gestion de financiamiento
1 mes
INVERSION
Proceso de selccion de empresa constructora
1 mes
Aprobacion de expediente tecmico 0,5 mes
SUPERVISION,EJECUCION DE LA OBRA

ESTRUTURA
Obras Provicionales 1 mes 1.00
Obras Preliminares 1 mes 1.00
Movimiento de Tierras 1 mes 1.00
Concreto Simple 1 mes 1.00
Concreto Armado 1 mes 1.00
ARQUITECTURA
Albañileria 1 mes 1.00
revoques 1 mes 1.00
Cielrraso 1 mes 1.00
Piso 1 mes 1.00
Contrazocalo 1 mes 1.00
Aparatos y accesorios Sanitarios 1 mes 1.00
Revestimientos 1 mes 1.00
Coberturas 1 mes 1.00
Carpinteria de Madera 1 mes 1.00
Carpinteria Metalica 1 mes 1.00
Cerrajeria 1 mes 1.00
Pintura 1 mes 1.00
Vidrios 1 mes 1.00
Juntas 1 mes 1.00
INSTALACIONES SANITARIAS
Red Exteriores de Desagues 1 mes 1.00
Red exteriores de Agua 1 mes 1.00
Red Interior 1 mes 1.00
Cisterna (11,5m3) 1 mes 1.00
Tanque Elevado (6m3) 1 mes 1.00
Electrobomba 1 mes 1.00
INSTALACIONES ELECTRICAS
Red de distribucion de baja tension 1 mes 1.00
Tablero de Distribucion 1 mes 1.00
CABLE NYY ALIMENTADOR DE TABLEROS DE DISTRIBUCION,
ALUMBRADO, SSHH Y BOMBA DE AGUA 1 mes
1.00
Costo directo 1 mes
Gastos generales (9.32%) 1 mes
utilidades (10%) 1 mes
Expediente tecnico 1,5 mes
Supervision 1 mes
SUB TOTAL
IGV

TOTAL

NUMERO DE
I.E PROCEDENCIA MATRICULADOS

82674 Chugur 25
82675 Tacamache 1
82721 Chencho 11

82720 Coyunde Grande 1


Perlamayo Tambillo
82909 0
Bajo

Perlamayo Tambillo
82678 0
Alto

Otros 0
Total Matriculados 2008 38

AÑOS 0 1
P. referencia 1,351 1,347
12 años 38 38
13 años 30 29
14 años 32 32
15 años 28 27
16 años 24 23
TOTAL 152 149

EVOLUCION HISTORICO DE LA MATRICULA DE LOS CENTROS

ISTITUCION
CODIGO MODULAR GRADO
EDUCATIVO

1
2
521898 San Antonio de Padua 3
4
5
TOTAL

TASA DE MATRICULA

INSTITUCION
CODIGO MODULAR GRADO
EDUCATIVA
1
2
521898 San Antonio de Padua 3
4
5
Matricula Matricula 2011 0

1° 31 30
2° 22 31
3° 21 22
4° 26 21
5° 27 26
TOTAL 127 130

Matricula 2011 0 1
1° 38 38
2° 31 38
3° 22 31
4° 21 22
5° 26 21
TOTAL 138 150

BALANCE OFERTA- DEMANDA


DESCRIPCION Año 1 Año 2
Aulas 3 2
Auditorio -1 -1
SS.HH. Alumnos -1 -1
Aula de Computo -1 -1
Biblioteca -1 -1
Sala de Profedores -1 -1
Direccion -1 -1
Archivo -1 -1
Departamento de Educacion Fisica -1 -1
SS-HH Docentes -1 -1
Cerco Perimetrico -1 -1
Portico de Ingreso -1 -1
Drenaje Pluvial -1 -1

