The document provides a bill of quantities and manpower requirements for a construction project. It lists the materials needed including 3200 bags of cement, 100 tons of steel, 9.09 dumpers of aggregate, 4.54 dumpers of sand, and other items. It also lists the required equipment and manpower needed over a 7 day period, including 1 project manager, 1 construction manager, 3 site engineers, and other roles.
The document provides a bill of quantities and manpower requirements for a construction project. It lists the materials needed including 3200 bags of cement, 100 tons of steel, 9.09 dumpers of aggregate, 4.54 dumpers of sand, and other items. It also lists the required equipment and manpower needed over a 7 day period, including 1 project manager, 1 construction manager, 3 site engineers, and other roles.
The document provides a bill of quantities and manpower requirements for a construction project. It lists the materials needed including 3200 bags of cement, 100 tons of steel, 9.09 dumpers of aggregate, 4.54 dumpers of sand, and other items. It also lists the required equipment and manpower needed over a 7 day period, including 1 project manager, 1 construction manager, 3 site engineers, and other roles.