PUNCH POINT

Punch point for Bag House & Final Airslide Structure

Emami Cement Ltd, Emami Cement


Project Client
Odisha Grinding Unit Limited
Emami Cement Limited
Inspection Agency Digitech HR Indial Pvt Ltd Date: 09.11.2018
Buildmate-Mechanical
Following Items are joint Inspected as per the Approved Drawings in accordance to the mentioned below:

Sl. No Floor Level Area Reamining Activity Status

Final Product Air At 5mtr level platform Tie member end cleat fixing
185 EL 5.0Mtr
Slide balance at places.

Final Product Air At 5mtr level platform Tie member end cleat portion
186 EL 5.0Mtr
Slide welding balance at places.

Final Product Air


187 EL 5.0Mtr At 5mtr level Hand rail grinding & cleaning balance.
Slide
Final Product Air Hand Rail & tie member at 5mtr level touch up painting
188 EL 5.0Mtr
Slide balance.

Final Product Air


189 EL 3.0Mtr Blower 591FN8 & 591FN9 vibration bolt to be full tighting
Slide
Approach required 5mtr level platform to 6.5mtr level
190 EL 5.0Mtr Platform
platform.
Overhead welding balance at end portal frame towards
191 EL 2.0Mtr Gallery
silo side

Final Product Air Below 591AS5 final product air slide portion grating to be
192 EL 3.0Mtr
Slide fixed.
Final Airslide conveyor Gallery bottom tie member
193 EL 8.0Mtr Conveyor Gallery
[ISMC150] over head welding balance.

Bag Filter Bag Filter 591BF2 stool stiffner plate overhead welding
194 EL 10.0Mtr
591BF2 balance.

195 EL 8.0Mtr Airline piping Final Airslide airline pipe full painting balance

Final Product Air


196 EL 0.0Mtr All temporatory ladder & cleat to be removed.
Slide
End Portal frame of conveyor gallery corner portion
197 EL 8.0Mtr Conveyor gallery
welding balance at places.

Roof Truss of All Roof Truss bottom gusset plate area overhead welding
198 EL 14.3.0Mtr
gallery balance.

199 EL 8.0Mtr Conveyor gallery Gallery side runner joint area splice angle to be provided.

Final product Airslide gallery str trestle base plate


200 EL 0.0Mtr Trestle
foundation nut bolt to be full tightening before grouting.

Page 1 of 5
PUNCH POINT

Punch point for Bag House & Final Airslide Structure

Emami Cement Ltd, Emami Cement


Project Client
Odisha Grinding Unit Limited
Emami Cement Limited
Inspection Agency Digitech HR Indial Pvt Ltd Date: 09.11.2018
Buildmate-Mechanical
Following Items are joint Inspected as per the Approved Drawings in accordance to the mentioned below:

Sl. No Floor Level Area Reamining Activity Status


Gallery end portion towards cement silo side Portal frame
201 EL 8.0Mtr Conveyor gallery
base plate area overhead welding balance.

202 EL 10.0Mtr Expansion Joint All expansion joint area clamp to be removed.

Hand Rail welding & cleaning balance final airslide


203 EL 12.7Mtr Bag House
platform inside of Bag House portion.
Platform required Airslide 591AS1, 591AS2, 591AS3 &
204 EL 12.7Mtr Bag House
591AS4 joint portion at 12mtr level.

Airslide inclined Hand rail toe guard fixing balance at Air slide platform
205 EL 16.0Mtr
platform 12mtr level.

Airslide inclined 16mtr to 12mtr Air slide platform stud column base plate
206 EL 16.0Mtr
platform area welding balance at places.
Extension platform at 14mtr level [E6-7] area toe guard
207 EL 14.3Mtr Platform
fixing pending

208 EL 14.3Mtr Platform At 14mtr level hand rail finishing work pending.

Staircase step fixing pending at 14mtr level to final


209 EL 14.3Mtr Platform
airslide platform both side.

210 EL 25.0Mtr Product Airslide Airslide bottom cover plate fixing balance at places.

211 EL 25.0Mtr Product Airslide Airslide support str welding & finishing balance at places.

212 EL14.3Mtr Air Slide 591AS1 Painting balance air areation pipe line of Air slide 591AS1

213 EL14.3Mtr Air Slide 591AS2 Painting balance air areation pipe line of Air slide 591AS2

214 EL14.3Mtr Air Slide 591AS3 Painting balance air areation pipe line of Air slide 591AS3

215 EL14.3Mtr Air Slide 591AS4 Painting balance air areation pipe line of Air slide 591AS4

216 EL16.28Mtr Air Slide 591AS3 Air slide 591AS3 end cover plate bolt tightening balance.

Page 2 of 5
PUNCH POINT

Punch point for Bag House & Final Airslide Structure

Emami Cement Ltd, Emami Cement


Project Client
Odisha Grinding Unit Limited
Emami Cement Limited
Inspection Agency Digitech HR Indial Pvt Ltd Date: 09.11.2018
Buildmate-Mechanical
Following Items are joint Inspected as per the Approved Drawings in accordance to the mentioned below:

Sl. No Floor Level Area Reamining Activity Status

217 EL16.28Mtr Air Slide 591AS4 Air slide 591AS4 end cover plate bolt tightening balance.

Expansion joint near E5 column side bolt to be


218 EL 18.6Mtr Platform
replacement & full tightening required.
At 18mtr level staircase to platform area approach
219 EL 18.6Mtr Platform
walkway with grating required.
At 18mtr level Axis-5, Row D-E portion anchor fastner to
220 EL 18.6Mtr Platform
be full tightening.
10nos Rotary airlock discharge chute area support to be
221 EL 18.6Mtr Rotary Airlock
fixed.