SIN PROYECTO CON PROYECTO


AÑOS COSTO DE COSTO DE
MANTENIMIENTO MANTENIMIENTO
0
1 0.00 1150635.695475
2 0.00 1150635.695475
3 0.00 1150635.695475
4 0.00 1150635.695475
5 0.00 1150635.695475
6 0.00 1150635.695475
7 0.00 1150635.695475
8 0.00 1150635.695475
9 0.00 1150635.695475
10 0.00 1150635.695475
2 4 5 6 7
22 21 21 21 21
22 22 21 21 21
22 22 22 21 21
29 22 22 22 21
38 22 22 22 22
133 109 108 107 106

BALANCE OFERTA- DEMANDA DE INFRAESTRUCTURA


Año 3 Año 5 Año 6 Año 7 Año 8
1 0 0 0 0
-1 -1 -1 -1 -1
-1 -1 -1 -1 -1
-1 -1 -1 -1 -1
-1 -1 -1 -1 -1
-1 -1 -1 -1 -1
-1 -1 -1 -1 -1
-1 -1 -1 -1 -1
-1 -1 -1 -1 -1
-1 -1 -1 -1 -1
-1 -1 -1 -1 -1
-1 -1 -1 -1 -1
-1 -1 -1 -1 -1

P.U Parcial-Privado

60.00 S/. 36,268.20

1,200.00 S/. 397,524.00

1,050.00 S/. 347,833.50


90.00 S/. 6,836.40
130.00 S/. 7,406.10
700.00 S/. 23,905.00
7,000.00 S/. 7,000.00
315.00 S/. 26,586.00
130,000.00 S/. 130,000.00
10,000.00 S/. 10,000.00
12,000.00 S/. 12,000.00
S/. 1,005,359.20
S/. 100,535.92
S/. 80,428.74
S/. 1,186,323.86
S/. 213,538.29
S/. 1,399,862.15
5,000.00
5,000.00

S/. 1,409,862.15

P.U Parcial-Privado MES 1 MES2 MES 3


60.00 S/. 36,268.20

1,200.00 S/. 397,524.00

1,050.00 S/. 347,833.50


90.00 S/. 6,836.40
130.00 S/. 7,406.10
700.00 S/. 23,905.00
7,000.00 S/. 7,000.00
315.00 S/. 26,586.00
130,000.00 S/. 130,000.00
10,000.00 S/. 10,000.00
12,000.00 S/. 12,000.00
S/. 1,005,359.20
S/. 100,535.92
S/. 80,428.74
S/. 1,186,323.86
S/. 213,538.29
S/. 1,399,862.15 S/. 1,399,862.15
S/. 27,997.24
5,000.00
5,000.00
41,995.86
S/. 1,479,855.25 S/. 27,997.24

P.U Parcial-Privado MES 1 MES2 MES 3

60.00 S/. 36,268.20

1,200.00 S/. 397,524.00

1,050.00 S/. 347,833.50


90.00 S/. 6,836.40
130.00 S/. 7,406.10
700.00 S/. 23,905.00
7,000.00 S/. 7,000.00
315.00 S/. 26,586.00
130,000.00 S/. 130,000.00
10,000.00 S/. 10,000.00
12,000.00 S/. 12,000.00
S/. 1,005,359.20
S/. 100,535.92
S/. 80,428.74
S/. 1,186,323.86
S/. 213,538.29
S/. 1,399,862.15 100.00
S/. 27,997.24
5,000.00
5,000.00
41,995.86
S/. 1,479,855.25 2.00

P.U Parcial-Privado SUB TOTAL TOTAL


MES 1
S/. 4,012,604.58
S/ 5,000.00 S/. 5,000.00
S/ 62,446.25 S/. 62,446.25
S/ 540,269.43 S/. 540,269.43
S/ 1,167,156.60 S/. 1,167,156.60
S/ 2,237,732.30 S/. 2,237,732.30

S/. 1,986,166.30
S/ 450,582.99 S/. 450,582.99
S/ 279,027.06 S/. 279,027.06
S/ 144,999.14 S/. 144,999.14
S/ 131,550.61 S/. 131,550.61
S/ 116,837.36 S/. 116,837.36
S/ 33,082.66 S/. 33,082.66 100
S/ 122,761.63 S/. 122,761.63 50
S/ 66,460.30 S/. 66,460.30 100
S/ 188,151.70 S/. 188,151.70 40
S/ 133,037.64 S/. 133,037.64 40
S/ 24,383.37 S/. 24,383.37 100
S/ 206,661.57 S/. 206,661.57
S/ 77,174.18 S/. 77,174.18
S/ 11,456.09 S/. 11,456.09

