Ministry of Power, Coal and New & Renewable Energy
GOVERNMENT OF INDIA
2
A Year which started the journey towards ‘Year Round Power for All’
Record breaking
progress towards fulfilling
Hon’ble Prime Minister
Shri Narendra Modi’s
vision of...
24X7
POWER FOR ALL
3
ACHIEVEMENTS
Power deficit
reduced to
3.6%
the lowest ever
Highest ever
generation capacity addition
22,566 MW
22,100 ckm
Highest ever increase
in Transmission lines
65,554 MVA
Highest ever increase in
Sub-station capacity
4
A Year which surpassed past records
8.3%
8.4%
First time ever,
exceeded
renewable
Power Generation Growth
(Highest in 20 years)
capacity
addition
targets in solar, wind, small
hydro etc.
5
TARGETS
Doubling
Coal India’s
production to
100 Cr.
tonnes/year by 2020
Power Generation
to increase by
50%
by 2020
6
5 Times
increase in renewable capacity to
1,75,000 MW
by 2022
Energy saving to
increase to
10%
of current
consumption
7
MISSION
24X
POWER
8
BY 2
4X7
FOR ALL
2019 9
Annual production >24,000 MW of power
DARKNESS
growth of Coal only 1.5% capacity idle due to lack
between 2010-14 of fuel
Loss of ` 1.86 lakh Cr. Less than 1% of solar
FROM
estimated by CAG in potential realized
Coal allocation
POWER
IS DELIVERED
THROUGH A
CHAIN OF
ACTIVITIES
A chain is only FUEL GENERATION
as strong as the
weakest link
Highest coal Power generation
production growth in exceeds 1 lakh Cr. units
LIGHT
10
28 Cr. people without Discoms losing Spiralling
access to power ` 70,000 Cr. annually consumer tariffs
and accumulated
Largest power outage losses of Lack of focused
in history with 62 Cr. > ` 2,50,000 Cr. energy conservation
people in darkness in efforts
2012
REJUVENATED ECONOMY
Prevented NPAs, reduced import bill, generated momentum for
‘Make in India’ and raised resources for renewables & Ganga cleaning
through coal cess.
Legislation Enabled
Coal Mines (Special Provision) Act & Mines and Minerals (Development
and Regulation) Amendment Act enacted to enable growth of coal
sector and provide for the welfare of locals particularly tribals in the
mineral bearing areas
FUEL
15
INCREASING
PRODUCTION
THROUGH EFFICIENCY
IMPROVEMENT
16
DOUBLING
COAL INDIA
PRODUCTION
IN 5 YEARS
Trebling exploration activities
Double coal for enhancing coal production
production to
100
Cr. Tonnes
Over 60 new mines to be opened
Better evacuation of
coal planned by investing
by 2020 massively in new railway rakes,
expediting railway lines,
modern equipment and
mechanization
FUEL
17
SUPPLY RESUMED
18
Innovative and transparent Reviving these
new scheme for making gas available
for power generation and generating Gas
7,900 Cr. Based
units of power Power
over the next two years from Plants
24,150 MW of will reduce peak load
shortages in summer and
ensure grid stability.
gas based capacity
Below
` 4.7/unit
Many of the stranded
gas based power projects
are located in the Southern
region which is power
deficit due to transmission
constraints
FUEL
19
RAPID INCREASE IN
GENERATION CAPACITY
5 NEW
Ultra Mega Power Projects of
20,000 MW
to be setup in
plug-and-play mode
attracting an investment of
20
All clearances and linkages
will be in place before the
project is awarded by a
transparent auction system
4,000 MW emission
22 GENERATION
World’s largest renewable energy
financing meet.
Commitments of
2,73,000 MW
118
exhibitors from 62,000 MW
7
countries
of renewable manufacturing
commitment
70,000 MW
of renewable financing
commitment
Nearly
2500 delegates
from 32 countries
200 global
investors & 202 speakers including
financiers International speakers from
29 countries
GREEN
house for fuel when we should be
using Nature's inexhaustible sources of
PROGRESS
energy — sun, wind and tide.
