LIQUID APPLIED ROOFING HYDROSTOP PREMIUMCOAT SYSTEM

SECTION 07560

PART  1 – GENERAL 
1.1  DESCRIPTION OF EXISTING SUBSTRATES 
A. This specification is intended to outline the requirements for application of the Hydrostop®  
PremiumCoat® System, in conjunction with the appropriate product technical data sheets, over 
approved roof substrates in acceptable condition. Specific addenda address each surface at the end 
of this guide specification. 
 
1.2  DESCRIPTION OF LIQUID‐APPLIED ROOFING SYSTEM 
A. The Liquid‐Applied System consists of a polyester‐reinforced elastomeric acrylic system specifically 
designed for roofing installation. The system is 1) Approved by FM (Factory Mutual) according to the 
complete Standard 4470 for Class 1 Roof Constructions; 2) Classified and subjected to follow‐up by 
UL (Underwriters Laboratories); 3) Accepted by Miami‐Dade County; and 4) Manufactured in 
accordance with ISO 9001:2008 & 14001:2004 regulations. 
 
1.3  SECTION INCLUDES 
A. Liquid‐Applied flexible acrylic waterproofing system for use over new or existing roofing.  Work shall 
include the preparation of the roof surface, flashing, detailing, application of the roof system, and 
cleanup. 
 
1.4  RELATED WORK 
A. Contractor shall review all sections of the project specifications to determine items of work that will 
interface with the application of this roofing system. Compliance with applicable building codes shall 
be assured by the specifier or project engineer, while coordination and execution of related sections 
shall be the responsibility of the approved contractor. 
 
1.5  REFERENCES 
A. NRCA Roofing and Waterproofing Manual  
B. Factory Mutual RoofNav Directory 
C. Underwriters Laboratories Building Materials Directory 
D. Miami‐Dade County Product Control Section, Board and Code Administration 
E. ASTM D5034‐09(2013)   Breaking Strength and Elongation of Textile Fabrics 
F. ASTM D3787‐07(2011)   Bursting Strength of Textiles 
G. ASTM D1117‐01     Guide for Evaluating Nonwoven Fabric 
H. ASTM D1777‐96(2011)  Thickness of Textile Materials 
I. ASTM B117‐11    Standard Practice for Operating Salt Spray (Fog) Apparatus 
J. ASTM G29‐96(2010)  Test Methods for Algae Resistance 
K. ASTM E108‐11     Test Method for Fire Tests of Roof Coverings 
L. ASTM D1653‐13     Water Vapor Transmission of Organic Coating Films 
 
 


LIQUID APPLIED ROOFING HYDROSTOP PREMIUMCOAT SYSTEM
SECTION 07560

M. ASTM G155‐13           Practice for Operating Xenon Arc Light Apparatus for Exposure  of  
                                                   Non‐Metallic Materials 
N. ASTM D412‐06a (2013)   Tensile Properties of Vulcanized Rubber & Thermoplastic Elastomers 
O. ASTM D6083‐05e1     Standard Specification for Liquid Applied Acrylic Coating 
P. ASTM C1549‐09   Determination of Solar Reflectance at Near Ambient Temperature Using 
a Portable Solar Reflectometer 
Q. ASTM C1371‐04a (2010)e1   Determination of Emittance of Materials at Near Room Temperature 
Using Portable Emissometers 
R. FM 4470   Standard for Class 1 Spread of Flame, Windstorm Pressure, Windstorm 
Pull, Hail Damage, Resistance to Foot Traffic, and Susceptibility to 
Leakage 
1.6  REVIEW / SUBMITTALS 
A. Shop Drawings: Submit a scale drawing illustrating layout of joint reinforcing and all flashing details. 
A. Product Data: Provide manufacturer’s published technical literature, SDS, and warranty on products 
that make up the roofing system, including coatings, reinforcing fabrics, flashing materials, roof 
drains, fasteners, etc. 
B. Installation Instructions: Submit all data sheets available from the manufacturer on the installation 
of the roofing system applicable to the project. 
C. Submit manufacturer's Certificates of Compliance or Analysis that all products meet or exceed 
project requirements. If required, Contractor to supply samples or mockup. 
D. Applicator is responsible for submitting proof of appropriate GAF Certified Contractor Status. 
E. Prior to bid, all project specifications, details, and submittals shall be reviewed by manufacturer for 
pre‐approval and to comply with warranty requirements. Successful bidder should initiate warranty 
pre‐inspection process before commencing work. 
 
1.7  QUALIFICATIONS 
A. Contractor Qualifications: The Applicator of the specified roofing material shall be a Certified 
Contractor designated by GAF.  The Applicator shall provide a certified contractor letter from the 
roofing system manufacturer verifying the Contractor’s status, level, and ability to furnish the 
specified warranty type and term.  
B. Manufacturer Qualifications: Manufacturer shall have a minimum twenty (20) years manufacturing 
experience in the roof coating industry. 
 
1.8  QUALITY CONTROL 
A. Codes and Standards: The contractor shall become thoroughly familiar with all codes, regulations 
and standards governing the specified work. Any contradiction between the manufacturer’s 
requirements and these specifications shall be brought to the attention of the manufacturer and the 
specifier or project engineer.  
B. Deviations: There shall not be any deviations from these specifications unless the deviation is 
submitted in writing to the specifier/project engineer.   Any request for deviation must be approved 
in writing from the roofing manufacturer’s technical department delineating the details of the 
deviation. 
C. Training and Documentation: The Contractor is responsible for ensuring a trained foreman is on site 
during the installation of any GAF / Hydrostop®  products. A daily log of application activities and 

LIQUID APPLIED ROOFING HYDROSTOP PREMIUMCOAT SYSTEM
SECTION 07560

environmental conditions should be maintained and available on‐site with copies of technical 
data/application instructions & SDS. 
D. Technical Inspections:  The Manufacturer may require Technical Inspections based on warranty 
types and terms.  These inspections include, but not limited to, pre‐construction, interim, and final 
inspections.  Consult GAF Technical Services or a GAF Technical Sales Representative to confirm 
inspection requirements. 
 
1.9  DELIVERY, STORAGE & HANDLING 
A. Deliver materials to jobsite in manufacturer's unopened and undamaged containers bearing the 
following information:  
1. Name and Address of Manufacturer 
2. Identification of Contents – Including Product Code 
3. Net Volume of Contents  
4. Lot or Batch Number  
5. VOC Content 
6. Storage Temperature Limits  
7. Shelf Life and Expiration Date  
8. Mixing Instructions and Proportions of Contents  
9. Safety Information and Instructions 
B. Store and protect materials from damage and weather in accordance with manufacturer's published 
instructions. 
C. Ambient temperatures should range between 50 and 90°F (10 to 32°C). Keep out of direct sunlight. 
D. Place stored material containers on pallets and cover with tarpaulin tied to bottom of pallets. 
 
1.10  ENVIRONMENTAL REQUIREMENTS 
A. Do not apply if ambient temperatures are expected to fall below 50°F (10°C), or if rain or heavy dew 
is anticipated before liquid coating component has cured. 
 