S/. 245,757.96
S/ 115,321.55 S/. 115,321.55
S/ 69,680.09 S/. 69,680.09
S/ 49,893.72 S/. 49,893.72
S/ 4,018.50 S/. 4,018.50
S/ 1,982.50 S/. 1,982.50
S/ 4,861.60 S/. 4,861.60

S/. 364,771.32
S/ 58,118.47 S/. 58,118.47
S/ 9,597.13 S/. 9,597.13

S/ 297,055.72 S/. 297,055.72

S/. 6,609,300.16
S/. 615,986.77
S/. 660,930.02
S/. 330,465.01
S/. 528,744.01
S/. 8,745,425.97 100
1,574,176.67
S/ 10,319,602.65 S/ 10,319,602.65 2.00

P.U Parcial-Privado SUB TOTAL TOTAL RESPONSABLE

Formulador
OPI-MDC
Alcalde

Comité
Area Tecnico

S/. 4,012,604.58
S/ 5,000.00 S/. 5,000.00 Contratista
S/ 62,446.25 S/. 62,446.25 Contratista
S/ 540,269.43 S/. 540,269.43 Contratista
S/ 1,167,156.60 S/. 1,167,156.60 Contratista
S/ 2,237,732.30 S/. 2,237,732.30 Contratista
S/. 1,986,166.30
S/ 450,582.99 S/. 450,582.99 Contratista
S/ 279,027.06 S/. 279,027.06 Contratista
S/ 144,999.14 S/. 144,999.14 Contratista
S/ 131,550.61 S/. 131,550.61 Contratista
S/ 116,837.36 S/. 116,837.36 Contratista
S/ 33,082.66 S/. 33,082.66 Contratista
S/ 122,761.63 S/. 122,761.63 Contratista
S/ 66,460.30 S/. 66,460.30 Contratista
S/ 188,151.70 S/. 188,151.70 Contratista
S/ 133,037.64 S/. 133,037.64 Contratista
S/ 24,383.37 S/. 24,383.37 Contratista
S/ 206,661.57 S/. 206,661.57 Contratista
S/ 77,174.18 S/. 77,174.18 Contratista
S/ 11,456.09 S/. 11,456.09 Contratista
S/. 245,757.96
S/ 115,321.55 S/. 115,321.55 Contratista
S/ 69,680.09 S/. 69,680.09 Contratista
S/ 49,893.72 S/. 49,893.72 Contratista
S/ 4,018.50 S/. 4,018.50 Contratista
S/ 1,982.50 S/. 1,982.50 Contratista
S/ 4,861.60 S/. 4,861.60 Contratista
S/. 364,771.32
S/ 58,118.47 S/. 58,118.47 Contratista
S/ 9,597.13 S/. 9,597.13 Contratista

Contratista
S/ 297,055.72 S/. 297,055.72
S/. 6,609,300.16 Contratista
S/. 615,986.77 Contratista
S/. 660,930.02 Contratista
S/. 330,465.01 Consultor
S/. 528,744.01 Consultor
S/. 8,745,425.97 Consultor
1,574,176.67 Consultor
S/ 10,319,602.65 S/ 10,319,602.65

NUMERO DE
% I.E PROCEDENCIA MATRICULADOS

66% 82674 Chugur 15


3% 82675 Tacamache 0
28% 82721 Chencho 6

3% 82720 Coyunde Grande 1


Perlamayo Tambillo
0% 82909 2
Bajo

Perlamayo Tambillo
0% 82678 2
Alto

0% Otros 0
100% Total Matriculados 2009 26

2 3 4 5 6
1,343 1,339 1,335 1,331 1,327
38 38 39 39 39
29 28 28 27 27
32 32 32 31 31
27 26 26 25 24
22 22 21 21 20
148 146 146 143 141

