4-Mar-2019

9:48 AM

WQ1 Work Order Details - Work Order : 20611


Location : IQD6-624 Asset : IQD6-HPL624312A

Work Order : 20611 DS6 TR C WCD - WATER ECONOMIZER - HPL IQD6-


HPL624312A
Priority :
Maint. ActType :
Location : IQD6-624 Crude Coalescers, Desalters
Asset : IQD6-HPL624312A TRAIN C WATER ECONOMIZER
Asset Type : EXCHANGER
ABC Indicator : C ESSENTIAL
Sys Condition :
Planner Group :
Lead Craft : FOD MECH FOD MECHANICAL TECH
Basic Start : 30-Dec-2018 Basic Finish :28-Feb-2019

Summary of operations
Task Description Scheduled Start Scheduled Finish
10 Monitor Scale Inhibitor program 30-Dec-2018
effectiveness.

Check for Calcium & Magnesium ions

Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
10 Monitor Scale Inhibitor program effectiveness. Check for FOD PROG 2 2
Calcium & Magnesium ions

WO#: Date:
As Found (Comments should include condition of device when individual Readings: Circle One
arrive on site. Include picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
4- Expected: Pass / Fail
- Actual:
Actions Taken (Include comments about work completed addition to those included in the WO):

wq1_wo_details
alalzah PAGE: 1 Of 28
4-Mar-2019
9:48 AM

WQ1 Work Order Details - Work Order : 20611


Location : IQD6-624 Asset : IQD6-HPL624312A

WO#: Date:
As Left (Comments about condition when the site was left. Include Readings: Circle One
picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:

- 4- Expected: Pass / Fail


Actual:

-
Completed By: Date:
Confirmed By: Date:

Technical Comments:

Technician Date : / /

Supervisor Date : / /

wq1_wo_details
alalzah PAGE: 2 Of 28
4-Mar-2019
9:48 AM

WQ1 Work Order Details - Work Order : 20611


Location : IQD6-624 Asset : IQD6-HPL624312A

Summary of Materials
Item Description Quantity Withdrawn Qty Outstanding Qty

Summary of Services
Service Description Quantity

wq1_wo_details
alalzah PAGE: 3 Of 28
4-Mar-2019
9:48 AM

WQ1 Work Order Details - Work Order : 20612


Location : IQD6-624 Asset : IQD6-HPL624312B

Work Order : 20612 DS6 TR C WCD - WATER ECONOMIZER - HPL IQD6-


HPL624312B
Priority :
Maint. ActType :
Location : IQD6-624 Crude Coalescers, Desalters
Asset : IQD6-HPL624312B TRAIN C WATER ECONOMIZER
Asset Type : EXCHANGER
ABC Indicator : C ESSENTIAL
Sys Condition :
Planner Group :
Lead Craft : FOD MECH FOD MECHANICAL TECH
Basic Start : 30-Dec-2018 Basic Finish :28-Feb-2019

Summary of operations
Task Description Scheduled Start Scheduled Finish
10 Monitor Scale Inhibitor program 30-Dec-2018
effectiveness.

Check for Calcium & Magnesium ions

Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
10 Monitor Scale Inhibitor program effectiveness. Check for FOD PROG 2 2
Calcium & Magnesium ions

WO#: Date:
As Found (Comments should include condition of device when individual Readings: Circle One
arrive on site. Include picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
4- Expected: Pass / Fail
- Actual:
Actions Taken (Include comments about work completed addition to those included in the WO):

wq1_wo_details
alalzah PAGE: 4 Of 28
4-Mar-2019
9:48 AM

WQ1 Work Order Details - Work Order : 20612


Location : IQD6-624 Asset : IQD6-HPL624312B

WO#: Date:
As Left (Comments about condition when the site was left. Include Readings: Circle One
picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:

- 4- Expected: Pass / Fail


Actual:

-
Completed By: Date:
Confirmed By: Date:

Technical Comments:

Technician Date : / /

Supervisor Date : / /

wq1_wo_details
alalzah PAGE: 5 Of 28
4-Mar-2019
9:48 AM

WQ1 Work Order Details - Work Order : 20612


Location : IQD6-624 Asset : IQD6-HPL624312B

Summary of Materials
Item Description Quantity Withdrawn Qty Outstanding Qty

Summary of Services
Service Description Quantity

wq1_wo_details
alalzah PAGE: 6 Of 28
4-Mar-2019
9:48 AM

WQ1 Work Order Details - Work Order : 20613


Location : IQD6-624 Asset : IQD6-HPL624312C

Work Order : 20613 DS6 TR C WCD - WATER ECONOMIZER - HPL IQD6-


HPL624312C
Priority :
Maint. ActType :
Location : IQD6-624 Crude Coalescers, Desalters
Asset : IQD6-HPL624312C TRAIN C WATER ECONOMIZER
Asset Type : EXCHANGER
ABC Indicator : C ESSENTIAL
Sys Condition :
Planner Group :
Lead Craft : FOD MECH FOD MECHANICAL TECH
Basic Start : 30-Dec-2018 Basic Finish :28-Feb-2019

Summary of operations
Task Description Scheduled Start Scheduled Finish
10 Monitor Scale Inhibitor program 30-Dec-2018
effectiveness.

Check for Calcium & Magnesium ions

Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
10 Monitor Scale Inhibitor program effectiveness. Check for FOD PROG 2 2
Calcium & Magnesium ions

WO#: Date:
As Found (Comments should include condition of device when individual Readings: Circle One
arrive on site. Include picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
4- Expected: Pass / Fail
- Actual:
Actions Taken (Include comments about work completed addition to those included in the WO):

wq1_wo_details
alalzah PAGE: 7 Of 28
4-Mar-2019
9:48 AM

WQ1 Work Order Details - Work Order : 20613


Location : IQD6-624 Asset : IQD6-HPL624312C

WO#: Date:
As Left (Comments about condition when the site was left. Include Readings: Circle One
picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:

- 4- Expected: Pass / Fail


Actual:

-
Completed By: Date:
Confirmed By: Date:

Technical Comments:

Technician Date : / /

Supervisor Date : / /

wq1_wo_details
alalzah PAGE: 8 Of 28
4-Mar-2019
9:48 AM

WQ1 Work Order Details - Work Order : 20613


Location : IQD6-624 Asset : IQD6-HPL624312C

Summary of Materials
Item Description Quantity Withdrawn Qty Outstanding Qty

Summary of Services
Service Description Quantity

wq1_wo_details
alalzah PAGE: 9 Of 28
4-Mar-2019
9:48 AM

WQ1 Work Order Details - Work Order : 20845


Location : IQD6-838 Asset : IQD6-TAN838130

Work Order : 20845 DS6 1M PM - DIESEL GENERATOR (TER)


Priority :
Maint. ActType :
Location : IQD6-838 Aux Generators (incl. Drilling Gen)
Asset : IQD6-TAN838130 DIESEL GENERATOR (TER)
Asset Type : GENERATOR
ABC Indicator : C ESSENTIAL
Sys Condition :
Planner Group : PLANNER
Lead Craft : FOD MECH FOD MECHANICAL TECH
Basic Start : 28-Jan-2019 Basic Finish :27-Feb-2019

Summary of operations
Task Description Scheduled Start Scheduled Finish
10 Battery FOD ELECrolyte Level - Check 28-Jan-2019
20 Belts - Inspect/Adjust/Replace 28-Jan-2019
30 Cooling System Supplemental Coolant 28-Jan-2019
Additive (SCA) - Test/Add
40 Inspect/clean/tighten cylinder head 28-Jan-2019
grounding stud
50 Engine Protective Devices - Check 28-Jan-2019
60 Fan Drive Bearing - Lubricate 28-Jan-2019
70 Heat Shield - Inspect/Replace 28-Jan-2019
80 Hoses and Clamps - Inspect/Replace 28-Jan-2019
90 Radiator - Clean 28-Jan-2019
100 Engine Crankcase Breather (Clean) 28-Jan-2019

Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
10 FOD ELEC 1 0.5
20 FOD MECH 1 1
30 FOD MECH 1 1
40 FOD MECH 1 1
50 FOD MECH 1 1
60 FOD MECH 1 1
70 FOD MECH 1 1
80 FOD MECH 1 1
90 FOD MECH 1 1

wq1_wo_details
alalzah PAGE: 10 Of 28
4-Mar-2019
9:48 AM

WQ1 Work Order Details - Work Order : 20845


Location : IQD6-838 Asset : IQD6-TAN838130

WO#: Date:
As Found (Comments should include condition of device when individual Readings: Circle One
arrive on site. Include picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
4- Expected: Pass / Fail
- Actual:
Actions Taken (Include comments about work completed addition to those included in the WO):

