2.4.1 Conveyors
a Conveying pipe D
2.4.2 Horizantal looper
a Horizantal looper D
2.4.3 Pinch Roll
a Pinch Roll D&C
Each pinch roll includes :
b Pinch roll baseplate D&C
c Inlet / outlet equipment D&C
d Motor coupling D&C
e Motor baseplate and coupling guards D
2.4.4 Cropping shear
a Crop shear D&C
Each shear includes :
b Inlet / outlet equipment D&C
c Motor Coupling D&C
d Motor baseplate and coupling guards D
e Conveying chute D
f Scrap collecting unit D
g Protection cabin D
6 passes fast finishing block
2.4.5 Finishing blocks
Each unit has the following characteristics :
a Mandrel unit D&C
b Module unit D&C
c Ring locking unit D&C
d Baseplate D&C
e Distributor gear box D&C
f Motor coupling D&C
g Motor baseplate and coupling guards D
h Cover D&C
j Snap shear and emergency box D&C
k Valves bench D&C
l Vibration and temperature monitoring device D&C
WATER COOLING AREA FOR "SMAL ROUNDS" (ø8 ÷ 18
2.5 mm)
2.5.1 QTB water cooling line
a Water - box D&C
b Cooling elements -
2.5.2 Conveyors
a Conveying pipe D
2.5.3 Pinch Roll along water cooling lines
a Pinch roll D&C
Each pinch roll includes :
b Pinch roll baseplate D&C
c Inlet / outlet equipment D&C
d Motor Coupling D&C
e Motor baseplate and coupling guards D
2.5.4 Chopping shear for small rounds
a Chopping shear D&C
b Shear baseplate D&C
c Inlet / outlet equipment D&C
d Motor Coupling D&C
e Motor baseplate and coupling guards D
f Conveying chute D
g Crop collecting unit D
h Protection guard D
i Diverter D&C
2.5.5 Pinch Roll
a Pinch roll D&C
Each pinch roll includes :
b Pinch roll baseplate D&C
c Inlet / outlet equipment D&C
d Motor coupling D&C
e Motor baseplate and coupling guards D
2.5.6 Dividing shears for small rounds
a Dividing shear D&C
Each shear includes :
b Shear baseplate D&C
c Inlet / outlet equipment D&C
d Motor Coupling D&C
e Motor baseplate and coupling guards D
f Protection guard D
g Diverter D&C
2.5.7 Twin conveyors
a Conveying pipe D
WATER COOLING AREA FOR "BIG ROUNDS" AT COOLING
2.6
BED ENTRY SIDE (ø20 ÷ 40 mm)