ICO DE LA MATRICULA DE LOS CENTROS EDUCATIVOS EN EL AREA DE INFLUENCIA

2007 2008 2009 2010 2011

40 38 26 27 31
26 35 36 30 22
27 24 33 32 21
28 27 20 31 26
27 26 25 22 27
148 150 140 142 127

TASA DE MATRICULA

2008 2009 2009 2011 PROMEDIO

-0.05 -0.316 0.038 0.148


0.346 0.029 -0.167 -0.267
-0.111 0.375 -0.030 -0.344
-0.036 -0.259 0.550 -0.161
-0.037 -0.038 -0.120 0.227
1 2 3 4 5

28 27 26 25 24
30 28 27 26 25
31 30 28 27 26
22 31 30 28 27
21 22 31 30 28
132 138 142 136 130

2 3 4 5 6
38 38 39 39 39
38 38 38 39 39
38 38 38 38 39
31 38 38 38 38
22 31 38 38 38
167 183 191 192 193

BALANCE OFERTA- DEMANDA DE INFRAESTRUCTURA


Año 3 Año 5 Año 6 Año 7 Año 8
1 0 0 0 0
-1 -1 -1 -1 -1
-1 -1 -1 -1 -1
-1 -1 -1 -1 -1
-1 -1 -1 -1 -1
-1 -1 -1 -1 -1
-1 -1 -1 -1 -1
-1 -1 -1 -1 -1
-1 -1 -1 -1 -1
-1 -1 -1 -1 -1
-1 -1 -1 -1 -1
-1 -1 -1 -1 -1
-1 -1 -1 -1 -1

CON PROYECTO
COSTO INCREMENTAL
INVERSIONES

10,319,602.65 10,319,602.65
1150635.695475
1150635.695475
1150635.695475
1150635.695475
1150635.695475
1150635.695475
1150635.695475
1150635.695475
1150635.695475
1150635.695475
8 9 10
21 21 21
21 21 21
21 21 21
21 21 21
21 21 21
105 105 105

Año 9 Año 10
0 0
-1 -1
-1 -1
-1 -1
-1 -1
-1 -1
-1 -1
-1 -1
-1 -1
-1 -1
-1 -1
-1 -1
-1 -1

RENAJE FLUVIAL

MOVILIARIA

LADRILLO PASTELERO

PISO PULIDO COLOERADO


MESES

MES 4 MES 5 MES 6 MES 7 MES 8 MES 9


S/. 36,268.20

S/. 79,504.80 ### ###

### ### S/. 69,566.70


S/. 6,836.40
S/. 7,406.10
S/. 23,905.00
S/. 7,000.00
S/. 26,586.00
S/. 130,000.00
S/. 10,000.00
S/. 2,000.00 S/. 2,000.00 S/. 2,000.00 S/. 2,000.00 S/. 2,000.00 S/. 2,000.00
S/. 119,637.74 ### ### ### ### S/. 237,264.77
S/. 11,782.81 S/. 16,115.91 ### S/. 16,497.94 ### S/. 23,806.91
S/. 9,410.16 S/. 13,190.31 ### S/. 13,190.31 ### S/. 18,981.18
S/. 141,172.54 ### ### ### ### S/. 279,972.43
S/. 23,681.40 S/. 34,358.31 ### S/. 35,020.28 ### S/. 51,035.65
27,997.24
5,000.00
5,000.00
S/. 4,917.72 S/. 800.50 ### S/. 6,891.52 S/. 6,467.36 S/. 9,911.02
S/. 168,895.88 ### ### ### ### S/. 351,539.61

MESES

MES 4 MES 5 MES 6 MES 7 MES 8 MES 9

100.00

20.00 40.00 40.00

40.00 40.00 20.00


100.00
100.00
100.00
100.00
100.00
100.00
100.00
16.65 16.67 16.67 16.67 16.67 16.67
11.70 16.02 16.70 16.42 15.47 23.69
11.70 16.02 16.70 16.42 15.47 23.69
11.71 16.02 16.70 16.42 15.47 23.69
11.71 16.02 16.70 16.42 15.47 23.69
11.71 16.02 16.70 16.42 15.47 23.69

