9:48 AM
Summary of operations
Task Description Scheduled Start Scheduled Finish
10 Monitor Scale Inhibitor program 30-Dec-2018
effectiveness.
Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
10 Monitor Scale Inhibitor program effectiveness. Check for FOD PROG 2 2
Calcium & Magnesium ions
WO#: Date:
As Found (Comments should include condition of device when individual Readings: Circle One
arrive on site. Include picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
4- Expected: Pass / Fail
- Actual:
Actions Taken (Include comments about work completed addition to those included in the WO):
wq1_wo_details
alalzah PAGE: 1 Of 28
4-Mar-2019
9:48 AM
WO#: Date:
As Left (Comments about condition when the site was left. Include Readings: Circle One
picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
-
Completed By: Date:
Confirmed By: Date:
Technical Comments:
Technician Date : / /
Supervisor Date : / /
wq1_wo_details
alalzah PAGE: 2 Of 28
4-Mar-2019
9:48 AM
Summary of Materials
Item Description Quantity Withdrawn Qty Outstanding Qty
Summary of Services
Service Description Quantity
wq1_wo_details
alalzah PAGE: 3 Of 28
4-Mar-2019
9:48 AM
Summary of operations
Task Description Scheduled Start Scheduled Finish
10 Monitor Scale Inhibitor program 30-Dec-2018
effectiveness.
Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
10 Monitor Scale Inhibitor program effectiveness. Check for FOD PROG 2 2
Calcium & Magnesium ions
WO#: Date:
As Found (Comments should include condition of device when individual Readings: Circle One
arrive on site. Include picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
4- Expected: Pass / Fail
- Actual:
Actions Taken (Include comments about work completed addition to those included in the WO):
wq1_wo_details
alalzah PAGE: 4 Of 28
4-Mar-2019
9:48 AM
WO#: Date:
As Left (Comments about condition when the site was left. Include Readings: Circle One
picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
-
Completed By: Date:
Confirmed By: Date:
Technical Comments:
Technician Date : / /
Supervisor Date : / /
wq1_wo_details
alalzah PAGE: 5 Of 28
4-Mar-2019
9:48 AM
Summary of Materials
Item Description Quantity Withdrawn Qty Outstanding Qty
Summary of Services
Service Description Quantity
wq1_wo_details
alalzah PAGE: 6 Of 28
4-Mar-2019
9:48 AM
Summary of operations
Task Description Scheduled Start Scheduled Finish
10 Monitor Scale Inhibitor program 30-Dec-2018
effectiveness.
Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
10 Monitor Scale Inhibitor program effectiveness. Check for FOD PROG 2 2
Calcium & Magnesium ions
WO#: Date:
As Found (Comments should include condition of device when individual Readings: Circle One
arrive on site. Include picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
4- Expected: Pass / Fail
- Actual:
Actions Taken (Include comments about work completed addition to those included in the WO):
wq1_wo_details
alalzah PAGE: 7 Of 28
4-Mar-2019
9:48 AM
WO#: Date:
As Left (Comments about condition when the site was left. Include Readings: Circle One
picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
-
Completed By: Date:
Confirmed By: Date:
Technical Comments:
Technician Date : / /
Supervisor Date : / /
wq1_wo_details
alalzah PAGE: 8 Of 28
4-Mar-2019
9:48 AM
Summary of Materials
Item Description Quantity Withdrawn Qty Outstanding Qty
Summary of Services
Service Description Quantity
wq1_wo_details
alalzah PAGE: 9 Of 28
4-Mar-2019
9:48 AM
Summary of operations
Task Description Scheduled Start Scheduled Finish
10 Battery FOD ELECrolyte Level - Check 28-Jan-2019
20 Belts - Inspect/Adjust/Replace 28-Jan-2019
30 Cooling System Supplemental Coolant 28-Jan-2019
Additive (SCA) - Test/Add
40 Inspect/clean/tighten cylinder head 28-Jan-2019
grounding stud
50 Engine Protective Devices - Check 28-Jan-2019
60 Fan Drive Bearing - Lubricate 28-Jan-2019
70 Heat Shield - Inspect/Replace 28-Jan-2019
80 Hoses and Clamps - Inspect/Replace 28-Jan-2019
90 Radiator - Clean 28-Jan-2019
100 Engine Crankcase Breather (Clean) 28-Jan-2019
Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
