NO. URAIAN
I MATERIAL/ BAHAN
Bearing Pad 40x40
II TENAGA
Pekerja / Pembantu Tukang
Mandor
Jumlah ( I + II )
NO. URAIAN
I UPAH
Pekerja / Pembantu Tukang
Tukang
Kepala Tukang
Mandor
II ALAT
Crawler Crane 50 ton
Pontoon 120 ft
Jumlah ( I + II )
HARGA TOTAL
SAT. VOLUME SATUAN HARGA SATUAN
(Rp.) (Rp.)
Jumlah I 476,500.00
J u m l a h II 107,800.00
584,300.00
584,300.00
HARGA TOTAL
SAT. VOLUME SATUAN HARGA SATUAN
(Rp.) (Rp.)
Jumlah I 209,605.00
J u m l a h II 4,566.40
214,171.40
214,171.40