100.00
100.00
100.00
11.71 16.02 16.70 16.42 15.47 23.69
11.41 15.60 16.27 15.99 15.07 23.76

MESES
MES2 MES 3 MES 4 MES 5 MES 6 MES 7
100
20 40 40
40
100

100

50

40 20
40 20

20 20 20

40
40
40

20 20 20

11.70 16.02 16.70 16.42


11.70 16.02 16.70 16.42
11.70 16.02 16.70 16.42

11.70 16.02 16.70 16.42

11.70 16.02 16.70 16.42


11.41 15.50 16.27 15.99

RECURSOS NECESARIOS

Consultor
OPI-MDC
Alcalde

Comité
Area Tecnico

Contratista
Contratista
Contratista
Contratista
Contratista

Contratista
Contratista
Contratista
Contratista
Contratista
Contratista
Contratista
Contratista
Contratista
Contratista
Contratista
Contratista
Contratista
Contratista

Contratista
Contratista
Contratista
Contratista
Contratista
Contratista
Contratista
Contratista
Contratista

Contratista

Contratista
Contratista
Contratista
Consultor
Consultor
Consultor
Consultor

NUMERO DE
% I.E PROCEDENCIA MATRICULA %
DOS

58% 82674 Chugur 19 70%


0% 82675 Tacamache 3 11%
22% 82721 Chencho 3 11%
Coyunde
4% 82720 0 0%
Grande
Perlamayo
8% 82909 Tambillo 0 0%
Bajo

Perlamayo
8% 82678 0 0%
Tambillo Alto

0% Otros 2 8%
100% Total Matriculados 2010 27 100%

7 8 9 10
1,323 1,319 1,315 1,311
39 39 39 39
26 26 25 25
31 31 31 31
24 23 23 22
20 19 19 18
140 138 137 135

Promedio

32
30
27
26
25
140
6 7 8 9 10

22 21 21 20 19
24 22 21 21 20
25 24 22 21 21
26 25 24 22 21
27 26 25 24 22
124 118 113 108 103

7 8 9 10
39 39 39 39
39 39 39 39
39 39 39 39
39 39 39 39
38 39 39 39
194 195 195 195

Año 9 Año 10
0 0
-1 -1
-1 -1
-1 -1
-1 -1
-1 -1
-1 -1
-1 -1
-1 -1
-1 -1
-1 -1
-1 -1
-1 -1
TOTAL POR META

S/. 347,833.50

S/. 12,000.00
S/. 1,005,359.20
S/. 100,535.92
S/. 80,428.74
S/. 1,186,323.86
S/. 213,538.29
S/. 1,399,862.15
27,997.24
5,000.00
5,000.00
S/. 41,995.86
S/. 1,479,855.25

TOTAL POR META

100.00

100.00

100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00

TOTAL POR
MES 8 MES 9 META
100
100
40 20 100
100
100 100

100
100 100
100 100
100 100
100 100
100.00
100.00
100.00
100.00
100.00
100.00
20 20 100
80 20 100
100 100

40 20 100
40 20 100
40 20 100
100 100
100 100
100 100

20 20 100
100 100

80 20 100

15.47 23.69
15.47 23.69
15.47 23.69
100.00 100.00
15.47 23.69 100.00
100
15.47 23.69 100.00
15.07 23.76 100.00
NUMERO DE
I.E PROCEDENCIA MATRICULADOS %

82674 Chugur 19 61%


82675 Tacamache 0 0%
82721 Chencho 5 16%
Coyunde
82720 3 11%
Grande
Perlamayo
82909 Tambillo 0 0%
Bajo

Perlamayo
82678 Tambillo 2 6%
Alto
Otros 2 6%
Total Matriculados 2011 31 100%

Vous aimerez peut-être aussi