10 FOD ELEC 1 0.5
20 FOD MECH 1 1
30 FOD MECH 1 1
40 FOD MECH 1 1
50 FOD MECH 1 1
60 FOD MECH 1 1
70 FOD MECH 1 1
80 FOD MECH 1 1
90 FOD MECH 1 1
wq1_wo_details
alalzah PAGE: 10 Of 28
4-Mar-2019
9:48 AM
WO#: Date:
As Found (Comments should include condition of device when individual Readings: Circle One
arrive on site. Include picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
4- Expected: Pass / Fail
- Actual:
Actions Taken (Include comments about work completed addition to those included in the WO):
-
As Left (Comments about condition when the site was left. Include Readings: Circle One
picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
-
Completed By: Date:
Confirmed By: Date:
Technical Comments:
Technician Date : / /
Supervisor Date : / /
wq1_wo_details
alalzah PAGE: 11 Of 28
4-Mar-2019
9:48 AM
Summary of Materials
Item Description Quantity Withdrawn Qty Outstanding Qty
Summary of Services
Service Description Quantity
wq1_wo_details
alalzah PAGE: 12 Of 28
4-Mar-2019
9:48 AM
Summary of operations
Task Description Scheduled Start Scheduled Finish
10 Battery FOD ELECrolyte Level - Check 28-Jan-2019
20 Belts - Inspect/Adjust/Replace 28-Jan-2019
30 Cooling System Supplemental Coolant 28-Jan-2019
Additive (SCA) - Test/Add
40 Clean/Inspect Engine Crankcase breather 28-Jan-2019
50 Engine Protective Devices - Check 28-Jan-2019
60 Fan Drive Bearing - Lubricate 28-Jan-2019
70 Heat Shield - Inspect/Replace 28-Jan-2019
80 Hoses and Clamps - Inspect/Replace 28-Jan-2019
90 Radiator - Clean 28-Jan-2019
100 Engine Crankcase Breather (Clean) 28-Jan-2019
110 Engine Mounts (Check) 28-Jan-2019
120 Fuel Injector(Inspect/Adjust) 28-Jan-2019
130 Generator Lead (Round Cable - Check) 28-Jan-2019
140 Generator Set Vibration (Test / Record) 28-Jan-2019
150 Insulation (Test) 28-Jan-2019
160 Stator Lead (Check) 28-Jan-2019
Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
10 FOD ELEC 1 0.5
20 FOD MECH 1 1
30 FOD MECH 1 1
40 FOD MECH 1 1
50 FOD ELEC 1 1
60 FOD MECH 1 1
70 FOD MECH 1 1
80 FOD MECH 1 1
90 FOD MECH 1 1
wq1_wo_details
alalzah PAGE: 13 Of 28
4-Mar-2019
9:48 AM
Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
100 FOD MECH 1 1
110 FOD MECH 1 0.5
120 FOD ELEC 1 1
130 FOD ELEC 1 1
140 FOD ELEC 1 1
150 FOD ELEC 1 0.5
160 FOD ELEC 1 0.5
WO#: Date:
As Found (Comments should include condition of device when individual Readings: Circle One
arrive on site. Include picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
4- Expected: Pass / Fail
- Actual:
Actions Taken (Include comments about work completed addition to those included in the WO):
-
As Left (Comments about condition when the site was left. Include Readings: Circle One
picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
-
Completed By: Date:
Confirmed By: Date:
wq1_wo_details
alalzah PAGE: 14 Of 28
4-Mar-2019
9:48 AM
Technical Comments:
Technician Date : / /
Supervisor Date : / /
wq1_wo_details
alalzah PAGE: 15 Of 28
4-Mar-2019
9:48 AM
Summary of Materials
Item Description Quantity Withdrawn Qty Outstanding Qty
Summary of Services
Service Description Quantity
wq1_wo_details
alalzah PAGE: 16 Of 28
4-Mar-2019
9:48 AM
Summary of operations
Task Description Scheduled Start Scheduled Finish
10 1M Test Spare Operation 30-Jan-2019
Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
10 FOD PROD 1 1
WO#: Date:
As Found (Comments should include condition of device when individual Readings: Circle One
arrive on site. Include picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
4- Expected: Pass / Fail
- Actual:
Actions Taken (Include comments about work completed addition to those included in the WO):
wq1_wo_details
alalzah PAGE: 17 Of 28
4-Mar-2019
9:48 AM
WO#: Date:
As Left (Comments about condition when the site was left. Include Readings: Circle One
picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
-
Completed By: Date:
Confirmed By: Date:
Technical Comments:
Technician Date : / /
Supervisor Date : / /
wq1_wo_details
alalzah PAGE: 18 Of 28
4-Mar-2019
9:48 AM
Summary of Materials
Item Description Quantity Withdrawn Qty Outstanding Qty
