Vous êtes sur la page 1sur 8

CURRICULUM VITAE

PERSONAL INFORMATION

Name : Mohammadan Adilla Adzanys


Place / Date of Birth : Jakarta, January 8, 1975
Nationality : Indonesian
Permanent Address : Callysta Permata blok D7 no.7 Permata Bintaro, Bintaro Jaya Tangerang 15414
Home Phone : (+62) 21-91301273
Mobile Phone : (+62) 856-9802834, (+62) 81281796002
E-mail Address : adilmech75@yahoo.com, adilmech75@gmail.com
Passport Number : S 735198

Qualifications : - International Welding Engineer (IWE) IIW-ANB Austria


- Welding Inspector CSWIP 3.1
- Welding Inspector MIGAS- B4T
- Radiographic Interpretation – PCN BINDT
- Coating Inspector – BGAS CSWIP (Exp’d)

EDUCATION BACKGROUND

Bandung Institute of Technology (ITB) - Bachelor Degree in Mechanical Engineering

SUMMARY OF EXPERIENCE

Having more than 9 (nine) years in Fabrication, Construction, Site Installation & Modification for
Inspection and Quality Assurance / Control including supervision & coordination, inspection, prepare
quality control procedure and responsible for general QA/QC activities to confirm that they comply with
specified procedure or Client requirement. Has served as QA/QC Engineer / Coordinator, Mechanical
Engineer, Welding Engineer, QC / Welding Inspector, and Project Quality Engineer for offshore / onshore
Oil & Gas Project (Topside, Jacket, FSO, Plant and Pipeline)

PROFESSIONAL TRAINING ATTENDED

CV of M. Adilla Adzanys 1 of 8
 International Welding Engineer (IWE) by Approved Training Body B4T
within IIW (International Institute of Welding) by ANB Austria, Bandung, Certificate No. IWE
AT 0159

 Radiographic Interpretation (RI) PCN BINDT by TWI (The Welding


Institute), Jakarta, PCN No. 309647, Expiry Date : 3 May 2015

 Welding Inspector International Certification CSWIP 3.1 by TWI (The


Welding Institute), Jakarta, Certificate No. 31025, Expiry Date: 4 November 2012

 Welding Inspector at The institute for Research and Development of


Materials and Technical Product Industries (B4T), Bandung, Certificate No. 0502.12.47.0998

 International Certification Coating Inspector BGAS-CSWIP by TWI


(The Welding Institute), Jakarta-Indonesia. Certificate No: BG552429, Expiry Date 12 December
2009

SAFETY & OTHERS TRAINING ATTENDED

 Tropical – Basic Offshore Safety Induction & Emergency Training (T-


BOSIET), by Survival Systems Asia / PT. Samson Tiara, 28-30 November 2005

 Helicopter Underwater Escape Training (HUET), by Industrialindo


Konsultrain Services, member of British Safety Council, 4 June 2005.

 S T O P (Safety Training Observation Program) Training, by Vico


Indonesia, 26 March 2003

 Basic Professional Selling Skill, Workshop by World Trade Center Jakarta,


5 Feb. 2005

 H S E Guide Book Socialization, by Vico Indonesia, 12 March 2003

 WPS (Work Permit System) Training, by Vico Indonesia, 12 January 2003

 National Seminar of Corrosion in Oil & Petroleum Industries ,by


INDOCOR, 4 March 1999

 Organization Leadership Training ( LKO ), held by HMM ITB, 1994

CAREER HISTORY
(From current company to previous company)

1. Period : June 2009 – September 2010


Company : PT. Java Velosi Mandiri for ConocoPhillips Indonesia Inc. Ltd
Project Assigned : Installation of 8” Bypass Line Grissik - Letang and Pipeline Assessment
for PSC Oil Area
Position : QA / QC Inspector
Duties & • Visual inspection and verification for pipe identification prior
Responsibilities installation of 4 km 8” bypass line to replace leaking 12” condensate line