Bag Filter Bag Filter at 14mtr level base plate welding balance with
222 EL 14.3Mtr
591BF1 Insert plate.

Bag Filter Bag Filter duct line "Round" type support fixing balance at
223 EL 14.3Mtr
591BF1 14mtr level

Bag Filter
224 EL 14.3Mtr Bag Filter duct line painting balance.
591BF1
Bag Filter Bag Filter ID fan inlet & outlet duct area nut bolt full
225 EL 14.3Mtr
591BF1 tightening required.

Bag House
226 EL 18.6Mtr All opening at 18mtr level to be closed by chequered plate.
Platform
Bag House
227 EL 18.6Mtr Hand Rail Grinding & finishing balance at 18mtr level
Platform
Bag House
228 EL 18.6Mtr Toe gurad fixing balance at places.
Platform
Bag House Walkway with Grating & handrail erection pending at Row
229 EL 18.6Mtr
Platform D-E, axis 4 area.

Bag House Walkway with Grating & handrail erection pending at Row
230 EL 18.6Mtr
Platform D-E, axis 9 area.

Bag House Bag Filter duct line "Round" type support fixing balance at
231 EL 18.6Mtr
Platform 18mtr level

Bag House
232 EL 18.6Mtr House keeping pending at 18mtr level
Platform

Page 3 of 5
PUNCH POINT

Punch point for Bag House & Final Airslide Structure

Emami Cement Ltd, Emami Cement


Project Client
Odisha Grinding Unit Limited
Emami Cement Limited
Inspection Agency Digitech HR Indial Pvt Ltd Date: 09.11.2018
Buildmate-Mechanical
Following Items are joint Inspected as per the Approved Drawings in accordance to the mentioned below:

Sl. No Floor Level Area Reamining Activity Status


Tie member [MC200] one side end cleat fixed at site, As
Bag House
233 EL 18.6Mtr per standard drawing both side cleat mentioned in
Platform
drawing
Bag House
234 EL 18.6Mtr Tie member welding balance at 18mtr level at places.
Platform

Bag House
235 EL 18.6Mtr Touch up painting balance at 18mtr level.
Platform
Bag House
236 EL 21.4Mtr At 21mtr level handrail toe guard fixing balance at places.
Platform
Tie member [MC200] one side end cleat fixed at site, As
Bag House
237 EL 21.4Mtr per standard drawing both side cleat mentioned in
Platform
drawing
Bag House
238 EL 21.4Mtr Hand rail welding & cleaning balance.
Platform
Bag House
239 EL 21.4Mtr Touch up painting balance at 21mtr level.
Platform
Bag House
240 EL 21.4Mtr House keeping pending at 21mtr level
Platform
Bag House Additional 1 no walkway required in between hopper "L"
241 EL 21.4Mtr
Platform & "R" portion in axis 6-7 area.

Bag House At 21mtr level platform to be extended at hopper door


242 EL 21.4Mtr
Platform opening area.

Bag House At 24mtr level Hand rail welding & finishing work
243 EL 24.4Mtr
Platform pending.

Bag House
244 EL 24.4Mtr Toe gurad fixing balance at places
Platform
Bag House
245 EL 24.4Mtr Handrail Touch up painting balance.
Platform
Bag House
246 EL 24.4Mtr House keeping pending at 24.4mtr level.
Platform
Bag House Staircase from 0 level to 24mtr level all landing area toe
247 EL0.0Mtr
Staircase guard fixing balance.

Bag House
248 EL0.0Mtr Staircase hand rail bend portion connection pending.
Staircase

Page 4 of 5
PUNCH POINT

Punch point for Bag House & Final Airslide Structure

Emami Cement Ltd, Emami Cement


Project Client
Odisha Grinding Unit Limited
Emami Cement Limited
Inspection Agency Digitech HR Indial Pvt Ltd Date: 09.11.2018
Buildmate-Mechanical
Following Items are joint Inspected as per the Approved Drawings in accordance to the mentioned below:

Sl. No Floor Level Area Reamining Activity Status


Bag House
249 EL0.0Mtr Temporatory ladder & scrap plate to be removed.
Staircase
Bag House
250 EL0.0Mtr Staircase handrail touch up painting balance.
Staircase

END OF REPORT

Page 5 of 5