Summary of Services
Service Description Quantity
wq1_wo_details
alalzah PAGE: 19 Of 28
4-Mar-2019
9:48 AM
Summary of operations
Task Description Scheduled Start Scheduled Finish
10 Change lubricating oil 20-Jan-2019
30 Change lubricating oil 20-Jan-2019
Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
10 Change lubricating oil FOD MECH 1 2
30 Change lubricating oil FOD MECH 2 2
30 Change lubricating oil FOD MECH 2 1
WO#: Date:
As Found (Comments should include condition of device when individual Readings: Circle One
arrive on site. Include picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
4- Expected: Pass / Fail
- Actual:
Actions Taken (Include comments about work completed addition to those included in the WO):
wq1_wo_details
alalzah PAGE: 20 Of 28
4-Mar-2019
9:48 AM
WO#: Date:
As Left (Comments about condition when the site was left. Include Readings: Circle One
picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
-
Completed By: Date:
Confirmed By: Date:
Technical Comments:
Technician Date : / /
Supervisor Date : / /
wq1_wo_details
alalzah PAGE: 21 Of 28
4-Mar-2019
9:48 AM
Summary of Materials
Item Description Quantity Withdrawn Qty Outstanding Qty
Summary of Services
Service Description Quantity
wq1_wo_details
alalzah PAGE: 22 Of 28
4-Mar-2019
9:48 AM
Work Order : 22028 fix or replace the lock of the door(gate) of the diesel
generator
fix or replace the lock of the door(gate) of the diesel generator (1)
Priority : 2 Routine
Maint. ActType :
Location : IQD6-838 Aux Generators (incl. Drilling Gen)
Asset : IQD6-TAN838112 DIESEL GENERATOR (HT)
Asset Type : GENERATOR
ABC Indicator : B BUSINESS CRITICAL
Sys Condition :
Planner Group :
Lead Craft : FOD MECH FOD MECHANICAL TECH
Basic Start : 18-Feb-2019 Basic Finish :19-May-2019
Summary of operations
Task Description Scheduled Start Scheduled Finish
10 fix or replace the lock of the door(gate) of 18-Feb-2019
the diesel generator
Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
10 FOD MECH 3 3
WO#: Date:
As Found (Comments should include condition of device when individual Readings: Circle One
arrive on site. Include picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
4- Expected: Pass / Fail
- Actual:
Actions Taken (Include comments about work completed addition to those included in the WO):
wq1_wo_details
alalzah PAGE: 23 Of 28
4-Mar-2019
9:48 AM
WO#: Date:
As Left (Comments about condition when the site was left. Include Readings: Circle One
picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
-
Completed By: Date:
Confirmed By: Date:
Technical Comments:
Technician Date : / /
Supervisor Date : / /
wq1_wo_details
alalzah PAGE: 24 Of 28
4-Mar-2019
9:48 AM
Summary of Materials
Item Description Quantity Withdrawn Qty Outstanding Qty
Summary of Services
Service Description Quantity
wq1_wo_details
alalzah PAGE: 25 Of 28
4-Mar-2019
9:48 AM
Work Order : 22030 fix or replace the lock of the door(gate) of the diesel
generator
Summary of operations
Task Description Scheduled Start Scheduled Finish
10 fix or replace the lock of the door(gate) of 18-Feb-2019
the diesel generator
Labor Details
Task Long Description Craft Skill Level Qty Regular Hours
10 FOD MECH 3 4
WO#: Date:
As Found (Comments should include condition of device when individual Readings: Circle One
arrive on site. Include picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
4- Expected: Pass / Fail
- Actual:
Actions Taken (Include comments about work completed addition to those included in the WO):
wq1_wo_details
alalzah PAGE: 26 Of 28
4-Mar-2019
9:48 AM
WO#: Date:
As Left (Comments about condition when the site was left. Include Readings: Circle One
picture if desired):
1- Expected: Pass / Fail
Actual:
-
2- Expected: Pass / Fail
Actual:
- 3- Expected: Pass / Fail
Actual:
-
Completed By: Date:
Confirmed By: Date:
Technical Comments:
Technician Date : / /
Supervisor Date : / /
wq1_wo_details
alalzah PAGE: 27 Of 28
4-Mar-2019
9:48 AM
Summary of Materials
Item Description Quantity Withdrawn Qty Outstanding Qty
Summary of Services
Service Description Quantity
wq1_wo_details
alalzah PAGE: 28 Of 28