1.11  WARRANTIES AND ELIGIBILITY 
A. Contractor to furnish GAF Warranty or Guarantee in accordance with project specifications. 
Contractor shall follow written application process in accordance with manufacturer’s warranty 
program. 
1. GAF Liquid‐Applied Limited Product Warranty 
a. GAF Commercial Master or Master Select Restoration Contractors – Up to 10 Years 
b. GAF Premium Coating Systems Contractors – Up to 20 Years 
B. GAF Liquid‐Applied Emerald Pledge Labor and Material Warranty 
1. GAF Commercial Master or Master Select Restoration Contractors – Up to 10 Years 
2. GAF Premium Coating Systems Contractors – Up to 25 Years 
C. GAF Liquid‐Applied Diamond Pledge NDL Guarantee 
1. GAF Premium Coating Systems Contractors Only – Up to 25 Years 

Refer to individual addenda at the end of this guide specification for application instructions as they relate to 
warranty / guarantee coverage. 

 

LIQUID APPLIED ROOFING HYDROSTOP PREMIUMCOAT SYSTEM
SECTION 07560

PART  2 – PRODUCTS 
2.1  MANUFACTURUER 
A. GAF ‐ 1 Campus Drive Parsippany, New Jersey 07054, 1‐973‐628‐3000, www.gaf.com. 
 
2.2  MEMBRANE COMPUND MATERIAL 
A. Waterproofing Material: PremiumCoat® System: three stage, fabric‐reinforced, flexible acrylic 
coating, fluid‐applied in successive steps to form a continuous, seamless, watertight membrane; 39 
to 60 mils (1,143 to 1,524 micron) minimum cured total system thickness, comprised of the 
following: 
1. Foundation and Saturation Coats: PremiumCoat® FoundationCoat (highly flexible, water‐ based, 
100% pure acrylic polymer resin coatings). 
2. Fabric: PremiumCoat® Fabric (polyester, non‐woven, stitch‐bonded and heat‐set fabric). 
3. FinishCoat: PremiumCoat® FinishCoat (ultraviolet light‐resistant blend of highly flexible, water‐
based, 100% pure acrylic polymer resin coating). Color as selected from manufacturer's standard 
color chart.  
B. Reinforcing Fabric: PremiumCoat® Fabric shall be non‐woven, 100% polyester, stitch bonded, heat‐
set fabric with the following characteristics: 

Weight:      3 oz. / per square yard (102 grams/m²)  
Tensile Strength                 MD: 124 lbs. (56 kg)     ASTM D5034  
CD: 77 lbs. (35 kg)  
Elongation @ Break   MD: 26%       ASTM D5034  
CD: 64%  
Ball Burst     109 lbs. (49 kg)      ASTM D3787  
Trapezoid     MD: 17 lbs. (7.7 kg)     ASTM D1117  
         CD: 20 lbs. (9.1 kg)  
Thickness     0.018 inches (0.457 mm)   ASTM D1777 
 

   


LIQUID APPLIED ROOFING HYDROSTOP PREMIUMCOAT SYSTEM
SECTION 07560

C. Cured Membrane Characteristics 

ASTM D‐6083 Material Properties 
Property  Method  PremiumCoat® FinishCoat  PremiumCoat® FoundationCoat 
Krebs Viscosity  D-562  130 123
Brookfield 6 rpm Viscosity D-2196 66,400 34,000
Volume Solids D-2697 52 52
Weight Solids D-1644 66 66
Tensile D-2370 207 173
Elongation D-2370 306 323
Elongation, Post 1,000 hrs Xenon D-2370 148 122
Tear Resistance D-624 93 82
Accelerated Weathering @ 1,000 hrs D-4798 Pass, no change Pass, no change
Low Temp Flex, Post 1,000 hrs Xenon D-522 Pass -15F Pass -15F
Water Swelling @ 7 days D-471 9.2 7.8
Permeance (wet cup) D-1653 3.9 4.9
Wet Adhesion D-903 8.7 7.3
Fungi Resistance G-21 0 rating 0 rating
Membrane Properties 
Property  Method  PremiumCoat® System 
Wind Driven Rain TT-C-555B/D6904 Pass 0.0 lbs weight gain
Elongation of Membrane ASTM D4798 (G155) and D2370 MD: 36% @ 8000 hrs weathering
(40 mils DFT) CD: 41% @ 8000 hrs weathering
Tensile Strength of membrane ASTM D4798 (G155) and D2370 MD: 65lbs/in-width @ 8000 hrs weathering
(40 mils DFT) CD: 69lbs/in-width @ 8000 hrs
Tensile strength of membrane ASTM D-412 2210 PSI (13,789 kPa)
(40 mils DFT)
Water vapor permeability ASTM E-96 3-5 perms; a Class III vapor retarder
(40 mils DFT)
Cured Weight Generic 0.33 lbs per ft2 (56.8 oz. per m2)
Salt Spray ASTM B-117 No effects
Algae Resistance: ASTM G-29 0 rating
IBC Code Approval Properties 
Property  IBC Test Reference  Rating  A2LA/ANSI Approved Lab 
Exterior Fire ASTM E108/UL790 Class A up to 4”/12” slope File R26758 and FM RoofNav
Interior Fire FM 4470 Calorimeter Class 1 FM RoofNav
Wind FM 4470/4474 and TAS Concrete: 6,089 (psf) FM RoofNav
114 D&J and TAS 125 LWIC: 4,621 (psf) Dade County NOAs
Polyisocyanurate: 1,189 (psf)
Smooth BUR: 2,261 (psf)
Granulated Cap Sheet: 1,753 (psf)
Impact/Durability FM 4470 Foot Traffic Pass FM RoofNav
Leakage FM 4470 ASTM D7281 Pass a free standing membrane FM RoofNav Report J.I. 3000150
Hail FM 4470 Hail Pass-Severe FM RoofNav
Weathering ASTM D4798 (G155) and 40 mil system: Pass, maintained over PRI-CMT HSI-012-02-01
D2370 90% tensile strength after 8,000 hrs
ASTM Xenon-Acr.
ASTM Material Properties ASTM D-6083 Pass PRI-CMT
Solar Reflectance 79% initial, 70% aged Pass all standards CRRC/UL
Thermal Emittance 0.9 initial and aged Pass all standards CRRC/UL
SRI Index 99 initial, 86 aged Pass all standards CRRC/UL
Safety Generic ISO 14001:2004 ANSI/PJR
Quality Generic ISO 9001:2008 ANSI /PJR
 
 
 

LIQUID APPLIED ROOFING HYDROSTOP PREMIUMCOAT SYSTEM
SECTION 07560

2.3  ACCESSORIES 

A. Cant Strips: Approved composition materials are EPS (Expanded Polystyrene), ISO 
(Polyisocyanurate), and wood (Non‐Pressure Treated). Refer to construction details for installation 
requirements as specified by GAF. 

B. Polyisocyanurate: EnergyGuard™ Polyisocyanurate Insulation with glass‐based facer meeting or 
exceeding the requirements for ASTM C1289 [min. 16 psi (1.1 kg/cm) compressive strength].   1.5” 
(38 mm) minimum thickness.  Max board size: 4’ x 8’ (1.2 m x 2.4 m) if mechanically fastened or 4’ x 
4’ (1.2 m x 1.2 m) if adhered with Factory Mutual approved roofing adhesive.  

C. Polyisocyanurate: EnergyGuard™ Polyisocyanurate HD or HD Plus  0.5” (13 mm) minimum thickness.  
Max board size: 4’ x 8’ (1.2 m x 2.4 m) if mechanically fastened or 4’ x 4’ 1.2 m x 1.2 m) if adhered 
with Factory Mutual approved roofing adhesive. 