CV of M. Adilla Adzanys 2 of 8
• Monitor stringing, fir up and welding activities (prior, during and
after welding) and lowering of 8” bypass line
• Review RT film and monitor PT and UT lamination check for cut
out joint
• Monitor field joint coating application and witness holiday test
• Perform visual observation and monitor UT check for remaining
thickness on leaking pipe section of current pipeline
• Perform pipeline assessment for flowline from well to jumper line
(manifold) such as verify actual remaining WT, external corrosion and
pitting, support, crossing, cathodic protection, and community along ROW

Project Assigned : Valves Inspection for Corridor Mercury Removal & Gelam Compressor
Position : QA / QC Inspector
Duties & • Verify and visual check to material condition and identification
Responsibilities stamp of valves and review mill sheet and other test report
• Monitor and witness leak test for Butterfly valves, Ball valves,
Gate valves, Globe valves and Check valves as per API 598 and API 6D
which consist of low and high closure test, backseat test and shell test
• Witness PMI (Positive Material Identification) performed on
stainless steel valves include Pressure Safety Valves
• Monitor repair carried out on leakage valves and re-test after
repair.
• Monitor and check blasting for surface preparation and painting
applied on carbon steel valves as per project procedure and specification

2. Period : April - May 2009


Company : PT. Java Velosi Mandiri for ConocoPhillips Indonesia Inc. Ltd
Project Assigned : North Belut Project – Offshore Pipeline Installation
Position : QA / QC & Welding Inspector
Duties & • Conduct QC surveillance for 16” dia. (API 5L X65), 37 km gas
Responsibilities pipeline installation between NBCPP and Kerisi PLEM.
• Review project procedure, WPS, welder certificates, verify and
check all welding equipment and consumables (gaseous and wire rod) and
witness welder qualification test for additional welder to be assigned for the
work.

• Monitor pipelay installation work as per ITP since transferring


pipes from material barge, cleaning, bevelling, gauss checking, anode
spacing until through firing line (8 stations) with automatic GMAW
welding, automatic UT for NDT, HSS and HDPUF infill coating.

• Monitor and witness repair work for welding, prepare daily


inspection report and review report of welding parameter record

CV of M. Adilla Adzanys 3 of 8
3. Period : March - April 2009
Company : PT. Java Velosi Mandiri for ConocoPhillips Indonesia Inc. Ltd
Project Assigned : North Belut Project – CPP Jacket Offshore Installation
Position : QA / QC & Welding Inspector
Duties & • Conduct QC surveillance for mainly welding work during
Responsibilities execution of final 8 legs CPP jacket installation for crown, transition piece
and boat landing

• Monitor NDT (UT & MT) after weld completion and hardness test
to verify its mechanical properties due to some circum and long seam weld
position

• Prepare daily inspection report, review NDT report and contractor


QC inspection report (fit up, welding and visual check)
• Monitor and verify contractor activity to ensure the work is
comply to project procedure and specification

4. Period : December 2008 - February 2009


Company : PTSC Mechanical & Construction Co. Ltd, Vietnam
(via Eurtrue Overseas Pte. Ltd )
Owner : Cuu Long Joint Operating Company
Project Assigned : Open Drain Caisson Package for Su Tu Den Northeast Project
at Vendor (Alpha ECC) Yard, Vung Tau, Vietnam
Position : 3rd Party Inspector for Open Drain Caisson Package
Duties & • Review and verify project procedures and document, Project
Responsibilities material inspection and verification

• Verify assembly/shop fabrication activities for Open Drain


Caisson package and prepare weekly inspection report for Company and
Owner information
• Monitor and verify welding work such as joint preparation, fit up,
weld activity, visual inspection and NDT of welds.
• Monitor painting work for all coating system applied, Verify
dimensional inspection (overall dimension, proper orientation and
orientation check)
• Conduct pre-shipment inspection, Review all final documentation

