Académique Documents
Professionnel Documents
Culture Documents
Project Report
submitted in partial fulfillment of the requirements
for the degree of
i
A
PROJECT REPORT
ON
Submitted by
Name 1 Name 2
Name 3 Name 4
Name 5
Guided by
Prof/Dr/Mr. Guide Name
2016-17
ii
GOVERNMENT POLYTECTNIC, DHULE
CERTIFICATE
This is to certify that project report entitled
Name of your project
submitted by
Name 1 Name 2
Name 3 Name 4
Name 5
Guide HOD
Name Name
Examiner Principal
R. K. Chaudhary
iii
Acknowledgements
iv
Abstract
v
Contents
Abstract iv
List of Tables
List of Figures
Nomenclature
1 Introduction 1
CHAPTER–0 EXECUTIVE SUMMARY
CHAPTER–1 INTRODUCTION
Hi
1.2 OBJECTIVES AND SCOPE OF STUDY
................................................................ 1.1
1.3 JICA REQUIREMENT
............................................................................................. 1.3
1.4 LEGAL, POLICY AND INSTITUTIONAL FRAME WORK
....................................... 1.4
1.4.1 Water and Water Pollution
........................................................................ 1.4
1.4.2 Air Quality
.................................................................................................. 1.5
1.4.3 Noise Quality
............................................................................................. 1.6
vi
1.4.4 Solid Waste Management
......................................................................... 1.6
1.5 INSTITUTIONAL FRAMEWORK
............................................................................. 1.6
1.5.1 Central and State Pollution Control Boards
............................................. 1.6
1.6 APPROACH AND METHODOLOGY
....................................................................... 1.7
1.6.1 Data Collection
.......................................................................................... 1.9
1.6.2 Environmental Impact Assessment
........................................................... 1.9
1.6.3 Environmental Management Plan
........................................................... 1.10
1.6.4 Environmental Monitoring
........................................................................ 1.10
1.6.5 Liaison with Authorities
............................................................................ 1.10
1 1.7 FORMAT OF THE REPORT
................................................................................. 1.10Literature
survey 6
2 Report on the present investigation
vii
References
Appendix
List of Tables
viii
List of Figures
ix
Nomenclature
Abbreviations and list of Greek and roman symbols
x
Chapter 1
Introduction
xi
Chapter 2
Literature survey
xii
Chapter 3
Project/technology used (Explain project)
xiii
Chapter 4
Results and Discussions
Results from the report.
Contributions from the project.
The discussion shall logically lead to inferences and conclusions as well as
scope for possible further future work.
xiv
Chapter 5
Summary and Conclusions
xv
References
xvi
Appendix
xvii
xviii