D. DensDeck or SecuRock: ¼” (6 mm) minimum thickness if used over an approved, smooth existing 
substrate. The standard thickness recommendation is ½” (13 mm).  

E. Insulation Adhesives:   GAF OlyBond, GAF LRF‐M, or GAF 2 Part Roofing Adhesive. 

F. Mechanical Fasteners:  GAF Drill‐Tec™ membrane fasteners and plates, insulation fasteners and 
plates, and flashing fasteners and termination bars. 

G. BarrierGuard: Polymer modified cementitious slurry to fill cracks, voids, or low depressions on 
various substrates or embedded in PremiumCoat® Fabric as below grade waterproofing. 

H. Butter Grade: Single package, high solids acrylic, elastomeric sealant.  

I. HydroFiber: Bulking material used in conjunction with PremiumCoat®FoundationCoat or Butter 
Grade.  

J. HydroCaps: Fabric reinforcement for sealing metal fasteners. 

K. StableRust Primer: Water‐based, surfactant‐free primer used on direct‐to‐metal applications to 
stabilize and protect metal surfaces.  

L. CleanAct Primer: Water‐based cleaner used in EPDM surface preparation.  

M. SureBond Primer: Water‐based acrylic primer for sealing masonry, metal, and chalky surfaces.   

N. Unibase Primer: Penetrating adhesive/primer for saturating fabric and adhering coating.  

O. GAF TPO Red Primer: VOC‐compliant, solvent‐based thermoplastic liquid to be applied to TPO to 
promote adhesion of water‐based coatings.  

P. TrafficCoat: Durable wear coating to provide additional abrasion resistance and color selection. 

Q. UCC ‐ United Cleaning Concentrate: Non‐Toxic cleaner for use on existing elastomeric roof coatings 
metal surfaces, concrete and masonry substrates, as well as uncoated roof, deck and wall surfaces. 


LIQUID APPLIED ROOFING HYDROSTOP PREMIUMCOAT SYSTEM
SECTION 07560

R. GAF  Epoxy  Primer:    Use  to  penetrate  and  seal  porous  substrates  and  to  improve  the  adhesion  of 
high performance topcoats. 

PART  3 – EXECUTION 

3.1  EXAMINATION 

A. When  applying  a  Liquid‐Applied  Roofing  System  as  a  recover  over  an  existing  roofing  system,  GAF 
requires investigation of moisture in the existing system through various Moisture Survey methods.  
See Substrate Preparation Guide for Liquid Applied Roofing Systems for requirements. 

B. Verify that substrate surfaces are durable, free of frozen matter, dampness, loose particles, cracks, 
pits,  projections,  and/or  foreign  matter  detrimental  to  adhesion  or  application  of  waterproofing 
system. 

C. Verify that substrate surfaces are smooth and not detrimental to full contact bond of waterproofing 
materials. Perform test patches to verify substrate suitability to receive the HydroStop PremiumCoat 
System.  Field test methods are outlined in the GAF Substrate Preparation Guide for Liquid‐Applied 
Roofing Systems. 

D. Verify  items  that  penetrate  surfaces  to  receive  waterproofing  are  securely  installed  and  suitably 
flashed.  

E. Verify that substrate areas are adequately supported and firmly fastened in place.  

F. Verify that roof deck has a minimum slope of  ¼:12. 

G. Verify that roof does not have areas of ponding water. 

H. Verify that all contiguous walls are properly waterproofed. 

3.2  PREPARATION 

A. Protect adjacent surfaces not designated to receive waterproofing. 

B. Inspect  and  make  all  necessary  repairs  to  substrate.  Remove  and  replace  wet  substrates  and 
insulation, if applicable. 

C. At a minimum, clean and prepare surfaces to receive waterproofing by removing all dirt, dust, loose 
and  flaking  particles,  grease  and  debris  with  the  use  of  a  stiff  bristle  push  broom.    Apply  United 
Cleaning Concentrate and rinse per manufacturer’s instructions.  Care should be taken not to inject 
water  into  the  substrate  during  the  preparation  phase.    Allow  adequate  time  for  complete  drying 
after the cleaning process.   

D. Substrates  with  heavy  contamination  of  grease,  oils,  dirt,  etc.  may  require  supplemental  cleaning 
methods.    Contact  a  GAF  Technical  Services  or  Technical  Sales  Representative  for  additional 
information. 


LIQUID APPLIED ROOFING HYDROSTOP PREMIUMCOAT SYSTEM
SECTION 07560

E. At a minimum, seal cracks and joints with Butter Grade and PremiumCoat Fabric.  Repair additional 
substrate conditions per approved GAF details. Contact a GAF Technical Services or Technical Sales 
Representative for additional information. 

F. Refer to GAF Substrate Preparation Guide for Liquid Applied Roofing Systems for detailed substrate 
preparation procedures by individual substrate. 

G. Do  not  apply  waterproofing  to  surfaces  unacceptable  to  manufacturer,  or  under  inclement 
environmental conditions. 

3.3  APPLICATION 
A. Refer to individual addenda at the end of this guide specification for preparation and application 
requirements for specific substrates.  
 
3.4  PROTECTION OF FINISHED WORK 
A. Monitor finished system for seven days, sweeping off any birdbaths to allow for full cure.  
 
3.5  CLEANING  
A. Immediately clean surfaces not scheduled to receive waterproofing in accordance with 
manufacturer's instructions.  

 
END OF SECTION 
 

   


LIQUID APPLIED ROOFING HYDROSTOP PREMIUMCOAT SYSTEM
SECTION 07560

ADDENDUM 1 – Existing Membranes (BUR / APP / SBS / EPDM / Hypalon / PVC / TPO) 

3.3  APPLICATION 
A. Preparation and Priming by Substrate: 
1. Asphaltic Membranes (Smooth BUR / APP / SBS) 
a. Verify Adhesion per Section 3.1.C. and prepare substrate per Section 3.2 of this Specification. 
b. Prime new asphaltic surfaces with UniBase Primer at a rate of .5 ‐1.0 gallon per square (2‐4.1 L/10 
m2) using a roof brush, roller, or airless sprayer.  Coverage rate will vary by substrate porosity.  For 
aged asphaltic surfaces, Unibase Primer is recommended to promote adhesion and enhance 
bleed‐blocking. 
2. PVC and Hypalon 
a. Verify Adhesion per Section 3.1.C. and prepare substrate per Section 3.2 of this Specification. 
b. Adhesion test is required.  If results are less than 2.0 pli, contact a GAF Technical Services or 
Technical Sales Representative to identify supplemental cleaning or priming requirements. 
3. TPO 
a. Verify Adhesion per Section 3.1.C. and prepare substrate per Section 3.2 of this Specification. 
b. Apply GAF TPO Red Primer at a rate of .5 gallons per square(2 L/10 m2). 
4. EPDM 
a. Apply CleanAct Primer at a rate of .2 gallons per square (0.8 L/10 m2). CleanAct should remain on 
the EPDM surface for 10‐30 minutes, followed by two separate power rinses, using clean water, at 
a minimum of 3,000 psi (20,680 kPa). 
b. Using a clean white towel, verify that all carbon black has been removed from the surface of the 
EPDM.  Verify adhesion per Section 3.1.C. and repeat cleaning if necessary. 
 