5. Period : August - November 2008


Company : PT. Java Velosi Mandiri for ConocoPhillips Indonesia Inc. Ltd
Project Assigned : North Belut Project – WHPD, WHPC & CPP Jacket Offshore Installation
Position : QC Lead & Welding Inspector
Duties & • Conduct QC surveillance during execution of WHPD, WHPC and
Responsibilities CPP jacket pile and deck installation performed by installation contractor

• Review all appropriate project document on site and procedure of


corrective action for non-conformance findings proposed by contractor
CV of M. Adilla Adzanys 4 of 8
• Prepare daily quality control inspection status, review NDT result
after weld completion and contractor QC inspection report

• Liase with contractor QC personnel on site to ensure the inspection


work to be performed comply with procedure, drawing, specification and
standard

6. Periods : December 2003 – July 2008


Company : PT. Sarku Enjinering Utama

6. Project Assigned : Yadana Field Development – MCP (Medium Compression Platform)


1 Offshore - Andaman Sea, Myanmar (November 2007- May 2008)
Owner : Total E&P Myanmar
Client : Hyundai Heavy Industries

Position : Project Coordinator & QC Engineer


Duties & & • Review project specification, procedures and technical drawing.
Responsibilities Establish welder qualification scheme prior to carry out the test for ABS
qualification and prepare the test schedule, consumable, tools and
equipment

• Conduct WQT for ABS certification as per ASME sec IX.


• Liaise with all involved party for work execution related to schedule /
sequence, safety, pre / during / and post shutdown activities

6. Project Assigned : Escravos Gas Project 3, FSO Modification, Offshore Nigeria


2 West Africa (Feb – May 2007)
Owner : Chevron Nigeria Limited
Client : Hyundai Heavy Industries
Position : Project Coordinator & Mechanical / QC Engineer
Duties & & • Review technical job cards and drawing for piping and structural.
Responsibilities Conduct site survey to familiarize scope of work, Prepare WQT for ABS
(American Bureau of Shipping) certification as per client requirement

• Review WPS & specifications, Establish manning level for the work
• Coordinate with field supervisor to perform installation work (welding,
coating, insulation, testing, etc) as per project plan and schedule

• Liaise with client representative for technical issues during project


execution, support planning engineer to prepare progress reporting

6. Project Assigned : Hang Tuah Platform Modification, Offshore - Natuna Sea, Indonesia
3 (June – December 2006)
Client : Conoco Phillips Indonesia Inc. Ltd.
Position : Project & QC Engineer
Duties & & • Review and develop procedures in project deliverable list
Responsibilities • Prepare ITP for fabrication and installation, monitor and control shop
fabrication of piping and structural work
• Review WPS and prepare welder qualification test

• Control topside installation work until pre-commissioning stage mainly


CV of M. Adilla Adzanys 5 of 8
for installation of mechanical equipment Gas Filter 22 MAJ-002
• Assist and monitor site QA/QC team for topside work (welding,
hydrotest, leak test etc) and subsea (spool installation, hydratight, testing
KaMos Ring, flushing, dewatering and purging)

• Prepare project dossier after mechanical completion

6. Project Assigned : KRA South Gas Development Subsea Tie-In, Offshore - Natuna Sea
4 Indonesia (January-December 2006)
Client : Star Energy (Kakap) Ltd.
Position : Project / Construction Engineer & QC Inspector - Topside (Tripatra-
Sarku Consortium)
Duties & &
Responsibilities • Develop procedures in project deliverable list, Review the design of
installation aids and WPS required

• Develop ITP for fabrication and installation, monitor fabrication work


for subsea pipe spool, I-Tube and clamps and structural

• Control application of Raychem coating special on subsea pipe spools


• Monitor and control topside installation work

6. Project Assigned : West Seno Turnaround Project for FPU and TLP, Offshore - Makassar
5 Strait, Indonesia (July – October 2005)
Owner : Unocal Makassar Ltd.
Client : Hyundai Heavy Industries
Position : Mechanical / QC Engineer & Inspector
Duties & &
Responsibilities • Review WPS, Welder Certificates, drawing and other project
procedures for installation of mechanical equipment (CPI Tank), piping &
structural