– Thomas Edison
24
42%
increase in solar
Highest ever increase in
solar capacity of capacity during
2014-15
1,112 MW
17
solar parks
in 14 states
have already 25
been approved
solar parks
Accelerated depreciation with capacity of
restored for wind power ~1000 MW
from July 2014 to help each planned
increase wind capacity
Coal cess
SMART GRID
National Smart Grid
Mission approved to
bring efficiency in
SMART power supply
GRID network and facilitate
reduction in losses &
outages
26
Level playing field in transmission
through seperation of
POSOCO and POWERGRID
` 38,000 Cr.
GREEN ENERGY CORRIDOR
project being rolled out to
ensure evacuation from
`to be1spent
LAKH Cr.
on transmission projects over the
next year
` 45,816 Cr.
Smart-metering for large consumers and
tamper-proof meters at homes
Comprehensive sub-transmission & distribution
infrastructure upgradation
in urban areas
Underground cabling and high tech GIS
NATIONWIDE ENERGY
CAMPAIGN EFFICIENCY:
FOR ENERGY CONSERVATION ONE UNIT OF
LAUNCHED
POWER SAVED
IS WORTH 1.33 UNITS PRODUCED
TARGET
TO SAVE 10%
OF CURRENT ENERGY CONSUMPTION
ALL INCANDESCENT BULBS TO BE
CHANGE TO LED IN THREE YEARS
30
LED PRICE
` 310 74%
DOMESTIC ` 204
Reduction
EFFICIENT ` 149
states to replace
20.45 Cr. bulbs in Due to transparent procurement,
6.3 Cr. households price of LED has reduced by 74% from
by 2016 ` 310 in Feb 2014 to ` 82 in Mar 2015
CONSUMPTION 31
CO-OPERATIVE FEDERALISM
SABKA
SAATH, Entire Coal auction revenue
SABKA will go to coal bearing states
especially under developed
VIKAS states of Eastern India like
Jharkhand, Chhattisgarh,
Odisha, West Bengal etc.
For the first time, National State Power Ministers’ conference was
held in Guwahati where Ministers & Officials from all over India
converged in North East
24X7 power plans made for Andhra Pradesh and Rajasthan. Action
plans for other states at advanced stage of finalization
32
BEYOND
ZERO EFFECT
Drinking water problem will be solved for more than 7.6 lakh
families through solar pumps for drinking water
UNNAT CHULHA ABHIYAN provides improved cook stoves for clean cooking, thus saving
the lives of our mothers and sisters. 3.5 lakh cook stoves were sanctioned last year.
Compulsory crushing and washing of coal to reduce ash transport by linking plants to
their closest mines
33
o Massive thrust for ‘MAKE IN INDIA’ program: Orders of more than ` 100,000 crores
being placed from NTPC, Coal India, Energy Efficiency Services Ltd., Powergrid
Corporation etc. to kickstart the economy
o Domestic industry being encouraged to scale up and become more cost effective
o 1000 MW of solar capacity to be setup by PSUs with solar cells made in India
o Defence establishments will buy 300 MW solar plants
o Similar initiatives across sectors
34
BEYOND
FUEL > GENERATION > TRANSMISSION & DISTRIBUTION > CONSUMPTION
Swachh Bharat
The PSUs under the three Ministries are committed to active involvement in this effort.
As a first step, they are investing over
After construction, the PSUs will also maintain these toilets for a period of five years thus
ensuring a complete sanitation programme.
35
TRANSPARENCY & EFFICIENCY
in USING TECHNOLOGY
DIGITAL
National Optical fiber network to connect all high voltage substations thus
Transmission Asset reducing outages
Management Centre
Reduction in coal theft using RFID/GPS tagging
(NTAMC) to remotely
monitor national Coal project monitoring portal for quick decision making, faster
power grid and help dispute resolution and accelerated removal of bottlenecks
increase power
Smart Grid & Smart Metering to improve power availability
availability
e-Office implemented in Ministries
36
BEYOND
TRANSPARENCY
37
A GOVERNMENT
24
365
WHICH CARES
38
Rapid
BEYOND
Emergency
39
India has now graduated from
megawatts to gigawatts in terms
of renewable energy production.
Ministry of Power, Coal and New & Renewable Energy Prime Minister Narendra Modi
GOVERNMENT OF INDIA at RE-Invest 2015
www.ujwalbharat.com