B. PremiumCoat® FoundationCoat & Fabric Components – This procedure consists of one coat of 
PremiumCoat® FoundationCoat (“FoundationCoat”) applied to the substrate at the rate of 1.25 to 2.0 
gallons / square.  HydroStop PremiumCoat® Fabric (“Fabric”) (sizes vary) laid into the wet 
FoundationCoat, and a second coat of FoundationCoat immediately applied over the top at the rate 
of of 1.25 to 2.0 gallons / square (5.1‐8.2 L/10 m2)  to saturate the Fabric. FoundationCoat is applied 
at a total rate of 2.5 to 4.0 gallons / square (10.2 – 16.3 L/10 m2), depending on the texture and 
porosity of the substrate. FoundationCoat should only be applied using approved roof brushes. 
Rolling and/or spraying FoundationCoat is strictly prohibited.  Total Dry Film Thickness of 
FoundationCoat & Fabric Components is a minimum 27 mils. 
1. Roof Perimeter‐ Using 12” (305 mm) Fabric and FoundationCoat components (described above), 
waterproof entire roof perimeter. Continue waterproofing up vertical surfaces and onto the deck a 
minimum of 6” (151 mm) in each direction. 
2. Roof Penetrations‐ Using 12” (305 mm) Fabric and FoundationCoat components (described above), 
seal any items projecting through waterproofing material to render them watertight. Extend 
waterproofing vertically up penetrations a minimum of 6” (151 mm).  
3. Roof Field – Using 40” (1016 mm) Fabric and FoundationCoat components (as described above), 
reinforce the entire roof field. Overlap adjacent runs of Fabric a minimum of 4” (102 mm). 
 
C. PremiumCoat® Finish Coat Component: 
1. Apply PremiumCoat® FinishCoat in multi‐directional passes.  Apply each coat perpendicularly to the 
previous coat. 


LIQUID APPLIED ROOFING HYDROSTOP PREMIUMCOAT SYSTEM
SECTION 07560

2. When applying PremiumCoat® FinishCoat in 3 or more coats on a single project, or to promote 
faster dry times of individual coats, alternate colors of PremiumCoat® FinishCoat may be applied. 
3. Precautions: 
a. PremiumCoat® FinishCoat should not be applied at rates exceeding 1.5 gallons / square ( 6.1 L/10 
m2)  in a single coat.   
b. Atmospheric conditions may require application rates of less than 1.5 gallons /square (6.1 L/10 
m2)  per coat to allow for reasonable cure times, as well as preventing “cracking” of the 
FinishCoat.   
c. The installing contractor is responsible for adjusting application rates and number of coats 
installed based on conditions such as ambient temperature, relative humidity, and future weather 
forecasting as they relate to a specific application of the PremiumCoat® system. 
 
D. System Options for Warranty and Guarantee Coverage: 

10‐Year Option – Apply a minimum of 2 coats of PremiumCoat® FinishCoat (“FinishCoat”) at a total finished rate 
of 1.5 gallons / square (6.1 L/10 m2). Allow to dry between coats.  Total Dry Film Thickness of FinishCoat 
Component is 12.5 mils.  Completed PremiumCoat® System must be installed to a minimum 39 mil total cured 
thickness. 

15‐Year Option – Apply a minimum of 2 coats of PremiumCoat® FinishCoat (“FinishCoat”) at a total finished rate 
of 2.0 gallons / square (8.2 L/10 m2).  Allow to dry between coats.  Total Dry Film Thickness of FinishCoat 
Component is 16.5 mils.  Completed PremiumCoat® System must be installed to a minimum 43.5 mil total cured 
thickness. 

20‐Year Option – Apply a minimum of 2 coats of PremiumCoat® FinishCoat (“FinishCoat”) at a total finished rate 
of 3.0 gallons / square (12.2 L/10 m2).  Allow to dry between coats.  Total Dry Film Thickness of FinishCoat 
Component is 25 mils.  Completed PremiumCoat® System must be installed to a minimum 52 mil total cured 
thickness. 

25‐Year Option – Apply a minimum of 3 coats of PremiumCoat® FinishCoat (“FinishCoat”) at a total finished rate 
of 4.0 gallons / square (16.3 L/10 m2).  Allow to dry between coats.  Total Dry Film Thickness of FinishCoat 
Component is 33 mils.  Completed PremiumCoat® System must be installed to a minimum 60 mil total cured 
thickness. 

End of Addendum   

10 
LIQUID APPLIED ROOFING HYDROSTOP PREMIUMCOAT SYSTEM
SECTION 07560

ADDENDUM 2 –Structural and Precast Concrete 

3.3  APPLICATION 

A. Preparation and Priming by Substrate 

1. Structural and Precast Concrete  
a. New concrete must be allowed to cure for a minimum 28 days prior to application of primers. 
b. Verify Adhesion per Section 3.1.C. and prepare substrate per Section 3.2 of this Specification. 
c. Apply one or more coats of GAF Epoxy Primer at .5 gallons per square (2 L/10 m2) depending on   
porosity of substrate. 
B. PremiumCoat® FoundationCoat & Fabric Components – This procedure consists of one coat of 
PremiumCoat® FoundationCoat (“FoundationCoat”) applied to the substrate at the rate of 1.25 to 2.0 
gallons / square (5.1 – 8.2 L/10 m2).  HydroStop PremiumCoat® Fabric (“Fabric”) (sizes vary) laid into 
the wet FoundationCoat, and a second coat of FoundationCoat immediately applied over the top at 
the rate of of 1.25 to 2.0 gallons / square (5.1 – 8.2 L/10 m2) to saturate the Fabric. FoundationCoat is 
applied at a total rate of 2.5 to 4.0 gallons / square (10.2 ‐ 16.3 L/10 m2), depending on the texture 
and porosity of the substrate. FoundationCoat should only be applied using approved roof brushes. 
Rolling and/or spraying FoundationCoat is strictly prohibited.  Total Dry Film Thickness of 
FoundationCoat & Fabric Components is a minimum 27 mils. 
1. Roof Perimeter‐ Using 12” (305 mm) Fabric and FoundationCoat components (described above), 
waterproof entire roof perimeter. Continue waterproofing up vertical surfaces and onto the deck a 
minimum of 6” (152 mm) in each direction.  
2. Roof Penetrations‐ Using 12” (305 mm) Fabric and FoundationCoat components (described above), 
seal any items projecting through waterproofing material to render them watertight. Extend 
waterproofing vertically up penetrations a minimum of 6” (152 mm).  
3. Roof Field – Using 40” (1016 mm) Fabric and FoundationCoat components (as described above), 
reinforce the entire roof field. Overlap adjacent runs of Fabric a minimum of 4” (102 mm). 
C. PremiumCoat® Finish Coat Component: 

1. Apply PremiumCoat® FinishCoat in multi‐directional passes.  Apply each coat perpendicularly to the 
previous coat. 
2. When applying PremiumCoat® FinishCoat in 3 or more coats on a single project, or to promote 
faster dry times of individual coats, alternate colors of PremiumCoat® FinishCoat may be applied. 
3. Precautions: 
 
a. PremiumCoat® FinishCoat should not be applied at rates exceeding 1.5 gallons / square  
(6.1 L/10 m2) in a single coat.   
b. Atmospheric conditions may require application rates of less than 1.5 gallons /square  
(6.1 L/10 m2) per coat to allow for reasonable cure times, as well as preventing “cracking” of the 
FinishCoat.   