• Monitor for welding and final insulation work of piping and


firewall

• Identify mechanical punch list and advise supervisor to rectify

• Control the work during pre-commissioning stage

6. Project Assigned : Block B Subsea Development–Topside Modification Belida Platform


6 Offshore - Natuna Sea, Indonesia (January-May 2004)
Owner : ConocoPhillips Indonesia Inc. Ltd
Client : PT. Technip Indonesia
Position : QA / QC & Welding Inspector
Duties & & • Perform field inspection activities as per ITP and Project Quality
Responsibilities Plan

• Review QA/QC document and prepared QC progress status


reports

• Monitor and control construction and installation work on piping,


structural and mechanical equipment (Malong Slug Catcher 22 MBF-001)

CV of M. Adilla Adzanys 6 of 8
• Review the inspection and NDT result

• Develop Hydrotest Packages and monitor the work during pre-


commissioning stage prior mechanical completion and hand over

7. Periods : June 2002 – July 2003


Company : PT. Kelsri

7. Project Assigned : Flowline Installation and Preventive Maintenance Support


1 VICO Operation Area, East Kalimantan (December 2002-May 2003)
Client : VICO Indonesia
Position : QC Coordinator
Duties & & • Report to Site Manager and QA Manager for the status of field
Responsibilities inspection & implementation of ITP and Project Quality Plan (PQP)

• Assure all inspection on piping and structural work meet the


client specification, applicable standard and project procedures

• Liase with filed inspectors, monitor and review work quality


result

• Liaise with the client and other parties for progress of quality
achievement and ensure corrective/preventive actions are performed as
well

7.2 Project Assigned : Semberah VLP/MP Gas Compressor Additional - Semberah 14 Plant
Muara Badak, East Kalimantan (June-November 2002)
Client : VICO Indonesia
Position : QA / QC & Welding Inspector
Duties & & • Perform inspection and monitor work on piping, structural and
Responsibilities mechanical equipment (VLP and MP Gas Compressor) as per ITP, spec.
and standard

• Liaise with QA/QC Chief Engineer and client representative


during construction/installation phase
• Monitor and review NDT result and keep all appropriate
quality record

• Prepare report for final dossier after mechanical completion

8. Periods : November 2001 – January 2002


Company : PT. Sarana Chrome Persada, Hard Chrome & Engineering Services
Position : Engineering Staff
Duties & & • Control workshop operations which include engineering
Responsibilities measurement, machining and chrome plating

• Check incoming either mechanical part or component to


conclude type of services needed to attain client’s requirement

• Ensure the work meet the schedule and quality

9. Periods : August 2000 – January 2001


Company : PT. Matsushita Kotobuki Electronic Industries Indonesia
CV of M. Adilla Adzanys 7 of 8
Position : Factory Engineering Department Staff
Duties & & • New Product Evaluation,
Responsibilities • Engineering Document Control,

• Trouble Solving Analysis

10 Periods : July – August 1997


.
Company : PT. Rekayasa Industri, Engineering & Construction
Position : Job Trainee at Mechanical Department
Job Description • Design of Vertical Pressure Vessel According to ASME Section VIII
Code

11 Periods : July – Aug. 1995


.
Company : Garuda Maintenance Facilities, Aircraft Maintenance
Position : Trainee
Job Description • Inspection of Decarburization in Heat Treatment 4130 and 4340
Alloy Steel by Microhardness Method

MISCELLANEOUS

• Familiar with Code and Standard ASME Sec. IX, AWS D1.1, API 1104, ANSI B31.3, ANSI B31.4,
ANSI B31.8 etc
• Understanding about Failure Analysis

Note:
Original copy of certification and other supporting documents may be called for and presented if and when
required.

I hereby certify that all statements in this data are true and correct to the best of my knowledge and
belief.

Mohammadan Adilla Adzanys

CV of M. Adilla Adzanys 8 of 8

Vous aimerez peut-être aussi