2.6.1 QTB water cooling line
a Water box D&C
b Cooling elements -
2.6.2 Valve bench and pumping unit
a Valve bench D&C
b Pumping unit D&C
2.6.3 Pinch Roll along water cooling line for big rounds
a Pinch roll D&C
b Pinch roll baseplate D&C
c Inlet / outlet equipment D&C
d Motor Coupling D&C
e Motor baseplate and coupling guards D
2.6.4 Dividing shear
a Dividing shear D&C
b Inlet / outlet equipment D&C
c Motor coupling D&C
d Motor baseplate and coupling guards D
e Protection guard D
f Shear baseplate D&C
2.6.5 Conveying pipe
a Conveying pipe D
b Tank D
3.2.2 Oil lubrication unit
Oil lubrication unit housingless stands from 11 to 16 and
a D
shear
b Tank D
3.2.3 Oil lubrication unit
b Tank D
3.2.4 Oil lubrication unit
a Lubrication unit for Twin module block D
b Tank D
3.2.5 Oil lubrication unit
a Lubrication unit for laying head D
b Tank D
3.2.6 Oil lubrication Storage Unit
a Lube fresh oil filling D
b Lube fresh oil filling D
c Lube spent oil emptying D
d Unit for grease units filling, with lifting device D
3.2.7 Oil lubrication auxiliary system
a Fixed centrifuge for gear lube units D
b Vacume dehydrator for gear lube units D
c Fixed centrifuge for BGV lube units D
d Vacume dehydrator for BGV lube units D
e Fixed centrifuge for TMB lube units D
f Fixed centrifuge for laying head lube units D
g Vacuum dehydrator for TMB/TFS lube units D
h Mobile lube fluid filling / filtering for small units. D
3.2.8 Air / oil lubrication Unit
a Air / oil lubrication Unit for mill D
3.2.9 Air / oil lubrication Unit
Air/oil lubrication unit for 2 passes and 8 passes finishing
a D
blocks area
3.2.10 Air / oil lubrication Unit
a Air / oil lubrication Unit for TMB D
3.3 GREASE LUBRICATION FAC.
3.3.1 Centralised grease lubrication unit
a Centralised grease lubrication unit D
3.3.2 Mobile grease unit
a Mobile grease unit D
a Air / oil lubrication unit for fast finishing block (right side) D
a Air / oil lubrication unit for fast finishing block (left side) D
b Tank D
4.3 GREASE LUBRICATION FACILITIES
4.3.1 Centralised grease lubrication unit D
a Centralised grease lubrication unit D
4.3.2 Mobile grease unit D
a Mobile grease unit D
AUXILIARY MECHANICAL PARTS
5
Equipment weight 1975 ton approx. (local supply)
5.1 AUXILIARY MECHANICAL PARTS
Foundation bolts and levelingshims for mechanical
1 D
equipment
T-head bolds with anchor platesand sleeves for the
2 D
anchor bolts, where necessary
Stairs, handrails and access platform, ladders, handrails,
3 D
walkways.
4 Embedded parts (at civil contractor's care) -
5 Cover grids and cover plates for piping D
6 Supports for sensors and instrumentation D
Cabins for main pulpit (3 for the wire rod mill and 3 for
7 D
the rebar mill)
5.2 INTERCONNECTING PIPING (INSIDE BUILDING)
Interconnecting piping - Technological utilities (Water,
1 compressed air, gas) with relevant supports, including SH
also the piping for portable water and firefighting
200/50 kN capacity EOT crane for wire rod mill bay (K-L)
200/50 kN capacity EOT crane for bar mill bay (M-N) with
rotating trolley and magnet attachment
4 D
Maintenance hoist 2 ton capacity
200/50 kN capacity EOT crane for wire rod mill bay (K-L) with
rotating trolley and magnet attachment for handiling coils
13 D
Maintenance hoist 2 ton capacity
1 Set of plain blades for CVSB 125 for PG test sizes D&C
2 Set of plain blades for CVSD 020 for PG test sizes D&C
5 Coolers for water box after TMB for PG test sizes D&C
Crop shear
2.1.2.2 Relevant weight included in the machine /
equipment weight
Set of plain blades for No. 2 CVR 012 for PG test
1 D&C
sizes (1 set each)
Chopping Shear
2.1.2.4 Relevant weight included in the machine /
equipment weight)
Set of plain blades for No. 2 shears for covering
1 D&C
the range of PG test sizes (1 set each)
Dividing Shear
2.1.2.5 Relevant weight included in the machine /
equipment weight)
Bar braker
2.1.2.7 Relevant weight included in the machine /
equipment weight)
1 Set of grooved rings for PG test sizes D&C
Cold Shear
2.1.2.8. Relevant weight included in the machine /
equipment weight)
1 Set of plain blades for cold shear for PG test sizes D&C
2 A - guide body
B - base for guide D&C
C - Set of guide
3 Tools for roller guide type RG D&C
2.2.2 Bar Line Area
6-Passes Fast Finishing Block
2.2.2.1 Relevant weight included in the machine /
equipment weight)
1 Mandrel unit (in total) D&C
2 Ring locking groups (In total) D&C