11 
LIQUID APPLIED ROOFING HYDROSTOP PREMIUMCOAT SYSTEM
SECTION 07560

c. The installing contractor is responsible for adjusting application rates and number of coats 
installed based on conditions such as ambient temperature, relative humidity, and future weather 
forecasting as they relate to a specific application of the PremiumCoat® system. 
D. System Options for Warranty and Guarantee Coverage: 

10‐Year Option – Apply a minimum of 2 coats of PremiumCoat® FinishCoat (“FinishCoat”) at a total finished rate 
of 1.5 gallons / square (6.1 L/10 m2). Allow to dry between coats.  Total Dry Film Thickness of FinishCoat 
Component is 12.5 mils.  Completed PremiumCoat® System must be installed to a minimum 39 mil total cured 
thickness. 

15‐Year Option – Apply a minimum of 2 coats of PremiumCoat® FinishCoat (“FinishCoat”) at a total finished rate 
of 2.0 gallons / square (8.2 L/10 m2).  Allow to dry between coats.  Total Dry Film Thickness of FinishCoat 
Component is 16.5 mils.  Completed PremiumCoat® System must be installed to a minimum 43.5 mil total cured 
thickness. 

20‐Year Option – Apply a minimum of 2 coats of PremiumCoat® FinishCoat (“FinishCoat”) at a total finished rate 
of 3.0 gallons / square (12.2 L/10 m2).  Allow to dry between coats.  Total Dry Film Thickness of FinishCoat 
Component is 25 mils.  Completed PremiumCoat® System must be installed to a minimum 52 mil total cured 
thickness. 

25‐Year Option – Apply a minimum of 3 coats of PremiumCoat® FinishCoat (“FinishCoat”) at a total finished rate 
of 4.0 gallons / square (16.3 L/10 m2).  Allow to dry between coats.  Total Dry Film Thickness of FinishCoat 
Component is 33 mils.  Completed PremiumCoat® System must be installed to a minimum 60 mil total cured 
thickness. 

 
End of Addendum 
 

   

12 
LIQUID APPLIED ROOFING HYDROSTOP PREMIUMCOAT SYSTEM
SECTION 07560

ADDENDUM 3 – Polyisocyanurate Insulation, Gypsum coverboard, DensDeck, & Securock  

3.3  APPLICATION 

Newly Installed Polyisocyanurate Insulation, Gypsum coverboard, DensDeck, & Securock do not require cleaning 
or priming.  If using these substrates as a recovery board over an existing roof assembly, the contractor must 
apply proper Examination and General Preparation practices to the existing roof assembly as outlined in Sections 
3.1 and 3.2 of this document. 

A. Attachment:  Adhere or mechanically fasten insulation to deck with polyurethane adhesive or 
approved fasteners in accordance with manufacturer's installation instructions to meet a 
minimum uplift requirement of 1‐90. Verify the proper uplift requirements with the specifier or 
the local   building code authority. 
1. Stagger all board joints. Lay boards with edges in moderate contact, without forcing. Cut 
insulation to fit neatly to perimeter blocking and around penetrations through the roof.  
2. Apply no more insulation than can be covered with waterproofing on the same day.  
3. Install cant strips at internal corners and metal drip edge on outside perimeter.  
 
B. Recover over an existing roof: One (1) layer of ISO required. Refer to local building code for 
further insulation requirements. 
New construction or tear‐off: One(1) layer of ISO and minimum ¼” (6 mm) gypsum coverboard 
or two (2) layers of fully adhered staggered ISO. If the top layer is mechanically attached, plates 
must be encapsulated with Butter Grade Flashing. 
 
C. PremiumCoat® FoundationCoat & Fabric Components – This procedure consists of one coat of 
PremiumCoat® FoundationCoat (“FoundationCoat”) applied to the substrate at the rate of 1.25 
to 2.0 gallons / square (5.1 – 8.2 L/10 m2).  HydroStop PremiumCoat® Fabric (“Fabric”) (sizes 
vary) laid into the wet FoundationCoat, and a second coat of FoundationCoat immediately 
applied over the top at the rate of of 1.25 to 2.0 gallons / square (5.1 – 8.2 L/10 m2) to saturate 
the Fabric. FoundationCoat is applied at a total rate of 2.5 to 4.0 gallons / square (10.2 – 16.3 
L/10 m2), depending on the texture and porosity of the substrate. FoundationCoat should only 
be applied using approved roof brushes. Rolling and/or spraying FoundationCoat is strictly 
prohibited.  Total Dry Film Thickness of FoundationCoat & Fabric Components is a minimum 27 
mils. 
 
1. Recovery Board Seams – Using 12” (305 mm) Fabric and FoundationCoat components (as 
described above), waterproof all board seams, cracks and non‐working joints. Center 6”  
(152 mm) fabric over all seams.  
2. Roof Perimeter‐ Using 12” (305 mm) Fabric and FoundationCoat components (described 
above), waterproof entire roof perimeter. Continue waterproofing up vertical surfaces and 
onto deck a minimum of 6” (152 mm) in each direction.  
3. Roof Penetrations‐ Using 12” (305 mm) Fabric and FoundationCoat components (described 
above) seal any items projecting through waterproofing material so they are watertight. 
Waterproof up penetrations a minimum of 6” (152 mm).  
4. Roof Field‐ Using 40” (1016 mm) Fabric and FoundationCoat components (as described 
above) seal the entire roof field. Overlap adjacent runs of fabric a minimum of 4” (102 mm). 
 
D. PremiumCoat® Finish Coat Component: 

13 
LIQUID APPLIED ROOFING HYDROSTOP PREMIUMCOAT SYSTEM
SECTION 07560

1. Apply PremiumCoat® FinishCoat in multi‐directional passes.  Apply each coat 
perpendicularly to the previous coat. 
2. When applying PremiumCoat® FinishCoat in 3 or more coats on a single project, or to 
promote faster dry times of individual coats, alternate colors of PremiumCoat® FinishCoat 
may be applied. 
3. Precautions: 
a. PremiumCoat® FinishCoat should not be applied at rates exceeding 1.5 gallons / square 
(  6.1 L/10 m2)  in a single coat.   
b. Atmospheric conditions may require application rates of less than 1.5 gallons /square  
( 6.1 L/10 m2)  per coat to allow for reasonable cure times, as well as preventing “cracking” 
of the FinishCoat.   
c. The installing contractor is responsible for adjusting application rates and number of coats 
installed based on conditions such as ambient temperature, relative humidity, and future 
weather forecasting as they relate to a specific application of the PremiumCoat® system. 
 
E. System Options for Warranty and Guarantee Coverage: 

10‐Year Option – Apply a minimum of 2 coats of PremiumCoat® FinishCoat (“FinishCoat”) at a total finished 
rate of 1.5 gallons / square (6.1 L/10 m2). Allow to dry between coats.  Total Dry Film Thickness of FinishCoat 
Component is 12.5 mils.  Completed PremiumCoat® System must be installed to a minimum 39 mil total cured 
thickness. 