-
As Left (Comments about condition when the site was left. Include Readings: Circle One
picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:

- 4- Expected: Pass / Fail


Actual:

-
Completed By: Date:
Confirmed By: Date:

Technical Comments:

Technician Date : / /

Supervisor Date : / /

wq1_wo_details
alalzah PAGE: 11 Of 28
4-Mar-2019
9:48 AM

WQ1 Work Order Details - Work Order : 20845


Location : IQD6-838 Asset : IQD6-TAN838130

Summary of Materials
Item Description Quantity Withdrawn Qty Outstanding Qty

Summary of Services
Service Description Quantity

wq1_wo_details
alalzah PAGE: 12 Of 28
4-Mar-2019
9:48 AM

WQ1 Work Order Details - Work Order : 20993


Location : IQD6-838 Asset : IQD6-TAN838130

Work Order : 20993 DS6 1M PM - DIESEL GENERATOR (TER)


Priority :
Maint. ActType :
Location : IQD6-838 Aux Generators (incl. Drilling Gen)
Asset : IQD6-TAN838130 DIESEL GENERATOR (TER)
Asset Type : GENERATOR
ABC Indicator : C ESSENTIAL
Sys Condition :
Planner Group : PLANNER
Lead Craft : FOD MECH FOD MECHANICAL TECH
Basic Start : 28-Jan-2019 Basic Finish :27-Feb-2019

Summary of operations
Task Description Scheduled Start Scheduled Finish
10 Battery FOD ELECrolyte Level - Check 28-Jan-2019
20 Belts - Inspect/Adjust/Replace 28-Jan-2019
30 Cooling System Supplemental Coolant 28-Jan-2019
Additive (SCA) - Test/Add
40 Clean/Inspect Engine Crankcase breather 28-Jan-2019
50 Engine Protective Devices - Check 28-Jan-2019
60 Fan Drive Bearing - Lubricate 28-Jan-2019
70 Heat Shield - Inspect/Replace 28-Jan-2019
80 Hoses and Clamps - Inspect/Replace 28-Jan-2019
90 Radiator - Clean 28-Jan-2019
100 Engine Crankcase Breather (Clean) 28-Jan-2019
110 Engine Mounts (Check) 28-Jan-2019
120 Fuel Injector(Inspect/Adjust) 28-Jan-2019
130 Generator Lead (Round Cable - Check) 28-Jan-2019
140 Generator Set Vibration (Test / Record) 28-Jan-2019
150 Insulation (Test) 28-Jan-2019
160 Stator Lead (Check) 28-Jan-2019

Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
10 FOD ELEC 1 0.5
20 FOD MECH 1 1
30 FOD MECH 1 1
40 FOD MECH 1 1
50 FOD ELEC 1 1
60 FOD MECH 1 1
70 FOD MECH 1 1
80 FOD MECH 1 1
90 FOD MECH 1 1

wq1_wo_details
alalzah PAGE: 13 Of 28
4-Mar-2019
9:48 AM

WQ1 Work Order Details - Work Order : 20993


Location : IQD6-838 Asset : IQD6-TAN838130

Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
100 FOD MECH 1 1
110 FOD MECH 1 0.5
120 FOD ELEC 1 1
130 FOD ELEC 1 1
140 FOD ELEC 1 1
150 FOD ELEC 1 0.5
160 FOD ELEC 1 0.5

WO#: Date:
As Found (Comments should include condition of device when individual Readings: Circle One
arrive on site. Include picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
4- Expected: Pass / Fail
- Actual:
Actions Taken (Include comments about work completed addition to those included in the WO):

-
As Left (Comments about condition when the site was left. Include Readings: Circle One
picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:

- 4- Expected: Pass / Fail


Actual:

-
Completed By: Date:
Confirmed By: Date:

wq1_wo_details
alalzah PAGE: 14 Of 28
4-Mar-2019
9:48 AM

WQ1 Work Order Details - Work Order : 20993


Location : IQD6-838 Asset : IQD6-TAN838130

Technical Comments:

Technician Date : / /

Supervisor Date : / /

wq1_wo_details
alalzah PAGE: 15 Of 28
4-Mar-2019
9:48 AM

WQ1 Work Order Details - Work Order : 20993


Location : IQD6-838 Asset : IQD6-TAN838130

Summary of Materials
Item Description Quantity Withdrawn Qty Outstanding Qty

Summary of Services
Service Description Quantity

wq1_wo_details
alalzah PAGE: 16 Of 28
4-Mar-2019
9:48 AM

WQ1 Work Order Details - Work Order : 21261


Location : IQD6-624 Asset : IQD6-PBA624352B

Work Order : 21261 DS6 TR C WCD - 1M PM - RECYCLE WASH WATER PUMP


PBA624352B
Priority :
Maint. ActType : 017 Business Critical Check
Location : IQD6-624 Crude Coalescers, Desalters
Asset : IQD6-PBA624352B Train C Recycle Wash Water Pump
Asset Type : PUMPS
ABC Indicator : B BUSINESS CRITICAL
Sys Condition :
Planner Group : PLANNER
Lead Craft : FOD MECH FOD MECHANICAL TECH
Basic Start : 30-Jan-2019 Basic Finish :01-Mar-2019

Summary of operations
Task Description Scheduled Start Scheduled Finish
10 1M Test Spare Operation 30-Jan-2019

Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
10 FOD PROD 1 1

WO#: Date:
As Found (Comments should include condition of device when individual Readings: Circle One
arrive on site. Include picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
4- Expected: Pass / Fail
- Actual:
Actions Taken (Include comments about work completed addition to those included in the WO):

wq1_wo_details
alalzah PAGE: 17 Of 28
4-Mar-2019
9:48 AM

WQ1 Work Order Details - Work Order : 21261


Location : IQD6-624 Asset : IQD6-PBA624352B

WO#: Date:
As Left (Comments about condition when the site was left. Include Readings: Circle One
picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:

- 4- Expected: Pass / Fail


Actual:

-
Completed By: Date:
Confirmed By: Date:

Technical Comments:

Technician Date : / /

Supervisor Date : / /

wq1_wo_details
alalzah PAGE: 18 Of 28
4-Mar-2019
9:48 AM

WQ1 Work Order Details - Work Order : 21261


Location : IQD6-624 Asset : IQD6-PBA624352B

Summary of Materials
Item Description Quantity Withdrawn Qty Outstanding Qty

Summary of Services
Service Description Quantity

wq1_wo_details
alalzah PAGE: 19 Of 28
4-Mar-2019
9:48 AM

WQ1 Work Order Details - Work Order : 21283


Location : IQD6-624 Asset : IQD6-PBA624354B

Work Order : 21283 DS6 TR C WCD - 3M PM - EFFLUENT WATER PUMP


PBA624354B
Priority :
Maint. ActType : 020 Preventive
Location : IQD6-624 Crude Coalescers, Desalters
Asset : IQD6-PBA624354B TRAIN C EFFLUENT WATER PUMP
Asset Type : PUMPS
ABC Indicator : C ESSENTIAL
Sys Condition :
Planner Group : PLANNER
Lead Craft : FOD MECH FOD MECHANICAL TECH
Basic Start : 20-Jan-2019 Basic Finish :19-Feb-2019

Summary of operations
Task Description Scheduled Start Scheduled Finish
10 Change lubricating oil 20-Jan-2019
30 Change lubricating oil 20-Jan-2019

Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
10 Change lubricating oil FOD MECH 1 2
30 Change lubricating oil FOD MECH 2 2
30 Change lubricating oil FOD MECH 2 1

WO#: Date:
As Found (Comments should include condition of device when individual Readings: Circle One
arrive on site. Include picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
4- Expected: Pass / Fail
- Actual:
Actions Taken (Include comments about work completed addition to those included in the WO):

wq1_wo_details
alalzah PAGE: 20 Of 28
4-Mar-2019
9:48 AM

WQ1 Work Order Details - Work Order : 21283


Location : IQD6-624 Asset : IQD6-PBA624354B

WO#: Date:
As Left (Comments about condition when the site was left. Include Readings: Circle One
picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:

- 4- Expected: Pass / Fail


Actual:

-
Completed By: Date:
Confirmed By: Date:

Technical Comments:

Technician Date : / /

Supervisor Date : / /

wq1_wo_details
alalzah PAGE: 21 Of 28
4-Mar-2019
9:48 AM

WQ1 Work Order Details - Work Order : 21283


Location : IQD6-624 Asset : IQD6-PBA624354B

Summary of Materials
Item Description Quantity Withdrawn Qty Outstanding Qty

Summary of Services
Service Description Quantity

wq1_wo_details
alalzah PAGE: 22 Of 28
4-Mar-2019
9:48 AM

WQ1 Work Order Details - Work Order : 22028


Location : IQD6-838 Asset : IQD6-TAN838112

Work Order : 22028 fix or replace the lock of the door(gate) of the diesel
generator

fix or replace the lock of the door(gate) of the diesel generator (1)
Priority : 2 Routine
Maint. ActType :
Location : IQD6-838 Aux Generators (incl. Drilling Gen)
Asset : IQD6-TAN838112 DIESEL GENERATOR (HT)
Asset Type : GENERATOR
ABC Indicator : B BUSINESS CRITICAL
Sys Condition :
Planner Group :
Lead Craft : FOD MECH FOD MECHANICAL TECH
Basic Start : 18-Feb-2019 Basic Finish :19-May-2019

Summary of operations
Task Description Scheduled Start Scheduled Finish
10 fix or replace the lock of the door(gate) of 18-Feb-2019
the diesel generator

Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
10 FOD MECH 3 3

WO#: Date:
As Found (Comments should include condition of device when individual Readings: Circle One
arrive on site. Include picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
4- Expected: Pass / Fail
- Actual:
Actions Taken (Include comments about work completed addition to those included in the WO):

wq1_wo_details
alalzah PAGE: 23 Of 28
4-Mar-2019
9:48 AM

WQ1 Work Order Details - Work Order : 22028


Location : IQD6-838 Asset : IQD6-TAN838112

WO#: Date:
As Left (Comments about condition when the site was left. Include Readings: Circle One
picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:

- 4- Expected: Pass / Fail


Actual:

-
Completed By: Date:
Confirmed By: Date:

Technical Comments:

Technician Date : / /

Supervisor Date : / /

wq1_wo_details
alalzah PAGE: 24 Of 28
4-Mar-2019
9:48 AM

WQ1 Work Order Details - Work Order : 22028


Location : IQD6-838 Asset : IQD6-TAN838112

Summary of Materials
Item Description Quantity Withdrawn Qty Outstanding Qty

Summary of Services
Service Description Quantity

wq1_wo_details
alalzah PAGE: 25 Of 28
4-Mar-2019
9:48 AM

WQ1 Work Order Details - Work Order : 22030


Location : IQD6-838 Asset : IQD6-TAN838121

Work Order : 22030 fix or replace the lock of the door(gate) of the diesel
generator

fix or replace the lock of the door(gate) of the diesel generator(2)


Priority : 2 Routine
Maint. ActType :
Location : IQD6-838 Aux Generators (incl. Drilling Gen)
Asset : IQD6-TAN838121 DIESEL GENERATOR (HT)
Asset Type : GENERATOR
ABC Indicator : B BUSINESS CRITICAL
Sys Condition :
Planner Group :
Lead Craft : FOD MECH FOD MECHANICAL TECH
Basic Start : 18-Feb-2019 Basic Finish :07-Mar-2019

Summary of operations
Task Description Scheduled Start Scheduled Finish
10 fix or replace the lock of the door(gate) of 18-Feb-2019
the diesel generator

Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
10 FOD MECH 3 4

WO#: Date:
As Found (Comments should include condition of device when individual Readings: Circle One
arrive on site. Include picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
4- Expected: Pass / Fail
- Actual:
Actions Taken (Include comments about work completed addition to those included in the WO):

wq1_wo_details
alalzah PAGE: 26 Of 28
4-Mar-2019
9:48 AM

WQ1 Work Order Details - Work Order : 22030


Location : IQD6-838 Asset : IQD6-TAN838121

WO#: Date:
As Left (Comments about condition when the site was left. Include Readings: Circle One
picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:

- 4- Expected: Pass / Fail


Actual:

-
Completed By: Date:
Confirmed By: Date:

Technical Comments:

Technician Date : / /

Supervisor Date : / /

wq1_wo_details
alalzah PAGE: 27 Of 28
4-Mar-2019
9:48 AM

WQ1 Work Order Details - Work Order : 22030


Location : IQD6-838 Asset : IQD6-TAN838121

Summary of Materials
Item Description Quantity Withdrawn Qty Outstanding Qty

Summary of Services
Service Description Quantity

--- End of Report ---

wq1_wo_details
alalzah PAGE: 28 Of 28