15‐Year Option – Apply a minimum of 2 coats of PremiumCoat® FinishCoat (“FinishCoat”) at a total finished 
rate of 2.0 gallons / square (8.2 L/10 m2).  Allow to dry between coats.  Total Dry Film Thickness of FinishCoat 
Component is 16.5 mils.  Completed PremiumCoat® System must be installed to a minimum 43.5 mil total 
cured thickness. 

20‐Year Option – Apply a minimum of 2 coats of PremiumCoat® FinishCoat (“FinishCoat”) at a total finished 
rate of 3.0 gallons / square (12.2 L/10 m2).  Allow to dry between coats.  Total Dry Film Thickness of FinishCoat 
Component is 25 mils.  Completed PremiumCoat® System must be installed to a minimum 52 mil total cured 
thickness. 

25‐Year Option – Apply a minimum of 3 coats of PremiumCoat® FinishCoat (“FinishCoat”) at a total finished 
rate of 4.0 gallons / square (16.3 L/10 m2).  Allow to dry between coats.  Total Dry Film Thickness of FinishCoat 
Component is 33 mils.  Completed PremiumCoat® System must be installed to a minimum 60 mil total cured 
thickness. 

End of Addendum 

   

14 
LIQUID APPLIED ROOFING HYDROSTOP PREMIUMCOAT SYSTEM
SECTION 07560

ADDENDUM 4 – Standard Commercial Metal Panels 
3.3  APPLICATION 
 
A. Cleaning and Priming 
1. Verify Adhesion per Section 3.1.C. and prepare substrate per Section 3.2 of this 
Specification. 
2. For mild rust: Prime substrate using Acrylex 400 Primer or StableRust Primer @ .33‐.67 
gallon per square (1.3 – 2.7 L/10 m2) depending on substrate. 
3. For severe rust : Prime substrate with Lock Down Primer @ .25 gallons per square (1 L/10 
m2) 
4. For Kynar® coated metal panels: Prime substrate using XR‐2000 @ .75 gallons per square  
(3.1 L/10 m2). 
5. For residual asphalt areas: Prime areas with UniBase Primer @ .50‐1.0 gallons per square 
 (2 – 4.1 L/10 m2) depending on prepared substrate. 
 
B. PremiumCoat® FoundationCoat & Fabric Components – This procedure consists of one coat of 
PremiumCoat® FoundationCoat (“FoundationCoat”) applied to the substrate at the rate of 1.25 
to 2.0 gallons / square (5.1 – 8.2 L/10 m2).  HydroStop PremiumCoat® Fabric (“Fabric”) (sizes 
vary) laid into the wet FoundationCoat, and a second coat of FoundationCoat immediately 
applied over the top at the rate of of 1.25 to 2.0 gallons / square (5.1 – 8.2 L/10 m2)  to saturate 
the Fabric. FoundationCoat is applied at a total rate of 2.5 to 4.0 gallons / square (10.2 – 16.3 
L/10 m2), depending on the texture and porosity of the substrate. FoundationCoat should only 
be applied using approved roof brushes. Rolling and/or spraying FoundationCoat is strictly 
prohibited.  Total Dry Film Thickness of FoundationCoat & Fabric Components is a minimum 27 
mils. 
 
1. Roof Penetrations – Using 12” (305 mm) Fabric and Foundation Coat components 
(described above), seal any items projecting through waterproofing material watertight. 
Waterproof penetrations vertically a minimum of 6” (152 mm). 
2. Vertical Seams – using 6” (152 mm) Fabric and Foundation Coat components (described 
above), seal all vertical seams. Foundation Coat and Fabric components must be centered on 
the panels seams. Protect from weather until dry. 
3. Horizontal laps – using 12” (305 mm) Fabric and Foundation Coat components (described 
above), seal all horizontal laps. Foundation Coat and Fabric components must be centered on 
the panels laps. Protect from weather until dry. 
4. Exposed Mechanical Fasteners – Using either a Hydro Cap or a 6” x 6” (152 x 152 mm) piece 
of Fabric and Foundation Coat Component (described above), seal all mechanical fasteners. 
Protect from weather until dry. 
5. Parapet & Vertical Wall junctions – Using 12” (305 mm) fabric Foundation Coat 
components (described above), waterproof all roof/wall junctions. Continue waterproofing 
up vertical surfaces and onto deck a minimum of 6” (152 mm) in each direction. 
 
C. PremiumCoat® Finish Coat Component: 
1. Apply PremiumCoat® FinishCoat in multi‐directional passes.  Apply each coat 
perpendicularly to the previous coat. 

15 
LIQUID APPLIED ROOFING HYDROSTOP PREMIUMCOAT SYSTEM
SECTION 07560

2. When applying PremiumCoat® FinishCoat in 3 or more coats on a single project, or to 
promote faster dry times of individual coats, alternate colors of PremiumCoat® FinishCoat 
may be applied. 
3. Precautions: 
a. PremiumCoat® FinishCoat should not be applied at rates exceeding 1.5 gallons / square 
(6.1 L/10 m2)  in a single coat.   
b. Atmospheric conditions may require application rates of less than 1.5 gallons /square 
(6.1 L/10 m2)  per coat to allow for reasonable cure times, as well as preventing “cracking” 
of the FinishCoat.   
c. The installing contractor is responsible for adjusting application rates and number of coats 
installed based on conditions such as ambient temperature, relative humidity, and future 
weather forecasting as they relate to a specific application of the PremiumCoat® system. 
 
D. System Options for Warranty and Guarantee Coverage: 

10‐Year Option – Apply a minimum of 2 coats of PremiumCoat® FinishCoat (“FinishCoat”) at a total finished 
rate of 1.5 gallons / square (6.1 L/10 m2). Allow to dry between coats.  Total Dry Film Thickness of FinishCoat 
Component is 12.5 mils.  Completed PremiumCoat® System must be installed to a minimum 39 mil total cured 
thickness. 

15‐Year Option – Apply a minimum of 2 coats of PremiumCoat® FinishCoat (“FinishCoat”) at a total finished 
rate of 2.0 gallons / square (8.2 L/10 m2).  Allow to dry between coats.  Total Dry Film Thickness of FinishCoat 
Component is 16.5 mils.  Completed PremiumCoat® System must be installed to a minimum 43.5 mil total 
cured thickness. 

20‐Year Option – Apply a minimum of 2 coats of PremiumCoat® FinishCoat (“FinishCoat”) at a total finished 
rate of 3.0 gallons / square (12.2 L/10 m2).  Allow to dry between coats.  Total Dry Film Thickness of FinishCoat 
Component is 25 mils.  Completed PremiumCoat® System must be installed to a minimum 52 mil total cured 
thickness. 

25‐Year Option – Apply a minimum of 3 coats of PremiumCoat® FinishCoat (“FinishCoat”) at a total finished 
rate of 4.0 gallons / square (16.3 L/10 m2).  Allow to dry between coats.  Total Dry Film Thickness of FinishCoat 
Component is 33 mils.  Completed PremiumCoat® System must be installed to a minimum 60 mil total cured 
thickness. 

End of Addendum 

   

16 
LIQUID APPLIED ROOFING HYDROSTOP PREMIUMCOAT SYSTEM
SECTION 07560

ADDENDUM 5 – Commercial Standing Seam Metal 

3.3  APPLICATION 
 
A. Cleaning and Priming 
1. Verify Adhesion per Section 3.1.C. and prepare substrate per Section 3.2 of this Specification. 
2. For mild rust: Prime substrate using Acrylex 400 Primer or StableRust Primer @ .33‐.67 gallon per 
square (1.3 ‐2.7 L/10 m2)  depending on substrate. 
3. For severe rust : Prime substrate with Lock Down Primer @ .25 gallons per square (1 L/10 m2) 
4. For Kynar® coated metal panels: Prime substrate using XR‐2000 @ .75 gallons per square  
(3.1 L/10 m2). 
5. For residual asphalt areas: Prime areas with UniBase Primer @ .50‐1.0 gallons per square 
 ( 2 ‐ 4.1 L/10 m2)  depending on prepared substrate. 
 
B. PremiumCoat® FoundationCoat & Fabric Components – This procedure consists of one coat of 
PremiumCoat® FoundationCoat (“FoundationCoat”) applied to the substrate at the rate of 1.25 to 
2.0 gallons / square (5.1 – 8.2 L/10 m2).  HydroStop PremiumCoat® Fabric (“Fabric”) (sizes vary) laid 
into the wet FoundationCoat, and a second coat of FoundationCoat immediately applied over the 
top at the rate of of 1.25 to 2.0 gallons / square (5.1 – 8.2 L/10 m2) to saturate the Fabric. 
FoundationCoat is applied at a total rate of 2.5 to 4.0 gallons / square (10.2 – 16.3 L/10 m2), 
depending on the texture and porosity of the substrate. FoundationCoat should only be applied 
using approved roof brushes. Rolling and/or spraying FoundationCoat is strictly prohibited.  Total 
Dry Film Thickness of FoundationCoat & Fabric Components is a minimum 27 mils. 
1. Roof Penetrations – Using 12” (305 mm) Fabric and Foundation Coat components (described 
above), seal any items projecting through waterproofing material watertight. Waterproof 
penetrations vertically a minimum of 6” (152 mm). 
2. Vertical Seams – Sealing vertical standing seams with Butter Grade is recommended, but may not 
be required for all standing seam profiles.  Consult GAF Technical Services to verify flashing 
requirements by individual standing seam profile. 
3. Horizontal laps – using 12” (305 mm) Fabric and Foundation Coat components (described above), 
seal all horizontal laps. Foundation Coat and Fabric components must be centered on the panels 
laps. Protect from weather until dry. 
4. Exposed Mechanical Fasteners – Using either a Hydro Cap or a 6” x 6” (152 x 152 mm)piece of 
Fabric and Foundation Coat Component (described above), seal all mechanical fasteners. Protect 
from weather until dry. 
5. Parapet & Vertical Wall junctions – Using 12” (305 mm) fabric Foundation Coat components 
(described above), waterproof all roof/wall junctions. Continue waterproofing up vertical surfaces 
and onto deck a minimum of 6” (152 mm) in each direction. 
 
C. PremiumCoat® Finish Coat Component: 
1. Apply PremiumCoat® FinishCoat in multi‐directional passes.  Apply each coat perpendicularly to 
the previous coat. 
2. When applying PremiumCoat® FinishCoat in 3 or more coats on a single project, or to promote 
faster dry times of individual coats, alternate colors of PremiumCoat® FinishCoat may be applied. 
3. Precautions: 
a. PremiumCoat® FinishCoat should not be applied at rates exceeding 1.5 gallons / square  

17 
LIQUID APPLIED ROOFING HYDROSTOP PREMIUMCOAT SYSTEM
SECTION 07560

(6.1 L/10 m2)  in a single coat.   
b. Atmospheric conditions may require application rates of less than 1.5 gallons /square  
(6.1 L/10 m2)  per coat to allow for reasonable cure times, as well as preventing “cracking” of 
the FinishCoat.   
c. The installing contractor is responsible for adjusting application rates and number of coats 
installed based on conditions such as ambient temperature, relative humidity, and future 
weather forecasting as they relate to a specific application of the PremiumCoat® system. 
D. Systems Options for Warranty and Guarantee Coverage: 

10‐Year Option – Apply a minimum of 2 coats of PremiumCoat® FinishCoat (“FinishCoat”) at a total finished 
rate of 1.5 gallons / square (6.1 L/10 m2). Allow to dry between coats.  Total Dry Film Thickness of FinishCoat 
Component is 12.5 mils.  Completed PremiumCoat® System must be installed to a minimum 39 mil total cured 
thickness where fabric is utilized. 

15‐Year Option – Apply a minimum of 2 coats of PremiumCoat® FinishCoat (“FinishCoat”) at a total finished 
rate of 2.0 gallons / square (8.2 L/10 m2).  Allow to dry between coats.  Total Dry Film Thickness of FinishCoat 
Component is 16.5 mils.  Completed PremiumCoat® System must be installed to a minimum 43.5 mil total 
cured thickness where fabric is utilized. 

20‐Year Option – Apply a minimum of 2 coats of PremiumCoat® FinishCoat (“FinishCoat”) at a total finished 
rate of 3.0 gallons / square (12.2 L/10 m2).  Allow to dry between coats.  Total Dry Film Thickness of FinishCoat 
Component is 25 mils.  Completed PremiumCoat® System must be installed to a minimum 52 mil total cured 
thickness where fabric is utilized. 

25‐Year Option – Apply a minimum of 3 coats of PremiumCoat® FinishCoat (“FinishCoat”) at a total finished 
rate of 4.0 gallons / square (16.3 L/10 m2).  Allow to dry between coats.  Total Dry Film Thickness of FinishCoat 
Component is 33 mils.  Completed PremiumCoat® System must be installed to a minimum 60 mil total cured 
thickness where fabric is utilized 

End of Addendum 

   

18 
LIQUID APPLIED ROOFING HYDROSTOP PREMIUMCOAT SYSTEM
SECTION 07560

ADDENDUM 6 – Historic Standing Seam Metal  

3.3  APPLICATION 
 
A. Cleaning and Priming 
a. Verify Adhesion per Section 3.1.C. and prepare substrate per Section 3.2 of this Specification. 
b. For mild rust: Prime substrate using Acrylex 400 Primer or StableRust Primer @ .33‐.67 gallon 
per square 1.3 – 2.7 L/10 m2) depending on substrate. 
c. For severe rust : Prime substrate with Lock Down Primer @ .25 gallons per square  
(1 L/10 m2) 
d. For Kynar® Coated metal panels: Prime substrate using XR‐2000 @ .75 gallons per square 
(3.1 L/10 m2). 
e. For residual asphalt areas: Prime areas with UniBase Primer @ .50‐1.0 gallons per square  
(2 ‐ 4.1 L/10 m2) depending on prepared substrate. 
 
B. PremiumCoat® FoundationCoat & Fabric Components – This procedure consists of one coat of 
PremiumCoat® FoundationCoat (“FoundationCoat”) applied to the substrate at the rate of 1.25 to 
2.0 gallons / square (5.1 – 8.2 L/10 m2).  HydroStop PremiumCoat® Fabric (“Fabric”) (sizes vary) laid 
into the wet FoundationCoat, and a second coat of FoundationCoat immediately applied over the 
top at the rate of of 1.25 to 2.0 gallons / square (5.1 – 8.2 L/10 m2)  to saturate the Fabric. 
FoundationCoat is applied at a total rate of 2.5 to 4.0 gallons / square (10.2 – 16.3 L/10 m2), 
depending on the texture and porosity of the substrate. FoundationCoat should only be applied 
using approved roof brushes. Rolling and/or spraying FoundationCoat is strictly prohibited.  Total 
Dry Film Thickness of FoundationCoat & Fabric Components is a minimum 27 mils. 
1. Roof Penetrations – Using 12” (305 mm) Fabric and Foundation Coat components (described 
above), seal any items projecting through waterproofing material watertight. Waterproof 
penetrations vertically a minimum of 6” (152 mm). 
2. Valleys and Peaks – using 12, 16, 24” (305, 406, 610 mm) Fabric and Foundation Coat components 
(described above), seal all valets and peaks. Foundation Coat and Fabric components must be 
centered in the valleys or on the peaks overlapping adjoining fabric. Protect from weather until 
dry. 
3. Vertical or Horizontal Seams  – using 6” (152 mm)Fabric and Foundation Coat components 
(described above), seal all vertical seams. Foundation Coat and Fabric components must be 
centered on the panels seams. Protect from weather until dry. 
4. Vertical Pans – using 16” or 24” (406 or 610 mm) Fabric and Foundation Coat components 
(described above), seal all vertical pans. Foundation Coat and Fabric components must be 
centered in the vertical pans overlapping both adjoining 6” (152 mm) fabrics used on the vertical 
seams. Protect from weather until dry. (Note: most historical standing seam metal roofs have 
standing seams that are centered on 17” or 25” (432 or 610 mm). For seams centered on 17” (432 
mm) use 16” (406 mm) fabric and for 25” (635 mm) seams use 24” (610 mm) fabric.). 
5. Parapet & Vertical Wall junctions – Using 12” (305 mm) fabric Foundation Coat components 
(described above), waterproof all roof/wall junctions. Continue waterproofing up vertical surfaces 
and onto deck a minimum of 6” (152 mm) in each direction. 
 
C. PremiumCoat® Finish Coat Component: 

19 
LIQUID APPLIED ROOFING HYDROSTOP PREMIUMCOAT SYSTEM
SECTION 07560

1. Apply PremiumCoat® FinishCoat in multi‐directional passes.  Apply each coat perpendicularly to 
the previous coat. 
2. When applying PremiumCoat® FinishCoat in 3 or more coats on a single project, or to promote 
faster dry times of individual coats, alternate colors of PremiumCoat® FinishCoat may be applied. 
3. Precautions: 
a. PremiumCoat® FinishCoat should not be applied at rates exceeding 1.5 gallons / square (6.1 L/10 
m2) in a single coat.   
b. Atmospheric conditions may require application rates of less than 1.5 gallons /square (6.1 L/10 
m2)  per coat to allow for reasonable cure times, as well as preventing “cracking” of the 
FinishCoat.   
c. The installing contractor is responsible for adjusting application rates and number of coats 
installed based on conditions such as ambient temperature, relative humidity, and future 
weather forecasting as they relate to a specific application of the PremiumCoat® system. 
D. System Options for Warranty and Guarantee Coverage: 

10‐Year Option – Apply a minimum of 2 coats of PremiumCoat® FinishCoat (“FinishCoat”) at a total finished 
rate of 1.5 gallons / square (6.1 L/10 m2). Allow to dry between coats.  Total Dry Film Thickness of FinishCoat 
Component is 12.5 mils.  Completed PremiumCoat® System must be installed to a minimum 39 mil total cured 
thickness where fabric is utilized. 

15‐Year Option – Apply a minimum of 2 coats of PremiumCoat® FinishCoat (“FinishCoat”) at a total finished 
rate of 2.0 gallons / square (8.2 L/10 m2).  Allow to dry between coats.  Total Dry Film Thickness of FinishCoat 
Component is 16.5 mils.  Completed PremiumCoat® System must be installed to a minimum 43.5 mil total 
cured thickness where fabric is utilized. 

20‐Year Option – Apply a minimum of 2 coats of PremiumCoat® FinishCoat (“FinishCoat”) at a total finished 
rate of 3.0 gallons / square (12.2 L/10 m2).  Allow to dry between coats.  Total Dry Film Thickness of FinishCoat 
Component is 25 mils.  Completed PremiumCoat® System must be installed to a minimum 52 mil total cured 
thickness where fabric is utilized. 

25‐Year Option – Apply a minimum of 3 coats of PremiumCoat® FinishCoat (“FinishCoat”) at a total finished 
rate of 4.0 gallons / square (16.3 L/10 m2).  Allow to dry between coats.  Total Dry Film Thickness of FinishCoat 
Component is 33 mils.  Completed PremiumCoat® System must be installed to a minimum 60 mil total cured 
thickness where fabric is utilized. 

End of Addendum 
   

20 
LIQUID APPLIED ROOFING HYDROSTOP PREMIUMCOAT SYSTEM
SECTION 07560

ADDENDUM 7 – Renewal of Existing HydroStop Roofing Systems  

3.3  APPLICATION 
 
A. EXAMINATION 
1. The HydroStop Roofing System will be inspected by a GAF Field Service or Technical Sales 
Representative to determine eligibility for a recoat guarantee or warranty. 
2. The GAF Field Service or Technical Sales Representative will provide a scope of repair to restore 
the system to a warrantable condition. 
  
B. Preparation 
1. Contractor shall restore the roofing system per the established scope of work. 
2. Clean per section 3.2C of this specification. 
 
C. PremiumCoat® Finish Coat Component: 
1. Apply PremiumCoat® FinishCoat in multi‐directional passes.  Apply each coat perpendicularly to 
the previous coat. 
2. When applying PremiumCoat® FinishCoat in 3 or more coats on a single project, or to promote 
faster dry times of individual coats, alternate colors of PremiumCoat® FinishCoat may be applied. 
3. Precautions: 
a. PremiumCoat® FinishCoat should not be applied at rates exceeding 1.5 gallons / square  
(6.1 L/10 m2)  in a single coat.   
b. Atmospheric conditions may require application rates of less than 1.5 gallons /square 
(6.1 L/10 m2)  per coat to allow for reasonable cure times, as well as preventing “cracking” of the 
FinishCoat.   
c. The installing contractor is responsible for adjusting application rates and number of coats 
installed based on conditions such as ambient temperature, relative humidity, and future weather 
forecasting as they relate to a specific application of the PremiumCoat® system. 
 
D. System Options for Warranty and Guarantee Coverage: 

10‐Year Option – Apply a minimum of 2 coats of PremiumCoat® FinishCoat (“FinishCoat”) at a total finished 
rate of 1.5 gallons / square (6.1 L/10 m2). Allow to dry between coats.  Total Dry Film Thickness of FinishCoat 
Component is 12.5 mils.  Completed PremiumCoat® System must be installed to a minimum 39 mil total cured 
thickness where fabric is utilized. 

15‐Year Option – Apply a minimum of 2 coats of PremiumCoat® FinishCoat (“FinishCoat”) at a total finished 
rate of 2.0 gallons / square (8.2 L/10 m2).  Allow to dry between coats.  Total Dry Film Thickness of FinishCoat 
Component is 16.5 mils.  Completed PremiumCoat® System must be installed to a minimum 43.5 mil total 
cured thickness where fabric is utilized. 

End of Addendum 